Att E HBE Schedule.pdf

PDF 1 MB Posted

Attached to
RFP B12-2026 Special Testing and Inspection Services
Solicitation number
S-P03062-00016905
Issued by
Clackamas County, Oregon

About this file

This document is a project coordination timeline for the Holcomb Elementary School Phased Renovation project undertaken by Oregon City School District No. 62. The timeline, published on April 14, 2026, spans 525 days from August 7, 2025, through September 7, 2027, and encompasses preconstruction, design and estimating, permitting, procurement, and construction phases. The preconstruction and design phase runs from August 2025 through July 2026 and includes 100% schematic design, design development, and construction document phases with multiple review and reconciliation cycles by the district and design team. Permitting activities span from December 2025 through June 2026, including land use review, building permits, and various trade permits for mechanical, electrical, plumbing, fire sprinkler, and HVAC systems. The procurement phase occurs from January 2026 through August 2026, with four separate request for proposals issued for design-assist MEPFS, spring break abatement, early procurement, and abatement/demo/roofing scopes, culminating in a guaranteed maximum price bid process scheduled for board approval on April 27, 2026. Construction is scheduled to commence in June 2026 and includes multiple renovation sequences for sector C, cafeteria, restrooms, corridors, classrooms, mechanical rooms, music room, and new cafeteria and kitchen addition, with substantial completion targeted for September 7, 2027.

The project timeline identifies numerous trade contractors and design professionals responsible for specific tasks, including BRIC (likely the architect), Bremik (construction manager), KPFF (structural engineer), and various mechanical, electrical, plumbing, and specialty contractors. Key construction milestones include mobilization and startup in June 2026, completion of roofing in August 2026, sector C wing finalization in September 2026, new cafeteria and kitchen addition completion in June 2027, primary power switchover in July 2027, and final closeout activities through September 2027. The schedule incorporates school calendar considerations, including summer and spring breaks, with the 2026-2027 academic year beginning September 8, 2026. Multiple inspection and approval points are scheduled throughout the permitting and construction phases, and the timeline indicates contingency provisions for weather delays of up to 20 days during the final construction phase.

View the file

Other files

Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ID Task Name Duration Start Finish Responsibility

0 Holcomb Elem School Phased Renovation 525 days Thu 8/7/25 Tue 9/7/27 1 Preconstruction 244 days Thu 8/7/25 Mon 7/27/26 2 Design & Estimating 244 days Thu 8/7/25 Mon 7/27/26 3 Project Kick Off Meeting 0 days Thu 8/7/25 Thu 8/7/25 INFO 4 100% SD - Distribute SD Drawings 0 days Thu 8/7/25 Thu 8/7/25 BRIC 5 100% SD - Estimate Development 27 days Fri 8/8/25 Tue 9/16/25 Bremik 6 100% SD - Estimate Review 0 days Tue 9/16/25 Tue 9/16/25 Bremik 7 100% SD - Reconciliation/VE 27 days Wed 9/17/25 Thu 10/23/25 Bremik 8 100% DD - Develop Drawings 16 days Fri 10/24/25 Fri 11/14/25 BRIC 9 100% DD - District Review & Approval 10 days Mon 11/17/25 Tue 12/2/25 OCSD

10 100% DD - Constructability Review 13 days Mon 11/17/25 Fri 12/5/25 Bremik 11 100% DD - Develop Estimate 19 days Mon 11/17/25 Mon 12/15/25 Bremik 12 100% DD - Estimate Review 0 days Wed 12/17/25 Wed 12/17/25 Bremik 13 100% DD - Reconciliation/VE 10 days Thu 12/18/25 Tue 1/6/26 OCSD 14 25% CD - MEP Early Procurement Drawings 21 days Wed 1/7/26 Wed 2/4/26 BRIC 15 25% CD - Develop Drawings (Early Bidding) 46 days Mon 12/8/25 Fri 2/13/26 BRIC 16 50% CD - Develop Drawings (Permit/Bidding) 10 days Mon 2/16/26 Fri 2/27/26 BRIC 17 50% CD - District Review & Approval 10 days Mon 3/2/26 Fri 3/13/26 OCSD 18 50% CD - Constructability Review 15 days Mon 3/2/26 Fri 3/20/26 Bremik 19 50% CD - Develop Estimate (Basis of GMP) 31 days Mon 3/2/26 Mon 4/13/26 Bremik 20 50% CD - GMP Estimate Review 5 days Tue 4/14/26 Mon 4/20/26 Bremik 21 100% CD - Develop Drawings (IFC Set) 10 days Mon 6/15/26 Fri 6/26/26 BRIC 22 100% CD - Price Changes 20 days Mon 6/29/26 Mon 7/27/26 Bremik 23 Permitting 117 days Mon 12/29/25Fri 6/12/26 24 Land Use Review 105 days Mon 12/29/25Wed 5/27/26 25 30 Day Completeness Review 29 edays Mon 12/29/25 Tue 1/27/26 BRIC 26 2 Week Window for Resubmission - approved 1 day Tue 1/27/26 Tue 1/27/26 BRIC 27 Go/No Go on phased permit docus 0 days Wed 1/21/26 Wed 1/21/26 BRIC 28 LUR - Class 3/Lot Line Adjustment (120 days) 17 wks Wed 1/28/26 Wed 5/27/26 BRIC 29 LUR - Meeting 1 day Mon 3/23/26 Mon 3/23/26 3J 30 LUR - Conditions of Approval 1 day Tue 3/24/26 Tue 3/24/26 3J 31 LUCS - Submittal Complete 8 days Mon 3/23/26 Wed 4/1/26 KPFF 32 KPFF Working on 1200C Submittal 4 days Mon 3/30/26 Thu 4/2/26 KPFF 33 LUR Public Comment Period Ends (5/27) 1 day Wed 5/27/26 Wed 5/27/26 34 Main Building Permit 73 days Tue 3/3/26 Fri 6/12/26 35 Building Permit - Submission & Intake 1 day Tue 3/3/26 Tue 3/3/26 BRIC 36 Building Permit - First Round of comments 1 day Tue 3/31/26 Tue 3/31/26 37 50CD comments due 1 day Wed 4/8/26 Wed 4/8/26 38 50CD Addemdum 3 Updates and Permit Response 1 day Wed 4/15/26 Wed 4/15/26 39 Building Permit - AHJ Review & Comment 60 days Wed 3/4/26 Wed 5/27/26 BRIC 40 Building Permit - Issuance 5 days Thu 5/28/26 Wed 6/3/26 BRIC 41 Permit - DEQ 1200C Timeline 50 days Fri 4/3/26 Fri 6/12/26 KPFF 42 Onsite Permits 30 days Wed 4/22/26 Wed 6/3/26 43 Permit - Onsite Utilities 5 days Wed 4/22/26 Tue 4/28/26 BRIC 44 Permit - Onsite Site/Civil 20 days Wed 4/22/26 Tue 5/19/26 BRIC 45 Permit - Site Water & Fire System 20 days Wed 4/22/26 Tue 5/19/26 BRIC 46 Plumbing Trade Permit 10 days Wed 4/22/26 Tue 5/5/26 Hydro 47 Fire Sprinkler Permit 15 days Wed 4/22/26 Tue 5/12/26 Cosco 48 HVAC Trade Permit 10 days Wed 4/22/26 Tue 5/5/26 Hydro 49 Elec Trade Permit 10 days Wed 4/22/26 Tue 5/5/26 PECI 50 Modular Demo Permit 10 days Wed 4/22/26 Tue 5/5/26 Site 51 MEP DFS Submittal 15 days Wed 4/22/26 Tue 5/12/26 Hydro 52 Food Service Permit 10 days Wed 4/22/26 Tue 5/5/26 Food 53 Health Permit 30 days Wed 4/22/26 Wed 6/3/26 Food 54 DFS Ceiling Permit 15 days Wed 4/22/26 Tue 5/12/26 Ceiling 55 PGE Primary Power Design/Procurement 356 days Thu 8/7/25 Fri 1/8/27 56 Electrical Prep & Phasing 5 days Thu 8/7/25 Wed 8/13/25

Holcomb Elem School Phased Renovation8/7 Preconstruction Design & Estimating

8/7 Project Kick Off Meeting 8/7 100% SD - Distribute SD Drawings 8/8 100% SD - Estimate Development 9/16 100% SD - Estimate Review 9/17 100% SD - Reconciliation/VE

10/24 100% DD - Develop Drawings 11/17 100% DD - District Review & Approval 11/17 100% DD - Constructability Review 11/17 100% DD - Develop Estimate

12/17 100% DD - Estimate Review 12/18 100% DD - Reconciliation/VE

1/7 25% CD - MEP Early Procurement Drawings 12/8 25% CD - Develop Drawings (Early Bidding)

2/16 50% CD - Develop Drawings (Permit/Bidding) 3/2 50% CD - District Review & Approval 3/2 50% CD - Constructability Review 3/2 50% CD - Develop Estimate (Basis of GMP)

4/14 50% CD - GMP Estimate Review 6/15 100% CD - Develop Drawings (IFC Set) 6/29 100% CD - Price Changes

Permitting Land Use Review

12/29 30 Day Completeness Review 1/27 2 Week Window for Resubmission - approved

1/21 Go/No Go on phased permit docus 1/28 LUR - Class 3/Lot Line Adjustment (120 days)

3/23 LUR - Meeting 3/24 LUR - Conditions of Approval 3/23 LUCS - Submittal Complete 3/30 KPFF Working on 1200C Submittal

5/27 LUR Public Comment Period Ends (5/27) Main Building Permit

3/3 Building Permit - Submission & Intake 3/31 Building Permit - First Round of comments

4/8 50CD comments due 4/15 50CD Addemdum 3 Updates and Permit Response

3/4 Building Permit - AHJ Review & Comment 5/28 Building Permit - Issuance

4/3 Permit - DEQ 1200C Timeline Onsite Permits

4/22 Permit - Onsite Utilities 4/22 Permit - Onsite Site/Civil 4/22 Permit - Site Water & Fire System 4/22 Plumbing Trade Permit 4/22 Fire Sprinkler Permit 4/22 HVAC Trade Permit 4/22 Elec Trade Permit 4/22 Modular Demo Permit 4/22 MEP DFS Submittal 4/22 Food Service Permit 4/22 Health Permit 4/22 DFS Ceiling Permit

PGE Primary Power Design/Procurement Electrical Prep & Phasing

M M J S N J M M J S N J M M J S N J M M J S N J M M J S N J M M J S N J M M J S N J Half 1, 2025 Half 2, 2025 Half 1, 2026 Half 2, 2026 Half 1, 2027 Half 2, 2027 Half 1, 2028 Half 2, 2028 Half 1, 2029 Half 2, 2029 Half 1, 2030 Half 2, 2030 Half 1, 2031 Half 2, 2031 Half 1, 2032

Holcomb Elementary School Renovations Project Coordination Timeline

Published: Tue 4/14/26 DRAFT in Progress

69 Onsite Review of PGE Power Phasing w/ PGE 1 day Wed 9/10/25 Wed 9/10/25 70 Develop PGE Design Submittals & Details 70 days Thu 9/11/25 Fri 12/19/25 Interface Engr 71 Submit PGE New Commercial Service Revision 1 day Mon 12/22/25 Mon 12/22/25 OTAK 72 Interface ENGR Finalizes Mech/Elec Demands 40 days Tue 12/23/25 Fri 2/20/26 Interface Engr 73 Develop & Submit PGE Gear Design (PECI: NC/Siemens) 25 days Mon 1/19/26 Fri 2/20/26 Interface Engr 74 Design Team Approves Gear Submittals 10 days Tue 2/17/26 Mon 3/2/26 Elec. / Interface 75 PGE Meter Gear Review ~ 800A Temp (M3005875) 27 days Mon 2/23/26 Tue 3/31/26 PGE 76 PGE Meter Gear Review ~ 1600A Main (M5992813) 40 days Mon 2/23/26 Fri 4/17/26 PGE 77 PGE Design Development 60 days Mon 3/9/26 Mon 6/1/26 PGE 78 Finalize & Release PGE Main Gear (Pend EWA approval) 5 days Mon 4/20/26 Fri 4/24/26 PECI 79 Procure Main Gear (Siemens) 8 mons Mon 4/27/26 Fri 1/8/27 Electrical 80 PGE Issues LECA & Easements 1 day Mon 6/1/26 Mon 6/1/26 PGE 81 Owner Pays LECA Fees 5 days Tue 6/2/26 Mon 6/8/26 OTAK 82 Final PGE Construction Dwgs Released 1 day Tue 6/9/26 Tue 6/9/26 PGE 83 Contracting 118 days Wed 11/5/25 Mon 4/27/26 84 RFP 01 - Design/Assist MEPFS (100% DD) 27 days Wed 11/5/25 Mon 12/15/25 89 RFP 02 - Spring Break Abatement (100% DD HazMat) 44 days Wed 1/7/26 Mon 3/9/26 94 EWA 06 - MEP Early Procurement 16 days Thu 2/5/26 Thu 2/26/26 99 RFP 03 (EWA 07)- Abatement, Demo, DFH, Storefront, Roofing, Metal

Siding, Flashing, Expansion Joints 36 days Tue 2/24/26 Tue 4/14/26

109 RFP 04 - GMP - All Remaining Scopes (50% CD) 37 days Fri 3/6/26 Mon 4/27/26 110 GMP - RFP Release 1 day Fri 3/6/26 Fri 3/6/26 Bremik 111 GMP - Site Walk All Scopes @ 3:00 1 day Wed 3/11/26 Wed 3/11/26 Bremik 112 GMP - Addendum 1 1 day Fri 3/13/26 Fri 3/13/26 BRIC 113 GMP - QA Due @ 2:00 1 day Fri 3/13/26 Fri 3/13/26 OCSD 114 GMP - Addendum 2 1 day Mon 3/23/26 Mon 3/23/26 BRIC 115 GMP - Bids Due 1 day Tue 3/31/26 Tue 3/31/26 Bremik 116 GMP - Bid Leveling & Sub Selection 10 days Wed 4/1/26 Tue 4/14/26 Bremik 117 GMP - District Review 10 days Tue 4/14/26 Mon 4/27/26 OCSD 118 GMP - Board Approval - 4/27/26 0 days Mon 4/27/26 Mon 4/27/26 OCSD 119 District Key Dates 430 days Mon 12/22/25Fri 9/3/27 120 2025 Winter Break 6 days Mon 12/22/25 Wed 12/31/25 OCSD 121 2026 Spring Break 5 days Mon 3/23/26 Fri 3/27/26 OCSD 122 2026 Summer Break 61 days Thu 6/11/26 Fri 9/4/26 OCSD 123 26/27 Academic Year Starts (First Day of School 9/08/26) 1 day Tue 9/8/26 Tue 9/8/26 OCSD 124 2026 Winter Break 6 days Mon 12/21/26 Wed 12/30/26 OCSD 125 2027 Spring Break 5 days Mon 3/22/27 Fri 3/26/27 OCSD 126 26/27 Academic Year Ends (June 17th) 1 day Thu 6/17/27 Thu 6/17/27 OCSD 127 2027 Summer Break 55 days Fri 6/18/27 Fri 9/3/27 OCSD 128 Procurement 158 days Tue 1/13/26 Mon 8/24/26 281 Construction 370 days Sat 3/21/26 Tue 9/7/27 282 ACM Abatement 324 days Sat 3/21/26 Thu 7/1/27 283 2026 Spring Break (EWA 05) 5 days Sat 3/21/26 Sat 3/28/26 287 2026 Summer Break 9 days Thu 6/11/26 Tue 6/23/26 288 Owner Removes FF&E 3 edays Thu 6/11/26 Sun 6/14/26 Owner Movers 289 Abate Floor Tile - Remaining Classroom Areas 7 days Mon 6/15/26 Tue 6/23/26 Abatement 290 Abate Pipe Insulation 7 days Mon 6/15/26 Tue 6/23/26 Abatement 291 2027 Summer Break 10 days Fri 6/18/27 Thu 7/1/27 292 Abate Floor Tile - Cafeteria & Kitchen 5 days Fri 6/18/27 Thu 6/24/27 Abatement 293 Abate Remaining Hydronic Line Fittings 10 days Fri 6/18/27 Thu 7/1/27 Abatement 294 Start Up & Mobilization 66 days Thu 6/11/26 Mon 9/14/26 295 Mobilize & Setup Temp Fence 2 days Thu 6/11/26 Fri 6/12/26 Bremik 296 Setup Temp Field Offices (Early Setup June 1st?) 2 days Thu 6/11/26 Fri 6/12/26 Bremik 297 Owner Relocates School FF&E to Holding Zone 3 edays Thu 6/11/26 Sun 6/14/26 OCSD 298 Construct Trade Rock Parking Lot above Addition 5 days Tue 9/8/26 Mon 9/14/26 Earthwork 299 2026 Summer 65 days Thu 6/11/26 Sun 9/13/26 300 Sector C Wing (1974 Wing) 60 days Thu 6/11/26 Sun 9/6/26

9/10 Onsite Review of PGE Power Phasing w/ PGE 9/11 Develop PGE Design Submittals & Details

12/22 Submit PGE New Commercial Service Revision 12/23 Interface ENGR Finalizes Mech/Elec Demands

1/19 Develop & Submit PGE Gear Design (PECI: NC/Siemens) 2/17 Design Team Approves Gear Submittals 2/23 PGE Meter Gear Review ~ 800A Temp (M3005875) 2/23 PGE Meter Gear Review ~ 1600A Main (M5992813)

3/9 PGE Design Development 4/20 Finalize & Release PGE Main Gear (Pend EWA approval) 4/27 Procure Main Gear (Siemens)

6/1 PGE Issues LECA & Easements 6/2 Owner Pays LECA Fees 6/9 Final PGE Construction Dwgs Released

Contracting RFP 01 - Design/Assist MEPFS (100% DD)

RFP 02 - Spring Break Abatement (100% DD HazMat) EWA 06 - MEP Early Procurement

RFP 03 (EWA 07)- Abatement, Demo, DFH, Storefront, Roofing, Metal Siding, Flashing, Expansion Joints

RFP 04 - GMP - All Remaining Scopes (50% CD) 3/6 GMP - RFP Release

3/11 GMP - Site Walk All Scopes @ 3:00 3/13 GMP - Addendum 1 3/13 GMP - QA Due @ 2:00 3/23 GMP - Addendum 2 3/31 GMP - Bids Due

4/1 GMP - Bid Leveling & Sub Selection 4/14 GMP - District Review 4/27 GMP - Board Approval - 4/27/26

District Key Dates 12/22 2025 Winter Break

3/23 2026 Spring Break 6/11 2026 Summer Break

9/8 26/27 Academic Year Starts (First Day of School 9/08/26) 12/21 2026 Winter Break

3/22 2027 Spring Break 6/17 26/27 Academic Year Ends (June 17th) 6/18 2027 Summer Break

Procurement Construction

ACM Abatement 2026 Spring Break (EWA 05)

2026 Summer Break 6/11 Owner Removes FF&E 6/15 Abate Floor Tile - Remaining Classroom Areas 6/15 Abate Pipe Insulation

2027 Summer Break 6/18 Abate Floor Tile - Cafeteria & Kitchen 6/18 Abate Remaining Hydronic Line Fittings

Start Up & Mobilization 6/11 Mobilize & Setup Temp Fence 6/11 Setup Temp Field Offices (Early Setup June 1st?)

6/11 Owner Relocates School FF&E to Holding Zone

9/8 Construct Trade Rock Parking Lot above Addition 2026 Summer

Sector C Wing (1974 Wing)

M M J S N J M M J S N J M M J S N J M M J S N J M M J S N J M M J S N J M M J S N J Half 1, 2025 Half 2, 2025 Half 1, 2026 Half 2, 2026 Half 1, 2027 Half 2, 2027 Half 1, 2028 Half 2, 2028 Half 1, 2029 Half 2, 2029 Half 1, 2030 Half 2, 2030 Half 1, 2031 Half 2, 2031 Half 1, 2032

Holcomb Elementary School Renovations Project Coordination Timeline

Published: Tue 4/14/26

301 Abatement RR GWB Ceilings / Plumbing Fittings 4 edays Thu 6/11/26 Mon 6/15/26 Abatement 302 Demolition & Sawcutting 13 days Fri 6/12/26 Tue 6/30/26 303 Mobilize Demo Drop Boxes & Equip 1 day Fri 6/12/26 Fri 6/12/26 McD&W / Bremik 304 MEP Cut/Cap/Isolate & Prep for Demolition 2 days Tue 6/16/26 Wed 6/17/26 HTM / PECI 305 Elec - Remove IDF Rack & Cabling 2 days Tue 6/16/26 Wed 6/17/26 PECI 306 Elec - Setup Temp Power & Lighting 1 day Tue 6/16/26 Tue 6/16/26 PECI / Bremik 307 Demolition (walls & ceilings complete) (Overtime) 7 days Thu 6/18/26 Fri 6/26/26 Demolition 308 Demolition of Mech Roof Penthouse and HVAC Eq. 6 days Thu 6/18/26 Thu 6/25/26 Demolition 309 Sawcut & Demo SOG for New Restrooms 2 days Mon 6/22/26 Tue 6/23/26 Demolition 310 Sawcut & Demo SOG for Shear wall Ftgs 2 days Thu 6/25/26 Fri 6/26/26 Demolition 311 Sawcut & Demo for New Sink Wasteline 2 days Mon 6/29/26 Tue 6/30/26 Demolition 312 Sawcut & Demo Wall Openings for STRFT Windows and UV's 4 days Thu 6/25/26 Tue 6/30/26 Demolition 313 C122 - Reset Ext Doors & Re-Establish Security @ Ramp 1 day Fri 6/12/26 Fri 6/12/26 Bremik 314 C122 - Install Shoring & Demo CMU Bearing Wall 3 days Mon 6/15/26 Wed 6/17/26 Bremik / Demo 315 C122 - Install New GLB to Resupport Ex. Roof Structure 2 days Thu 6/18/26 Fri 6/19/26 Bremik 316 C122 - Sawcut & Remove Ext Storage Room SOG 3 days Mon 6/22/26 Wed 6/24/26 Demolition 317 Exterior Utilitys 14 days Fri 6/12/26 Wed 7/1/26 318 Sawcut & Demo Hardscapes for New Utilites 1 day Fri 6/12/26 Fri 6/12/26 Sitework 319 Sitework UG Fire Water Plumbing 5 days Mon 6/15/26 Fri 6/19/26 Sitework 320 Sitework Correct Lake 'Holcomb' 3 days Mon 6/22/26 Wed 6/24/26 Sitework 321 Sitework Waste Line 3 days Mon 6/15/26 Wed 6/17/26 Sitework 322 Sitework Repair Hardscapes 3 days Thu 6/25/26 Mon 6/29/26 Sitework 323 Sitework Repair Landscape Scars 2 days Tue 6/30/26 Wed 7/1/26 Landscape 324 Interior Underground & SOG Pourback 16 days Mon 6/22/26 Tue 7/14/26 325 Install UG Fire Sprinkler Riser & Manifold 2 days Mon 6/22/26 Tue 6/23/26 Fire Sprinkler 326 FS Riser SOG Pourback 2 days Wed 6/24/26 Thu 6/25/26 Concrete 327 FS Riser UG Flow Test Inspection 1 day Fri 6/26/26 Fri 6/26/26 Fire Sprinkler 328 Excavation for Shear wall Ftgs 4 days Mon 6/29/26 Thu 7/2/26 Earthwork 329 Excavation for New UG Plumbing 2 days Wed 7/1/26 Thu 7/2/26 HydroTemp 330 Shear wall Ftg Reinforcement 2 days Mon 7/6/26 Tue 7/7/26 Reinforcement 331 Shear wall Ftg Place & Finish 2 days Mon 7/13/26 Tue 7/14/26 Concrete 332 MEP Underground Work 5 days Mon 7/6/26 Fri 7/10/26 MEP 333 MEP Trench Backfill/Compact 1 day Mon 7/13/26 Mon 7/13/26 MEP 334 MEP Trench Pour Backs 1 day Tue 7/14/26 Tue 7/14/26 Concrete 335 C122 - SOG Pour Back 2 days Mon 7/13/26 Tue 7/14/26 Concrete 336 Roof Construction 45 days Mon 6/15/26 Mon 8/17/26 337 Demo & Remove Existing Roofing & Gutters 3 days Mon 6/15/26 Wed 6/17/26 Demolition 338 HVAC Frame Steel Posts (12/S6.05) 4 days Thu 6/18/26 Tue 6/23/26 Rough Carp 339 Frame Roof Hatch Curb 2 days Thu 6/18/26 Fri 6/19/26 Rough Carp 340 Set Plumb Roof Penetrations 2 days Thu 6/18/26 Fri 6/19/26 MEP 341 RH & EF Curbs for New Equipment 3 days Thu 6/18/26 Mon 6/22/26 Structural 342 MEP Curbs, Penetrations & Lineset Hoods 5 days Mon 6/22/26 Fri 6/26/26 Rough Carp 343 Roofing Sector C (North to South) 5 days Wed 6/24/26 Tue 6/30/26 Roof 344 Rooftop Equipment & MEP Connections 5 days Wed 7/1/26 Wed 7/8/26 MEP 345 Install Roof Hatch & Ships Ladder 2 days Fri 8/14/26 Mon 8/17/26 Rough Carp 346 Interior Construction 47 days Mon 6/29/26 Wed 9/2/26 347 Fire Sprinkler Rough-in 9 days Mon 6/29/26 Fri 7/10/26 Fire Sprinkler 348 Interior Partition & Shear Wall Framing (overtime) 7 days Wed 7/15/26 Thu 7/23/26 Framing 349 MEP Wall & Ceiling Rough-In 5 days Mon 7/20/26 Fri 7/24/26 MEP 350 Polished Concrete Flooring 5 days Fri 7/24/26 Thu 7/30/26 Flooring 351 HM Door Frames 3 days Fri 7/24/26 Tue 7/28/26 Door Frames 352 Inspection - Wall Cover 2 days Mon 7/27/26 Tue 7/28/26 Inspection 353 Wall Insulation 1 day Wed 7/29/26 Wed 7/29/26 Insulation 354 Inspection - Wall Cover 1 day Thu 7/30/26 Thu 7/30/26 Inspection 355 Drywall & Finishes 7 days Fri 7/31/26 Mon 8/10/26 Drywall 356 Interior Painting 5 days Fri 8/7/26 Thu 8/13/26 Painting 357 HVAC Unit Ventilators 5 days Fri 8/14/26 Thu 8/20/26 HVAC

6/11 Abatement RR GWB Ceilings / Plumbing Fittings Demolition & Sawcutting

6/12 Mobilize Demo Drop Boxes & Equip 6/16 MEP Cut/Cap/Isolate & Prep for Demolition 6/16 Elec - Remove IDF Rack & Cabling 6/16 Elec - Setup Temp Power & Lighting 6/18 Demolition (walls & ceilings complete) (Overtime) 6/18 Demolition of Mech Roof Penthouse and HVAC Eq.

6/22 Sawcut & Demo SOG for New Restrooms 6/25 Sawcut & Demo SOG for Shear wall Ftgs 6/29 Sawcut & Demo for New Sink Wasteline 6/25 Sawcut & Demo Wall Openings for STRFT Windows and UV's

6/12 C122 - Reset Ext Doors & Re-Establish Security @ Ramp 6/15 C122 - Install Shoring & Demo CMU Bearing Wall 6/18 C122 - Install New GLB to Resupport Ex. Roof Structure 6/22 C122 - Sawcut & Remove Ext Storage Room SOG

Exterior Utilitys 6/12 Sawcut & Demo Hardscapes for New Utilites 6/15 Sitework UG Fire Water Plumbing 6/22 Sitework Correct Lake 'Holcomb' 6/15 Sitework Waste Line 6/25 Sitework Repair Hardscapes 6/30 Sitework Repair Landscape Scars

Interior Underground & SOG Pourback 6/22 Install UG Fire Sprinkler Riser & Manifold 6/24 FS Riser SOG Pourback 6/26 FS Riser UG Flow Test Inspection 6/29 Excavation for Shear wall Ftgs

7/1 Excavation for New UG Plumbing 7/6 Shear wall Ftg Reinforcement

7/13 Shear wall Ftg Place & Finish 7/6 MEP Underground Work

7/13 MEP Trench Backfill/Compact 7/14 MEP Trench Pour Backs 7/13 C122 - SOG Pour Back

Roof Construction 6/15 Demo & Remove Existing Roofing & Gutters 6/18 HVAC Frame Steel Posts (12/S6.05) 6/18 Frame Roof Hatch Curb 6/18 Set Plumb Roof Penetrations 6/18 RH & EF Curbs for New Equipment 6/22 MEP Curbs, Penetrations & Lineset Hoods 6/24 Roofing Sector C (North to South)

7/1 Rooftop Equipment & MEP Connections 8/14 Install Roof Hatch & Ships Ladder

Interior Construction 6/29 Fire Sprinkler Rough-in

7/15 Interior Partition & Shear Wall Framing (overtime) 7/20 MEP Wall & Ceiling Rough-In 7/24 Polished Concrete Flooring 7/24 HM Door Frames 7/27 Inspection - Wall Cover 7/29 Wall Insulation 7/30 Inspection - Wall Cover 7/31 Drywall & Finishes

8/7 Interior Painting 8/14 HVAC Unit Ventilators

M M J S N J M M J S N J M M J S N J M M J S N J M M J S N J M M J S N J M M J S N J Half 1, 2025 Half 2, 2025 Half 1, 2026 Half 2, 2026 Half 1, 2027 Half 2, 2027 Half 1, 2028 Half 2, 2028 Half 1, 2029 Half 2, 2029 Half 1, 2030 Half 2, 2030 Half 1, 2031 Half 2, 2031 Half 1, 2032

Holcomb Elementary School Renovations Project Coordination Timeline

Published: Tue 4/14/26

358 Electrical Finishes 5 days Fri 8/14/26 Thu 8/20/26 MEP 359 Grid Ceilings 3 days Fri 8/14/26 Tue 8/18/26 Ceilings 360 Light Fixtures 3 days Mon 8/17/26 Wed 8/19/26 Electrical 361 Casework & Ctops 5 days Fri 8/21/26 Thu 8/27/26 Casework 362 Install Ceiling Tile 2 days Thu 8/20/26 Fri 8/21/26 Ceilings 363 Window Blinds 3 days Mon 8/24/26 Wed 8/26/26 Window Blinds 364 Carpet @ Sensory Rm C121 1 day Mon 8/24/26 Mon 8/24/26 Flooring 365 Doors & Hardware 4 days Fri 8/28/26 Wed 9/2/26 Doors & Hardware 366 Rubber Base 1 day Fri 8/28/26 Fri 8/28/26 Flooring 367 Exterior Wall Construction 22 days Wed 7/1/26 Fri 7/31/26 368 Install Temp Brick Shoring Lintels 1 day Wed 7/1/26 Wed 7/1/26 Rough Carp 369 Modify Framing for New STRFNT & UV Openings 4 days Wed 7/1/26 Tue 7/7/26 Rough Carp 370 Unit Ventilator Thru-Wall Plenums 1 day Tue 7/7/26 Tue 7/7/26 HydroTemp 371 WRB and Flashing @ STRFNT & UVs 4 days Wed 7/8/26 Mon 7/13/26 WRB 372 Storefront Windows 5 days Tue 7/14/26 Mon 7/20/26 Storefront 373 Repair Exterior Brick Veneer @ UVs 4 days Tue 7/14/26 Fri 7/17/26 Masonry 374 Install Fiber Cement Siding 4 days Tue 7/21/26 Fri 7/24/26 Siding 375 Finish Exterior Caulking 2 days Mon 7/27/26 Tue 7/28/26 Caulking 376 Exterior Painting 3 days Wed 7/29/26 Fri 7/31/26 Painting 377 Brick Veneer Wash & Sealing 3 days Wed 7/29/26 Fri 7/31/26 Masonry 378 Ramp Exterior Handrail 2 days Mon 7/27/26 Tue 7/28/26 Steel 379 Restroom Finishes 13 days Wed 8/12/26 Fri 8/28/26 380 Tile Restrooms 5 days Wed 8/12/26 Tue 8/18/26 Tile 381 SV & Cover Base @ Unisex RRs 3 days Wed 8/19/26 Fri 8/21/26 Flooring 382 Plumbing Fixtures in Restrooms 5 days Wed 8/19/26 Tue 8/25/26 Plumbing 383 Toilet Partitions & Accessories 3 days Wed 8/26/26 Fri 8/28/26 Accessories 384 Bulk Clean & Window Cleaning 1 day Mon 8/31/26 Mon 8/31/26 Final Clean 385 Window Film @ Existing (A041 note) 1 day Tue 9/1/26 Tue 9/1/26 Window Film 386 Final Clean & Turnover 2 days Wed 9/2/26 Thu 9/3/26 Bremik 387 FF&E Move-In & Prep for Acedemic Start 3 edays Thu 9/3/26 Sun 9/6/26 Holcomb 388 Cafeteria Restroom Renovation 60 days Fri 6/12/26 Sun 9/6/26 389 Wood Shearwall Footing Layout & Sawcut 1 day Fri 6/12/26 Fri 6/12/26 Demolition 390 Wood Shearwall Footing Excavation 1 day Mon 6/15/26 Mon 6/15/26 Excavation 391 Wood Shearwall Reinforcing & Pourback 3 days Tue 6/16/26 Thu 6/18/26 Concrete 392 Wood Shearwall Framing & Roof GLB 6-3/4x21 Install 4 days Fri 6/19/26 Wed 6/24/26 Framing 393 Demolition (Walls, Ceilings, Accessories, SOG) 7 days Tue 6/16/26 Wed 6/24/26 Demolition 394 Demo Electrical Panels 1 day Thu 6/25/26 Thu 6/25/26 Electrical 395 Excavate & Plumbing Underground 5 days Wed 6/24/26 Tue 6/30/26 Plumbing 396 Plumbing Cover Inspections 1 day Tue 6/30/26 Tue 6/30/26 Plumbing 397 SOG Replacement (VB, Reinforce, Place, Finish) 5 days Wed 7/1/26 Wed 7/8/26 Concrete 398 Infill CMU Walls 3 days Thu 7/9/26 Mon 7/13/26 CMU 399 Frame & Block Partition Walls & Ceilings 4 days Thu 7/9/26 Tue 7/14/26 Rough Carp 400 Install New Electrical Panels 2 days Mon 7/13/26 Tue 7/14/26 Electrical 401 Install Closet Door Frames 1 day Mon 7/13/26 Mon 7/13/26 Door Frames 402 Install New Exit Egress Door at Gym 1 day Mon 7/13/26 Mon 7/13/26 Door Frames 403 MEP Wall & Ceiling Rough-In 5 days Wed 7/15/26 Tue 7/21/26 MEP 404 Acoustical Insulation 1 day Wed 7/22/26 Wed 7/22/26 Drywall 405 Drywall & Tile Backer 5 days Thu 7/23/26 Wed 7/29/26 Drywall 406 Light Fixtures 2 days Thu 7/30/26 Fri 7/31/26 Electrical 407 Polished Concrete Floors 4 days Mon 8/3/26 Thu 8/6/26 Flooring 408 Wall Tile Installations 6 days Fri 8/7/26 Fri 8/14/26 Tile 409 Interior Paint Finishes 3 days Mon 8/17/26 Wed 8/19/26 Paint 410 Plumbing Finishes 5 days Thu 8/20/26 Wed 8/26/26 Plumbing 411 Partition Installations 2 days Wed 8/26/26 Thu 8/27/26 Accessories 412 Restroom Accessories 3 days Fri 8/28/26 Tue 9/1/26 Accessories 413 Final Clean & Turnover 2 days Wed 9/2/26 Thu 9/3/26 Bremik 414 FF&E Move-In & Prep for Acedemic Start 3 edays Thu 9/3/26 Sun 9/6/26 Holcomb

8/14 Electrical Finishes 8/14 Grid Ceilings 8/17 Light Fixtures 8/21 Casework & Ctops 8/20 Install Ceiling Tile 8/24 Window Blinds 8/24 Carpet @ Sensory Rm C121 8/28 Doors & Hardware 8/28 Rubber Base

Exterior Wall Construction 7/1 Install Temp Brick Shoring Lintels 7/1 Modify Framing for New STRFNT & UV Openings 7/7 Unit Ventilator Thru-Wall Plenums 7/8 WRB and Flashing @ STRFNT & UVs

7/14 Storefront Windows 7/14 Repair Exterior Brick Veneer @ UVs 7/21 Install Fiber Cement Siding 7/27 Finish Exterior Caulking 7/29 Exterior Painting 7/29 Brick Veneer Wash & Sealing 7/27 Ramp Exterior Handrail

Restroom Finishes 8/12 Tile Restrooms 8/19 SV & Cover Base @ Unisex RRs 8/19 Plumbing Fixtures in Restrooms 8/26 Toilet Partitions & Accessories 8/31 Bulk Clean & Window Cleaning

9/1 Window Film @ Existing (A041 note) 9/2 Final Clean & Turnover 9/3 FF&E Move-In & Prep for Acedemic Start

Cafeteria Restroom Renovation 6/12 Wood Shearwall Footing Layout & Sawcut 6/15 Wood Shearwall Footing Excavation 6/16 Wood Shearwall Reinforcing & Pourback 6/19 Wood Shearwall Framing & Roof GLB 6-3/4x21 Install 6/16 Demolition (Walls, Ceilings, Accessories, SOG) 6/25 Demo Electrical Panels 6/24 Excavate & Plumbing Underground 6/30 Plumbing Cover Inspections

7/1 SOG Replacement (VB, Reinforce, Place, Finish) 7/9 Infill CMU Walls 7/9 Frame & Block Partition Walls & Ceilings

7/13 Install New Electrical Panels 7/13 Install Closet Door Frames 7/13 Install New Exit Egress Door at Gym 7/15 MEP Wall & Ceiling Rough-In 7/22 Acoustical Insulation 7/23 Drywall & Tile Backer 7/30 Light Fixtures

8/3 Polished Concrete Floors 8/7 Wall Tile Installations 8/17 Interior Paint Finishes 8/20 Plumbing Finishes 8/26 Partition Installations 8/28 Restroom Accessories

9/2 Final Clean & Turnover 9/3 FF&E Move-In & Prep for Acedemic Start

M M J S N J M M J S N J M M J S N J M M J S N J M M J S N J M M J S N J M M J S N J Half 1, 2025 Half 2, 2025 Half 1, 2026 Half 2, 2026 Half 1, 2027 Half 2, 2027 Half 1, 2028 Half 2, 2028 Half 1, 2029 Half 2, 2029 Half 1, 2030 Half 2, 2030 Half 1, 2031 Half 2, 2031 Half 1, 2032

Holcomb Elementary School Renovations Project Coordination Timeline

Published: Tue 4/14/26

415 Gym Hallway Ramp Construction 64 days Fri 6/12/26 Sun 9/13/26 416 Demolition (WC lift, Stairs, Closets, Soffits, etc.) 7 days Fri 6/12/26 Mon 6/22/26 Demolition 417 Demolition of Corridor Ceiling 4 days Tue 6/23/26 Fri 6/26/26 Demolition 418 Demolition of Concrete Stairs 3 days Mon 6/29/26 Wed 7/1/26 Demolition 419 Exterior Cut for New Exterior Gym Door 1 day Thu 7/2/26 Thu 7/2/26 Demolition 420 CMU wall Footing (Form/Pour/Strip) 3 days Thu 7/2/26 Tue 7/7/26 Concrete 421 Infill CMU Wall Openings 5 days Thu 7/9/26 Wed 7/15/26 CMU 422 Backfill and Grade Ramp 3 days Thu 7/16/26 Mon 7/20/26 Excavator 423 Construct & Pour Conc. Ramp (wall-to-wall) 10 days Tue 7/21/26 Mon 8/3/26 Concrete 424 MEPF Ceiling Rough-in 5 days Tue 8/4/26 Mon 8/10/26 MEP 425 Place Gym Exterior Door Steel 4 days Mon 7/6/26 Thu 7/9/26 Steel 426 Place HM Frame and Door in Gym 2 days Fri 7/10/26 Mon 7/13/26 Doors 427 Frame Hallway Wall 2 days Tue 8/11/26 Wed 8/12/26 Framing 428 Insert Window Frame 1 day Thu 8/13/26 Thu 8/13/26 Framing 429 Drywall & Finishes 5 days Fri 8/14/26 Thu 8/20/26 Drywall 430 Interior Painting 2 days Fri 8/21/26 Mon 8/24/26 Painting 431 Grid Ceilings 3 days Tue 8/25/26 Thu 8/27/26 Ceilings 432 Light Fixtures 2 days Fri 8/28/26 Mon 8/31/26 Electrical 433 Flooring & Base 3 days Tue 9/1/26 Thu 9/3/26 Flooring 434 Wall Rails & Paint 2 days Fri 9/4/26 Tue 9/8/26 Railings 435 Final Clean & Turnover 2 days Wed 9/9/26 Thu 9/10/26 Clean 436 FF&E Move-In & Prep for Acedemic Start 3 edays Thu 9/10/26 Sun 9/13/26 Bremik 437 Corridors ~ Summer 2026 61 days Thu 6/11/26 Sun 9/6/26 438 Salvage Lighting 2 days Thu 6/11/26 Fri 6/12/26 Electrical 439 Abate Glue Up ACM Tiles 4 edays Fri 6/12/26 Tue 6/16/26 Abatement 440 Demo Remaining Hallway Ceiling Tiles & Insulation 5 days Mon 6/15/26 Fri 6/19/26 Demolition 441 Re-Hang Exist Hallway Light Fixtures & Fire Alarm Devices 4 days Mon 6/22/26 Thu 6/25/26 Electrical 442 Select MEP and Low Voltage Demo 10 days Mon 6/22/26 Mon 7/6/26 MEP 443 Polish Corridor Flooring 10 days Tue 7/7/26 Mon 7/20/26 Flooring 444 MEPF Ceiling Rough-In 30 days Tue 7/21/26 Mon 8/31/26 MEPF 445 Bulk & Final Clean 3 days Tue 9/1/26 Thu 9/3/26 Final Clean 446 FF&E Move-In & Prep for Acedemic Start 3 edays Thu 9/3/26 Sun 9/6/26 Holcomb 447 Classroom Renov. Seq. SQ1 (B113-B118), A101 & A104 51 days Thu 6/11/26 Mon 8/24/26 448 Remove Ex. Casework and all wall surfaces (Overtime) 2 edays Thu 6/11/26 Sat 6/13/26 Demolition 449 Abate Drywall and Roof Opening for RH 5 edays Fri 6/12/26 Wed 6/17/26 Abatement 450 Demo Exterior Stucco @ UV Openings 5 days Mon 6/15/26 Fri 6/19/26 Demolition 451 Re-Frame UV Sleeve Openings 5 days Mon 6/22/26 Fri 6/26/26 Rough Carp 452 MEP Wall Rough-In 5 days Wed 6/17/26 Tue 6/23/26 MEP 453 Install Fire Sprinkler lines 5 days Wed 6/17/26 Tue 6/23/26 Cosco 454 Install RH Ductwork thru Roof 5 days Wed 6/17/26 Tue 6/23/26 HydroTemp 455 New Wall Blocking for TV 3 days Wed 6/24/26 Fri 6/26/26 Rough Carp 456 Inspection - Wall Cover 1 day Mon 6/29/26 Mon 6/29/26 Inspection 457 Acoustical Insulation 1 day Tue 6/30/26 Tue 6/30/26 Insulation 458 Inspection - Wall Cover 1 day Wed 7/1/26 Wed 7/1/26 Inspection 459 Drywall & Finish 7 days Thu 7/2/26 Mon 7/13/26 Drywall 460 Paint Walls 5 days Tue 7/14/26 Mon 7/20/26 Painting 461 Polished Concrete 5 days Tue 7/21/26 Mon 7/27/26 Polish Conc.

462 Remove & Replace Light Fixtures 5 days Tue 7/28/26 Mon 8/3/26 Electrical 463 Spot Replace 12x12 Ceiling Tiles 5 days Tue 8/4/26 Mon 8/10/26 Drywall 464 Casework & Ctops 5 days Tue 7/28/26 Mon 8/3/26 Casework 465 Install UVs 5 days Tue 7/28/26 Mon 8/3/26 HydroTemp 466 Electrical Finishes 5 days Tue 8/4/26 Mon 8/10/26 Electrical 467 Rubber Base 2 days Tue 8/4/26 Wed 8/5/26 Flooring 468 Install Markerboards & Tackboards 5 days Tue 8/4/26 Mon 8/10/26 Finishes 469 Door Hardware 5 days Tue 8/4/26 Mon 8/10/26 Finishes 470 Bulk Clean 2 days Tue 8/11/26 Wed 8/12/26 Final Clean 471 Punchlisth 2 days Thu 8/13/26 Fri 8/14/26 INFO

Gym Hallway Ramp Construction 6/12 Demolition (WC lift, Stairs, Closets, Soffits, etc.)

6/23 Demolition of Corridor Ceiling 6/29 Demolition of Concrete Stairs

7/2 Exterior Cut for New Exterior Gym Door 7/2 CMU wall Footing (Form/Pour/Strip) 7/9 Infill CMU Wall Openings

7/16 Backfill and Grade Ramp 7/21 Construct & Pour Conc. Ramp (wall-to-wall)

8/4 MEPF Ceiling Rough-in 7/6 Place Gym Exterior Door Steel

7/10 Place HM Frame and Door in Gym 8/11 Frame Hallway Wall 8/13 Insert Window Frame 8/14 Drywall & Finishes 8/21 Interior Painting 8/25 Grid Ceilings 8/28 Light Fixtures

9/1 Flooring & Base 9/4 Wall Rails & Paint 9/9 Final Clean & Turnover

9/10 FF&E Move-In & Prep for Acedemic Start Corridors ~ Summer 2026

6/11 Salvage Lighting 6/12 Abate Glue Up ACM Tiles 6/15 Demo Remaining Hallway Ceiling Tiles & Insulation 6/22 Re-Hang Exist Hallway Light Fixtures & Fire Alarm Devices 6/22 Select MEP and Low Voltage Demo

7/7 Polish Corridor Flooring 7/21 MEPF Ceiling Rough-In

9/1 Bulk & Final Clean 9/3 FF&E Move-In & Prep for Acedemic Start

Classroom Renov. Seq. SQ1 (B113-B118), A101 & A104 6/11 Remove Ex. Casework and all wall surfaces (Overtime) 6/12 Abate Drywall and Roof Opening for RH 6/15 Demo Exterior Stucco @ UV Openings 6/22 Re-Frame UV Sleeve Openings 6/17 MEP Wall Rough-In 6/17 Install Fire Sprinkler lines 6/17 Install RH Ductwork thru Roof 6/24 New Wall Blocking for TV 6/29 Inspection - Wall Cover 6/30 Acoustical Insulation

7/1 Inspection - Wall Cover 7/2 Drywall & Finish 7/14 Paint Walls 7/21 Polished Concrete 7/28 Remove & Replace Light Fixtures

8/4 Spot Replace 12x12 Ceiling Tiles 7/28 Casework & Ctops 7/28 Install UVs

8/4 Electrical Finishes 8/4 Rubber Base 8/4 Install Markerboards & Tackboards 8/4 Door Hardware

8/11 Bulk Clean 8/13 Punchlisth

M M J S N J M M J S N J M M J S N J M M J S N J M M J S N J M M J S N J M M J S N J Half 1, 2025 Half 2, 2025 Half 1, 2026 Half 2, 2026 Half 1, 2027 Half 2, 2027 Half 1, 2028 Half 2, 2028 Half 1, 2029 Half 2, 2029 Half 1, 2030 Half 2, 2030 Half 1, 2031 Half 2, 2031 Half 1, 2032

Holcomb Elementary School Renovations Project Coordination Timeline

Published: Tue 4/14/26

472 Punchlist Corrections 5 days Mon 8/17/26 Fri 8/21/26 Bremik 473 Ready for FF&E Move-In & Prep for Acedemic Start 1 day Mon 8/24/26 Mon 8/24/26 Holcomb 474 2026/2027 School Year 286 days Fri 6/12/26 Fri 7/30/27 475 New Cafeteria & Kitchen Addition 261 days Fri 6/12/26 Thu 6/24/27 476 Asbestos Abatement at Modulars (SV & Fittings) 3 days Fri 6/12/26 Tue 6/16/26 Abatement 477 Demolition of Existing Modulars 3 days Wed 6/17/26 Fri 6/19/26 Demolition 478 Rough Grade & Bldg. Pad Excavation 10 days Mon 6/15/26 Fri 6/26/26 Earthwork 479 Footing Excavation 5 days Mon 6/29/26 Mon 7/6/26 Earthwork 480 MEP Underground 15 days Tue 7/7/26 Mon 7/27/26 MEP 481 Footing Form, Rebar, Pour 10 days Tue 7/7/26 Mon 7/20/26 Concrete 482 SOG (Formwork, VB, Rebar, Place, Finish) 15 days Thu 7/23/26 Wed 8/12/26 Concrete 483 Below Grade Waterproofing 5 days Thu 8/13/26 Wed 8/19/26 Ext Finish 484 Foundation Drain & Backfill 5 days Thu 8/20/26 Wed 8/26/26 Ext. Finish 485 Ext. Framing & Steel Erection 20 days Thu 8/13/26 Thu 9/10/26 Framing 486 Roof Framing (OWJ, 3x6 Decking, Roof Curbs) 15 days Fri 9/11/26 Thu 10/1/26 Framing 487 Int. Wall Partition Framing 10 days Fri 10/9/26 Thu 10/22/26 Framing 488 Set HM Door Frames 2 days Fri 10/16/26 Mon 10/19/26 Framing 489 MEP Wall Rough-In 10 days Fri 10/16/26 Thu 10/29/26 MEP 490 MEP Ceiling Rough-in 15 days Fri 10/30/26 Thu 11/19/26 MEP 491 MEP & Framing Cover Inspections 2 days Fri 11/20/26 Mon 11/23/26 MEP 492 Ext. WRB & SAM @ Openings 15 days Fri 10/2/26 Thu 10/22/26 WRB 493 Storefront Windows 15 days Fri 10/23/26 Thu 11/12/26 Storefront 494 Exterior Cladding (Brick & MWP) 40 days Fri 11/13/26 Fri 1/15/27 Ext Finishes 495 Wall & Ceiling Cover Inspections 2 days Tue 11/24/26 Wed 11/25/26 Framing 496 Roof Construction 30 days Fri 10/23/26 Mon 12/7/26 Roofing 497 AHU & KEC Exhaust Equipment 20 days Fri 11/20/26 Mon 12/21/26 Mechanical 498 Bldg. Dry out Target & Temp Heat 5 days Tue 12/1/26 Mon 12/7/26 Dry-Out 499 Insulation 5 days Tue 12/8/26 Mon 12/14/26 Insulation 500 Hang Drywall 15 days Tue 12/15/26 Fri 1/8/27 Drywall 501 Finish Drywall 15 days Mon 1/11/27 Fri 1/29/27 Drywall 502 Exterior Sitework & Hardscapes 30 days Mon 1/18/27 Fri 2/26/27 Ext Finishes 503 Painting 3 days Mon 2/1/27 Wed 2/3/27 Painting 504 Interior Wainscot & Wall Paneling & Tiling 5 days Thu 2/4/27 Wed 2/10/27 Int Finishes 505 Kitchen OH Door Installations 5 days Thu 2/4/27 Wed 2/10/27 OH Door 506 Kitchen Wall Panels 5 days Thu 2/11/27 Wed 2/17/27 Kitchen 507 Install Ceiling Grid 3 days Thu 2/11/27 Mon 2/15/27 Ceiling 508 MEP Finishes 15 days Tue 2/16/27 Mon 3/8/27 MEP 509 Polished Conc Flooring 5 days Tue 3/9/27 Mon 3/15/27 Flooring 510 Kitchen Flooring (FAF-1 & B-4 Base) 5 days Tue 3/16/27 Mon 3/22/27 Flooring 511 Specialties & Accessories 10 days Tue 3/23/27 Mon 4/5/27 Int Finishes 512 KEC Installations 15 days Tue 3/23/27 Mon 4/12/27 Kitchen 513 Doors and Hardware 5 days Tue 4/6/27 Mon 4/12/27 Doors 514 Landscape Finishes 30 days Mon 3/1/27 Fri 4/9/27 Ext Finishes 515 Bulk Cleaning & Pre-Punchlist 10 days Tue 4/6/27 Mon 4/19/27 Int Finish 516 Trash Enclosure & Fencing 15 days Tue 4/13/27 Mon 5/3/27 Ext Finish 517 Punchlist & Commissioning 5 days Tue 4/20/27 Mon 4/26/27 Int Finish 518 Final Inspections & TCO 5 days Tue 5/4/27 Mon 5/10/27 Int Finish 519 Punchlist Corrections 10 days Tue 5/11/27 Mon 5/24/27 Int Finish 520 Weather Day Contingency Per GC Contract 20 days Tue 5/25/27 Tue 6/22/27 Bremik 521 Ready for Owner Move-in 2 days Wed 6/23/27 Thu 6/24/27 INFO 522 Interior Misc Renovations 277 days Thu 6/25/26 Fri 7/30/27 523 Mechanical Room 277 days Thu 6/25/26 Fri 7/30/27 524 Install New 4-0 x 7-0 Exterior HM Door & Frame 3 days Thu 6/25/26 Mon 6/29/26 D/F/H 525 Demo & Replace 2.5" Domestic CW Main Line 10 days Fri 7/2/27 Fri 7/16/27 Plumbing 526 Decom & Demo Ex. Boiler System 10 days Mon 7/19/27 Fri 7/30/27 Mechanical 527 Music Room Renovations 40 days Fri 10/23/26 Mon 12/21/26 528 Music Room Structural GLBs 20 days Fri 10/23/26 Thu 11/19/26 Bremik

8/17 Punchlist Corrections 8/24 Ready for FF&E Move-In & Prep for Acedemic Start

2026/2027 School Year New Cafeteria & Kitchen Addition

6/12 Asbestos Abatement at Modulars (SV & Fittings) 6/17 Demolition of Existing Modulars 6/15 Rough Grade & Bldg. Pad Excavation 6/29 Footing Excavation

7/7 MEP Underground 7/7 Footing Form, Rebar, Pour 7/23 SOG (Formwork, VB, Rebar, Place, Finish)

8/13 Below Grade Waterproofing 8/20 Foundation Drain & Backfill 8/13 Ext. Framing & Steel Erection

9/11 Roof Framing (OWJ, 3x6 Decking, Roof Curbs) 10/9 Int. Wall Partition Framing

10/16 Set HM Door Frames 10/16 MEP Wall Rough-In 10/30 MEP Ceiling Rough-in

11/20 MEP & Framing Cover Inspections 10/2 Ext. WRB & SAM @ Openings 10/23 Storefront Windows

11/13 Exterior Cladding (Brick & MWP) 11/24 Wall & Ceiling Cover Inspections

10/23 Roof Construction 11/20 AHU & KEC Exhaust Equipment

12/1 Bldg. Dry out Target & Temp Heat 12/8 Insulation

12/15 Hang Drywall 1/11 Finish Drywall 1/18 Exterior Sitework & Hardscapes

2/1 Painting 2/4 Interior Wainscot & Wall Paneling & Tiling 2/4 Kitchen OH Door Installations

2/11 Kitchen Wall Panels 2/11 Install Ceiling Grid 2/16 MEP Finishes

3/9 Polished Conc Flooring 3/16 Kitchen Flooring (FAF-1 & B-4 Base) 3/23 Specialties & Accessories 3/23 KEC Installations

4/6 Doors and Hardware 3/1 Landscape Finishes

4/6 Bulk Cleaning & Pre-Punchlist 4/13 Trash Enclosure & Fencing 4/20 Punchlist & Commissioning

5/4 Final Inspections & TCO 5/11 Punchlist Corrections 5/25 Weather Day Contingency Per GC Contract

6/23 Ready for Owner Move-in Interior Misc Renovations Mechanical Room

6/25 Install New 4-0 x 7-0 Exterior HM Door & Frame 7/2 Demo & Replace 2.5" Domestic CW Main Line 7/19 Decom & Demo Ex. Boiler System

Music Room Renovations 10/23 Music Room Structural GLBs

M M J S N J M M J S N J M M J S N J M M J S N J M M J S N J M M J S N J M M J S N J Half 1, 2025 Half 2, 2025 Half 1, 2026 Half 2, 2026 Half 1, 2027 Half 2, 2027 Half 1, 2028 Half 2, 2028 Half 1, 2029 Half 2, 2029 Half 1, 2030 Half 2, 2030 Half 1, 2031 Half 2, 2031 Half 1, 2032

Holcomb Elementary School Renovations Project Coordination Timeline

Published: Tue 4/14/26

529 Music Room Corridor Wall Modifications 20 days Fri 11/20/26 Mon 12/21/26 Bremik 530 New Exterior MDP Timeline 24 days Mon 1/11/27 Thu 2/11/27 531 Install New Exterior MDP Gear 10 days Mon 1/11/27 Fri 1/22/27 Electrical 532 AHJ & PGE Green Sticker 3 days Mon 1/25/27 Wed 1/27/27 Electrical / PGE 533 PGE Meter Set & Makeups 10 days Thu 1/28/27 Wed 2/10/27 Electrical / PGE 534 New Ext. MDP Service Ready for Power Swap 1 day Thu 2/11/27 Thu 2/11/27 Electrical 535 Primary Power Switchover (Summer 2027) 13 days Fri 6/18/27 Wed 7/7/27 Electrical 536 Decom & Demo Ex. Electrical Service Gear 5 days Fri 6/18/27 Thu 6/24/27 Electrical 537 Install New Sub-Distribution Elec Gear 3 days Fri 6/25/27 Tue 6/29/27 Electrical 538 Remove Ex. Transformer & Conductors 2 days Fri 6/25/27 Mon 6/28/27 Electrical 539 Pull New Secondary Conductors 2 days Wed 6/30/27 Thu 7/1/27 Electrical 540 Sub Distribution Panel Make-Ups & Testing 2 days Fri 7/2/27 Tue 7/6/27 Electrical 541 Primary Bldg. Power Online 1 day Wed 7/7/27 Wed 7/7/27 Electrical 542 Classroom Renov. Seq. SQ2 (A119, A120, B119, B120, B101, B102 & C123 51 days Thu 6/17/27 Mon 8/30/27 543 Remove Ex. Casework and all wall surfaces (Overtime) 2 edays Thu 6/17/27 Sat 6/19/27 Demolition 544 Abate Drywall and Roof Opening for RH 5 edays Fri 6/18/27 Wed 6/23/27 Abatement 545 Demo Exterior Stucco @ UV Openings 5 days Mon 6/21/27 Fri 6/25/27 Demolition 546 Re-Frame UV Sleeve Openings 5 days Mon 6/28/27 Fri 7/2/27 Rough Carp 547 MEP Wall Rough-In 5 days Wed 6/23/27 Tue 6/29/27 MEP 548 Install Fire Sprinkler lines 5 days Wed 6/23/27 Tue 6/29/27 Cosco 549 Install RH Ductwork thru Roof 5 days Wed 6/23/27 Tue 6/29/27 HydroTemp 550 New Wall Blocking for TV 3 days Wed 6/30/27 Fri 7/2/27 Rough Carp 551 Inspection - Wall Cover 1 day Tue 7/6/27 Tue 7/6/27 Inspection 552 Acoustical Insulation 1 day Wed 7/7/27 Wed 7/7/27 Insulation 553 Inspection - Wall Cover 1 day Thu 7/8/27 Thu 7/8/27 Inspection 554 Drywall & Finish 7 days Fri 7/9/27 Mon 7/19/27 Drywall 555 Paint Walls 5 days Tue 7/20/27 Mon 7/26/27 Painting 556 Polished Concrete 5 days Tue 7/27/27 Mon 8/2/27 Polish Conc.

557 Remove & Replace Light Fixtures 5 days Tue 8/3/27 Mon 8/9/27 Electrical 558 Spot Replace 12x12 Ceiling Tiles 5 days Tue 8/10/27 Mon 8/16/27 Drywall 559 Casework & Ctops 5 days Tue 8/3/27 Mon 8/9/27 Casework 560 Install UVs 5 days Tue 8/3/27 Mon 8/9/27 HydroTemp 561 Electrical Finishes 5 days Tue 8/10/27 Mon 8/16/27 Electrical 562 Rubber Base 2 days Tue 8/10/27 Wed 8/11/27 Flooring 563 Install Markerboards & Tackboards 5 days Tue 8/10/27 Mon 8/16/27 Finishes 564 Door Hardware 5 days Tue 8/10/27 Mon 8/16/27 Finishes 565 Bulk Clean 2 days Tue 8/17/27 Wed 8/18/27 Final Clean 566 Punchlisth 2 days Thu 8/19/27 Fri 8/20/27 INFO 567 Punchlist Corrections 5 days Mon 8/23/27 Fri 8/27/27 Bremik 568 Ready for FF&E Move-In & Prep for Acedemic Start 1 day Mon 8/30/27 Mon 8/30/27 Holcomb 569 Roofing 285 days Mon 6/22/26 Fri 8/6/27 570 Roofing Summer 2026 50 days Mon 6/22/26 Mon 8/31/26 571 New Cafeteria and Kitchen Schedule 30 days Fri 10/23/26 Mon 12/7/26 572 Roofing Summer 2027 30 days Fri 6/25/27 Fri 8/6/27 573 2027 Summer 51 days Fri 6/18/27 Mon 8/30/27 574 HVAC Finishes 20 days Thu 7/8/27 Wed 8/4/27 575 New Gym AHU & Transition Ductwork 20 days Thu 7/8/27 Wed 8/4/27 HVAC 576 New Library AHU & Transition Ductwork 20 days Thu 7/8/27 Wed 8/4/27 HVAC 577 New Electric Heaters @ Corridors 10 days Thu 7/8/27 Wed 7/21/27 HVAC & Elec 578 Restroom & Custodial Exhaust Fans 5 days Thu 7/22/27 Wed 7/28/27 HVAC 579 Sitework Finishes 40 days Fri 6/18/27 Fri 8/13/27 580 Sitework - Replace Ex. Domestic Waterline 5 days Fri 6/18/27 Thu 6/24/27 Sitework 581 Sitework - Remove existing AC Pavement 3 days Fri 6/25/27 Tue 6/29/27 Sitework 582 Sitework - Prep for new AC pavement 2 days Thu 7/8/27 Fri 7/9/27 Sitework 583 Sitework - AC Paving 1 day Mon 7/12/27 Mon 7/12/27 Sitework 584 Playground Sub-Surface Prep (no rat slab) 15 days Fri 6/18/27 Fri 7/9/27 Playground 585 Playground Rubber Surface Tiles 15 days Mon 7/12/27 Fri 7/30/27 Playground

11/20 Music Room Corridor Wall Modifications New Exterior MDP Timeline

1/11 Install New Exterior MDP Gear 1/25 AHJ & PGE Green Sticker 1/28 PGE Meter Set & Makeups 2/11 New Ext. MDP Service Ready for Power Swap

Primary Power Switchover (Summer 2027) 6/18 Decom & Demo Ex. Electrical Service Gear 6/25 Install New Sub-Distribution Elec Gear 6/25 Remove Ex. Transformer & Conductors 6/30 Pull New Secondary Conductors

7/2 Sub Distribution Panel Make-Ups & Testing 7/7 Primary Bldg. Power Online

Classroom Renov. Seq. SQ2 (A119, A120, B119, B120, B101, B102 & C123 6/17 Remove Ex. Casework and all wall surfaces (Overtime) 6/18 Abate Drywall and Roof Opening for RH 6/21 Demo Exterior Stucco @ UV Openings 6/28 Re-Frame UV Sleeve Openings 6/23 MEP Wall Rough-In 6/23 Install Fire Sprinkler lines 6/23 Install RH Ductwork thru Roof 6/30 New Wall Blocking for TV

7/6 Inspection - Wall Cover 7/7 Acoustical Insulation 7/8 Inspection - Wall Cover 7/9 Drywall & Finish 7/20 Paint Walls 7/27 Polished Concrete

8/3 Remove & Replace Light Fixtures 8/10 Spot Replace 12x12 Ceiling Tiles 8/3 Casework & Ctops 8/3 Install UVs

8/10 Electrical Finishes 8/10 Rubber Base 8/10 Install Markerboards & Tackboards 8/10 Door Hardware 8/17 Bulk Clean 8/19 Punchlisth 8/23 Punchlist Corrections 8/30 Ready for FF&E Move-In & Prep for Acedemic Start

Roofing 6/22 Roofing Summer 2026

10/23 New Cafeteria and Kitchen Schedule 6/25 Roofing Summer 2027

2027 Summer HVAC Finishes

7/8 New Gym AHU & Transition Ductwork 7/8 New Library AHU & Transition Ductwork 7/8 New Electric Heaters @ Corridors 7/22 Restroom & Custodial Exhaust Fans

Sitework Finishes 6/18 Sitework - Replace Ex. Domestic Waterline 6/25 Sitework - Remove existing AC Pavement

7/8 Sitework - Prep for new AC pavement 7/12 Sitework - AC Paving

6/18 Playground Sub-Surface Prep (no rat slab) 7/12 Playground Rubber Surface Tiles

M M J S N J M M J S N J M M J S N J M M J S N J M M J S N J M M J S N J M M J S N J Half 1, 2025 Half 2, 2025 Half 1, 2026 Half 2, 2026 Half 1, 2027 Half 2, 2027 Half 1, 2028 Half 2, 2028 Half 1, 2029 Half 2, 2029 Half 1, 2030 Half 2, 2030 Half 1, 2031 Half 2, 2031 Half 1, 2032

Holcomb Elementary School Renovations Project Coordination Timeline

Published: Tue 4/14/26

586 Playground Equipment Upgrades 10 days Mon 8/2/27 Fri 8/13/27 Playground 587 Playground WQ Facility 20 days Mon 7/12/27 Fri 8/6/27 Sitework 588 Site Fencing 2 days Mon 8/9/27 Tue 8/10/27 Fencing 589 Site Lighting Upgrades 5 days Fri 6/18/27 Thu 6/24/27 Electrical 590 Sealcoat & Stripe Parking Lot 5 days Tue 7/13/27 Mon 7/19/27 Site Finishes 591 Classroom Finish Upgrades B104-B108 46 days Fri 6/25/27 Mon 8/30/27 592 Remove Ex. Casework and all wall surfaces 1 day Fri 6/25/27 Fri 6/25/27 Classroom Finish 593 Remove Drywall and ACT for Roof Opening for RH 3 days Mon 6/28/27 Wed 6/30/27 Classroom Finish 594 MEP Wall Rough-In 5 days Thu 7/1/27 Thu 7/8/27 Classroom Finish 595 Install RHs 3 days Thu 7/1/27 Tue 7/6/27 Classroom Finish 596 Remove Ex. Casework and all wall surfaces 5 days Wed 7/7/27 Tue 7/13/27 Classroom Finish 597 Drywall Patching 4 days Wed 7/14/27 Mon 7/19/27 Classroom Finish 598 Remove & Replace Light Fixtures 3 days Tue 7/20/27 Thu 7/22/27 Classroom Finish 599 Polished Concrete 10 days Fri 7/23/27 Thu 8/5/27 Classroom Finish 600 Install New Casework & Ctops 5 days Fri 8/6/27 Thu 8/12/27 Classroom Finish 601 Install HVAC 6 days Fri 8/6/27 Fri 8/13/27 602 Repair ACT Ceiling 3 days Mon 8/16/27 Wed 8/18/27 Classroom Finish 603 Paint Walls 5 days Thu 8/19/27 Wed 8/25/27 Classroom Finish 604 Rubber Base 1 day Thu 8/19/27 Thu 8/19/27 Classroom Finish 605 Install Markerboards & Tackboards 2 days Thu 8/26/27 Fri 8/27/27 Classroom Finish 606 Door Hardware 1 day Mon 8/30/27 Mon 8/30/27 Classroom Finish 607 Classroom Finish Upgrades B101, B102, C123 35 days Fri 6/25/27 Fri 8/13/27 608 Remove Ex. Casework and all wall surfaces 1 day Fri 6/25/27 Fri 6/25/27 Classroom Finish 609 Remove Drywall 3 days Mon 6/28/27 Wed 6/30/27 Classroom Finish 610 MEP Wall Rough-In 4 days Thu 7/1/27 Wed 7/7/27 Classroom Finish 611 Drywall Patching 5 days Thu 7/8/27 Wed 7/14/27 Classroom Finish 612 Remove & Replace Light Fixtures 1 day Thu 7/15/27 Thu 7/15/27 Classroom Finish 613 Polished Concrete 7 days Fri 7/16/27 Mon 7/26/27 Classroom Finish 614 Install New Casework & Ctops 3 days Tue 7/27/27 Thu 7/29/27 Classroom Finish 615 Install Fire Sprinkler lines 3 days Fri 7/30/27 Tue 8/3/27 Classroom Finish 616 Paint Walls & Ceiling Tiles 3 days Wed 8/4/27 Fri 8/6/27 Classroom Finish 617 Rubber Base 1 day Mon 8/9/27 Mon 8/9/27 Classroom Finish 618 Install Markerboards & Tackboards 2 days Tue 8/10/27 Wed 8/11/27 Classroom Finish 619 Door Hardware 2 days Thu 8/12/27 Fri 8/13/27 Classroom Finish 620 Classroom Finish Upgrades A119, A123, A126, B119, B120 28 days Fri 6/25/27 Wed 8/4/27 621 Remove Ex. Casework and all wall surfaces 1 day Fri 6/25/27 Fri 6/25/27 Classroom Finish 622 Remove Drywall 2 days Mon 6/28/27 Tue 6/29/27 Classroom Finish 623 MEP Wall Rough-In 3 days Wed 6/30/27 Fri 7/2/27 Classroom Finish 624 Drywall Patching 3 days Tue 7/6/27 Thu 7/8/27 Classroom Finish 625 Remove & Replace Light Fixtures 1 day Fri 7/9/27 Fri 7/9/27 Classroom Finish 626 Polished Concrete 7 days Mon 7/12/27 Tue 7/20/27 Classroom Finish 627 Install New Casework & Ctops 3 days Wed 7/21/27 Fri 7/23/27 Classroom Finish 628 Install Fire Sprinkler lines 2 days Mon 7/26/27 Tue 7/27/27 Classroom Finish 629 Paint Walls & Ceiling Tiles 3 days Wed 7/28/27 Fri 7/30/27 Classroom Finish 630 Rubber Base 1 day Mon 8/2/27 Mon 8/2/27 Classroom Finish 631 Install Markerboards & Tackboards 1 day Tue 8/3/27 Tue 8/3/27 Classroom Finish 632 Door Hardware 1 day Wed 8/4/27 Wed 8/4/27 Classroom Finish 633 Gang Restroom Renovations (Center RRs) 46 days Fri 6/18/27 Mon 8/23/27 634 Demolition of Restroom Fixtures and Slab 5 days Fri 6/18/27 Thu 6/24/27 Demolition 635 CMU wall Footing (Form/Pour/Strip) 3 days Fri 6/25/27 Tue 6/29/27 Concrete 636 Infill CMU Wall Openings 2 days Wed 6/30/27 Thu 7/1/27 CMU 637 Excavate & Plumbing Underground 5 days Fri 7/2/27 Fri 7/9/27 MEP 638 Construct & Pour Conc. Slab 5 days Mon 7/12/27 Fri 7/16/27 Concrete 639 MEPF Ceiling Rough-in 5 days Mon 7/19/27 Fri 7/23/27 MEP 640 Drywall & Finishes 5 days Mon 7/26/27 Fri 7/30/27 Drywall 641 Interior Painting 3 days Mon 8/2/27 Wed 8/4/27 Painting 642 Light Fixtures 2 days Thu 8/5/27 Fri 8/6/27 Electrical

8/2 Playground Equipment Upgrades 7/12 Playground WQ Facility

8/9 Site Fencing 6/18 Site Lighting Upgrades

7/13 Sealcoat & Stripe Parking Lot Classroom Finish Upgrades B104-B108

6/25 Remove Ex. Casework and all wall surfaces 6/28 Remove Drywall and ACT for Roof Opening for RH

7/1 MEP Wall Rough-In 7/1 Install RHs 7/7 Remove Ex. Casework and all wall surfaces

7/14 Drywall Patching 7/20 Remove & Replace Light Fixtures 7/23 Polished Concrete

8/6 Install New Casework & Ctops 8/6 Install HVAC 8/16 Repair ACT Ceiling 8/19 Paint Walls 8/19 Rubber Base 8/26 Install Markerboards & Tackboards 8/30 Door Hardware

Classroom Finish Upgrades B101, B102, C123 6/25 Remove Ex. Casework and all wall surfaces 6/28 Remove Drywall

7/1 MEP Wall Rough-In 7/8 Drywall Patching

7/15 Remove & Replace Light Fixtures 7/16 Polished Concrete 7/27 Install New Casework & Ctops 7/30 Install Fire Sprinkler lines

8/4 Paint Walls & Ceiling Tiles 8/9 Rubber Base

8/10 Install Markerboards & Tackboards 8/12 Door Hardware

Classroom Finish Upgrades A119, A123, A126, B119, B120 6/25 Remove Ex. Casework and all wall surfaces 6/28 Remove Drywall 6/30 MEP Wall Rough-In

7/6 Drywall Patching 7/9 Remove & Replace Light Fixtures

7/12 Polished Concrete 7/21 Install New Casework & Ctops 7/26 Install Fire Sprinkler lines 7/28 Paint Walls & Ceiling Tiles

8/2 Rubber Base 8/3 Install Markerboards & Tackboards 8/4 Door Hardware

Gang Restroom Renovations (Center RRs) 6/18 Demolition of Restroom Fixtures and Slab 6/25 CMU wall Footing (Form/Pour/Strip) 6/30 Infill CMU Wall Openings

7/2 Excavate & Plumbing Underground 7/12 Construct & Pour Conc. Slab 7/19 MEPF Ceiling Rough-in 7/26 Drywall & Finishes

8/2 Interior Painting 8/5 Light Fixtures

M M J S N J M M J S N J M M J S N J M M J S N J M M J S N J M M J S N J M M J S N J Half 1, 2025 Half 2, 2025 Half 1, 2026 Half 2, 2026 Half 1, 2027 Half 2, 2027 Half 1, 2028 Half 2, 2028 Half 1, 2029 Half 2, 2029 Half 1, 2030 Half 2, 2030 Half 1, 2031 Half 2, 2031 Half 1, 2032

Holcomb…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .