Att 08 - TDL CDRL attachment COR_TPOC May 2026.xlsx

XLSX spreadsheet 65 KB Posted

Attached to
NAWCAD (WOLF) Airborne Systems Integration (ASI ) Division Technical/Project Management Support (TPMS)
Solicitation number
N0042127R1008
Issued by

About this file

This file is a template and instruction guide for a Contracting Officer's Representative (COR) Management Report on Technical Direction Letters (TDLs) for federal contracts under the Naval Air Warfare Center Aircraft Division (NAWCAD) WOLF organization. The template is designed to track and report on contract performance, funding, and deliverables for Task Orders (TOs) issued under awarded contracts, with a scheduled reporting period of May 2026.

The template establishes comprehensive reporting requirements organized by individual TDLs and Contract Line Item Numbers (CLINs), including labor hours and costs, travel expenses, material purchases, and other direct costs (ODCs). Key data elements include Prime Contract Number, TO Number, Period of Performance dates, billing periods, awarded ceiling hours and amounts, cumulative expenditures, outstanding commitments, cost-to-date, Estimate at Completion (EAC), and funding balance calculations. For each TDL, contractors must provide detailed breakouts of labor by category and employee, itemized material purchases with vendor information and variance analysis, and travel documentation with justification and government approval dates. Narrative sections require contractors to describe progress against milestones, identify problem areas with recommendations, confirm schedule status, report on deliverables (CDRLs) with due dates and points of contact, and outline plans for the next reporting period. The template accommodates multiple CLINs and TDLs with flexibility for additional rows while maintaining standardized formatting requirements. No specific products or services, response dates, or award information are included in this template document.

View the file

Other files

Show all 21

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Title Page Definition

Title Page
TitleDefinition
Contractor's NameEnter the name of the contractor
Contractor's AddressEnter the address of the contractor
Title of ReportEnter the Title of Report ( Contracting Officer’s Representative (COR) Management Report for Technical Direction Letters (TDLs))
CDRL #Enter the CDRL number (Pull from awarded CDRLs)
Date of ReportEnter the date the report is being generated
Period Covered by ReportEnter the dates this report covers (start date through end date)
Contract NumberEnter the contract number
Task Order NumberEnter the task order number
Name of issuing Government AgencyProvide the name of the Government Agency (NAWCAD WOLF XXXX Division)
Program/System NomenclatureEnter the name of the Contract
Security Classification or other appropriate markingsEnter the security classification or other appropriate markings (i.e. CUI, Proprietary)

Title Page

TDL CDRL attachment COR/TPOC May 2026
Contractor's Name
Contractor's Address
Title of Report
CDRL #
Date of Report
Period Covered by Report
Contract Number
Task Order Number
Name of issuing Government Agency
Program/System Nomenclature
Security Classification or other appropriate markings
Instructions:
A tab should be added for each individual TDL
Data in all cells on all tabs is sample data only
Rows can be added, do not change the columns
Ensure work accomplishments sections a - f are completed for each TDL

CDRL# & Title TO Number

TDL Breakout Definitions

TDL 1 Breakout One tab per TDL - Definition
TDL 1 BreakoutCOR TO Data BreakoutBusiness Rules
Column TitleDefinitionsTitleDefinition
Prime Contract NoEnter the Prime Contract NumberContract NoEnter the Prime Contract NumberRequired format: NXXXXX-XX-X-XXXX
TO NumberEnter the Task Order (TO) NumberTO NumberEnter the Task Order NumberRequired format: NXXXXX-XX-F-XXXX (If this is a C-Type Contract this field with get left blank.)
Invoice NumberEnter the Contractor Invoice NumberInvoice NumberEnter the Contractor Invoice Number
Invoice DateEnter the date the Invoice is generatedInvoice DateEnter the date the Invoice is generatedRequired format: XX/XX/XXXX
TDL #Enter the Technical Direction Letter NumberPoP StartEnter the TO/Option Period of Performance Start dateRequired format: XX/XX/XXXX
Date IssuedEnter the Date TDL was signed by the KOPoP EndEnter the TO/Option Period of Performance End dateRequired format: XX/XX/XXXX
PoP StartEnter the TO/Option Period of Performance Start dateTO periodEnter the current Option Year the Contract/TO is in (i.e. Base, OPT I, OPT II)
PoP EndEnter the TO/Option Period of Performance End dateBilling StartEnter the Billing Period Start DateRequired format: XX/XX/XXXX
Billing PeriodEnter the Billing Period (Start Date through End Date)Billing EndEnter the Billing Period End DateRequired format: XX/XX/XXXX
Project NameEnter the Technical Direction Letter TitleAwarded Ceiling HrsEnter the Awarded Ceiling Hours for Labor by CLIN (Travel and Material should be N/A)
CLINEnter the CLIN numberAwarded Ceiling $Enter the Awarded Ceiling Amounts for Labor, Travel, and Material by CLIN
Subtask # (If Applicable)Enter the Subtask number (If Applicable)Cost IncurredEnter the total Cumulative Expenditures to-date for Labor, Travel, and Material by CLIN
DescriptionEnter a high level description of the TDLOutstanding CommitmentsEnter any Outstanding Commitments for Labor, Travel, and Material by CLIN
LCATEnter the Labor Categories applicable to the TDL (Note: Rows can be added as needed)Cost Incurred w/commitmentsEnter the total Cost Incurred plus Outstanding Commitments for Labor, Travel, and Material by CLIN
Employee IdentifierEnter the Employee's Contractor Identification NumberUnfunded CeilingEnter Unfunded Ceiling for Labor, Travel, and Material by CLIN (Total Ceiling value - Total Funding value)
LABOREstimated Amount $Enter the Estimated TDL Value (numbers)Balance (funded - Exp)Enter the remaining funding balance (Total Funding - Cost Incurred w/commitments) for Labor, Travel, and Material by CLIN
Estimated HRSEnter the Estimated TDL Hours% Ceiling Expended HrsEnter the percentage of Ceiling Expended for Hours by CLIN
Funding Received $Enter the Funding Received per the latest MOD (dollar amount)% Ceiling Expended $Enter the percentage of Ceiling Expended for Labor, Travel, and Material by CLIN
Funded HrsEnter the Funded Hours per the latest MOD% Ceiling Expended $ w/commitmentsEnter the percentage of Ceiling Expended w/commitments for Labor, Travel, and Material by CLIN
Current ExpendituresEnter the Expenditures for the current reporting period (dollar amount)% Funding ExpendedEnter the percentage of Funding Expended for Labor, Travel, and Material by CLIN
Current InvoicedEnter the Invoiced amount for the current reporting period (dollar amount)EACEnter the Estimate at Completion for Labor, Travel, and Material by CLIN (What will the total CLIN cost be at the end of the TO/Option PoP)
Funding BalanceEnter the funding balance (Funding Received - Cost Incurred To-Date)Projected funding neededEnter the Project funding needed for Labor, Travel, and Material by CLIN for the TO/Option PoP
Funded HRS BalEnter the funding hours balance (Funded Hours - Total Current Hours)Task Order Summary - This section is broken out by MOD
Outstanding CommitmentsEnter any outstanding labor commitments (i.e. subcontractor costs)TitleDefinition
Cumulative ExpendituresEnter total Cumulative Expenditures to-date to include outstanding labor commitmentsCLIN LABOR HRS APPN 1Enter the Total Hours by CLIN per the latest MOD
Current Reg HrsEnter the Current Regular Hours expended for the reporting periodCLIN LABOR Dollars APPN 1Enter the Total Labor Ceiling by CLIN per the latest MOD
Current Overtime HrsEnter in current Overtime hours for the reporting periodCLIN LABOR HRS APPN 2Enter the Total Hours by CLIN per latest the MOD
Total Current HrsEnter the Total Current Expended Hours for the reporting period (Current Reg Hrs. + Current UT/TTA Hrs.)CLIN LABOR Dollars APPN 2Enter the Total Labor Ceiling by CLIN per the latest MOD
Cumulative Reg HrsEnter the Cumulative Reg Hours Expended for the TO/Option PoPCLIN LABOR HRS APPN 3Enter the Total Hours by CLIN per the latest MOD
Cumulative Overtime HrsEnter the Cumulative Overtime Hours Expended for the TO/Option PoPCLIN LABOR Dollars APPN 3Enter the Total Labor Ceiling by CLIN per the latest MOD
Total Cumulative HrsEnter the Cumulative Hours Expended for the TO/Option PoP (Cumulative Reg Hours + Cumulative UT/TTA Hrs.)CLIN Travel Dollars APPN 1Enter the Total Travel Ceiling by CLIN per the latest MOD
EACEnter the projected Estimate at Completion (What will the total cost be at the end of the TO/Option PoP)CLIN Travel Dollars APPN 2Enter the Total Travel Ceiling by CLIN per the latest MOD
Projected date for 75% notification (Based on expenditure to-date)Enter the date when 75% of the funding will be exhaustedCLIN Travel Dollars APPN 3Enter the Total Travel Ceiling by CLIN per the latest MOD
TRAVELCurrent TravelEnter the current travel cost for the reporting periodCLIN Material Dollars APPN 1Enter the Total Material Ceiling by CLIN per the latest MOD
Invoiced TravelEnter the invoiced travel amount for the reporting periodCLIN Material Dollars APPN 2Enter the Total Material Ceiling by CLIN per the latest MOD
Cumulative TravelEnter the total cumulative travel cost for the TO/Option PoPCLIN Material Dollars APPN 3Enter the Total Material Ceiling by CLIN per the latest MOD
Outstanding CommitmentsEnter any outstanding travel commitmentsFundingEnter the Total Funding amount by CLIN per the latest MOD
MATERIALCurrent MaterialEnter the current material cost for the reporting periodExpended as of date of reportEnter the Cumulative To-Date Expenditures w/Commitments for each CLIN
Invoiced MaterialEnter the invoiced material amount for the reporting periodCLIN Breakout- This section should be broken out so that each CLIN on the Contract/TO has its own section inclusive of all the required details within each column title.

- If you are unsure of what data a column title is requesting you can find the definitions on this tab.

- The overarching CLIN row that shows the TDL cumulatives has the following required format: CLIN XXXX (i.e, CLIN 1000)

- LOA CLINs should be captured on this tab as well, each with their own line.

Cumulative MaterialEnter the cumulative material cost for the TO/Option PoPCLINEnter the CLIN; Required format: XXXX (i.e, 1001)
OTHER ODCOutstanding CommitmentsEnter any outstanding material commitmentsTDL #Enter the Technical Direction Letter NumberRequired format: XXXX (i.e, 1001)
Current Other ODCEnter the current cost for any other ODCs for the reporting period (i.e. field services)Subtask # (If Applicable)Enter the Subtask number (If Applicable)- Each TDL within each CLIN should be subtotals. The row the subtotal is on does not matter; however, the following formats are required:

- TDL Total: Total #TDL # (i.e, Total #1001)

- CLIN #: CLIN XXXX (i.e, CLIN 1000)

- TDL #: XXXX (i.e, 1001)

- The TDL Title should also be included on this row

Add as many rows as needed to support CLIN/TDL requirements. No data should be entered below the red highlighted row that shows “[END].

Invoiced Other ODCEnter the invoiced amount for any other ODCs for the reporting period (i.e. field services)TDL TitleEnter the Technical Direction Letter Title
Cumulative Other ODCEnter the cumulative cost for any other ODCs for the TO/Option PoP (i.e. field services)Date IssuedEnter the Date TDL was signed by the KO
Outstanding CommitmentsEnter any other outstanding ODC commitments (i.e. field services)Estimated Amount $Enter the Estimated TDL Value (numbers)
MATERIAL PURCHASESPO#Enter the Purchase Order Number for the materialEstimated HRSEnter the Estimated TDL Hours
Subtask (if applicable)Enter the Subtask number if Material is specific to a Subtask on the TDLFunding Received $Enter the Funding Received per the latest MOD (dollar amount)
DescriptionEnter a high level description of the Material purchasedFunded HrsEnter the Funded Hours per the latest MOD
Invoice NumberEnter the Invoice Number the Material was purchased underCurrent ExpendituresEnter the Expenditures for the current reporting period (dollar amount)
PurposeEnter the reason for the Material purchase (this should include the specific project supported)Current Labor InvoicedEnter the Invoice total for Labor for the current reporting period (dollar amount)
VendorEnter the Vendor the material was purchased fromFunding BalanceEnter the funding balance (Funding Received - Cost Incurred To-Date)
QuantityEnter the Quantity purchasedFunded HRS BalEnter the funding hours balance (Funded Hours - Total Current Hours)
Unit PriceEnter the Unit Price for the MaterialOutstanding CommitmentsEnter any outstanding labor commitments (i.e. subcontractor costs)
Estimated CostEnter the Estimated Cost for the MaterialCummulative ExpendituresEnter total Cumulative Expenditures to-date to include commitments
Actual CostEnter the Actual Cost for the MaterialCurrent Reg HrsEnter the Current Regular Hours expended for the reporting period
Variance (between estimated and actual costs)Enter the Difference in the cost (Actual Cost - Estimated Cost)Current Overtime HrsEnter in current Overtime hours for the reporting period
Gov Approver if required by ContractWho from the Government approved the material purchase, if under approval thresholds, who was the material purchased for.Total Current HrsEnter the Total Current Expended Hours for the reporting period (Current Reg Hrs. + Current UT/TTA Hrs.)
DispositionWhat is the disposition of the Material (i.e. has the material been transferred to the Government; is it still in the Contractor's possession)Cumulative Reg HrsEnter the Cumulative Reg Hours Expended for the TO/Option PoP
Cumulative Total:Enter the Cumulative Total of Material purchased during the reporting period (should match the Current Material column)Cumulative Overtime HrsEnter the Cumulative Overtime Hours Expended for the TO/Option PoP
TRAVELTravelerEnter the Traveler's nameTotal Cumulative HrsEnter the Cumulative Hours Expended for the TO/Option PoP (Cumulative Reg Hours + Cumulative UT/TTA Hrs.)
Subtask (if applicable)Enter the Subtask number if Travel is specific to a Subtask on the TDLEACEnter the projected Estimate at Completion (What will the total cost be at the end of the TO/Option PoP)
DestinationEnter the Traveler's destinationProjected date for 75% notification (Based on expenditure to-date)Enter the date when 75% of the Labor funding will be exhausted
PurposeEnter the reason for the travelCurrent TravelEnter the current travel cost for the reporting period
Date of TravelEnter the date the travel commencedCurrent Travel InvoicedEnter the current travel invoiced amount for the reporting period
Length (days)Enter the total number of days for the tripCumulative TravelEnter the total cumulative travel cost for the TO/Option PoP
Estimated CostEnter the estimated cost for the tripOutstanding CommitmentsEnter any outstanding travel commitments
Actual CostEnter the actual Cost for the tripProjected date for 75% notification (Based on expenditure to-date)Enter the date when 75% of the Travel funding will be exhausted
Variance (between estimated and actual costs)Enter the Difference in the cost (Actual Cost - Estimated Cost)Current MaterialEnter the current material cost for the reporting period
JustificationEnter the Justification for the travel (this should include the specific project supported)Current Material InvoicedEnter the current material invoiced amount for the reporting period
Government approverEnter the Government ApproverCumulative MaterialEnter the cumulative material cost for the TO/Option PoP
Government approval dateEnter the date the Government provided ApprovalOutstanding CommitmentsEnter any outstanding material commitments
Cumulative Total:Enter the Cumulative Total of Travel during the reporting period (should match the Current Travel column)Projected date for 75% notification (Based on expenditure to-date)Enter the date when 75% of the Material funding will be exhausted
Current Other ODCEnter the current cost for any other ODCs for the reporting period (i.e. field services)
Current Other ODC InvoicedEnter the current invoiced amount for any other ODCs for the reporting period (i.e. field services)
Cumulative Other ODCEnter the cumulative cost for any other ODCs for the TO/Option PoP (i.e. field services)
Outstanding CommitmentsEnter any other outstanding ODC commitments (i.e. field services)
Projected date for 75% notification (Based on expenditure to-date)Enter the date when 75% of the ODC funding will be exhausted

COR TO Data Breakout

Awarded Ceiling HrsAwarded Ceiling $Cost IncurredOutstanding CommitmentsCost Incurred w/commitmentsUnfunded CeilingBalance (funded - Exp)% Ceiling Expended Hrs% Ceiling Expended $% Ceiling Expended $ w/commitments% Funding ExpendedEACProjected funding needed
Contract NoLabor
TO NumberTravel
Invoice NumberMaterial
Invoice DateTotal:
PoP Start*Rows can be added for additional CLINs as needed
PoP End
TO period
Billing Start
Billing End
TO SummaryTO baseTO mod 2TO mod 5FundingExpended as of date of report
CLIN LABOR HRS APPN 1
CLIN LABOR Dollars APPN 1
CLIN LABOR HRS APPN 2
CLIN LABOR Dollars APPN 2
CLIN LABOR HRS APPN 3
CLIN LABOR Dollars APPN 3
CLIN Travel Dollars APPN 1
CLIN Travel Dollars APPN 2
CLIN Travel Dollars APPN 3
CLIN Material Dollars APPN 1
CLIN Material Dollars APPN 2
CLIN Material Dollars APPN 3
*Rows can be added for additional CLINs as needed
Summary
CLINTDL #Subtask # (If Applicable)TDL TitleTotalEstimated Amount $Estimated HRSFunding Received $Funded HrsCurrent ExpendituresCurrent Amount InvoicedFunding BalanceFunded HRS BalOutstanding CommitmentsCumulative ExpendituresCurrent Reg HrsCurrent Overtime HrsTotal Current HrsCumulative Reg HrsCumulative Overtime HrsTotal Cumulative HrsEACProjected date for 75% notification (Based on expenditure to-date)
CLIN XXXXThis row is for TDL Cumulative for the CLINTotal XXXX:

Total #XXXX:

tc={742A1788-4CDB-4EDF-B9F6-BC6BD986984F}: [Threaded comment]

Your version of Excel allows you to read this threaded comment; however, any edits to it will get removed if the file is opened in a newer version of Excel. Learn more: https://go.microsoft.com/fwlink/?linkid=870924

Comment:

This is CLIN Number

Total #XXXX:
Total #XXXX:
Total #XXXX:
Total #XXXX:
Total #XXXX:
Total #XXXX:
CLIN XXXXThis row is for TDL Cumulative for the CLINTotal XXXX:

Total #XXXX:

tc={1A401BDE-71BC-4917-B730-8C50B70536F2}: [Threaded comment]

Your version of Excel allows you to read this threaded comment; however, any edits to it will get removed if the file is opened in a newer version of Excel. Learn more: https://go.microsoft.com/fwlink/?linkid=870924

Comment:

This is CLIN Number tc={742A1788-4CDB-4EDF-B9F6-BC6BD986984F}: [Threaded comment]

Your version of Excel allows you to read this threaded comment; however, any edits to it will get removed if the file is opened in a newer version of Excel. Learn more: https://go.microsoft.com/fwlink/?linkid=870924

Comment:

This is CLIN NumberTotal #XXXX:
Total #XXXX:
Total #XXXX:
Total #XXXX:
Total #XXXX:
Total #XXXX:
Total #XXXX:
Total #XXXX:
[END]
*Rows can be added for additional CLINs as needed
Data in all cells on all tabs is sample data
No data should be entered beyond the "[END]" rowa. Identify any new subcontractors approved during the reporting period and any proposed subcontractors/consultants for the next reporting period. Their capability set and areas of expertise shall be thoroughly addressed.

This is CLIN Number

This is CLIN Number

CDRL# & Title TO Number

This section of the deliverable may be submitted in Microsoft Word or as a Separate PDF document.

TDL 1 Breakout

TDL CDRL attachment COR/TPOC May 2026
Prime Contract No
TO Number
TDL Number
Date Issued
Invoice Number
Invoice Date
PoP Start
PoP End
Billing Period
LABORTravelMaterialOther ODC
Project NameCLINSubtask # (If Applicable)DescriptionLCATEmployee IdentifierEstimated Amount $Estimated HRSFunding Received $Funded HrsCurrent ExpendituresCurrent InvoicedFunding BalanceFunded HRS BalOutstanding CommitmentsCumulative ExpendituresCurrent Reg HrsCurrent Overtime HrsTotal Current HrsCumulative Reg HrsCumulative Overtime HrsTotal Cumulative HrsEACProjected date for 75% notification (Based on expenditure to-date)Current TravelInvoiced TravelCumulative TravelOutstanding CommitmentsCurrent MaterialInvoiced MaterialCumulative MaterialOutstanding CommitmentsCurrent Other ODCInvoiced Other ODCCumulative Other ODCOutstanding Commitments
*Add Rows as needed
Material Purchases
PO#Subtask (if applicable)DescriptionInvoice NumberPurposeVendorQuantityUnit PriceEstimated CostActual CostVariance (between estimated and actual costs)Gov Approver if required by ContractDisposition

Cumulative Total:

Travel
TravelerSubtask (if applicable)DestinationPurposeDate of TravelLength (days)Estimated CostActual CostVariance (between estimated and actual costs)JustificationGovernment approverGovernment approval date
Cumulative Total:
*Field Services or other ODC fields to be added based on specific procurement requirements
Month 1Month 2Month 3Month 4Month 5Month 6Month 7Month 8Month 9Month 10Month 11Month 12*Adjust Title and Columns/Rows as needed (i.e. Pop/Invoice # or title or add additional months if needed)
FUNDED*Total TDL Funding based on the data provided above
Expenditures to Date*Total TDL Expenditures to date based on the data provided above
EAC*Total TDL EAC based on the data provided above
Estimate*Total TDL Estimate based on the data provided above

a. Description of the progress made against milestones during the reporting period. Specifically address the value-added tasks performed by the prime contractor when work is performed by a subcontractor; clearly identify the key and non-key personnel performing the tasks described.

b. Identification of problem areas affecting technical, scheduling, or costs elements with background and any recommendations for solutions beyond the scope of the contract. Specifically, address results, positive or negative, obtained related to previously-identified program areas, with conclusions and recommendations for solutions.

c. Whether the task is on schedule, ahead of schedule, or behind schedule. Discuss what steps are being or will be taken to complete all requirements on time if possible, or provide a proposed revised schedule based on best current estimates if behind schedule.

d. The status of all assigned deliverables, including title, CDRL number, due date, date delivered, Contractor point of contact and description or title of deliverable(s). The report for each contract period shall include a cumulative list of all deliverable items provided.

e. Plans and recommendations for activities at TDL level during the next reporting period;

FUNDED Month 1 Month 2 Month 3 Month 4 Month 5 Month 6 Month 7 Month 8 Month 9 Month 10 Month 11 Month 12 Expenditures to Date Month 1 Month 2 Month 3 Month 4 Month 5 Month 6 Month 7 Month 8 Month 9 Month 10 Month 11 Month 12 EAC Month 1 Month 2 Month 3 Month 4 Month 5 Month 6 Month 7 Month 8 Month 9 Month 10 Month 11 Month 12 Estimate Month 1 Month 2 Month 3 Month 4 Month 5 Month 6 Month 7 Month 8 Month 9 Month 10 Month 11 Month 12

This section of the deliverable may be submitted in Microsoft Word or as a Separate PDF document.

TDL 2 Breakout

TDL CDRL attachment COR/TPOC May 2026
Prime Contract No
TO Number
TDL Number
Date Issued
Invoice Number
Invoice Date
PoP Start
PoP End
Billing Period
LABORTravelMaterialOther ODC
Project NameCLINSubtask # (If Applicable)DescriptionLCATEmployee IdentifierEstimated Amount $Estimated HRSFunding Received $Funded HrsCurrent ExpendituresCurrent InvoicedFunding BalanceFunded HRS BalOutstanding CommitmentsCumulative ExpendituresCurrent Reg HrsCurrent Overtime HrsTotal Current HrsCumulative Reg HrsCumulative Overtime HrsTotal Cumulative HrsEACProjected date for 75% notification (Based on expenditure to-date)Current TravelInvoiced TravelCumulative TravelOutstanding CommitmentsCurrent MaterialInvoiced MaterialCumulative MaterialOutstanding CommitmentsCurrent Other ODCInvoiced Other ODCCumulative Other ODCOutstanding Commitments
*Add Rows as needed
Material Purchases
PO#Subtask (if applicable)DescriptionInvoice NumberPurposeVendorQuantityUnit PriceEstimated CostActual CostVariance (between estimated and actual costs)Gov Approver if required by ContractDisposition

Cumulative Total:

Travel
TravelerSubtask (if applicable)DestinationPurposeDate of TravelLength (days)Estimated CostActual CostVariance (between estimated and actual costs)JustificationGovernment approverGovernment approval date
Cumulative Total:
*Field Services or other ODC fields to be added based on specific procurement requirements
Month 1Month 2Month 3Month 4Month 5Month 6Month 7Month 8Month 9Month 10Month 11Month 12*Adjust Title and Columns/Rows as needed (i.e. Pop/Invoice # or title or add additional months if needed)
FUNDED*Total TDL Funding based on the data provided above
Expenditures to Date*Total TDL Expenditures to date based on the data provided above
EAC*Total TDL EAC based on the data provided above
Estimate*Total TDL Estimate based on the data provided above

a. Description of the progress made against milestones during the reporting period. Specifically address the value-added tasks performed by the prime contractor when work is performed by a subcontractor; clearly identify the key and non-key personnel performing the tasks described.

b. Identification of problem areas affecting technical, scheduling, or costs elements with background and any recommendations for solutions beyond the scope of the contract. Specifically, address results, positive or negative, obtained related to previously-identified program areas, with conclusions and recommendations for solutions.

c. Whether the task is on schedule, ahead of schedule, or behind schedule. Discuss what steps are being or will be taken to complete all requirements on time if possible, or provide a proposed revised schedule based on best current estimates if behind schedule.

d. The status of all assigned deliverables, including title, CDRL number, due date, date delivered, Contractor point of contact and description or title of deliverable(s). The report for each contract period shall include a cumulative list of all deliverable items provided.

e. Plans and recommendations for activities at TDL level during the next reporting period;

FUNDED Month 1 Month 2 Month 3 Month 4 Month 5 Month 6 Month 7 Month 8 Month 9 Month 10 Month 11 Month 12 Expenditures to Date Month 1 Month 2 Month 3 Month 4 Month 5 Month 6 Month 7 Month 8 Month 9 Month 10 Month 11 Month 12 EAC Month 1 Month 2 Month 3 Month 4 Month 5 Month 6 Month 7 Month 8 Month 9 Month 10 Month 11 Month 12 Estimate Month 1 Month 2 Month 3 Month 4 Month 5 Month 6 Month 7 Month 8 Month 9 Month 10 Month 11 Month 12

This section of the deliverable may be submitted in Microsoft Word or as a Separate PDF document.