Att D - Cost Proposal.xlsx
XLSX spreadsheet 41 KB Posted
- Solicitation number
- RFP 25-83595
- Issued by
- St. Joseph County, Indiana
About this file
This is a Cost Proposal Excel file for the Douglas Road Landfill Superfund Site Services RFP (Request for Proposal) numbered 25-83595, likely for a state or local government environmental management project. The document outlines a comprehensive two-year contract with optional two-year extension for ongoing landfill maintenance and monitoring services, covering eight primary tasks including project planning, site security, landfill cap inspections, gas system maintenance, compliance monitoring, groundwater monitoring, utility support, and project documentation. The contract term spans two initial years with potential additional two-year renewal, with detailed pricing structures for each task broken down by yearly intervals and specific subtask components.
The cost proposal template requires respondents to complete only yellow-shaded cells, with blue cells automatically calculating totals. Pricing must be all-inclusive and submitted in the original Excel format, with scoring based on the Total Bid Amount. The document includes provisions for tracking costs across multiple contract years, with unit cost calculations for various environmental management activities such as site inspections, maintenance, sampling, analysis, and reporting. Notably, the current file shows zero-dollar amounts, indicating this is a template for potential bidders to complete, with specific emphasis on precise cost documentation and compliance with state procurement requirements.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Att G - Q&A State Response.xlsx | XLSX spreadsheet | |
| Vendor Networking Opportunities List.xlsx | XLSX spreadsheet | |
| Att C - Indiana Economic Impact Form.xls | XLS spreadsheet | |
| Att E - Business Proposal.docx | DOCX document | |
| Att J - Attestation Form.docx | DOCX document | |
| Att K - AI Tech Proposal Questions.docx | DOCX document | |
| Att M - Scope of Work.pdf | ||
| RFP 25-83595 Main Document.pdf | ||
| Att A1 - IVOSB.docx | DOCX document | |
| Att B - Sample Contract.docx | DOCX document | |
| Att B3 - SaaS.docx | DOCX document | |
| Att H - Reference Check Form.docx | DOCX document | |
| Att I - Pre-proposal Network Form.docx | DOCX document | |
| Att A - MWBE.docx | DOCX document | |
| Att B1 - IaaS.docx | DOCX document | |
| Att B2 - PaaS.docx | DOCX document | |
| Att F - Technical Proposal.docx | DOCX document | |
| Att G - Q&A Template.xlsx | XLSX spreadsheet | |
| Att L - Infrastructure Overview.docx | DOCX document |
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Instruction
Respondent's Name:
| Dougas Road Landfill Superfund Site Services RFP 25-83595 |
| Cost Proposal - Attachment D |
| Instructions |
| 1. Respondents should only populate the YELLOW shaded cells in the Task tabs. Note that the blue cells will populate automatically. Submit a working Excel file with your proposal. Proposals submitted without a working copy of this Excel file may be deemed unresponsive. |
| 2. Pricing proposed must correspond directly to the Tasks as described in the Scope of Work (Attachment J). Prices must be ALL INCLUSIVE. |
| 3. The Cost Proposal must be submitted in the original format. Any attempt to manipulate the format of the Cost Proposal document, attach caveats to pricing, or submit pricing that deviates from the current format will put your proposal at risk. |
| Worksheet Descriptions |
| Cost Summary: The Cost Summary worksheet sums the total cost for each Task worksheet. The Respondent will be scored on the Total Bid Amount, specifically cell C15 on the Cost Summary worksheet. This figure should also be used when completing the Minority and Women Business Subcontractor Commitment Form (Attachment A), The Indiana Veteran Owned Small Business Subcontractor Commitment Form (Attachment A1), and the Indiana Economic Impact Form (Attachment C). |
| Task Tabs A - H: Each Task worksheet requests completion of the unit cost for each task. |
Cost Summary
| Cost Summary - Two Year Term | |
| This tab will be used to assign cost points. There is no response necessary on this worksheet. | |
| Task Description | AMOUNT (YEAR 1 - 2) |
| Task A - Project Planning and Management, Site Visits/Meetings, Office Meetings, and Conference Calls | $ - 0 |
| Task B - Site Security and Perimeter Fence Inspections, Repairs/Replacements and Vegetation Control & Removal | $ - 0 |
| Task C - Landfill Cap and Drainage Inspections & Maintenance, Mowing, Vegetative Growth Control, Nuisance Animal Control, Settlement/Erosion/Drainage Repairs & Oversight | $ - 0 |
| Task D - Landfill Gas System Inspections, Maintenance, and Repairs | $ - 0 |
| Task E - Landfill Compliance Monitoring and Sampling, Analysis, and Data Validation | $ - 0 |
| Task F - Groundwater Monitoring Network Inspection and Maintenane, Water Level Measurement and Sampling, Laboratory Analytical Analysis, and Data Validation | $ - 0 |
| Task G - Utility Support Services and Utility Systems Repair & Maintenance | $ - 0 |
| Task H - Project Documents and Reports | $ - 0 |
TOTAL BID AMOUNT (2 YEAR) $ - 0
Task A
| Year 1 | Year 2 | Optional Contract Year 3 and 4 | ||||||||||
| Task A - Project Planning and Management, Site Visits/Meetings, Office Meetings, and Conference Calls | Unit of Measure (UOM) | Qty | Unit Cost Year 1 | Year 1 Total | Unit Cost Year 2 | Year 2 Total | TOTAL COST (Year 1 & 2) | Unit Cost Year 3 | Year 3 Total | Unit Cost Year 4 | Year 4 Total | TOTAL COST (Year 3 &4) |
| Subtask - Type of Expenditure / Description | ||||||||||||
| Background Document Review and Site Familiarization | EA | 1 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Kick-Off Meeting | EA | 1 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Initial Site Visit / Tour / Meeting | EA | 1 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Monthly Progress Conference Calls | EA | 12 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Additional Conference Calls | EA | 10 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Additional Site Visits / Meetings | EA | 6 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Project Management | HR | 120 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| TOTAL Cost for Task A | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
Task B
| Year 1 | Year 2 | Optional Contract Year 3 and 4 | ||||||||||
| Task B - Site Security and Perimeter Fence Inspections, Repairs/Replacements and Vegetation Control & Removal | Unit of Measure (UOM) | Qty | Unit Cost Year 1 | Year 1 Total | Unit Cost Year 2 | Year 2 Total | TOTAL COST (Year 1 & 2) | Unit Cost Year 3 | Year 3 Total | Unit Cost Year 4 | Year 4 Total | TOTAL COST (Year 3 &4) |
| Subtask - Type of Expenditure / Description | ||||||||||||
| Site Security and Perimeter Fence Inspections | EA | 12 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Fence Repairs | PER FT. | 300 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Fence Post Repairs/Replacement | EA | 10 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Fencing Barbed-Wire Repairs/Replacement | PER FT. | 300 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Gate Component Repair/Replacement | EA | 4 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Padlock Replacement | EA | 8 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Chain Replacement | EA | 2 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Perimeter Fence Vegetative Control and Removal | EA | 1 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Site Access Road Repair and Maintenance | EA | 1 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| TOTAL Cost for Task B | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
Task C
| Year 1 | Year 2 | Optional Contract Year 3 and 4 | ||||||||||
| Task C - Landfill Cap and Drainage Inspections & Maintenance, Mowing, Vegetative Growth Control, Nuisance Animal Control, Settlement/Erosion/Drainage Repairs & Oversight | Unit of Measure (UOM) | Qty | Unit Cost Year 1 | Year 1 Total | Unit Cost Year 2 | Year 2 Total | TOTAL COST (Year 1 & 2) | Unit Cost Year 3 | Year 3 Total | Unit Cost Year 4 | Year 4 Total | TOTAL COST (Year 3 &4) |
| Subtask - Type of Expenditure / Description | ||||||||||||
| Landfill Cap & Drainage System Inspections | EA | 12 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Detailed Landfill Cap and Drainage Ditch Inspections | EA | 4 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Mowing | EA | 2 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Vegetative and Nuisance Plant Growth Control | EA | 1 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Nuisance Animal Control | EA | 5 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| TOTAL Cost for Task C | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
Task D
| Year 1 | Year 2 | Optional Contract Year 3 and 4 | ||||||||||
| Task D - Landfill Gas System Inspections, Maintenance, and Repairs | Unit of Measure (UOM) | Qty | Unit Cost Year 1 | Year 1 Total | Unit Cost Year 2 | Year 2 Total | TOTAL COST (Year 1 & 2) | Unit Cost Year 3 | Year 3 Total | Unit Cost Year 4 | Year 4 Total | TOTAL COST (Year 3 &4) |
| Subtask - Type of Expenditure / Description | ||||||||||||
| Landfill Gas System Inspections | EA | 24 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Landfill Gas System Maintenance and Repairs | EA | 1 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Landfill Gas System Building Painting and Weather-Proofing | EA | 1 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Landfill Gas System Building Maintenance and Repairs | EA | 2 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| TOTAL Cost for Task D | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
Task E
| Year 1 | Year 2 | Optional Contract Year 3 and 4 | ||||||||||
| Task E - Landfill Compliance Monitoring and Sampling, Analysis, and Data Validation | Unit of Measure (UOM) | Qty | Unit Cost Year 1 | Year 1 Total | Unit Cost Year 2 | Year 2 Total | TOTAL COST (Year 1 & 2) | Unit Cost Year 3 | Year 3 Total | Unit Cost Year 4 | Year 4 Total | TOTAL COST (Year 3 &4) |
| Subtask - Type of Expenditure / Description | ||||||||||||
| Landfill Compliance Monitoring | EA | 4 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Landfill Compliance Sampling | EA | 4 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Landfill Compliance Sample Analysis | EA | 4 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Landfill Compliance Sample Data Validation | EA | 4 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| TOTAL Cost for Task E | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
Task F
| Year 1 | Year 2 | Optional Contract Year 3 and 4 | ||||||||||
| Task F - Groundwater Monitoring Network Inspection and Maintenane, Water Level Measurement and Sampling, Laboratory Analytical Analysis, and Data Validation | Unit of Measure (UOM) | Qty | Unit Cost Year 1 | Year 1 Total | Unit Cost Year 2 | Year 2 Total | TOTAL COST (Year 1 & 2) | Unit Cost Year 3 | Year 3 Total | Unit Cost Year 4 | Year 4 Total | TOTAL COST (Year 3 &4) |
| Subtask - Type of Expenditure / Description | ||||||||||||
| Groundwater Monitoring Network Inspection and Maintenance | EA | 1 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Groundwater Monitoring Network Water Level Measurement and Sampling | EA | 1 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Groundwater Monitoring Network Sample Analysis | EA | 1 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Groundwater Monitoring Network Sample Result Data Validation | EA | 1 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Monitoring Well Redevelopment | EA | 4 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Monitoring Well Abandonment | EA | 2 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| TOTAL Cost for Task F | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
Task G
| Year 1 | Year 2 | Optional Contract Year 3 and 4 | ||||||||||
| Task G - Utility Support Services and Utility Systems Repair & Maintenance | Unit of Measure (UOM) | Qty | Unit Cost Year 1 | Year 1 Total | Unit Cost Year 2 | Year 2 Total | TOTAL COST (Year 1 & 2) | Unit Cost Year 3 | Year 3 Total | Unit Cost Year 4 | Year 4 Total | TOTAL COST (Year 3 &4) |
| Subtask - Type of Expenditure / Description | ||||||||||||
| Utility Support Services | EA | 1 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Utility Systems Repair & Maintenance | EA | 1 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| TOTAL Cost for Task G | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
Task H
| Year 1 | Year 2 | Optional Contract Year 3 and 4 | ||||||||||
| Task H - Project Documents and Reports | Unit of Measure (UOM) | Qty | Unit Cost Year 1 | Year 1 Total | Unit Cost Year 2 | Year 2 Total | TOTAL COST (Year 1 & 2) | Unit Cost Year 3 | Year 3 Total | Unit Cost Year 4 | Year 4 Total | TOTAL COST (Year 3 &4) |
| Subtask - Type of Expenditure / Description | ||||||||||||
| Annual Update to the Health and Safety Plan (HASP) | EA | 1 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Annual Update to the Quality Assurance Project Plan (QAPP) and Sampling and Analysis Plan (SAP) | EA | 1 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Quarterly Progress Reports | EA | 4 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Annual Sampling Report | EA | 1 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| TOTAL Cost for Task H | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |