Amend 2 Questions and Answers.xlsx

XLSX spreadsheet 12 KB Posted

Attached to
AFRH Keyless Lock System Replacement
Solicitation number
20342325R00004
Issued by

About this file

This is a Questions and Answers document for solicitation 20342325R00004, which relates to replacing keyless lock systems at Armed Forces Retirement Home (AFRH) facilities in Washington, D.C. and Gulfport, MS. The Q&A clarifies that both facilities currently use different access control systems (Lenel OnGuard ADV in DC and Assa Abloy Vingcard in Gulfport), but the existing systems will not meet the new requirements. The new system must be cloud-based with all locks online, not offline with data on cards.

Key details include: the proposal due date has been extended to January 10, 2025 at 10:00am EST; anticipated award date is February 2025; period of performance will be based on the contractor's submitted Gantt chart; existing locks are Signature RFiD Satin Chrome models (54 left-hand ILS-C4A6MFNSCL9 and 81 right-hand ILS-C4A6MFNSCR9); site visits will be permitted at both locations; and evaluation criteria can be found on pages 32-38 of the solicitation. Site maps and building drawings will be provided to bidders.

View the file

Other files

File Type Posted
Amend 7 - Campus Map for Site Visit.pdf PDF
Amend 6 Questions and Answers.xlsx XLSX spreadsheet
Amend 5 Questions and Answers.xlsx XLSX spreadsheet
Amend 2 Card Reader points.pdf PDF
Amend 2 Lenel ILS Locks.pdf PDF
GP Lock Info.zip ZIP file
GP Lock Layout.zip ZIP file
DC Lock Info.zip ZIP file
Att E - FRH GP Drawings 2.zip ZIP file
Att C - Pricing.xls XLS spreadsheet
Att D - AFRH-DC Drawings.zip ZIP file
Att E - AFRH GP Drawings 1.zip ZIP file
20342325R00004 Keyless Lock System Replacement.pdf PDF
Att A - Small Business Participation Plan.pdf PDF
Att B - SF1019A Subcontracting Plan v2.pdf PDF
Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1 (2)

DCGP
No.QUESTIONSANSWERSANSWERS
0001Will there be an opportunity to go to both site to look at the applications?YesYes
0002How many credentials (cards, fobs, mobile) are needed
0003Are there any construction as-built documents available showing existing wire paths and infrastructure for the Scott and Gulfport buildings?YesYes
0004What is the existing ACS (Access control system) manufacturer in at each site?Lenel - OnGuard ADVAssa Abloy Vingcard
0005What is the model number of the existing wireless locks at these sites?(54 Left Hand) Model# ILS-C4A6MFNSCL9 (81 Right Hand) Model# ILS-C4A6MFNSCR9Signature RFiD Satin Chrome w/functional handle
0006Can we get a report from the existing systems of existing access points and connectivity for both sites?See attachedYes Security will have to run the report
0007What is the timeline for this upgrade for each site?The contract PoP will be based on the timeframe indicated in the contractor's Ghatt Chart provided in their proposalThe contract PoP will be based on the timeframe indicated in the contractor's Ghatt Chart provided in their proposal
0008What is the timeline for the project’s award once bids are submitted?Depending on proposals received and reviews that will take place an exact award date cannot be provided. It is anticipated that award should take place in February 2025.Depending on proposals received and reviews that will take place an exact award date cannot be provided. It is anticipated that award should take place in February 2025.
0009Can you confirm timeline for each project completion is so many days after award.See answer to question 0007See answer to question 0007
0010Are new devices to be provided in additional buildings and at campus site location as indicated in the attached building layout drawings and campus site maps? Can more clarification be provided. I did not see a campus site map and a drawing reference would help.The site map and drawings will be providedThe site map and drawings will be provided
0011Can you confirm that the locks for the DC and Gulfport campuses are to be online or offline with data on card?
Or will it depend on the type of door?All looks will be online and connected to the cloud based systemAll looks will be online and connected to the cloud based system
0012Since Thanksgiving is before the due date of the solicitation, would it be possible to get a 2 week extension?Yes, this solicitation shall be extended until 10:00am EST, Friday, January 10, 2025.Yes, this solicitation shall be extended until 10:00am EST, Friday, January 10, 2025.
0013Can you explain the evaluation criteria being used to determine the award?Please see pages 32 - 38 of 20342325R00004.Please see pages 32 - 38 of 20342325R00004.
0014What access control software is preferred or has been used in the past?The manufacture of the control software used as the bases for the scope of work is described in section 3.1.1 of the solicitation (Pages 15-16). The existing system used is indicated in question 0004. The existing system is not desired and will NOT meet the scope of work requirements.The manufacture of the control software used as the bases for the scope of work is described in section 3.1.1 of the solicitation (Pages 15-16). The existing system used is indicated in question 0004. The existing system is not desired and will NOT meet the scope of work requirements.
0015What kind of locking hardware is used at this location?Please see question 0005 for this answer.Please see question 0005 for this answer.

Sheet1

File details come from the government source that posted it. Updated .