This is an Installation or Relocation Checklist for Ceiling Mounted Patient Lifts (Revision 2.1) used by the VA (Veterans Affairs) Medical Center (VAMC) to ensure proper commissioning of patient ceiling lift systems. The checklist applies to both new installations and relocations of ceiling-mounted patient lifts and explicitly prohibits installation in treatment units with actively suicidal patients. The document serves as a template for documenting compliance across four primary phases: Pre-Installation, Installation, Post-Installation, and specialized testing and training sections.
The Pre-Installation phase requires 10 verification points including site surveys of existing conditions, obtaining structural engineering drawings specific to pre-existing facility conditions, confirming seismic compliance (per VA Handbook H-18-8 and VA Directive 7512), verifying environmental suitability per manufacturer specifications, confirming NFPA 13 fire sprinkler compliance, and ensuring NFPA 99 and NFPA 70 electrical and safety system compliance. The Installation phase verifies proper structural connections, ceiling interface integrity, fastener security, rail/track alignment, motor installation, electrical connections, and operational functionality. The Post-Installation phase requires compliance walkthroughs and operational testing. Additional sections address Rails/Tracks and End Stops (4 inspection points), Lift Unit and Straps (5 inspection points), Load Testing (5 requirements including speed verification at zero load and maximum capacity, emergency stop, and emergency lowering features), Manuals receipt confirmation, and Training verification ensuring clinicians and staff receive manufacturer-provided training with documented competency prior to patient use. All sections include checkbox spaces for marking completion status.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 36C24626Q0351 0008.docx | DOCX document | |
| 36C24626Q0351 0007.docx | DOCX document | |
| 36C24626Q0351 0006.docx | DOCX document | |
| 36C24626Q0351 0005.docx | DOCX document | |
| 36C24626Q0351 0004.docx | DOCX document | |
| RFQ 36C24626Q0351- Patient Ceiling Lifts.docx | DOCX document | |
| 36C24626Q0351 0003.docx | DOCX document | |
| 36C24626Q0351 0002.docx | DOCX document | |
| 36C24626Q0351 0001.docx | DOCX document | |
| Att D VHA ICRA-1.2 Oct 1 2024.pdf | ||
| Att A Wage Determination 2015-4341.pdf | ||
| 36C24626Q0351_1.docx | DOCX document | |
| Att C QUALITY ASSURANCE SURVEILLANCE PLAN.pdf |
Show all 13
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Revision 2.1 1 of 4 Serial #: ____________________
Verify NFPA 99 and NFPA 70 compliance for access to electrical and safety systems.
Verify required access to mechanical, HVAC, and fire systems components within the lift installation area.
Verifiy minimum clearances for operation are compliant with manufacturer recommendations. (Ensure room clearance and that the ceiling height is adequate for lift usage.)
Facility: Manufacturer:
Model:
COMPLETE
Mfgr Contact:VAMC Contact's Phone Number:
Installer:
Serial Number: EE Number:
Work Order:
Installation or Relocation Checklist for Ceiling Mounted Patient Lifts The commissioning for a patient ceiling lift system(s) shall include, but not be limited to, the following points as components of the commissioning procedures.
NOTE: Ceiling mounted patient lifts are not to be installed in treatment units with actively suicidal patients.
Lift Location:
VAMC Contact:
Pre-Installation COMPLETE
Obtain structural and related engineering design drawings and calculations for the new lift installation.
Design drawings shall be developed for specific lift installation under specific pre-existing conditions of the facility.
Mfgr Contact's Phone Number:
Date:Installer's Phone Number:
Verify NFPA 99 and NFPA 70 compliance for proper grounding and bonding.
Verify that the lift is listed by the manufacturer to be installed and operated in the environment that the lift is operating under. (For example, water tight lifts shall be installed and operated in wet, damp or humid locations such as pools or bathrooms.)
Verify NFPA 13 compliance for fire sprinkler system (including but not limited to fire sprinkler heads and piping).
If the facility is located in a seismic area, as identified in VA Handbook H-18-8 Seismic Design Requirements, verify that the ceiling mounted patient lift system installation is in compliance with the requirements of VA Directive 7512 Seismic Safety of VA Buildings and VA Master Design Specification
13.05.041 Seismic Restraint Requirements for Non-Structural Components.
Perform site survey of the pre-existing conditions and as-built drawings above and below finish ceiling at the installation location to confirm existing structural and ceiling conditions.
Perform pre-installation walkthrough to confirm full understanding and consensus of design drawing(s) and installation conditions.
Verify proper connections of the lift's structural system to the building’s structure (including seismic bracing if applicable).
Verify proper interface at the ceiling (hard deck or soft tile) and proper installation of all protective features around the support rods and rails/tracks.
NOTES:
Installation
Revision 2.1 2 of 4 Serial #: ____________________
PASS FAIL
PASS FAIL
COMPLETE
Rails/Tracks and End Stops
NOTES:
Lift Unit and Straps
Inspection of lift unit casing for cracks and alignment.
Inspection and activation of hand control for full operation (e.g., up, down, left, right) and “return to charge” function if applicable.
Confirm any and all lift unit indicator lights are functioning. (e.g., red service warning light, charging state light) Inspection and verification of all emergency functions of the lift unit.
Verification that all fasteners and set screws are properly tightened on the trollies and rails/tracks.
Ensure that the rail/track is free of gaps (unless required by design). If included in installation, verify rail turntable function, exchanger function, gate alignment, and safety block installation.
Confirm track is clean and clear of all debris. (Use manufacturer’s recommended cleaning materials to avoid damage to the motor case and other components.)
Verify proper installation of electric motor per manufacturer's instructions to ensure operational rigidity of motor mounting.
Verify proper electrical connections per design drawings and manufacturer's instructions.
Verification that the lift unit charges properly.
Perform operational test to verify lift functionality.
NOTES:
Perform walkthrough to ensure compliance of the installation per the design drawing(s) and manufacturer's instructions.
Post-Installation
NOTES:
Verify structural component sizing and physical installation to ensure that the correct structural system is in place and properly installed to support the lift.
Verification that all manufacturer specified end stops or docking gates are properly installed.
Revision 2.1 3 of 4 Serial #: ____________________
PASS FAIL
2 Verify that training and competency are documented prior to release for use with patients.
Verify that manufacturer or manufacturer’s representative has provided training on the use of patient handling equipment to clinicians and other staff who move and handle patients.
COMPLETE
COMPLETE
Full extension and inspection of lift strap for loose threads or frays.
Verification of any “soft start” or “soft stop” features and that lifting speed does not exceed 2.5 inches per second with “zero” load.
Verification of load testing and deflection testing at the manufacturer's specified maximum rated lift capacity.
Verification of any “soft start” and “soft stop” features and that lifting speed does not exceed 1.5 inches per second under maximum rated lift capacity.
Verification of function of emergency stop at maximum rated lift capacity.
Verification of emergency lowering feature at maximum rated lift capacity.
NOTES:
NOTES:
Training
NOTES:
Inspection of spreader bar and clips for cracks and for loose or missing rings or cotter pins.
Confirm that the manufacturer's operating and maintenance manuals for this lift have been received.
Load Testing
NOTES:
Manuals