Att C3 - ASI TPMS Fixed_TandM Price Narrative.docx

DOCX document 45 KB Posted

Attached to
NAWCAD (WOLF) Airborne Systems Integration (ASI ) Division Technical/Project Management Support (TPMS)
Solicitation number
N0042127R1008
Issued by

About this file

This is a Fixed/T&M Price Narrative template for subcontractors responding to a Request for Offers (RFO N00421-27-R-1008) issued by the Naval Air Systems Command for NAWCAD WOLF Airborne Systems Integration (ASI) Division Technical/Project Management Support (TPMS) services. The template is part of Volume 2 Cost/Price documentation and serves as Attachment C3 to guide subcontractors in submitting pricing information under the SeaPort-Next Generation (NxG) Multiple Award Contract vehicle.

The template requires subcontractors to provide administrative information including RFO number, company name, address, Unique Entity Identifier (UEI), CAGE code, and point of contact details, with an offer validity period of at least 180 calendar days. Subcontractors must submit completed Section K clauses, current representations and certifications from the System for Award Management (SAM), and an Organizational Conflict of Interest (OCI) assessment using the KTXT.209-9511 provision, along with any OCI mitigation plans if applicable. The template also requires disclosure of any deviations from requested information and must be signed by an authorized representative. This is a template document rather than a solicitation with specific product or service requirements.

View the file

Other files

File Type Posted
N0042127R1008_Draft QandA.xlsx XLSX spreadsheet
Att 06 - ASI TPMS OCI List.docx DOCX document
Att 02 - N00421-26-R-1016_DD254_Signed.pdf PDF
Att 08 - TDL CDRL attachment COR_TPOC May 2026.xlsx XLSX spreadsheet
Exhibit A- ASI TPMS CDRL.docx DOCX document
Att P1 - ASI TPMS Past Performance Information Form.pdf PDF
Att T2 - ASI TPMS Sample Tasks.docx DOCX document
Att C4 - ASI TPMS LCAT Capacity Labor Hours.xlsx XLSX spreadsheet
Att T1 - ASI TPMS Key Personnel.docx DOCX document
Att C2 - ASI TPMS Cost Reimbursable Narrative.docx DOCX document
Att 01- ASI TPMS SOW.docx DOCX document
Att 10- NAWCAD Contractor Manpower Report.xlsx XLSX spreadsheet
Att 09 - TDL CDRL attachment COR only May 2026.xlsx XLSX spreadsheet
Att 07 - ASI TPMS List of Approved Subcontractors.docx DOCX document
Att 03- List of Authorized Key Personnel.docx DOCX document
Att P2 - ASI TPMS Contractor Performance Assessment Questionnaire (CPAQ).pdf PDF
Att C1 - ASI TPMS Cost Reimbursable Workbook.xlsx XLSX spreadsheet
Att L1 - ASI TPMS SAMPLE TASK removed.docx DOCX document
RFO N0042127R1008.pdf PDF
Att 04 - ASI TPMS LCAT Capacity Labor Hours.docx DOCX document
Att M1 - ASI TPMS FAR 16.507-2 HTRO w PP.docx DOCX document
Att 05- COR Designation Letters.docx DOCX document
Show all 22

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FIXED/T&M PRICE NARRATIVE N00421-27-R-1008

Volume 2 – Cost/Price Attachment C3 (Attachment L1, Part B, Paragraph 3.4) Page 1 of 2

I. ADMINISTRATIVE INFORMATION:

Subcontractors shall complete this attachment as instructed and within its entirety.

Subcontractors shall provide the following information:

· RFO Number:

· Subcontractor Name:

· Address:

· Unique Entity Identifier (UEI):

· CAGE Code:

· Point of Contact (POC) (Name, Title, Phone Number, and Email Address):

· Response Validity Date (Offer shall be valid for at least 180 calendar days):

Subcontractors shall include the following Enclosures as applicable:

· Completed Section K

· Completed OCI KTXT.209-9511 and OCI Mitigation Plan (if applicable)

· Letters of Commitment for each proposed Contingent Hire (only required if proposing Key Personnel) Subcontractors shall provide responses to the following items:

Section K Clause/Provision Fill-in or Responses:

The Subcontractor has completed the clauses and provisions contained in Section K of the RFO that require fill-in or response and included these items as an Enclosure. Choose an item.

Signed Representations, Certifications, and Acknowledgements and/or System for Award Management (SAM):

The Subcontractor’s representations and certifications are posted electronically on the System for Award Management (SAM) website and are current, accurate, complete, and applicable to this FOSR. Choose an item.

Table 1 – Organizational Conflict of Interest (OCI) KTXT.209-9511 Provision:

Table 1

Subcontractor Name
OCI Provision Completed and Submitted
Designate Conflict or No Conflict
Conflicts
Choose an item.
Choose an item.
Choose an item.
II.DEVIATIONS FROM THE INFORMATION REQUESTED IN ATTACHMENT C3:
Subcontractors shall provide a narrative to describe any deviation from the information requested within Attachment C3 as required by Attachment L1, Part B, Paragraph 3.4.3. Otherwise, state N/A below:

III. AUTHORIZED SIGNATURE:

An authorized representative must sign below.

Type Name

Signature

Title

Date

SOURCE SELECTION INFORMATION – SEE FAR 2.101 AND 3.104

File details come from the government source that posted it. Updated .