Att C - Pricing.xls

XLS spreadsheet 35 KB Posted

Attached to
AFRH Keyless Lock System Replacement
Solicitation number
20342325R00004
Issued by

About this file

This document is an Attachment C - Pricing Spreadsheet for the Keyless Lock Replacement System solicitation (Solicitation Number: 20342325R00004) issued by the Department of the Treasury Bureau of the Fiscal Service. The solicitation is seeking to fully replace the existing keyless lock systems at both the Washington, D.C. and Gulfport, MS campuses of the Armed Forces Retirement Home (AFRH) with a fully operational, complete, and cloud-based keyless lock system. The period of performance is anticipated to be 5 months from the date of award. The pricing spreadsheet provides line items for labor, materials, equipment rental, travel, and other costs. Questions are due by November 18, 2024 and proposals are due by December 3, 2024. This is a firm-fixed price contract with no set-asides indicated.

View the file

Other files

File Type Posted
Amend 7 - Campus Map for Site Visit.pdf PDF
Amend 6 Questions and Answers.xlsx XLSX spreadsheet
Amend 5 Questions and Answers.xlsx XLSX spreadsheet
Amend 2 Lenel ILS Locks.pdf PDF
Amend 2 Card Reader points.pdf PDF
Amend 2 Questions and Answers.xlsx XLSX spreadsheet
GP Lock Layout.zip ZIP file
GP Lock Info.zip ZIP file
DC Lock Info.zip ZIP file
Att B - SF1019A Subcontracting Plan v2.pdf PDF
Att E - AFRH GP Drawings 1.zip ZIP file
Att D - AFRH-DC Drawings.zip ZIP file
20342325R00004 Keyless Lock System Replacement.pdf PDF
Att A - Small Business Participation Plan.pdf PDF
Att E - FRH GP Drawings 2.zip ZIP file
Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Estimate-1

20342325R00004 Keyless Lock Replacement System
Armed Forces Retirement Home - Washington, DC & Gulfport, MS
Attachment C Pricing Spreadsheet
DESCRIPTION OF WORKLABOR HOURSFULLY LOADED LABOR HOUR RATETotal labor costLabor Hrs. TotalMATERIAL QUANTITYMATERIAL COSTTotal material costRENTAL HOURSRENTALHOUR RATETotal rental costLump SumTravel costTotal Line
Labor
1 Project Managers0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
2 Senior Technician0$ - 0$ - 0$ - 0$ - 0$ - 0
4 Technician0$ - 0$ - 0$ - 0$ - 0$ - 0
Electrician0$ - 0$ - 0$ - 0$ - 0$ - 0
Wiring and Fiber Cable$ - 00$ - 0$ - 0$ - 0$ - 0
Keyless Locks$ - 00$ - 0$ - 0$ - 0$ - 0
Router Access Points$ - 00$ - 0$ - 0$ - 0$ - 0
Control Center Equipment$ - 0$ - 0$ - 0$ - 0$ - 0
Miscellanous Supplies: Hardware, Bits, Screws, etc.$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
G&A0%$ - 0
Profit0%$ - 0
Contingency0%$ - 0
Total Firm-Fixed Price$ - 0

File details come from the government source that posted it. Updated .