Att. 2 Statement of Work 250424.pdf
PDF 68 KB Posted
- Solicitation number
- 12445525R0011
- Issued by
-
Department of Agriculture Forest Service
About this file
This document is a Statement of Work (SOW) for the Seagull Guard Station Bunkhouse Replacement project for the U.S. Forest Service. The project requires demolishing the existing bunkhouse and constructing a new prefabricated modular bunkhouse located at 11456 Gunflint Trail in Grand Marais, Minnesota. The scope of work includes providing all labor, materials, tools, equipment, transportation, and services necessary to complete the project, which involves multiple phases such as manufacturing the bunkhouse, site work and landscaping, transporting and placing the structure on-site, connecting utilities (water, wastewater/septic, communication lines), and final construction and grading to deliver a fully functional bunkhouse to the U.S. Forest Service.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Seagull Guard Station Bunkhouse Replacement
Statement of Work
Provide for and furnish all labor, superintendence, materials, tools, equipment, transportation, certificates, insurance, temporary protection, and other items designated under provisions of this contract necessary to demolish the existing bunkhouse and construct a new bunkhouse.
This shall include all associated appliances, construction and connection to utilities, water, wastewater/septic, communication lines, etc. at the U.S. Forest Service Seagull Guard Station located at 11456 Gunflint Trail Grand Marais, MN 55604 as outlined in the contract specifications and plans.
The project is designed with a prefabricated modular structure as the basis for design. Several phases will be needed in this project including, manufacturing the bunkhouse, site work and landscaping, transporting and placing on site, connecting and constructing all applicable utilities as described in the contract documents, final construction and grading, and all other services and construction to produce a final useable product to the U.S. Forest Service described in the contract plans and specifications.
File details come from the government source that posted it. Updated .