Att D OCHS CTE_PERMIT SET.pdf
PDF 39 MB Posted
- Solicitation number
- S-P03062-00016905
- Issued by
- Clackamas County, Oregon
About this file
This is a permit set of architectural drawings for the Oregon City High School Career and Technical Education (CTE) renovation project, a collaborative effort between Oregon City School District No. 62, BRIC Architecture Inc. (architect), KPFF (structural engineer), Interface Engineering (mechanical, plumbing, fire protection, and electrical engineers), Coffman Engineers (audio/visual and technology design), and Otak CPM (project management). The project involves the renovation of existing faculty spaces and classroom areas into career technology vocational training spaces and a college and career center at 19761 S Beavercreek Road, Oregon City, OR 97045. The scope includes four primary vocational classroom areas (Intro to Robotics, Intro to Digital Media, JROTC, and Intro to Trades), support spaces (production studio, control room, podcasting/recording room, storage areas, and offices), and related building systems modifications. The permit set comprises comprehensive architectural plans including floor plans, reflected ceiling plans, interior elevations, casework details, signage plans, and wall type specifications across two levels, with demolition plans indicating removal of existing fixtures, finishes, and non-structural elements while maintaining structural integrity of the existing 2004-constructed facility. The project is classified as Group E Educational Occupancy under Oregon Structural Specialty Code (OSSC) 2022, utilizing Type II-A construction and including automatic sprinkler systems and fire alarm modifications.
The design incorporates specialized acoustic assemblies with Sound Transmission Class (STC) ratings of 50-56 for noise-sensitive areas, impact-resistant gypsum board up to 4 feet above finished floor throughout, multiple wall types ranging from single-layer to double-layer configurations with acoustic insulation, and various finish materials including polished concrete, carpet tile, sheet linoleum, and rubber base. Interior finishes feature plastic laminate casework, laboratory-grade compact laminate countertops in specific areas, acoustic wall panels, tackable surfaces, and custom perforated metal panels. The project includes custom dimensional signage with perforated channel lettering, specialized window coverings (roller and blackout shades), and multiple casework types with adjustable shelving and fixed components. Building systems modifications encompass mechanical, plumbing, electrical, and technology infrastructure updates to support the new educational uses, with references to delegated design components requiring deferred submittals in structural, mechanical, plumbing, electrical, and audio-visual categories. The permit set indicates this is a renovation project that does not increase the building's overall square footage and maintains all existing exits, with construction documents dated January 30, 2026.
View the file
Other files
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
A
ROOM NAME & NUMBER
STOREFRONT OR
WINDOW TYPE
KEYNOTE REFERENCE
CEILING PLANE HEIGHT -
ALL REFERENCES TO FINISH
FLOOR ELEVATION
INTERIOR FINISH TYPE
HORIZONTAL ELEVATION
PLANE HEIGHT -
ALL REFERENCES TO
F.F. ELEVATION
SPOT ELEVATION -
ALL REFERENCES TO
F.F. ELEVATION UNO
DOOR NUMBER -
SEE DOOR SCHEDULE
RELITE NUMBER -
SEE RELITE SCHEDULE
GRID LINE
BUILDING
SECTION
EXTERIOR
ELEVATION
INTERIOR
ELEVATION
REVISION CLOUD
ENLARGED PLAN /
DETAIL
DETAIL SECTION0' - 0"
TB-1
0'-0"
LEVEL 1
N U
M
BE
R
A101
A101
REV #
A3.01
A5.01
1A
1B
1C
1D
WALL SECTION1
A101
SIM
SIM
NORTH ARROW
MATCHLINE
MATCHLINE SEE A0.11
1t
Room name
NUMBER
SHEET NORTH
PROJECT NORTH
0'-0" T.O.S.
FRAMELESS RELITE NUMBER -
SEE RELITE SCHEDULE
NUMBER
A101
A101
WALL TYPEA1
CL
ACT
ADA
ADD
AESS
AFF
AHJ
ALUM
ANOD
BD
BLDG
BLKG
BM
BO
BOD
BTWN
CAB
CG
CIP
CL
CLG
CLR
CJ
CMU
CONT
CSJ
CSMT
CT
CTR
DBL
DTL
DF
DIA
DIAG
DIM
DN
DR
DS
DW
DWG
(E)
EA
EF
ANGLE
AND
ACOUSTICAL CEILING TILE
AMERICANS WITH DISABILITY
ACT STANDARDS (2010)
ADDENDUM
ARCHITECTURAL EXPOSED
STRUCTURAL STEEL
ABOVE FINISH FLOOR
AUTHORITY HAVING
JURISDICTION
ALUMINUM
ANODIZED
BOARD
BUILDING
BLOCKING
BENCH MARK
BOTTOM OF
BOTTOM OF DECK
BETWEEN
CONTINUOUS AIR BARRIER
CORNER GUARD
CAST IN PLACE CONCRETE
CENTERLINE
CEILING
CLEAR
CONTROL JOINT
CONCRETE MASONRY UNIT
CONTINUOUS
CONSTRUCTION JOINT
CASEMENT
CERAMIC TILE
CENTER
CENTERLINE
DOUBLE
DETAIL
DRINKING FOUNTAIN
DIAMETER
DIAGONAL
DIMENSION
DOWN
DOOR
DOWNSPOUT
DISHWASHER
DRAWING
EXISTING
EACH
EXHAUST FAN
EJ
EL
ELEC
EJC
EOS
ENGR
EQ
EQUIP
ES
EXP
EXT
FA
FD
FDN
FE
FEC
FECB
FF
FIN
FL
FO
FOC
FOF
FOM
FOS
FRT
FTG
FURR
GA
GALV
GB
GC
GL
GND
GVP
GYP
HB
HM
HPC
HVAC
HW
INSUL
INT
IFP
EXPANSION JOINT
ELEVATION
ELECTRICAL
EXPANSION JOINT COVER
EDGE OF SLAB
ENGINEER
EQUAL
EQUIPMENT
EACH SIDE
EXPANSION
EXTERIOR
FIRE ALARM
FLOOR DRAIN
FOUNDATION
FIRE EXTINGUISHER
FIRE EXTINGUISHER CABINET
FIRE EXTINGUISHER CABINET
W/ BLANKET
FINISH FLOOR
FINISH
FLOOR
FACE OF
FACE OF CONCRETE
FACE OF FINISH
FACE OF MASONRY
FACE OF STUD/STRUCTURE
FIRE RETARDANT TREATED
FOOTING
FURRING
GAUGE/GAGE
GALVANIZED
GRAB BAR
GENERAL CONTRACTOR
GLASS/GLAZING
GROUND
GYPSUM VENEER PLASTER
GYPSUM
HOSE BIBB
HOLLOW METAL
HIGH PERFORMANCE COATING
HEATING, VENTILATION AND
AIR CONDITIONING
HOT WATER
INSULATION
INTERIOR
INTUMESCENT FIRE
PROTECTION
JT
JST
LAV
LKR
LVR
MATL
MB
MAX
MECH
MEZZ
MFR
MIN
MISC
MTD
MO
MTL
(N)
NA
NIC
NOM
NTS
OA
OC
OD
OFCI
OFD
OFOI
OH
OPNG
OPP
OS
PL
PLAM
PLAS
PLYWD
PT
PVMT
R
RD
REF
REFR
REQ'D
REV
RO
RT
RCP
JOINT
JOIST
LAVATORY
LOCKER
LOUVER
MATERIAL
MARKERBOARD
MAXIMUM
MECHANICAL
MEZZANINE
MANUFACTURER
MINIMUM
MISCELLANEOUS
MOUNTED
MASONRY OPENING
METAL
NEW
NOT APPLICABLE
NOT IN CONTRACT
NOMINAL
NOT TO SCALE
OVERALL
ON CENTER
OUTSIDE DIAMETER
OWNER FURNISHED
CONTRACTOR INSTALLED
OVERFLOW DRAIN
OWNER FURNISHED OWNER
INSTALLED
OVERHEAD
OPENING
OPPOSITE
OUTSIDE
PROPERTY LINE
PLASTIC LAMINATE
PLASTER
PLYWOOD
PRESSURE TREATED
PAVEMENT
RADIUS
ROOF DRAIN
REFERENCE
REFRIGERATOR
REQUIRED
REVISE OR REVISION
ROUGH OPENING
ROOF TIE-OFF
REFLECTED CEILING PLAN
ARCHITECTURAL ABBREVIATIONS ARCHITECTURAL SYMBOLSROOM ABBREVIATIONS
CR
CORR
ELEC
IDF
LG
MP
OFC
RR
RM
SM
ST
STOR
STR
U
CLASSROOM
CORRIDOR
ELECTRICAL
INTERMEDIATE DISTRIBUTION FRAME
LARGE
MULTI-PURPOSE
OFFICE
RESTROOM
ROOM
SMALL
STAFF TOILET
STORAGE
STAIR
UTILITY
SAHTS
SAM
SC
SECT
SF
SFRM
SHTG
SHWR
SHT
SIM
SJ
SOG
SQ
SS
STD
STL
STRUCT
SUSP
T/M
THK
TLT
TO
TOC
TOD
TOS
TJ
TP
TS
TYP
T&G
UNFIN
UNO
VB
VERT
VIF
VR
VFY
W/ W/O
WC
WD
WF
WH
WP
WRB
WT
SELF ADHERED HIGH
TEMPERATURE SHEET
SELF-ADHERED MEMBRANE
SOLID CORE
SECTION
SQUARE FOOT
SPRAY-APPLIED FIRE
RESISTIVE MATERIALS
SHEATHING
SHOWER
SHEET
SIMILAR
SEISMIC JOINT
SLAB ON GRADE
SQUARE
STAINLESS STEEL
STANDARD
STEEL
STRUCTURAL
SUSPENDED
TO MATCH
THICK
TOILET
TOP OF
TOP OF CURB
TOP OF DECK
TOP OF STRUCTURE
TOOL JOINT
TOILET PAPER
TUBE STEEL
TYPICAL
TONGUE AND GROOVE
UNFINISHED
UNLESS NOTED OTHERWISE
VAPOR BARRIER
VERTICAL
VERIFY IN FIELD
VAPOR RETARDER
VERIFY
WITH
WITHOUT
WATER CLOSET
WOOD
WIDE FLANGE
WATER HEATER
WATERPROOFING
WATER-RESISTIVE BARRIER
WEIGHT
VICINITY MAP
PERMIT SET
LIST IS NOT INCLUSIVE; OTHER ABBREVIATIONS MAY DEFINED BY DISCIPLINE OR BY INDIVIDUAL SHEET. WHERE IN CONFLICT, SUCH ABBREVIATIONS SUPERCEDE THOSE INDICATED IN THIS LIST.
JAN 30, 2026
DELEGATED DESIGN
Au tod es k D oc s:/
/25
3-
4 O
CH
S
CT
E Re no /O
CS
D
Or eg on C ity H
S
EC
.rv t
OREGON CITY HIGH SCHOOL CTE
OREGON CITY SCHOOL DISTRICT
19761 S BEAVERCREEK RD, OREGON CITY, OR 97045
PROJECT # 25003-154
ARCHITECTURE
A0.03 CODE ANALYSIS - LEVEL 1
A0.05 WALL TYPES & ACOUSTIC ASSEMBLIES
A0.11 OVERALL FLOOR PLAN - LEVEL 1
A0.12 OVERALL FLOOR PLAN - LEVEL 2
A1.11 DEMO PLANS
A1.12 DEMO PLANS
A1.21 DEMO REFLECTED CEILING PLANS
A1.22 DEMO REFLECTED CEILING PLANS
A2.11 FLOOR PLANS
A2.12 FLOOR PLANS
A4.11 FINISH FLOOR PLANS
A4.12 FINISH FLOOR PLANS
A5.01 INTERIOR ELEVATIONS - HALLWAYS
A5.20 INTERIOR ELEVATIONS - SECTOR B
A5.30 INTERIOR ELEVATIONS - SECTOR C
A5.40 INTERIOR ELEVATIONS - SECTOR D
A5.90 INTERIOR ELEVATIONS - SECTOR J
A6.11 REFLECTED CEILING PLANS
A6.12 REFLECTED CEILING PLANS
A8.01 DOORS AND RELITES
A9.10 CASEWORK DETAILS
A9.11 CASEWORK DETAILS
A9.12 CASEWORK DETAILS
A9.20 INTERIOR DETAILS - FLOORS AND MOBILE CASEWORK
A9.30 INTERIOR DETAILS - WALLS
A9.31 INTERIOR DETAILS - CEILINGS
A9.70 SIGNAGE PLAN
A9.71 SIGNAGE TYPES AND SCHEDULE
MECHANICAL
M0.01 SYMBOL LIST AND GENERAL NOTES - MECHANICAL
M0.02 SCHEDULES - MECHANICAL
M0.11 OVERALL FLOOR - LEVEL 1 - MECHANICAL
M0.12 OVERALL FLOOR PLAN - LEVEL 2 - MECHANICAL
M1.11 DEMO PLANS - MECHANICAL
M1.12 DEMO PLANS - MECHANICAL
M2.11 FLOOR PLANS - MECHANICAL
M2.12 FLOOR PLANS - MECHANICAL
M7.01 DETAILS - MECHANICAL
PLUMBING
P0.01 SYMBOL LIST AND GENERAL NOTES - PLUMBING
P0.02 SCHEDULES - PLUMBING
P0.11 OVERALL FLOOR PLAN - LEVEL 1 - PLUMBING
P0.12 OVERALL FLOOR PLAN - LEVEL 2 - PLUMBING
P1.11 DEMO PLANS - PLUMBING
P1.12 DEMO PLANS - PLUMBING
P2.11 FLOOR PLANS - PLUMBING
P2.12 FLOOR PLANS - PLUMBING
ELECTRICAL
E0.01 SYMBOL LIST AND GENERAL NOTES - ELECTRICAL
E0.02 LUMINAIRE SCHEDULE - ELECTRICAL
E0.11 OVERALL FLOOR PLAN - LEVEL 1 - ELECTRICAL
E0.12 OVERALL FLOOR PLAN - LEVEL 2 - ELECTRICAL
E1.11 DEMO PLANS - POWER & SIGNAL
E1.12 DEMO PLANS - POWER & SIGNAL
E1.21 DEMO REFLECTED CEILING PLANS - LIGHTING
E1.22 DEMO REFLECTED CEILING PLANS - LIGHTING
E2.11 FLOOR PLANS - POWER & SIGNAL
E2.12 FLOOR PLANS - POWER & SIGNAL
E6.11 REFLECTED CEILING PLANS - LIGHTING
E6.12 REFLECTED CEILING PLANS - LIGHTING
E9.01 PANEL SCHEDULES - ELECTRICAL
E9.02 PANEL SCHEDULES - ELECTRICAL
1.
2.
3.
4.
5.
6.
Seismic Anchorage of Architectural Wood Casework, Section 06 41 00.
Firestopping, Section 07 84 00.
Seismic Anchorage for Acoustic Ceilings, Section 09 51 00
Seismic Anchorage for Mechanical, Plumbing, and Electrical Equipment and Components, Divisions 21, 22, 23, 26, 27, and 28.
Fire Suppression, Division 21.
Fire Alarm Systems, Division 28.
Oregon City School District 1417 12th St.
Oregon City, Oregon 97045 t: (503) 785 8531
David Hobbs owner
Otak CPM 808 SW Third Ave., Suite 800
Portland, Oregon 97204 t: (503) 287 6825 Brian Hardebeck project manager
KPFF
111 SW 5th Ave., Suite 2500
Portland, Oregon 97204 t: (503) 764 0531 Paige Kabusreiter structural engineer
Interface Engineering 100 SW Main St Suite 1600
Portland, Oregon 97204 t: (503) 382 2266
Jim McClelland mechanical engineer
Interface Engineering 100 SW Main St Suite 1600
Portland, Oregon 97204 t: (503) 382 2266
Todd Kolibaba plumbing engineer
Interface Engineering 100 SW Main St Suite 1600
Portland, Oregon 97204 t: (503) 382 2266
Jane Jackson fire protection engineer
Interface Engineering 100 SW Main St Suite 1600
Portland, Oregon 97204 t: (503) 382 2266
Kristin Melling electrical engineer
Interface Engineering 100 SW Main St Suite 1600
Portland, Oregon 97204 t: (503) 382 2266
Todd Shenbeck technology & low voltage
Coffman Engineers 1101 2nd Ave., Suite 400
Seattle, Washington 98101 t: (206) 623 0717
Jaimie Penzell acoustical engineer
Julie Jenson / graphic design 1209 N. Morgan St.
Portland, Oregon 97217 t: (503) 545 4968
Julie Jenson graphic design
BRIC Architecture Inc.
1233 NW Northrup Street, Suite 100
Portland, Oregon 97209 t: (503) 595 4900
BRIC Contact architect
STRUCTURAL
S0.01 DRAWING INDEX AND LIST OF ABBREVIATIONS
S0.02 GENERAL STRUCTURAL NOTES
S0.03 SPECIAL INSPECTIONS AND TESTING
S0.04 LIVE LOADING PLANS
S0.11 OVERALL PLAN - LEVEL 1
S0.12 OVERALL PLAN - LEVEL 2
S2.11 PARTIAL PLANS
S2.12 PARTIAL PLANS
S6.01 DETAILS
S6.02 DETAILS
DELEGATED DESIGN COMPONENTS WHICH REQUIRE
DEFERRED SUBMITTALS INCLUDE, BUT NOT LIMITED
TO, THE FOLLOWING:
Coffman Engineers 1101 2nd Ave., Suite 400
Seattle, Washington 98101 t: (206) 623 0717
John Hardwich audio & visual design
AUDIO VISUAL
AV0.01 PRODUCTION STUDIO LEGENDS
AV2.11 PRODUCTION STUDIO AV SYSTEMS PLANS
AV3.0 PRODUCTION STUDIO AV SYSTEM DETAILS
AV5.30 PRODUCTION STUDIO AV SYSTEM ELEVATIONS
AV10.1 PRODUCTION STUDIO BLOCK DIAGRAM
UP
DN
DN
LEGEND
EXISTING 1 HOUR FIRE RATED ASSEMBLY
EXISTING 2 HOUR FIRE RATED ASSEMBLY
AREA NOT IN SCOPE
AREA OF ALTERATION
OCCUPANTS
NUMBER OF OCCUPANTS & DIRECTION OF TRAVEL
ACCESSORIES OCCUPANCIES: (OCCUPANTS NOT
INCLUDED IN OCCUPANT LOAD FOR EXITING)
980 20 49 1
ROOM NAME
(FUNCTION OF SPACE
PER TABLE 1004.5)
EXIT CALCULATIONS
A 184
EXIT OCCUPANT
LOAD
REQUIRED
WIDTH
(INCHES)*
PROVIDED
WIDTH
(INCHES)
NOTES
B
REQUIRED EGRESS COMPONENT WIDTH WITH SPRINKLER SYSTEM PER OSSC
1005.3.2 EXCEPTION 1: OCCUPANT LOAD X 0.15 = MIN. WIDTH
*32" MIN AT 49 OR FEWER OCCUPANTS; 44" MIN AT 50 OR MORE OCCUPANTS
C
D
PATH OF EGRESS TO AN EXIT (TRAVEL DISTANCE
NOTED IN (XX') EQUALS TOTAL DISTANCE FOR
ROUTE) MAX. DISTANCE OF 250' PER TABLE 1017.2
XX'
X
EXIT SIGN LOCATIONS
(ARROWS INDICATE DIRECTIONAL EXIT SIGN)
SEE EXIT CALCULATIONS
FEC-1, FEC-2 FIRE EXTINGUISHER WITH CABINET
ROOM
AREA
OCCUPANT LOAD
FACTOR (TABLE 1004.1.2)
# OF EXITS REQUIRED
U: UTILITY, MEP, CUSTODIAL USE
S: STORAGE USE
T: TOILET ROOMS
*U *S *T
F
G
E
398 59.7
397 59.55
196 29.4
197 29.55
326 48.9
212 31.8
212 31.8
H 325 48.75 68
I 100 15 40
J
K
54 8.1
17 2.55
L
M
38 5.7
4 0.6
N 1 0.15 68
DIGITIAL MEDIA STUDIO
(VOCATIONAL)
INTRO TO ROBOTICS
(VOCATIONAL)
INTRO TO TRADES
(VOCATIONAL)
JROTC
(EXERCISE)
STORAGE
(STORAGE)
CONTROL ROOM
(VOCATIONAL)
PODCASTING
(VOCATIONAL)
STORAGE
(STORAGE)
STORAGE
(STORAGE)
OFFICE
(BUSINESS)
*U
*T *U
*T
*T
*S
*U
*T
*U
*T
*T
*T
*T
*T *U
*S
*S
*T
*T
ELEV
*T
*T
*U
*S *U
*U
G
F
H
E
D
C
A
*S
*S *S
*S
*S
B
325 326
100I
BB
AA
CC
EE
DD
ft
47 ft
AREA NOT IN SCOPEAREA NOT IN SCOPE
98 1
(E) 2-HR RATED
ASSEMBLIES AT
STRUCTURAL WALLS, TYP.
AT NONCONTINOUS
RATED WALLS.
J
D C
B E
CODE SUMMARY
APPLICABLE CODES
OREGON STRUCTURAL SPECIALTY CODE (OSSC) 2022
USE & OCCUPANCY
GROUP E
EXISTING HIGH SCHOOL BUILDING. REMODEL SCOPE INCLUDES
RENOVATION OF EXISTING FACULTY SPACES AND A CLASSROOM
TO CAREER TECHNOLOGY VOCATIONAL TRAINING SPACES AND A
COLLEGE AND CAREER CENTER. ALL EXISTING EXITS ARE
EXISTING TO REMAIN IN RENOVATION SCOPE.
FIRE PROTECTION
(E) AUTOMATIC SPRINKLER SYSTEM PER NFPA 13.
FIRE ALARM SYSTEM
(E) FIRE ALARM SYSTEM PRESENT.
ALLOWABLE AREA
SUMMARY:
BUILDING IS AN EXISTING SINGLE-STORY & DOUBLE STORY
COMBUSTABLE & NONCOMBUSTABLE CONSTRUCTION. ORIGINAL
BUILDING CONSTRUCTED 2004.
USE & OCCUPANCY:
EDUCATIONAL GROUP E
CONSISTING OF CLASSROOMS, CAFETERIA, AUDITORIUM &
GYMNASIUM.
CONSTRUCTION TYPE:
EXISTING CONDITION IN AREA OF WORK: TYPE II-A PER TABLE 601
REMODEL DOES NOT INCREASE SQUARE FOOTAGE OF BUILDING.
PORTLAND, OREGON
E
RE
DAVID A. JOHNSON
T
AT T
S
G
RE
SI
HC
OGEROOF
N
E
TC
TI
RADE
date phase revisions date project
1/2 9/2
6 4
:16 :03
P M
Au tod es k D oc s:/
/25
3-
4 O
CH
S
CT
E Re no /O
CS
D
Or eg on C ity H
S
EC
.rv t
A0.03
CODE ANALYSIS - LEVEL 1
OR
EG
ON
C
IT
Y
HI
GH
SC
HO
OL
C
TE
T
5-
5-
OR
EG
ON
C
IT
Y
SC
HO
OL
D
IS
TR
IC
T
1/30/2026 25003-154
1 S B
EA
VE
RC
RE
EK
R
D, O
RE
GO
N
CI
TY
, O
R
PERMIT SET
SCALE: 3/64" = 1'-0" 1EGRESS PLAN - LEVEL 1
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
ENTIRE WALL ASSEMBLY SHALL EXTEND TO UNDERSIDE OF ROOF
OR FLOOR DECK ABOVE, UNLESS NOTED OTHERWISE.
SEE INTERIOR ELEVATIONS FOR LOCATION AND EXTENT OF APPLIED
WALL FINISHES.
EXTEND SOUND BATT INSULATION FULL HEIGHT OF WALL
ASSEMBLIES UNLESS NOTED OTHERWISE.
SEE STRUCTURAL DRAWINGS FOR WALL STUD SPACING.
PROVIDE MOISTURE RESISTANT GYPSUM BOARD ON ALL WALLS OF
TOILET ROOMS, KITCHEN AREAS, JANITOR CLOSETS AND BEHIND
DRINKING FOUNTAINS.
EXTEND ASSEMBLIES FOR FIRE RATED WALLS FROM STRUCTURAL
FLOOR TO UNDERSIDE OF FLOOR OR ROOF ABOVE UNLESS
SPECIFICALLY NOTED OTHERWISE. ALL OPENINGS SHALL BE
PROTECTED AS REQUIRED BY CODE.
AT FIREWALLS AND SMOKE BARRIERS ABOVE ACCESSIBLE CEILINGS,
PROVIDE IDENTIFICATION SIGNAGE, SPACED AT NOT MORE THAN 30
FEET MEASURED HORIZONTALLY, INDICATING “FIRE AND/OR SMOKE
BARRIER - PROTECT ALL OPENINGS”. SEE SIGNAGE TYPES.
PROVIDE FIRE BLOCKING IN CONCEALED SPACES OF STUD WALLS
AND PARTITIONS VERTICALLY AT THE CEILING AND FLOOR LEVELS
AND HORIZONTALLY AT INTERVALS NOT EXCEEDING 10 FEET.
SEE A0.05 FOR TYP. WALL INTERSECTION AND PENETRATION
DETAILS.
FOR STC ACOUSTIC WALLS, SEAL ALL PENETRATIONS AND GAPS
WITH ACOUSTIC SEALANT.
DO NOT INSTALL BACK-TO-BACK OUTLETS IN A WALL CAVITY. SEAL
ALL OPENINGS IN ELECTRICAL BOXES.
ALL NEW WALLS TO HAVE IMPACT RESISTANT WALLS UP TO 4'-0"
AFF.
WALL TYPES NOTES:
(1) LAYER TYPE "X" GYPSUM
BOARD BOTH SIDES (5/8"
UNO). IMPACT RESTISTANT
GYP BD UP TO 4' AFF.
FILL CAVITY WITH
ACOUSTIC INSULATION
METAL STUD FRAMING
FRAMING SIZES:
1a = 3.5" METAL STUDS 1b = 6" METAL STUDS 1c = 8" METAL STUDS
(2) LAYERS TYPE "X" GYPSUM
BOARD BOTH SIDES (5/8" UNO).
OUTSIDE LAYER IMPACT
RESISTANT GYP BD UP TO 4' AFF.
STAGGERED JOINTS.
FILL CAVITY WITH
ACOUSTIC INSULATION
METAL STUD FRAMING
FRAMING SIZES:
2a = 3.5" METAL STUDS 2b = 6" METAL STUDS 2c = 8" METAL STUDS
STC 54-56
(1) LAYER TYPE "X" GYPSUM
BOARD (5/8" UNO). IMPACT
RESISTANT GYP BD UP TO 4' AFF,
UNLESS WALL TYPE 3a*
FILL CAVITY WITH
ACOUSTIC INSULATION
METAL STUD FRAMING
FRAMING SIZES:
3a = 3.5" METAL STUDS 3a* = 3.5" METAL STUDS 3b = 6" METAL STUDS 3c = 8" METAL STUDS
1"
EXISTING WALL, FACE OF
FINISH WHERE OCCURS
WALL TYPE 3a* ADDITIONAL
LAYER TYPE "X" GYPSUM BOARD,
IMPACT RESISTANT GYP BD UP
TO 4' AFF. STAGGERED JOINTS.
MATCH (E) LAYERS TYPE "X"
GYPSUM BOARD BOTH SIDES
(5/8" UNO). OUTSIDE LAYER OF
GYP BD IMPACT RESISTANT
GYP BD UP TO 4' AFF.
STAGGER JOINTS WHERE (2)
LAYERS.
FILL CAVITY WITH
ACOUSTIC INSULATION
METAL STUD FRAMING
SIZE TO MATCH (E)
1" THICK MINIMUM 1.5 PCF
DENSITY GLASS OR MINERAL
FIBER
DUCT, SEE MECHANICAL
BACKER ROD WITH (2)
CONTINUOUS BEADS OF
ACOUSTIC SEALANT
AROUND FULL PERIMETER
OF PENETRATION
TYPICAL DUCT INSULATION,
SEE MECHANICAL
1" 1"
NOTE: MAINTAIN MINIMUM
5" SEPARATION BETWEEN
PENETRATIONS
SEE WALL TYPES
NOTE: SEE PLANS FOR
WALL TYPE CONSTRUCTION
24" MIN.
PROVIDE OUTLET BOX PAD
APPLIED TO BACK OF BOXES,
TYP
CONTINUOUS BEAD OF
SEALANT AROUND FULL
PERIMETER, TYP.
PLUG ALL UNUSED HOLES
WITH KNOCK-OUT CAPS,
TYP.
FLEXIBLE CONDUIT WITH 6"
SLACK PER 24" RUN
NOTE: SEE PLANS FOR WALL
TYPE CONSTRUCTION
CONTINUOUS BEADS
OF ACOUSTIC
SEALANT AT EDGES
OF GYPSUM BOARD,
MAXIMUM 1/4" GAP
CLEARANCE
TY
P
1/ 4"
M
AX
NOTE: SEE PLANS
FOR WALL TYPE
CONSTRUCTION
1" THICK MINIMUM 1.5 PCF
DENSITY GLASS OR MINERAL
FIBER
PIPE, SEE MECH,
PLUMBING, AND ELEC
1" 1"
1"
D
IA
SEE WALL TYPES
NOTE: SEE PLANS FOR
WALL TYPE CONSTRUCTION
BACKER ROD WITH (2)
CONTINUOUS BEADS OF
ACOUSTIC SEALANT
AROUND FULL PERIMETER
OF PIPE PENETRATION
BACKER ROD WITH (2)
CONTINUOUS BEADS OF
ACOUSTIC SEALANT
AROUND FULL PERIMETER
OF PIPE PENETRATION
SEE WALL TYPES
1/ 2"
M
AX
CONT ACOUSTIC
SEALANT EA SIDE
AGAINST TRACK
CONCRETE SLAB
PER STRUCT
PORTLAND, OREGON
E
RE
DAVID A. JOHNSON
T
AT T
S
G
RE
SI
HC
OGEROOF
N
E
TC
TI
RADE
date phase revisions date project
1/2 9/2
6 4
:16 :04
P M
Au tod es k D oc s:/
/25
3-
4 O
CH
S
CT
E Re no /O
CS
D
Or eg on C ity H
S
EC
.rv t
A0.05
WALL TYPES & ACOUSTIC
ASSEMBLIES
OR
EG
ON
C
IT
Y
HI
GH
SC
HO
OL
C
TE
T
5-
5-
OR
EG
ON
C
IT
Y
SC
HO
OL
D
IS
TR
IC
T
1/30/2026 25003-154
1 S B
EA
VE
RC
RE
EK
R
D, O
RE
GO
N
CI
TY
, O
R
PERMIT SET
SCALE: 3" = 1'-0"
WALL TYPE 1
SCALE: 3" = 1'-0"
WALL TYPE 2
SCALE: 3" = 1'-0"
WALL TYPE 3
SCALE: 3" = 1'-0"
WALL TYPE 4
SCALE: 3" = 1'-0"
TYP ACOUSTIC WALL DUCT PEN
SCALE: 3" = 1'-0"
TYP ACOUSTIC WALL ELEC BOXES
SCALE: 3" = 1'-0"
TYP ACOUSTIC WALL INTERSECTION
SCALE: 3" = 1'-0"
TYP ACOUSTIC WALL PIPE PEN
SCALE: 3" = 1'-0"
TYP WALL AT FLOOR - ACOUSTIC
UP
UP
UP
DN
DD
DA
D9*
D7
CC
CE
C7
BC
BE
BA
B9*
B7
CA
JROTC
INTRO TO
DIGITAL MEDIA
INTRO TO
ROBOTICS
DEMO 1 / A1.11
DEMO RCP 1 / A1.21
PLAN 1 / A2.11
FINISH 1 / A4.11
RCP 1 / A6.11
DEMO 2 / A1.11
DEMO RCP 2 / A1.21
PLAN 2 / A2.11
FINISH 2 / A4.11
RCP 2 / A6.11
DEMO 3 / A1.11
DEMO RCP 3 / A1.21
PLAN 3 / A2.11
FINISH 3 / A4.11
RCP 3 / A6.11
A6.11 1.5
A6.11 2.5
J1J3
JA
INTRO TO TRADES
DEMO 6 / A1.12
DEMO RCP 6 / A1.22
PLAN 6 / A2.12
FINISH 6 / A4.12
RCP 6 / A6.12
J
D C
B E
LEGEND
NOT IN SCOPE
(E) TO REMAIN
AREA IN SCOPE
IN CEILING, REPLACE (E) RECESSSED LINEAR
FIXTURES, SEE RCPS AND ELECTRICAL DWGS
FLOOR PLAN NOTES:
1.
2.
3.
4.
5.
6.
7.
CONDITIONS AND DETAILS MARKED "TYPICAL" SHALL APPLY IN ALL
CASES UNLESS SPECIFICALLY INDICATED OTHERWISE. TYPICAL
DETAILS NOT REFERENCED ON DRAWINGS APPLY UNLESS NOTED
OTHERWISE BY SPECIFIC NOTES AND DETAILS. WHERE NO SPECIFIC
DETAIL IS SHOWN, THE CONSTRUCTION SHALL BE IDENTICAL OR
SIMILAR TO THAT INDICATED FOR THE TYPICAL CONSTRUCTION OF
THE PROJECT.
WHERE NO SPECIFIC STANDARDS ARE APPLIED TO A MATERIAL OR
METHOD OF CONSTRUCTION TO BE USED ON THE WORK, ALL SUCH
MATERIAL AND METHODS ARE TO MAINTAIN STANDARDS OF THE
INDUSTRY AND, WHERE APPLICABLE, MANUFACTURER ’S
INSTRUCTIONS.
LOADING OF CONSTRUCTION MATERIALS SHALL NOT EXCEED THE
DESIGN LIVE LOAD PER SQUARE FOOT.
ESTABLISH AND VERIFY ALL OPENINGS AND INSERTS FOR
ARCHITECTURAL, MECHANICAL, ELECTRICAL, AND PLUMBING WITH
APPROPRIATE TRADES, DRAWINGS, AND SUBCONTRACTORS PRIOR
TO CONSTRUCTION.
PROVIDE ALL NECESSARY ANCHORAGE BLOCKING, BACKING,
FRAMING FOR HANDRAILS, DOOR STOPS, CASEWORK, SHELVING,
MIRRORS, WALL MOUNTED EQUIPMENT, AND ALL OTHER ITEMS AS
REQUIRED FOR COMPLETE INSTALLATION.
CONFIRM ALL ROUGH OPENING DIMENSIONS FOR DOORS AND
WINDOWS PRIOR TO COMMENCEMENT OF CONSTRUCTION.
REVISE AND SUPPLEMENT EXISTING FIRE ALARM AND FIRE
SUPPRESSION SYSTEMS ONLY WHERE NECESSARY TO MEET ALL
APPLICABLE LOCAL AND STATE CODES.
PORTLAND, OREGON
E
RE
DAVID A. JOHNSON
T
AT T
S
G
RE
SI
HC
OGEROOF
N
E
TC
TI
RADE
date phase revisions date project
1/2 9/2
6 4
:16 :06
P M
Au tod es k D oc s:/
/25
3-
4 O
CH
S
CT
E Re no /O
CS
D
Or eg on C ity H
S
EC
.rv t
A0.11
OVERALL FLOOR PLAN -
LEVEL 1
OR
EG
ON
C
IT
Y
HI
GH
SC
HO
OL
C
TE
T
5-
5-
OR
EG
ON
C
IT
Y
SC
HO
OL
D
IS
TR
IC
T
1/30/2026 25003-154
1 S B
EA
VE
RC
RE
EK
R
D, O
RE
GO
N
CI
TY
, O
R
PERMIT SET
SCALE: 1/16" = 1'-0" 1OVERALL PLAN - LEVEL 1
SCALE: 1/16" = 1'-0" 2OVERALL PLAN - LEVEL 1 - BUILDING J
NOTE: APPROXIMATE GEOGRAPHIC
LOCATION OF BUILDING J TO MAIN HIGH
SCHOOL BUILDING
DN
DN
DN
DN
DD
DA
D9*
D7
CC
CE
C7
BC
BE
BA
B9*
B7
CA
ONLY WORK ON THIS
LEVEL REPLACEMENT OF
WAYFINDING LETTER AT
WING B, C, D
J1J3
JA
DEMO 7 / A1.12
DEMO RCP 7 / A1.22
PLAN 7 / A2.12
FINISH 7 / A4.12
RCP 7 / A6.12
INTRO TO TRADES:
(E) STORAGE LOFT
REFFER TO MEP SHEETS FOR SCOPE.
J
D C
B E
LEGEND
NOT IN SCOPE
(E) TO REMAIN
AREA IN SCOPE
IN CEILING, REPLACE (E) RECESSSED LINEAR
FIXTURES, SEE RCPS AND ELECTRICAL DWGS
FLOOR PLAN NOTES:
1.
2.
3.
4.
5.
6.
7.
CONDITIONS AND DETAILS MARKED "TYPICAL" SHALL APPLY IN ALL
CASES UNLESS SPECIFICALLY INDICATED OTHERWISE. TYPICAL
DETAILS NOT REFERENCED ON DRAWINGS APPLY UNLESS NOTED
OTHERWISE BY SPECIFIC NOTES AND DETAILS. WHERE NO SPECIFIC
DETAIL IS SHOWN, THE CONSTRUCTION SHALL BE IDENTICAL OR
SIMILAR TO THAT INDICATED FOR THE TYPICAL CONSTRUCTION OF
THE PROJECT.
WHERE NO SPECIFIC STANDARDS ARE APPLIED TO A MATERIAL OR
METHOD OF CONSTRUCTION TO BE USED ON THE WORK, ALL SUCH
MATERIAL AND METHODS ARE TO MAINTAIN STANDARDS OF THE
INDUSTRY AND, WHERE APPLICABLE, MANUFACTURER ’S
INSTRUCTIONS.
LOADING OF CONSTRUCTION MATERIALS SHALL NOT EXCEED THE
DESIGN LIVE LOAD PER SQUARE FOOT.
ESTABLISH AND VERIFY ALL OPENINGS AND INSERTS FOR
ARCHITECTURAL, MECHANICAL, ELECTRICAL, AND PLUMBING WITH
APPROPRIATE TRADES, DRAWINGS, AND SUBCONTRACTORS PRIOR
TO CONSTRUCTION.
PROVIDE ALL NECESSARY ANCHORAGE BLOCKING, BACKING,
FRAMING FOR HANDRAILS, DOOR STOPS, CASEWORK, SHELVING,
MIRRORS, WALL MOUNTED EQUIPMENT, AND ALL OTHER ITEMS AS
REQUIRED FOR COMPLETE INSTALLATION.
CONFIRM ALL ROUGH OPENING DIMENSIONS FOR DOORS AND
WINDOWS PRIOR TO COMMENCEMENT OF CONSTRUCTION.
REVISE AND SUPPLEMENT EXISTING FIRE ALARM AND FIRE
SUPPRESSION SYSTEMS ONLY WHERE NECESSARY TO MEET ALL
APPLICABLE LOCAL AND STATE CODES.
PORTLAND, OREGON
E
RE
DAVID A. JOHNSON
T
AT T
S
G
RE
SI
HC
OGEROOF
N
E
TC
TI
RADE
date phase revisions date project
1/2 9/2
6 4
:16 :08
P M
Au tod es k D oc s:/
/25
3-
4 O
CH
S
CT
E Re no /O
CS
D
Or eg on C ity H
S
EC
.rv t
A0.12
OVERALL FLOOR PLAN -
LEVEL 2
OR
EG
ON
C
IT
Y
HI
GH
SC
HO
OL
C
TE
T
5-
5-
OR
EG
ON
C
IT
Y
SC
HO
OL
D
IS
TR
IC
T
1/30/2026 25003-154
1 S B
EA
VE
RC
RE
EK
R
D, O
RE
GO
N
CI
TY
, O
R
PERMIT SET
SCALE: 1/16" = 1'-0" 1OVERALL PLAN - LEVEL 2
SCALE: 1/16" = 1'-0" 2OVERALL PLAN - LEVEL 2 - BUILDING J
NOTE: APPROXIMATE GEOGRAPHIC
LOCATION OF BUILDING J TO MAIN HIGH
SCHOOL BUILDING
REF.
DN
R
EF
REF.
DN
J
D C
B E
LEGEND
NOT IN SCOPE
DEMOLITION
(E) TO REMAIN
REMOVE (E) FLOOR FINISH MATERIAL,
ADHESIVE, AND WALL BASE WHERE
APPLICABLE. PREPARE FLOOR FOR
FINISH PER FINISH PLANS
DD
DA
D9* D7
REMOVE SINK
& CASEWORK
REMOVE RELITE
(E) STRUCTURAL
COLUMN TO REMAIN
REMOVE RELITE
REMOVE (E) BANK
OF LOCKERS FROM
EXISTING WALL.
REMOVE WALL MOUNTED
TACK BOARD
REMOVE DOOR
AND FRAME
D 101
D 101C D 101D D 101B
D 101A
REMOVE PORTION OF WALL
FOR RELITE. SEE FLOOR PLAN.
REMOVE (E)
HVAC GRILL
REMOVE (E) MINI BLINDS
ABOVE AND BELOW LIGHT
SHELVES IN WINDOWS.
FIELD VERIFY
LOCATION OF
THRESHOLD.
(E) FLOOR BOXES
TO REMAIN
CC
CE
C7
CA
REMOVE SINK
& CASEWORK
REMOVE (E) BANK
OF LOCKERS.
(E) C101
(E) C101D
(E) C101E A1.11
(E) C101A
(E) C101B
(E) C101C
(E) C101F
REMOVE PAPER
TOWEL DISPENSER
REMOVE AND SALVAGE
INTERIOR LIGHT SHELVES
REMOVE (E)
HVAC GRILL
REMOVE (E) MINI BLINDS
ABOVE AND BELOW LIGHT
SHELVES IN WINDOWS.
(E) FRAME TO REMAIN. REMOVE
DOOR PANEL. SALVAGE DOOR
HARDWARE, LOCKSET, HINGES,
AND KICKPLATE FOR
REINSTALLATION
FIELD VERIFY
LOCATION OF
THRESHOLD.
BC
BE
BA
B9* B7
REMOVE SINK
& CASEWORK
REMOVE RELITE
(E) STRUCTURAL
COLUMN TO REMAIN
REMOVE RELITE
REMOVE (E) BANK
OF LOCKERS.
REMOVE WALL MOUNTED TACK BOARD
B 101 B 101D
B 101E
B 101A
B 101C B 101B
REMOVE PORTION OF WALL
FOR RELITE. SEE FLOOR PLAN.
REMOVE DOOR
AND FRAME
REMOVE DOOR
AND FRAME
REMOVE (E)
HVAC GRILL
REMOVE (E) MINI BLINDS
ABOVE AND BELOW LIGHT
SHELVES IN WINDOWS.
(E) FRAME TO REMAIN. REMOVE DOOR
PANEL. SALVAGE DOOR HARDWARE,
LOCKSET, HINGES, AND KICKPLATE FOR
REINSTALLATION
FIELD VERIFY
LOCATION OF
THRESHOLD.
(E) FLOOR BOXES
TO REMAIN
(E) FLATSCREEN: SALVAGE FOR
REINSTALLATION AT SAME LOCATION,
PROTECT WALL MOUNT
(E) C101E
(E) C101D
(E) C101
REMOVE RELITE
(E) STRUCTURAL
COLUMN TO
REMAIN
REMOVE WALL
MOUNTED TACK BOARD
REMOVE PORTION OF WALL
FOR RELITE. SEE FLOOR PLAN.
REMOVE DOOR
AND FRAME
(E) FRAME TO REMAIN. REMOVE DOOR
PANEL. SALVAGE DOOR HARDWARE,
LOCKSET, HINGES, AND KICKPLATE FOR
REINSTALLATION
PORTLAND, OREGON
E
RE
DAVID A. JOHNSON
T
AT T
S
G
RE
SI
HC
OGEROOF
N
E
TC
TI
RADE
date phase revisions date project
1/2 9/2
6 4
:16 :10
P M
Au tod es k D oc s:/
/25
3-
4 O
CH
S
CT
E Re no /O
CS
D
Or eg on C ity H
S
EC
.rv t
A1.11
DEMO PLANS
OR
EG
ON
C
IT
Y
HI
GH
SC
HO
OL
C
TE
T
5-
5-
OR
EG
ON
C
IT
Y
SC
HO
OL
D
IS
TR
IC
T
1/30/2026 25003-154
1 S B
EA
VE
RC
RE
EK
R
D, O
RE
GO
N
CI
TY
, O
R
PERMIT SET
DEMO PLAN NOTES:
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
AT DEMOLITION AREA, REMOVE ALL BUILDING ELEMENTS DOWN TO
STRUCTURAL FLOOR AND UP TO STRUCTURAL CEILING, UNLESS
NOTED OTHERWISE. INCLUDING BUT NOT LIMITED TO WALLS,
FINISHES, EQUIPMENT, ELECTRICAL, PLUMBING, AND TECHNOLOGY.
DO NOT DAMAGE OR UNDERMINE FOUNDATIONS SUPPORTING
STRUCTURAL BUILDING ELEMENTS.
PROVIDE TEMPORARY SHORING AND BRACING AS REQUIRED TO
SUPPORT REMAINING BUILDING ELEMENTS.
SAW CUT OR OTHERWISE NEATLY REMOVE DEMOLISHED
ELEMENTS AT THE INTERFACE WITH ELEMENTS TO REMAIN.
WHERE ELEMENTS ARE BEING REMOVED, REPAIR AND PATCH
ADJACENT FINISHES. WHERE THIS CREATES CONFLICTS WITH
PATTERN, TEXTURE, OR ALIGNMENT, EXTEND AREA OF REPAIR AND
PATCH TO ELIMINATE CONFLICT.
ALL REPAIR AND PATCH AT FLOOR AREAS MUST ALIGN TO EXISTING
FLOOR LEVEL AND FLOOR THICKNESS.
REVIEW AND DOCUMENT ANY ELEMENTS INTENDED TO REMAIN
WHICH ARE DAMAGED. NOTIFY OWNER AND ARCHITECT PRIOR TO
PROCEEDING WITH WORK IN THAT AREA.
DEMOLISH ABANDONED EQUIPMENT, PIPING, AND CONDUIT AS
NEEDED TO CAP AND TAG EXISTING UTILITIES BEYOND FACE OF
FINISHES.
PROVIDE TEMPORARY DUSTPROOF PARTITIONS TO LIMIT DUST,
DIRT, FUMES, AND NOISE MIGRATION FROM AREAS OF
CONSTRUCTION.
PROTECT IN PLACE EXISTING FLOOR TO REMAIN DURING
CONSTRUCTION.
WHERE PLUMBING FIXTURES, DOORS & DOOR FRAMES,
CASEWORK, ETC ARE INDICATED AS BEING REMOVED AND ARE IN
GOOD CONDITION, SALVAGE ELEMENTS FOR OWNER STOCK.
REFER TO OWNER'S LIST OF SALVAGE ITEMS FOR A COMPLETE LIST
OF ITEMS TO BE SALVAGED PRIOR TO COMMENCEMENT OF
DEMOLITION.
PROTECT EXISTING FLOOR RECEPTICLES WHERE APPLICABLE.
SCALE: 1/8" = 1'-0" 3DEMO - L1 - JROTC
SCALE: 1/8" = 1'-0" 2DEMO - L1 - INTRO TO DIGITAL MEDIA
SCALE: 1/8" = 1'-0" 1DEMO - L1 - INTRO TO ROBOTICS
SCALE: 1/4" = 1'-0" 4INTRO TO DIGITAL MEDIA - ENLARGED PLAN
J
D C
B E
J1J3
JA
(E) COLUMN TO REMAIN
PROTECT (E)
STAIR & RAILING
REMOVE FOLDING
WALL AND TRACK
REMOVE WHITE BOARD
J111
J110
J107
(E) IDF CABINET
TO REMAIN
REMOVE DOOR
AND FRAME
REMOVE (E) MINI BLINDS
REMOVE (E)
MINI BLINDS
REMOVE (3) UPPER CABS
(E) CMU WALL
TO REMAIN
LEGEND
NOT IN SCOPE
DEMOLITION
(E) TO REMAIN
REMOVE (E) FLOOR FINISH MATERIAL,
ADHESIVE, AND WALL BASE WHERE
APPLICABLE. PREPARE FLOOR FOR
FINISH PER FINISH PLANS
J1J3
JA
OPEN TO
BELOW
J201
REFFER TO MEP SHEETS FOR SCOPE.
PORTLAND, OREGON
E
RE
DAVID A. JOHNSON
T
AT T
S
G
RE
SI
HC
OGEROOF
N
E
TC
TI
RADE
date phase revisions date project
1/2 9/2
6 4
:16 :11
P M
Au tod es k D oc s:/
/25
3-
4 O
CH
S
CT
E Re no /O
CS
D
Or eg on C ity H
S
EC
.rv t
A1.12
DEMO PLANS
OR
EG
ON
C
IT
Y
HI
GH
SC
HO
OL
C
TE
T
5-
5-
OR
EG
ON
C
IT
Y
SC
HO
OL
D
IS
TR
IC
T
1/30/2026 25003-154
1 S B
EA
VE
RC
RE
EK
R
D, O
RE
GO
N
CI
TY
, O
R
PERMIT SET
SCALE: 1/8" = 1'-0" 1DEMO - L1 - INTRO TO TRADES
DEMO PLAN NOTES:
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
AT DEMOLITION AREA, REMOVE ALL BUILDING ELEMENTS DOWN TO
STRUCTURAL FLOOR AND UP TO STRUCTURAL CEILING, UNLESS
NOTED OTHERWISE. INCLUDING BUT NOT LIMITED TO WALLS,
FINISHES, EQUIPMENT, ELECTRICAL, PLUMBING, AND TECHNOLOGY.
DO NOT DAMAGE OR UNDERMINE FOUNDATIONS SUPPORTING
STRUCTURAL BUILDING ELEMENTS.
PROVIDE TEMPORARY SHORING AND BRACING AS REQUIRED TO
SUPPORT REMAINING BUILDING ELEMENTS.
SAW CUT OR OTHERWISE NEATLY REMOVE DEMOLISHED
ELEMENTS AT THE INTERFACE WITH ELEMENTS TO REMAIN.
WHERE ELEMENTS ARE BEING REMOVED, REPAIR AND PATCH
ADJACENT FINISHES. WHERE THIS CREATES CONFLICTS WITH
PATTERN, TEXTURE, OR ALIGNMENT, EXTEND AREA OF REPAIR AND
PATCH TO ELIMINATE CONFLICT.
ALL REPAIR AND PATCH AT FLOOR AREAS MUST ALIGN TO EXISTING
FLOOR LEVEL AND FLOOR THICKNESS.
REVIEW AND DOCUMENT ANY ELEMENTS INTENDED TO REMAIN
WHICH ARE DAMAGED. NOTIFY OWNER AND ARCHITECT PRIOR TO
PROCEEDING WITH WORK IN THAT AREA.
DEMOLISH ABANDONED EQUIPMENT, PIPING, AND CONDUIT AS
NEEDED TO CAP AND TAG EXISTING UTILITIES BEYOND FACE OF
FINISHES.
PROVIDE TEMPORARY DUSTPROOF PARTITIONS TO LIMIT DUST,
DIRT, FUMES, AND NOISE MIGRATION FROM AREAS OF
CONSTRUCTION.
PROTECT IN PLACE EXISTING FLOOR TO REMAIN DURING
CONSTRUCTION.
WHERE PLUMBING FIXTURES, DOORS & DOOR FRAMES,
CASEWORK, ETC ARE INDICATED AS BEING REMOVED AND ARE IN
GOOD CONDITION, SALVAGE ELEMENTS FOR OWNER STOCK.
REFER TO OWNER'S LIST OF SALVAGE ITEMS FOR A COMPLETE LIST
OF ITEMS TO BE SALVAGED PRIOR TO COMMENCEMENT OF
DEMOLITION.
PROTECT EXISTING FLOOR RECEPTICLES WHERE APPLICABLE.
SCALE: 1/8" = 1'-0" 2DEMO - L2 - INTRO TO TRADES
C
B E
CC
CE
C7
CA
REMOVE FIXTURES
IN (E) CEILING
A1.21
(E) C101
(E) C101D
(E) C101E
(E) C101A
(E) C101B
(E) C101C
(E) C101F
BC
BE
BA
B9* B7
REMOVE FIXTURES
IN (E) CEILING
B 101B 101D
B 101E
B 101A
B 101CB 101B
A9.12
DA
D9* D7
REMOVE FIXTURES
IN (E) CEILING
D 101
D 101C D 101DD 101B
D 101A
(E) C101E
(E) C101D
(E) C101
LEGEND
DEMOLITION AREA: REMOVE GYP. BD.
CEILING, LIGHT FIXTURES AND CEILING
MOUNTED EQUIPMENT. SEE
MECHANICAL, PLUMBING AND
ELECTRICAL DRAWINGS.
NOT IN SCOPE
DEMOLITION
(E) TO REMAIN
BE
B9*
REMOVE (E) FIXTURE,
PREPARE OPENING FOR
REPLACEMENT. SEE
ELECTRICAL.
/1 A1.21
/2 A1.21
CE
REMOVE (E) FIXTURE,
PREPARE OPENING FOR
REPLACEMENT. SEE
ELECTRICAL.
/3 A1.21
/2 A1.21
PORTLAND, OREGON
E
RE
DAVID A. JOHNSON
T
AT T
S
G
RE
SI
HC
OGEROOF
N
E
TC
TI
RADE
date phase revisions date project
1/2 9/2
6 4
:16 :12
P M
Au tod es k D oc s:/
/25
3-
4 O
CH
S
CT
E Re no /O
CS
D
Or eg on C ity H
S
EC
.rv t
A1.21
DEMO REFLECTED
CEILING PLANS
OR
EG
ON
C
IT
Y
HI
GH
SC
HO
OL
C
TE
T
5-
5-
OR
EG
ON
C
IT
Y
SC
HO
OL
D
IS
TR
IC
T
1/30/2026 25003-154
1 S B
EA
VE
RC
RE
EK
R
D, O
RE
GO
N
CI
TY
, O
R
PERMIT SET
SCALE: 1/8" = 1'-0" 2DEMO RCP - L1 - INTRO TO DIGITAL MEDIA
SCALE: 1/8" = 1'-0" 1DEMO RCP - L1 - INTRO TO ROBOTICS
SCALE: 1/8" = 1'-0" 3DEMO RCP - L1 - JROTC
SCALE: 1/4" = 1'-0" 4INTRO TO DIGITAL MEDIA - ENLARGED PLAN
DEMO PLAN NOTES:
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
AT DEMOLITION AREA, REMOVE ALL BUILDING ELEMENTS DOWN TO
STRUCTURAL FLOOR AND UP TO STRUCTURAL CEILING, UNLESS
NOTED OTHERWISE. INCLUDING BUT NOT LIMITED TO WALLS,
FINISHES, EQUIPMENT, ELECTRICAL, PLUMBING, AND TECHNOLOGY.
DO NOT DAMAGE OR UNDERMINE FOUNDATIONS SUPPORTING
STRUCTURAL BUILDING ELEMENTS.
PROVIDE TEMPORARY SHORING AND BRACING AS REQUIRED TO
SUPPORT REMAINING BUILDING ELEMENTS.
SAW CUT OR OTHERWISE NEATLY REMOVE DEMOLISHED
ELEMENTS AT THE INTERFACE WITH ELEMENTS TO REMAIN.
WHERE ELEMENTS ARE BEING REMOVED, REPAIR AND PATCH
ADJACENT FINISHES. WHERE THIS CREATES CONFLICTS WITH
PATTERN, TEXTURE, OR ALIGNMENT, EXTEND AREA OF REPAIR AND
PATCH TO ELIMINATE CONFLICT.
ALL REPAIR AND PATCH AT FLOOR AREAS MUST ALIGN TO EXISTING
FLOOR LEVEL AND FLOOR THICKNESS.
REVIEW AND DOCUMENT ANY ELEMENTS INTENDED TO REMAIN
WHICH ARE DAMAGED. NOTIFY OWNER AND ARCHITECT PRIOR TO
PROCEEDING WITH WORK IN THAT AREA.
DEMOLISH ABANDONED EQUIPMENT, PIPING, AND CONDUIT AS
NEEDED TO CAP AND TAG EXISTING UTILITIES BEYOND FACE OF
FINISHES.
PROVIDE TEMPORARY DUSTPROOF PARTITIONS TO LIMIT DUST,
DIRT, FUMES, AND NOISE MIGRATION FROM AREAS OF
CONSTRUCTION.
PROTECT IN PLACE EXISTING FLOOR TO REMAIN DURING
CONSTRUCTION.
WHERE PLUMBING FIXTURES, DOORS & DOOR FRAMES,
CASEWORK, ETC ARE INDICATED AS BEING REMOVED AND ARE IN
GOOD CONDITION, SALVAGE ELEMENTS FOR OWNER STOCK.
REFER TO OWNER'S LIST OF SALVAGE ITEMS FOR A COMPLETE LIST
OF ITEMS TO BE SALVAGED PRIOR TO COMMENCEMENT OF
DEMOLITION.
PROTECT EXISTING FLOOR RECEPTICLES WHERE APPLICABLE.
SCALE: 1/8" = 1'-0" 1.5DEMO RCP- L1 - C TO B
SCALE: 1/8" = 1'-0" 2.5RCP - L1 - D TO C
C
B E
LEGEND
NOT IN SCOPE
DEMOLITION
(E) TO REMAIN
REMOVE (E) FLOOR FINISH MATERIAL,
ADHESIVE, AND WALL BASE WHERE
APPLICABLE. PREPARE FLOOR FOR
FINISH PER FINISH PLANS
J1J3
JA
OPEN TO
ABOVEJ111
J110
J107
J1J3
JA
J201
REFFER TO MEP SHEETS FOR SCOPE.
PORTLAND, OREGON
E
RE
DAVID A. JOHNSON
T
AT T
S
G
RE
SI
HC
OGEROOF
N
E
TC
TI
RADE
date phase revisions date project
1/2 9/2
6 4
:16 :13
P M
Au tod es k D oc s:/
/25
3-
4 O
CH
S
CT
E Re no /O
CS
D
Or eg on C ity H
S
EC
.rv t
A1.22
DEMO REFLECTED
CEILING PLANS
OR
EG
ON
C
IT
Y
HI
GH
SC
HO
OL
C
TE
T
5-
5-
OR
EG
ON
C
IT
Y
SC
HO
OL
D
IS
TR
IC
T
1/30/2026 25003-154
1 S B
EA
VE
RC
RE
EK
R
D, O
RE
GO
N
CI
TY
, O
R
PERMIT SET
DEMO PLAN NOTES:
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
AT DEMOLITION AREA, REMOVE ALL BUILDING ELEMENTS DOWN TO
STRUCTURAL FLOOR AND UP TO STRUCTURAL CEILING, UNLESS
NOTED OTHERWISE. INCLUDING BUT NOT LIMITED TO WALLS,
FINISHES, EQUIPMENT, ELECTRICAL, PLUMBING, AND TECHNOLOGY.
DO NOT DAMAGE OR UNDERMINE FOUNDATIONS SUPPORTING
STRUCTURAL BUILDING ELEMENTS.
PROVIDE TEMPORARY SHORING AND BRACING AS REQUIRED TO
SUPPORT REMAINING BUILDING ELEMENTS.
SAW CUT OR OTHERWISE NEATLY REMOVE DEMOLISHED
ELEMENTS AT THE INTERFACE WITH ELEMENTS TO REMAIN.
WHERE ELEMENTS ARE BEING REMOVED, REPAIR AND PATCH
ADJACENT FINISHES. WHERE THIS CREATES CONFLICTS WITH
PATTERN, TEXTURE, OR ALIGNMENT, EXTEND AREA OF REPAIR AND
PATCH TO ELIMINATE CONFLICT.
ALL REPAIR AND PATCH AT FLOOR AREAS MUST ALIGN TO EXISTING
FLOOR LEVEL AND FLOOR THICKNESS.
REVIEW AND DOCUMENT ANY ELEMENTS INTENDED TO REMAIN
WHICH ARE DAMAGED. NOTIFY OWNER AND ARCHITECT PRIOR TO
PROCEEDING WITH WORK IN THAT AREA.
DEMOLISH ABANDONED EQUIPMENT, PIPING, AND CONDUIT AS
NEEDED TO CAP AND TAG EXISTING UTILITIES BEYOND FACE OF
FINISHES.
PROVIDE TEMPORARY DUSTPROOF PARTITIONS TO LIMIT DUST,
DIRT, FUMES, AND NOISE MIGRATION FROM AREAS OF
CONSTRUCTION.
PROTECT IN PLACE EXISTING FLOOR TO REMAIN DURING
CONSTRUCTION.
WHERE PLUMBING FIXTURES, DOORS & DOOR FRAMES,
CASEWORK, ETC ARE INDICATED AS BEING REMOVED AND ARE IN
GOOD CONDITION, SALVAGE ELEMENTS FOR OWNER STOCK.
REFER TO OWNER'S LIST OF SALVAGE ITEMS FOR A COMPLETE LIST
OF ITEMS TO BE SALVAGED PRIOR TO COMMENCEMENT OF
DEMOLITION.
PROTECT EXISTING FLOOR RECEPTICLES WHERE APPLICABLE.
SCALE: 1/8" = 1'-0" 1DEMO RCP - L1 - INTRO TO TRADES
SCALE: 1/8" = 1'-0" 2DEMO RCP - L2 - INTRO TO TRADES
DN
A1 WALL TAG
FLOOR PLAN NOTES:
1.
2.
3.
4.
5.
6.
CONDITIONS AND DETAILS MARKED "TYPICAL" SHALL APPLY IN ALL
CASES UNLESS SPECIFICALLY INDICATED OTHERWISE. TYPICAL
DETAILS NOT REFERENCED ON DRAWINGS APPLY UNLESS NOTED
OTHERWISE BY SPECIFIC NOTES AND DETAILS. WHERE NO SPECIFIC
DETAIL IS SHOWN, THE CONSTRUCTION SHALL BE IDENTICAL OR
SIMILAR TO THAT INDICATED FOR THE TYPICAL CONSTRUCTION OF
THE PROJECT.
WHERE A LENGTH OF WALL IS INTERSECTED BY PERPENDICULAR
WALLS, WALL TYPE TO BE CONTINUOUS BETWEEN TAGS UNLESS
NOTED OTHERWISE.
PROVIDE SOLID BLOCKING BETWEEN ROOF JOISTS WHERE WALL
RUNS PERPENDICULAR TO ROOF JOISTS. GYPSUM BOARD TO
TERMINATE AT ROOF JOISTS.
ALIGN FINISHES WHERE INDICATED.
DOORS NOT LOCATED BY DIMENSION ARE TO BE CENTERED IN
WALLS AS SHOWN OR LOCATED 6" FROM FACE OF STUD TO FACE OF
JAMB.
DIMENSIONS ARE TO FACES OF STUD UNLESS NOTED OTHERWISE.
LEGEND
BC
BE
BA
B9* B7
(E) ELEC RM
B101D
(E) RR
B101B
STOR
B101C
(E) MECH
B101A
A5.20
1A
A5.202D
2A
2B
2C
A5.01 1B
A5.01
1C
A5.20 1B
1C
1D
A5.201E
A5.011D
B101a
A5.203D
(E) FIRE EXTINGUISHER.
W/ IN 75' OF (N) ROOM
2a
B1
.3
B1
.1
INTRO TO
ROBOTICS
B101
CL 4' - 4" FOF
SPINE DISPLAY CASE
FLAT PANEL MONITOR (OFCI)
USE EXISTING DOOR
OPENING FOR (N) DOOR
A9.12
(4) (E) FLOOR
BOXES
A9.11
CC
CE
C7
CA
STOR
C101G
(E) RR
C101C
CONTROL
RM
C101D
PRODUCTION
STUDIO
C101
(E) MECH
C101A
(E) OFC
C101B
(E) ELEC RM
C101F
A5.30 1B
1C
A5.301D
A5.01 2B
A5.01
2C
HALL
C101H
A5.30
1A
3a* A2.11
2A
A5.203D
(E) FIRE EXTINGUISHER.
W/ IN 75' OF (N) ROOM
PODCASTING/
RECORDING
C101E
SPINE DISPLAY CASE
FLAT PANEL MONITOR (OFCI)
A9.30
SIM
A9.11
DD
DA
D9* D7
STORAGE
D101D
OFFICE
D101C
JROTC
DRILL RM
D101
(E) MECH
D101A
(E) RR
D101B
A5.40
1C
A5.40
5A
5B
5C
5D
A5.40
3E
A5.01
3C
A5.01 3B
1B
A5.40
3C
A5.401D
A5.013D
A5.40
1A
A5.403D
3A
3B
ARMOR
ROOM
D101E
1a
1a
D
1.
1a1a
D101.2
D101.4
D
1.
D101a
D
1b
D101c
A5.203D
HALL
D101F
A5.40 4B
4C
SPINE DISPLAY CASE
FLAT PANEL MONITOR (OFCI)
6'-0"
5' -6
5'
-0
3'-9" 11'-2"
2' -0
4'
-5
'-5
(4) (E) FLOOR BOXES
A9.20
A9.11
J
D C
B E
A5.30
A5.303D
3A
2B
2A
A5.012DA5.30 3BA5.30
3C
A5.302D A5.30
2C
A5.30
6C
A5.30 4B A5.305D A5.30
5A
5B
5C
6A
A5.306D 6B
CONTROL
RM
C101D
STOR
C101G
PODCASTING/
RECORDING
C101E C101.4
C
1.
C
1.
C
1.
C101b
C101a
PRODUCTION
STUDIO
C101
C101.2
(E) PAINTED
COLUMN TO
REMAIN
2a
2a
3a*
1a
3a*
3a*
7' -7
/4
9' -8
/4
A9.30
21EQ
EQ
6'-0"
USE EXISTING DOOR
OPENING FOR (N) DOOR
7'-8" MIN CLR, VIF
21'-10"
6'-6" 6'-1" 13'-9" 2'-0"
12" MIN CLR
5' -2
2'
-6
C
1.
A5.30
4C
HALL
C101H
A9.30
PORTLAND, OREGON
E
RE
DAVID A. JOHNSON
T
AT T
S
G
RE
SI
HC
OGEROOF
N
E
TC
TI
RADE
date phase revisions date project
1/2 9/2
6 4
:16 :15
P M
Au tod es k D oc s:/
/25
3-
4 O
CH
S
CT
E Re no /O
CS
D
Or eg on C ity H
S
EC
.rv t
A2.11
FLOOR PLANS
OR
EG
ON
C
IT
Y
HI
GH
SC
HO
OL
C
TE
T
5-
5-
OR
EG
ON
C
IT
Y
SC
HO
OL
D
IS
TR
IC
T
1/30/2026 25003-154
1 S B
EA
VE
RC
RE
EK
R
D, O
RE
GO
N
CI
TY
, O
R
PERMIT SET
SCALE: 1/8" = 1'-0" 1FLOOR PLAN - L1 - INTRO TO ROBOTICS
SCALE: 1/8" = 1'-0" 2FLOOR PLAN - L1 - INTRO TO DIGITAL MEDIA
SCALE: 1/8" = 1'-0" 3FLOOR PLAN - L1 - JROTC
SCALE: 1/4" = 1'-0" 2AINTRO TO DIGITAL MEDIA - ENLARGED PLAN
A1 WALL TAG
FLOOR PLAN NOTES:
1.
2.
3.
4.
5.
6.
CONDITIONS AND DETAILS MARKED "TYPICAL" SHALL APPLY IN ALL
CASES UNLESS SPECIFICALLY INDICATED OTHERWISE. TYPICAL
DETAILS NOT REFERENCED ON DRAWINGS APPLY UNLESS NOTED
OTHERWISE BY SPECIFIC NOTES AND DETAILS. WHERE NO SPECIFIC
DETAIL IS SHOWN, THE CONSTRUCTION SHALL BE IDENTICAL OR
SIMILAR TO THAT INDICATED FOR THE TYPICAL CONSTRUCTION OF
THE PROJECT.
WHERE A LENGTH OF WALL IS INTERSECTED BY PERPENDICULAR
WALLS, WALL TYPE TO BE CONTINUOUS BETWEEN TAGS UNLESS
NOTED OTHERWISE.
PROVIDE SOLID BLOCKING BETWEEN ROOF JOISTS WHERE WALL
RUNS PERPENDICULAR TO ROOF JOISTS. GYPSUM BOARD TO
TERMINATE AT ROOF JOISTS.
ALIGN FINISHES WHERE INDICATED.
DOORS NOT LOCATED BY DIMENSION ARE TO BE CENTERED IN
WALLS AS SHOWN OR LOCATED 6" FROM FACE OF STUD TO FACE OF
JAMB.
DIMENSIONS ARE TO FACES OF STUD UNLESS NOTED OTHERWISE.
LEGEND
J
D C
B E
J1J3
JA
INTRO TO
TRADES CR
J111
(E)
IDF
A5.90
1C
1B
1A
1D
3a
A9.10
TOTAL
OF (2)(4
) 4 ' x
' B
O O
TH
S
(M
ET
AL
(6) 4' x 4' BOOTHS (WOOD)
'-8
6'-2"
TRADE BOOTHS,
SEE STRUCTURAL
2'-9" 3'-10"
1'-3" MIN CLR
FIRESTOPPING AT PIPE
PEN THROUGH (E) 1-HR
WALL, SEE PLUMBING
EYEWASH, SEE PLUMBING
LINE OF (E)
MEZZANINE ABOVE
J1J3
JA
OPEN TO
BELOW
(E) STOR
LOFT
J201
A5.90 2B
2A
2D
2C
REFFER TO MEP SHEETS FOR SCOPE.
PORTLAND, OREGON
E
RE
DAVID A. JOHNSON
T
AT T
S
G
RE
SI
HC
OGEROOF
N
E
TC
TI
RADE
date phase revisions date project
1/2 9/2
6 4
:16 :16
P M
Au tod es k D oc s:/
/25
3-
4 O
CH
S
CT
E Re no /O
CS
D
Or eg on C ity H
S
EC
.rv t
A2.12
FLOOR PLANS
OR
EG
ON
C
IT
Y
HI
GH
SC
HO
OL
C
TE
T
5-
5-
OR
EG
ON
C
IT
Y
SC
HO
OL
D
IS
TR
IC
T
1/30/2026 25003-154
1 S B
EA
VE
RC
RE
EK
R
D, O
RE
GO
N
CI
TY
, O
R
PERMIT SET
SCALE: 1/8" = 1'-0" 1FLOOR PLAN - L1 - INTRO TO TRADES
SCALE: 1/8" = 1'-0" 2FLOOR PLAN - L2 - INTRO TO TRADES
DN
LEGEND:
BASE DESIGNATIONS:
B-1 4" RUBBER BASE
CORNER GUARDS:
NOTE: ALL CORNER GUARDS ARE STAINLESS STEEL 'L' SHAPED WITH
2" LEGS; HEIGHT INDICATED IS LENGTH OF CORNER GUARD
CG-1 6'-4" : ALIGN TOPS TO ADJACENT TACK SURFACE
CG-2 6'-10" : ALIGN TOPS TO ADJACENT DOOR FRAMES
FLOOR DRAIN - SEE PLUMBING
FLOOR BOX - SEE ELECTRICAL
AND TECHNOLOGY
CPT-1
CARPET TILE
SHEET NOTES:
1.
2.
3.
4.
5.
6.
7.
SEE FINISH LEGEND FOR MATERIAL DESIGNATIONS.
EXTEND FLOOR FINISHES UNDER TOEKICKS, OPEN COUNTERTOPS
AND EQUIPMENT, TYPICAL. EXTEND SCHEDULED BASE BEHIND ALL
APPLIANCES, TYPICAL.
ALL CLOSET FINISHES SHALL MATCH THE ADJACENT ROOM UNLESS
SPECIFICALLY NOTED OTHERWISE.
PROVIDE SPECIFIED TRANSITION STRIPS WHERE UNLIKE MATERIALS
MEET UNLESS NOTED OTHERWISE.
WHERE FLOOR FINISH CHANGES MATERIAL, COLOR, OR PATTERN AT
A DOOR, LOCATION SPECIFIED TRANSITION UNDER CENTERLINE OF
DOOR UNLESS NOTED OTHERWISE.
SEE VERTICAL CIRCULATION SHEET(S) FOR INFORMATION ON STAIR
AND/OR RAMP FINISHES.
JOINTS IN EXPOSED CONCRETE, FLOOR DRAINS, FLOOR
DATA/OUTLET, AND OTHER ELEMENTS RECESSED IN THE FLOOR ARE
SHOWN FOR REFERENCE ONLY. SEE SLAB PLANS.
LIN-1
SHEET
LINOLEUM
POL-1
POLISHED
CONCRETE
DD
DA
D9* D7
JROTC
DRILL
RM
D101
POL-1
B-1
STORAGE
D101D
POL-1
B-1
ARMOR
ROOM
D101E
POL-1
B-1
OFFICE
D101C
CPT-1
B-1
HALL
D101F
CPT-1
B-1
CG - 1
(E)
RR
D101B (E) (E)
JROTC EQUIPMENT STORAGE RACK (OFCI)
(E) EQUIPMENT
STORAGE RACK,
OFCI
A9.11
A9.20
A9.20
A9.20
(E) FLOOR
RECEPTACLES (TOTAL
OF 4) - REPLACE FLOOR
BOX COVERS WITH S/S
COVERS
CC
CE
C7
CA
PRODUCTION
STUDIO
C101
LIN-1
B-1
HALL
C101H
CPT-1
B-1
STOR
C101G
LIN-1
B-1
PODCASTING/
RECORDING
C101E
CPT-1
B-1
CONTROL
RM
C101D
CPT-1
B-1
A4.11
(E)
RR
C101C (E) (E)
A9.20
LIN-1
CG-2
BC
BE
BA
B9* B7
STOR
B101C
POL-1
B-1
(E)
ELEC
RM
B101D (E) (E)
CG - 1
(E)
RR
B101B (E) (E)
(E) FLOOR
RECEPTACLES
(TOTAL OF 4) -
REPLACE FLOOR
BOX COVERS
WITH S/S
COVERS
HALL
B101E
CPT-1
B-1
INTRO
TO
ROBOTICS
B101
POL-1
B-1
A9.12
5' X 5' CONC. POLISH
IN-PLACE MOCKUP
A9.20
J
D C
B E
CONTROL
RM
C101D
CPT-1
B-1
PODCASTING/
RECORDING
C101E
CPT-1
B-1
STOR
C101G
LIN-1
B-1
PRODUCTION
STUDIO
C101
LIN-1
B-1
HALL
C101H
CPT-1
B-1
CG - 1
LIN-1
A9.20
A9.20
CG-2
PORTLAND, OREGON
E
RE
DAVID A. JOHNSON
T
AT T
S
G
RE
SI
HC
OGEROOF
N
E
TC
TI
RADE
date phase revisions date project
1/2 9/2
6 4
:16 :18
P M
Au tod es k D oc s:/
/25
3-
4 O
CH
S
CT
E Re no /O
CS
D
Or eg on C ity H
S
EC
.rv t
A4.11
FINISH FLOOR PLANS
OR
EG
ON
C
IT
Y
HI
GH
SC
HO
OL
C
TE
T
5-
5-
OR
EG
ON
C
IT
Y
SC
HO
OL
D
IS
TR
IC
T
1/30/2026 25003-154
1 S B
EA
VE
RC
RE
EK
R
D, O
RE
GO
N
CI
TY
, O
R
PERMIT SET
SCALE: 1/8" = 1'-0" 3FINISH FLOOR PLAN - L1 - JROTC
SCALE: 1/8" = 1'-0" 2FINISH FLOOR PLAN - L1 - INTRO TO DIGITAL MEDIA
SCALE: 1/8" = 1'-0" 1FINISH FLOOR PLAN - L1 - INTRO TO ROBOTICS
SCALE: 1/4" = 1'-0" 4INTRO TO DIGITL MEDIA - ENLARGED PLAN
OPEN TO
BELOW
LEGEND:
BASE DESIGNATIONS:
B-1 4" RUBBER BASE
CORNER GUARDS:
NOTE: ALL CORNER GUARDS ARE STAINLESS STEEL 'L' SHAPED WITH
2" LEGS; HEIGHT INDICATED IS LENGTH OF CORNER GUARD
CG-1 6'-4" : ALIGN TOPS TO ADJACENT TACK SURFACE
CG-2 6'-10" : ALIGN TOPS TO ADJACENT DOOR FRAMES
FLOOR DRAIN - SEE PLUMBING
FLOOR BOX - SEE ELECTRICAL
AND TECHNOLOGY
CPT-1
CARPET TILE
SHEET NOTES:
1.
2.
3.
4.
5.
6.
7.
SEE FINISH LEGEND FOR MATERIAL DESIGNATIONS.
EXTEND FLOOR FINISHES UNDER TOEKICKS, OPEN COUNTERTOPS
AND EQUIPMENT, TYPICAL. EXTEND SCHEDULED BASE BEHIND ALL
APPLIANCES, TYPICAL.
ALL CLOSET FINISHES SHALL MATCH THE ADJACENT ROOM UNLESS
SPECIFICALLY NOTED OTHERWISE.
PROVIDE SPECIFIED TRANSITION STRIPS WHERE UNLIKE MATERIALS
MEET UNLESS NOTED OTHERWISE.
WHERE FLOOR FINISH CHANGES MATERIAL, COLOR, OR PATTERN AT
A DOOR, LOCATION SPECIFIED TRANSITION UNDER CENTERLINE OF
DOOR UNLESS NOTED OTHERWISE.
SEE VERTICAL CIRCULATION SHEET(S) FOR INFORMATION ON STAIR
AND/OR RAMP FINISHES.
JOINTS IN EXPOSED CONCRETE, FLOOR DRAINS, FLOOR
DATA/OUTLET, AND OTHER ELEMENTS RECESSED IN THE FLOOR ARE
SHOWN FOR REFERENCE ONLY. SEE SLAB PLANS.
LIN-1
SHEET
LINOLEUM
POL-1
POLISHED
CONCRETE
J1J3
JA
INTRO
TO
TRADES
CR
J111 (E) (E)
WHERE WALL REMOVED, FINISH
FLOOR TO MATCH (E) ADJACENT
J
D C
B E
J1J3
JA
(E)
STOR
LOFT
J201 (E) (E)
REFFER TO MEP SHEETS FOR SCOPE.
(E) CASEWORK AND
STORAGE UNITS
PORTLAND, OREGON
E
RE
DAVID A. JOHNSON
T
AT T
S
G
RE
SI
HC
OGEROOF
N
E
TC
TI
RADE
date phase revisions date project
1/2 9/2
6 4
:16 :18
P M
Au tod es k D oc s:/
/25
3-
4 O
CH
S
CT
E Re no /O
CS
D
Or eg on C ity H
S
EC
.rv t
A4.12
FINISH FLOOR PLANS
OR
EG
ON
C
IT
Y
HI
GH
SC
HO
OL
C
TE
T
5-
5-
OR
EG
ON
C
IT
Y
SC
HO
OL
D
IS
TR
IC
T
1/30/2026 25003-154
1 S B
EA
VE
RC
RE
EK
R
D, O
RE
GO
N
CI
TY
, O
R
PERMIT SET
SCALE: 1/8" = 1'-0" 1FINISH FLOOR PLAN - L1 - INTRO TO TRADES
SCALE: 1/8" = 1'-0" 2FINISH FLOOR PLAN - L2 - INTRO TO TRADES
P-1
A9.11
P-1 PAINT STEPPED SOFFIT AND FASCIA FULL LOCKER WALL LENGTH
P-1
P-1P-1 D
TS-2 TS-2
RUBBER BASE, TYP
TS
-2
8'-0"
EQEQFILL
A9.11
CORNER GUARD
A9.30
P-1
TS-2 TS-2
EQEQ
6' -4
6"
4"
P-1 P-1 P-1
C
EQEQ
8'-0"
RUBBER BASE, TYP
FILL
A9.11
TS-2TS-2TS-2
CORNER GUARD
A9.30
ON AIR
8' -0
CLP-1
TS-2 TS-2
EQEQ
6' -4
6"
4"
P-1
A9.11
P-1 PAINT STEPPED SOFFIT AND FASCIA FULL LOCKER WALL LENGTH
J
D C
B E
SHEET NOTES:LEGEND:MOUNTING HEIGHTS:
P-X
CONTROL JOINTCJ
TACKBOARDTB-X
PAINT COLOR (P-X)
PLASTIC LAMINATE (PL-X)
OWNER FURNISHED,
OWNER INSTALLEDOFOI
OWNER FURNISHED,
CONTRACTOR INSTALLEDOFCI
CASEWORK TYPEXX#X
WS1 ROLLER SHADES -
MANUAL
WS2 BLACKOUT SHADES -
MANUAL
FIRE EXTINGUISHER CABINETFEC-X
FEC-B
PL-X
WINDOW COVERINGS:
WCT-X FINISH MATERIAL PER
FINISH LEGEND
TS-2
TS-1
AWP-2
AWP-1
TACKSURFACE
TACKSURFACE
CUSTOM GRAPHIC
ACOUSTIC WALL
PANEL
TACKABLE
ACOUSTIC WALL
PANEL
FIBER
REINFORCED
PANEL
FRP-1
1.
2.
3.
4.
5.
6.
7.
MATERIALS WHICH ARE IN SIMILAR LOCATIONS ARE NOT NOTED AT EVERY
OCCURRENCE.
SEE FINISH FLOOR PLANS, REFLECTED CEILING PLANS, INTERIOR ELEVATIONS
AND FINISH LEGEND FOR ADDITIONAL INFORMATION.
SEE DOOR AND FRAME TYPES FOR ADDITIONAL INFORMATION AND REFERENCE
TO DETAILS.
DOOR SWINGS SHOWN ON ELEVATIONS ARE FOR REFERENCE ONLY- SEE FLOOR
PLANS.
ALL WALLS NOT ELEVATED OR TAGGED TO BE PAINTED P-1 (UNLESS NOTED
OTHERWISE).
MECHANICAL GRILLES AND ACCESS PANELS IN WALLS SHALL MATCH THE COLOR
OF THE WALL WHERE LOCATED, UNLESS NOTED OTHERWISE.
PROVIDE SOLID 2X BLOCKING AT ALL WALL MOUNTED ITEMS.
8. ALL COUNTERS TO BE PL-1, UNLESS NOTED OTHERWISE.
9. ALL CABINETS TO BE PL-2, UNLESS NOTED OTHERWISE.
10. SEE FINISH FLOOR PLANS FOR WALL BASE DESIGNATIONS.
11. ALL NEW WALLS TO HAVE IMPACT RESISTANT GYPSUM BOARD UP TO 4'-0" AFF.
1.
2.
HEIGHTS TYPICAL, UNLESS NOTED OTHERWISE.
PROVIDE BLOCKING PER SHEET NOTES AND PROJECT MANUAL.
WHERE BLOCKING IS SHOWN, PROVIDE BLOCKING AS INDICATED.
4'
8" R
.O
3' -1
0"
8' -0
5' -0
SIGNAGE, SEE
SIGNAGE SCHEDULE
SPEAKER
PULL
STATION
MARKER
BOARDTACKBOARD
7' -2
EQ EQ
FLAT PANEL MONITOR (OFCI)
BLOCKING PER MOUNTING
BRACKET REQUIRMENTS
8' -2
CLOCK (OFOI)
POWER/DATA PER ELEC & TECH, SEE
ELEC & TECH FOR HEIGHTS, VERIFY
WITH MANUFACTURER
FLAT PANEL MONITOR (OFCI) &
MOUNTING BRACKET (OFCI)
CUSTOM VINYL
GRAPHIC ON
GLAZING, APPLY ON
NON-CORRIDOR SIDE,
SEAL EDGES
LABORATORY GRADE
COMPACT LAMINATE (CPL-X)
CPL-X
TS-2
P-1P-1P-1
TS-2
BEQEQ
RUBBER BASE, TYP
8'-0"
TS
-2
A9.11
CORNER GUARD
A9.30
FILL
(E) FLATSCREEN
P-1
A9.11
P-1 PAINT STEPPED SOFFIT AND FASCIA FULL LOCKER WALL LENGTH
P-1
TS-2 TS-2
EQEQ
6' -4
6"
4"
PORTLAND, OREGON
E
RE
DAVID A. JOHNSON
T
AT T
S
G
RE
SI
HC
OGEROOF
N
E
TC
TI
RADE
date phase revisions date project
1/2 9/2
6 4
:16 :20
P M
Au tod es k D oc s:/
/25
3-
4 O
CH
S
CT
E Re no /O
CS
D
Or eg on C ity H
S
EC
.rv t
A5.01
INTERIOR ELEVATIONS -
HALLWAYS
OR
EG
ON
C
IT
Y
HI
GH
SC
HO
OL
C
TE
T
5-
5-
OR
EG
ON
C
IT
Y
SC
HO
OL
D
IS
TR
IC
T
1/30/2026 25003-154
1 S B
EA
VE
RC
RE
EK
R
D, O
RE
GO
N
CI
TY
, O
R
PERMIT SET
SCALE: 1/4" = 1'-0"
3B
ACADEMIC WING D - MAIN SPINE & ACADEMIC WING HALL
3C3D
2C2D
SCALE: 1/4" = 1'-0"
2B
ACADEMIC WING C - MAIN SPINE & ACADEMIC WING HALL
1C
SCALE: 1/4" = 1'-0"
1B
ACADEMIC WING B - MAIN SPINE & ACADEMIC WING HALL
1D
OPEN OPEN OPEN OPEN
TS-1
P-1P-1P-1
DISPLAY CASE
EQ EQ
EQ EQ
TS-1
FLAT PANEL MONITOR. SEE MOUNTING HEIGHT NOTE.P-1
6' -1
0" 4"
4X8 MB4'x4' TB-1 4X8 MB
P-1 P-1
EQ EQ EQ EQ
WS1 WS1 WS1
CPL-1 COUNTERTOP W/ 4" BACKSPLASH FULL LENGTH OF WALL32"W x 23"D x34" H
(TOTAL OF 6)
A9.10
96"x48" STEEL PEGBOARD
48"x48" STEEL PEGBOARD
WS1 WS1 WS1
P-1EQEQ
MC-2 CABINETS (TOTAL OF 5)
48"x48" STEEL PEGBOARD
P-1 DISPLAY CASE
CPL-1 COUNTERTOP
A9.10
32"W x 23" D x 34" H
32"W x 23" D x 34" H
P-1P-1P-1
WS2
A9.12
WS2
PATCH AND REPAIR WALL AS
NEEDED WHERE CASEWORK
AND PLUMBING REMOVED
WINDOW DISPLAY SHELVING
P-1 P-1 P-1
TS-1TS-1 TS-1
12'-0"
6' -1
0" 4"
EQ EQ EQ
P-1
SHEET NOTES:LEGEND:MOUNTING HEIGHTS:
P-X
CONTROL JOINTCJ
TACKBOARDTB-X
PAINT COLOR (P-X)
PLASTIC LAMINATE (PL-X)
OWNER FURNISHED,
OWNER INSTALLEDOFOI
OWNER FURNISHED,
CONTRACTOR INSTALLEDOFCI
CASEWORK TYPEXX#X
WS1 ROLLER SHADES -
MANUAL
WS2 BLACKOUT SHADES -
MANUAL
FIRE EXTINGUISHER CABINETFEC-X
FEC-B
PL-X
WINDOW COVERINGS:
WCT-X FINISH MATERIAL PER
FINISH LEGEND
TS-2
TS-1
AWP-2
AWP-1
TACKSURFACE
TACKSURFACE
CUSTOM GRAPHIC
ACOUSTIC WALL
PANEL
TACKABLE
ACOUSTIC WALL
PANEL
FIBER
REINFORCED
PANEL
FRP-1
1.
2.
3.
4.
5.
6.
7.
MATERIALS WHICH ARE IN SIMILAR LOCATIONS ARE NOT NOTED AT EVERY
OCCURRENCE.
SEE FINISH FLOOR PLANS, REFLECTED CEILING PLANS, INTERIOR ELEVATIONS
AND FINISH LEGEND FOR ADDITIONAL INFORMATION.
SEE DOOR AND FRAME TYPES FOR ADDITIONAL INFORMATION AND REFERENCE
TO DETAILS.
DOOR SWINGS SHOWN ON ELEVATIONS ARE FOR REFERENCE ONLY- SEE FLOOR
PLANS.
ALL WALLS NOT ELEVATED OR TAGGED TO BE PAINTED P-1 (UNLESS NOTED
OTHERWISE).
MECHANICAL GRILLES AND ACCESS PANELS IN WALLS SHALL MATCH THE COLOR
OF THE WALL WHERE LOCATED, UNLESS NOTED OTHERWISE.
PROVIDE SOLID 2X BLOCKING AT ALL WALL MOUNTED ITEMS.
8. ALL COUNTERS TO BE PL-1, UNLESS NOTED OTHERWISE.
9. ALL CABINETS TO BE PL-2, UNLESS NOTED OTHERWISE.
10. SEE FINISH FLOOR PLANS FOR WALL BASE DESIGNATIONS.
11. ALL NEW WALLS TO HAVE IMPACT RESISTANT GYPSUM BOARD UP TO 4'-0" AFF.
1.
2.
HEIGHTS TYPICAL, UNLESS NOTED OTHERWISE.
PROVIDE BLOCKING PER SHEET NOTES AND PROJECT MANUAL.
WHERE BLOCKING IS SHOWN, PROVIDE BLOCKING AS INDICATED.
4'
8" R
.O
3' -1
0"
8' -0
5' -0
SIGNAGE, SEE
SIGNAGE SCHEDULE
SPEAKER
PULL
STATION
MARKER
BOARDTACKBOARD
7' -2
EQ EQ
FLAT PANEL MONITOR (OFCI)
BLOCKING PER MOUNTING
BRACKET REQUIRMENTS
8' -2
CLOCK (OFOI)
POWER/DATA PER ELEC & TECH, SEE
ELEC & TECH FOR HEIGHTS, VERIFY
WITH MANUFACTURER
FLAT PANEL MONITOR (OFCI) &
MOUNTING BRACKET (OFCI)
CUSTOM VINYL
GRAPHIC ON
GLAZING, APPLY ON
NON-CORRIDOR SIDE,
SEAL EDGES
LABORATORY GRADE
COMPACT LAMINATE (CPL-X)
CPL-X
" M
IN
3'
-4
3'-5"
(N) VERTICAL GRAB BAR, 1.5"
DIA. STAINLESS STEEL, FINISH
TO MATCH (E). CONFIRM
INSTALL DOES NOT REQUIRE
IN-WALL BLOCKING. BASIS OF
DESIGN: WINGIT
(E) TOILET ACCESSORIES
J
D C
B E
PORTLAND, OREGON
E
RE
DAVID A. JOHNSON
T
AT T
S
G
RE
SI
HC
OGEROOF
N
E
TC
TI
RADE
date phase revisions date project
1/2 9/2
6 4
:16 :22
P M
Au tod es k D oc s:/
/25
3-
4 O
CH
S
CT
E Re no /O
CS
D
Or eg on C ity H
S
EC
.rv t
A5.20
INTERIOR ELEVATIONS -
SECTOR B
OR
EG
ON
C
IT
Y
HI
GH
SC
HO
OL
C
TE
T
5-
5-
OR
EG
ON
C
IT
Y
SC
HO
OL
D
IS
TR
IC
T
1/30/2026 25003-154
1 S B
EA
VE
RC
RE
EK
R
D, O
RE
GO
N
CI
TY
, O
R
PERMIT SET
SCALE: 1/4" = 1'-0"
1B
INTRO TO ROBOTICS B101 (CON'T.)
1C 1D
SCALE: 1/4" = 1'-0"
1E
INTRO TO ROBOTICS B101
1A
2C
SCALE: 1/4" = 1'-0"
2D
INTRO TO ROBOTICS B101D
2A 2B
SCALE: 1/4" = 1'-0" 3DTYP. (E) TOILET WALL
OPENOPEN
AWP-2AWP-2
6' -1
0" 4"
TYP.
EQ
TYP.
EQ
P-1
AWP-2AWP-2
P-1
WS2
4x4 MB
EQ EQP-1
TS-1 TS-1
EQ EQ
TS-1
FILL
WS2
AWP-1 AWP-1 AWP-1
P-1
P-1
P-1
AWP-1
3' -0
6'
-1 0"
EQ. 4'-0" EQ. 4'-0"
PRODUCTION CURTAIN TRACK
PATCH AND REPAIR WALL AS NEEDED AT
REMOVED PAPER TOWEL DISPENSER
WS2 WS2 WS2
WS2 WS2 WS2
AWP-1 AWP-1
P-1
AWP-1AWP-1AWP-1AWP-16'
-1
0" 3'
-0
TYP.
4'-0"
EQ
AWP-1
EQ
AWP-1
P-1
AWP-1AWP-1AWP-1
P-1 P-1
3' -0
6'
-2
EQ.EQ.
EQ. EQ.
PATCH AND PAINT AS NEEDED
WHERE CASEWORK AND
PLUMBING REMOVED
2" 2"
CORNER GUARD CORNER GUARD
P-1
AWP-1
P-1
PATCH AND REPAIR WALL AS
NEEDED WHERE CASEWORK
AND PLUMBING REMOVED.
EQ EQ
ALIGN AWP EDGES TO DOOR AND WINDOW FRAMES, TYP.
AWP-1 AWP-1 AWP-1 AWP-1AWP-1AWP-1AWP-1
4X8 MB WS2
3'-4"(4) EQ. SPACED PANELS
MOUNT ROOM SIGN TO DOOR
3'-4"
CORNER GUARD
P-1
WS2
P-1
AWP-2AWP-2WALL INFILL PER PLANS
P-1
REPLACE FULL WALL OF WALL BASE TO MATCH (E)
P-1 P-1 P-1 P-1
P-1
18"W x23"D x34" H
6'-2"
A9.10
AV EQUIPMENT RACK,
SEE AV, TECHNOLOGY, ELECTRICAL
ON AIR
CL
8' -0
P-1
WS2
PLASTIC LAMINATE
COUNTERTOP (PL-1)
MAX.
4'-0" O.C.
P-1 P-1
P-1
ON AIR LIGHT -
SEE ELECTRICAL.
1WS2
ON AIR
CL
EQEQ
8' -0
P-1
4'x4' TB-1
SHEET NOTES:LEGEND:MOUNTING HEIGHTS:
P-X
CONTROL JOINTCJ
TACKBOARDTB-X
PAINT COLOR (P-X)
PLASTIC LAMINATE (PL-X)
OWNER FURNISHED,
OWNER INSTALLEDOFOI
OWNER FURNISHED,
CONTRACTOR INSTALLEDOFCI
CASEWORK TYPEXX#X
WS1 ROLLER SHADES -
MANUAL
WS2 BLACKOUT SHADES -
MANUAL
FIRE EXTINGUISHER CABINETFEC-X
FEC-B
PL-X
WINDOW COVERINGS:
WCT-X FINISH MATERIAL PER
FINISH LEGEND
TS-2
TS-1
AWP-2
AWP-1
TACKSURFACE
TACKSURFACE
CUSTOM GRAPHIC
ACOUSTIC WALL
PANEL
TACKABLE
ACOUSTIC WALL
PANEL
FIBER
REINFORCED
PANEL
FRP-1
1.
2.
3.
4.
5.
6.
7.
MATERIALS WHICH ARE IN SIMILAR LOCATIONS ARE NOT NOTED AT EVERY
OCCURRENCE.
SEE FINISH FLOOR PLANS, REFLECTED CEILING PLANS, INTERIOR ELEVATIONS
AND FINISH LEGEND FOR ADDITIONAL INFORMATION.
SEE DOOR AND FRAME TYPES FOR ADDITIONAL INFORMATION AND REFERENCE
TO DETAILS.
DOOR SWINGS SHOWN ON ELEVATIONS ARE FOR REFERENCE ONLY- SEE FLOOR
PLANS.
ALL WALLS NOT ELEVATED OR TAGGED TO BE PAINTED P-1 (UNLESS NOTED
OTHERWISE).
MECHANICAL GRILLES AND ACCESS PANELS IN WALLS SHALL MATCH THE COLOR
OF THE WALL WHERE LOCATED, UNLESS NOTED OTHERWISE.
PROVIDE SOLID 2X BLOCKING AT ALL WALL MOUNTED ITEMS.
8. ALL COUNTERS TO BE PL-1, UNLESS NOTED OTHERWISE.
9. ALL CABINETS TO BE PL-2, UNLESS NOTED OTHERWISE.
10. SEE FINISH FLOOR PLANS FOR WALL BASE DESIGNATIONS.
11. ALL NEW WALLS TO HAVE IMPACT RESISTANT GYPSUM BOARD UP TO 4'-0" AFF.
1.
2.
HEIGHTS TYPICAL, UNLESS NOTED OTHERWISE.
PROVIDE BLOCKING PER SHEET NOTES AND PROJECT MANUAL.
WHERE BLOCKING IS SHOWN, PROVIDE BLOCKING AS INDICATED.
4'
8" R
.O
3' -1
0"
8' -0
5' -0
SIGNAGE, SEE
SIGNAGE SCHEDULE
SPEAKER
PULL
STATION
MARKER
BOARDTACKBOARD
7' -2
EQ EQ
FLAT PANEL MONITOR (OFCI)
BLOCKING PER MOUNTING
BRACKET REQUIRMENTS
8' -2
CLOCK (OFOI)
POWER/DATA PER ELEC & TECH, SEE
ELEC & TECH FOR HEIGHTS, VERIFY
WITH MANUFACTURER
FLAT PANEL MONITOR (OFCI) &
MOUNTING BRACKET (OFCI)
CUSTOM VINYL
GRAPHIC ON
GLAZING, APPLY ON
NON-CORRIDOR SIDE,
SEAL EDGES
LABORATORY GRADE
COMPACT LAMINATE (CPL-X)
CPL-X
J
D C
B E
ON AIR
CL
8' -0
EQEQ
PORTLAND, OREGON
E
RE
DAVID A. JOHNSON
T
AT T
S
G
RE
SI
HC
OGEROOF
N
E
TC
TI
RADE
date phase revisions date project
1/2 9/2
6 4
:16 :24
P M
Au tod es k D oc s:/
/25
3-
4 O
CH
S
CT
E Re no /O
CS
D
Or eg on C ity H
S
EC
.rv t
A5.30
INTERIOR ELEVATIONS -
SECTOR C
OR
EG
ON
C
IT
Y
HI
GH
SC
HO
OL
C
TE
T
5-
5-
OR
EG
ON
C
IT
Y
SC
HO
OL
D
IS
TR
IC
T
1/30/2026 25003-154
1 S B
EA
VE
RC
RE
EK
R
D, O
RE
GO
N
CI
TY
, O
R
PERMIT SET
3A
SCALE: 1/4" = 1'-0"
3D
PODCAST/RECORDING ROOM C101E
2B2A
1C1B
SCALE: 1/4" = 1'-0"
1D
DIGITAL MEDIA - PRODUCTION STUDIO C101
SCALE: 1/4" = 1'-0"
1A
DIGITAL MEDIA - PRODUCTION STUDIO C101 (CON'T.)
3B 3C4B
5A 5B 5C
SCALE: 1/4" = 1'-0"
5D
STORAGE C101G
SCALE: 1/4" = 1'-0"
2D
CONTROL ROOM C101D
2C
6A
SCALE: 1/4" = 1'-0"
6D
DIGITAL MEDIA - VESTIBULE
6C6B
SCALE: 1/4" = 1'-0"
4C
DIGITAL MEDIA - STAFF HALL
P-1P-1
36"W x 24"D x 86" H (TOTAL OF (7)
A9.10P-1 P-1 P-1
MB-1 MB-1
8'-0" 8"
4' -0
"TB-1
4'x4'
TB-1
4'x6'
P-1
EQ EQ
P-1
P-1
WS1 WS1 WS1
WS1 WS1 WS1
P-1
CHAIN LINK FENCE
WITH LOCKABLE GATE.
4" 3'
-4
3' -4
3'
-0
FASTEN TOP OF POST TO
STRUCTURAL DECK ABOVE,
EA POST, SEE STRUCTURAL.
FASTEN BOTTOM OF POST
TO CONC. FLOOR, TYP.
'-7
" V
IF
2" GAP TO WALL 2" GAP TO WALL
EQ EQ 3'-2" 2'-4"
ACT CEILING, HEIGHT PER RCP
P-1P-1
WS2
TS-1
P-1
TS-1 TS-1
6' -1
0" 4"
12'-0"
EQ EQ EQ
P-1
WS2
WS2
P-1P-1P-1
WS…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .