This document is a Quality Requirements specification section (014200) for FermiForward service subcontracts, effective October 2025.
Service subcontractors are required to establish and maintain comprehensive quality control programs to ensure compliance with subcontract documents, applicable codes, and industry standards. Subcontractors must submit a Corporate Quality Assurance Plan with their bid or proposal; failure to do so may result in a non-responsive bid. Within 10 working days of subcontract award, subcontractors must submit a Project Quality Control (PQC) Plan to the Procurement Administrator for FermiForward review and approval. FermiForward will review and accept or require modifications to the PQC Plan within 5 working days of submittal. The PQC Plan must be updated whenever scope changes occur through directed field changes or supplemental agreements. Work cannot commence until the PQC Plan receives acceptance, which is conditional upon satisfactory ongoing performance.
The PQC Plan must identify all personnel assigned quality control functions with their qualifications, duties, responsibilities, and authorities, including designation of a Project Quality Control Manager. The Project Quality Control Manager is responsible for implementing the plan, interfacing with the Task Manager on quality matters, maintaining quality records, attending coordination meetings, ensuring QC checks are performed, developing and maintaining a deficiency/nonconformance list, and preparing quality control reports. The specification provides detailed guidance in three appendices: Appendix A outlines required elements of Corporate Quality Assurance Plans; Appendix B provides Project Quality Control Plan guidance covering organizational structure, work phases, QC procedures, testing protocols, nonconformance handling, and documentation requirements; and Appendix C contains a template Corporate Quality Assurance Plan for contractors without existing quality documentation.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FermiForward Quality Requirements October 2025
QUALITY REQUIREMENTS 014200-1
SECTION 014200 – QUALITY REQUIREMENTS (For Services)
1.1 PURPOSE
The Service Subcontractor is responsible for all activities necessary to manage, control, and document work so as to ensure compliance with the Subcontract documents. The Subcontractor’s responsibility includes ensuring adequate Quality Control services are provided for work accomplished on- and off-site by their organization, suppliers, technical laboratories, and consultants.
The work activities include safety, testing and inspection, and all other functions relating to the requirements for the service being provided. The Subcontractor shall implement a Quality Control program and designate a quality responsible person(s) to achieve these goals. Depending on the size and complexity of the project, a dedicated Quality Control Project Manager may be required.
1.2 THE QUALITY PROGRAM
Corporate Quality Assurance Plan: The Subcontractor shall furnish with the bid or proposal a copy of their corporate Quality Assurance Plan. Failure to submit such a document could constitute a non-responsive bid or proposal. See Appendix A for Corporate Quality Assurance Plan guidance. If the Subcontractor does not have a Corporate Quality Assurance Plan developed at time of bid, they may elect to use form [Appendix C] to satisfy this requirement.
Project Quality Control Plan: The Subcontractor/Vendor shall furnish a Project Quality Control (PQC) Plan to the Procurement Administrator, for review by FermiForward, not later than 10 working days after receipt of award of Subcontract.
The PQC Plan shall identify personnel, procedures, controls, instructions, test, records, and forms to be used specific to this project at Fermilab. The PQC Plan shall be updated to incorporate any changes in scope of work, due to directed field changes or supplemental agreements, as these changes occur. See Appendix B for Project Quality Control Plan guidance.
1.3 REQUIREMENTS
The PQC Plan shall include, as a minimum, the following information to cover all efforts performed, both onsite and offsite, including work by sub-tier contractors, fabricators, suppliers, and purchasing agents:
The name, qualifications, duties, responsibilities, and authorities of each person assigned a Quality Control function, including the identity of the Project Quality Control Manager:
Depending on the size and complexity of the project, the project superintendent and/or competent person may also serve as the Quality Control Project Manager.
QUALITY REQUIREMENTS 014200-2
As a minimum, the Project Quality Control Manager shall be responsible for the following:
Ensure the defined Project Quality Control Plan is effectively implemented.
Interface with the Task Manager or designee on all quality matters;
Maintain all quality related records;
Attend any planned coordination meetings;
Assure all required QC checks are performed;
Develop and maintain a deficiency/nonconformance list;
Prepare and submit quality control reports;
1.4 ACCEPTANCE
Acceptance of the Subcontractor's PQC Plan is required prior to starting work.
Acceptance is conditional and will be predicated on satisfactory performance as work proceeds.
FermiForward reserves the right to require the Subcontractor to make modifications to their PQC Plan and operations including personnel as necessary to obtain the quality specified (Subcontract Terms and Conditions). FermiForward review and acceptance will occur within 5 working days of the submittal of the PQC Plan.
END OF SECTION
QUALITY REQUIREMENTS 014200-3
Appendix A – Corporate Quality Assurance (QA) Plan Guidance
The section below describes the elements expected in the Corporate Quality Assurance Plans submitted by Subcontractors.
Purpose o The Subcontractor is to describe the purpose of the document (Corporate QA Plan) as it relates to their organization.
Roles, Responsibilities, and Authorities o The Subcontractor is to describe the roles, responsibilities, and authorities relating to the various Quality Assurance processes described within this plan.
Scope o The Subcontractor is to describe the scope of the Corporate QA Plan.
Organizational Chart o The Subcontractor is to highlight the QA roles in the organization.
Requirements Verification o The Subcontractor is to describe how requirements relating to a scope of work are verified.
Document Control o The Subcontractor is to describe how documentations is controlled.
Submittals/Procurement o The Subcontractor is to describe their submittal and procurement process.
Material and Equipment Control o The Subcontractor is to describe how materials and equipment are received, stored, maintained, and released.
Procedures o The Subcontractor is to describe the various procedures that are used to control the performance of work to ensure requirements for design, materials, installation, etc.
are met.
Suspect/Counterfeit Items o The Subcontractor is to describe processes that will be in place for monitoring and controlling the use of suspect/counterfeit items.
Nonconformance Handling o The Subcontractor is to describe processes that will be in place for managing nonconforming goods or processes.
Lessons Learned o The Subcontractor is to describe their lessons learned process, including identifying, documenting, and sharing lessons.
Continuous Improvement o The Subcontractor is to describe processes that are in place to identify and implement improvement opportunities.
Inspection and Testing o The Subcontractor is to describe the inspection and testing requirements and methods for documentation. Additionally, the qualifications of personnel performing inspections and testes should also be described. Also, the managing of testing equipment including calibration requirements should also be described.
QUALITY REQUIREMENTS 014200-4
Commissioning o The Subcontractor is to describe the commissioning process that is followed.
Appendix B – Project Quality Control Plan Guidance
Purpose o Describe the purpose of the document as it relates to the specific project that’s been awarded.
Project Specific Organization o Describe the personnel that will be working directly on the project, highlighting the quality control responsible individuals and their lines of authority. An organizational chart should be provided as well as the names and qualifications of each member.
Describe the duties, responsibilities, and authorities of each person assigned a QC function.
List the phases for the Project o Provide a list of work phases specific to the project and describe the associated procedures for each.
QC Procedures/Submittals o Provide the control, verification, and acceptance testing procedures for each test to be performed.
o Include the test name, feature of work to be tested, testing frequency, and responsible party for each test. This includes QC performed both internally and by independent testing agents.
Turnover Records o The Subcontractor is to describe what documentation will be turned over to the
Owner and at what point in time.
QC Tracking/Verification o Describe the procedures for identifying and tracking of QC checks required, verification efforts, and acceptance testing.
Nonconformance Handling o Describe the procedures for tracking deficiencies/nonconformances from identification through corrective action implementation. Establish verification procedures that identified deficiencies/nonconformances have been corrected.
o Include communication process for deficiencies/nonconformances.
Meetings and Reports o The Subcontractor is to describe what meetings will take place.
Reports/documentation that is generated at each meeting should also be described.
QUALITY REQUIREMENTS 014200-5
Appendix C – Corporate Quality Assurance (QA) Plan
Quality Assurance Plan To be used by contractors who do not submit their own QA Plan
1. Purpose This Quality Assurance (QA) Plan establishes minimum quality standards, responsibilities, and procedures that the Contractor must follow to ensure that all work meets the contract requirements, applicable codes, and industry best practices. By signing this document the Contractor agrees to adopt and comply with this QA Plan for the duration of the project.
2. Roles, Responsibilities, and Authorities
• Contractor QA Representative The Contractor shall designate a QA Representative who will be responsible for overseeing quality-related activities, performing inspections, and coordinating with the Owner’s Quality personnel.
• Project Manager / Superintendent Responsible for ensuring that project staff and subcontractors adhere to this QA Plan and perform work according to approved drawings and specifications.
• Foremen / Trade Supervisors Responsible for daily implementation of quality requirements in their respective work areas.
3. Quality Objectives
• Deliver work that complies with all project specifications, approved drawings, and applicable codes.
• Prevent rework by ensuring quality is built in at every stage.
• Maintain consistent workmanship and construction practices across all trades.
4. Submittals and Approvals
• All required submittals (shop drawings, material certifications, product data, etc.) shall be submitted and approved before work begins.
• Deviations from approved submittals or specifications must be approved in writing by the Owner or their representative.
5. Inspection and Testing
• Pre-Work Inspection Conduct inspections before work starts to ensure site conditions are suitable and all materials/tools meet specified requirements.
• In-Process Inspections
QUALITY REQUIREMENTS 014200-6
Work shall be inspected during execution to identify deficiencies early and ensure compliance.
• Final Inspection All work shall be subject to a final inspection. Any deficiencies must be corrected before acceptance.
• Testing Testing shall be performed as required by contract documents, applicable codes, or at the direction of the Owner. Testing may include concrete testing, weld inspections, waterproofing tests, etc.
6. Nonconforming Work
• All nonconforming work must be documented, evaluated, and corrected in accordance with project specifications.
• Rework shall be completed at the Contractor’s expense and scheduled to minimize project impacts.
7. Documentation and Records
• Daily QA records shall be maintained by the Contractor and made available upon request.
• Records include: inspection checklists, test reports, material certifications, delivery tickets, and nonconformance logs.
8. Corrective and Preventive Action
• When quality issues are discovered, root causes shall be identified, and corrective measures shall be implemented to prevent recurrence.
• Preventive actions should be taken proactively when risks or trends are identified.
9. Training and Communication
• All personnel performing work under this plan shall be trained in quality requirements relevant to their duties.
• QA responsibilities and standards shall be communicated during pre-task meetings or toolbox talks.
10. Project Closeout
• Prior to final acceptance, the Contractor shall complete all punch list items and submit all required closeout documentation including warranties, as-builts, and test reports.
• Final QA review shall be conducted to ensure all deliverables are complete and compliant.
Acknowledgment By signing below, the Contractor agrees to adopt this Quality Assurance Plan in full and understands that failure to comply may result in rework, payment withholding, or termination for cause.
Contractor Name Signature Title Date