ATT L General Decision Highway issued 1.3.2025.pdf
PDF 9 MB Posted
- Solicitation number
- 25-01937
- Issued by
- Michigan
About this file
This document is a General Decision for Davis-Bacon wage rates issued by the U.S. Department of Labor for highway, airport, and bridge construction projects in Michigan, effective January 3, 2025. The document provides comprehensive wage determinations for various construction trades and classifications across multiple Michigan counties, including detailed hourly rates and fringe benefits for workers in roles such as carpenters, power equipment operators, laborers, truck drivers, and specialized construction positions. The wage rates are organized by geographical areas within the state and include specific job classifications with corresponding hourly wages and fringe benefit rates.
The wage determination covers contracts subject to the Davis-Bacon Act, which requires contractors to pay at least the applicable minimum wage rates as specified in the document. The rates are adjusted annually and include provisions for different types of work, skill levels, and geographical zones. Workers are entitled to specific base wages ranging from around $23 to $55 per hour depending on their classification and area of work, with additional considerations for overtime, hazardous conditions, and specialized skills. The document also includes footnotes about paid holidays, work classifications, and detailed scopes of work for different construction categories, providing a comprehensive guide for wage compliance in public works projects across Michigan.
View the file
Other files
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .