About this file
This is a Quality Assurance Surveillance Plan (QASP) for the Department of Veterans Affairs, VISN 6. The contractor shall provide labor, parts, and materials to maintain, repair, and restore Software-as-a-Service (SYaaS) systems during the Period of Performance to a condition ready for ordinary and intended use at VA Facilities. Services exclude third-party products and consumables (paper, optical media, ribbons, toner cartridges, cleaning pads, etc.) ordinarily exhausted in normal operation by VA personnel at clinical locations.
The QASP establishes surveillance and performance evaluation mechanisms administered by the Contracting Officer (CO) and Contracting Officer's Representative (COR) Dawn Knox. Three primary performance objectives are defined with "Satisfactory or higher" acceptable quality levels: (1) Installation—following standardized installation procedures for consistency and quality, monitored through direct observation; (2) Post-installation—performing thorough testing and inspection to verify lifts operate correctly and safely, monitored through direct observation; and (3) Maintenance and support—maintaining a preventive maintenance schedule to ensure lifts remain in optimal conditions, monitored through reports. The contractor must acknowledge receipt of any Contract Discrepancy Reports (CDRs) in writing and may be required to submit a corrective action plan within a specified timeframe. The COR shall meet with the contractor as needed to assess performance and provide written assessments. The QASP is designated as a "living document" subject to Government review and revision in coordination with the contractor.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 36C24626Q0351 0008.docx | DOCX document | |
| 36C24626Q0351 0007.docx | DOCX document | |
| 36C24626Q0351 0006.docx | DOCX document | |
| 36C24626Q0351 0005.docx | DOCX document | |
| 36C24626Q0351 0004.docx | DOCX document | |
| RFQ 36C24626Q0351- Patient Ceiling Lifts.docx | DOCX document | |
| 36C24626Q0351 0003.docx | DOCX document | |
| 36C24626Q0351 0002.docx | DOCX document | |
| 36C24626Q0351 0001.docx | DOCX document | |
| Att B Installation or Relocation Checklist.pdf | ||
| Att D VHA ICRA-1.2 Oct 1 2024.pdf | ||
| Att A Wage Determination 2015-4341.pdf | ||
| 36C24626Q0351_1.docx | DOCX document |
Show all 13
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
QUALITY ASSURANCE SURVEILLANCE PLAN (QASP)
The contractor shall be evaluated in accordance with the following QASP:
For: Department of Veterans Affairs, VISN 6
Contract Number: TBD
The Contractor shall provide labor, parts, and materials reasonably required to maintain, repair, or restore the Contractor’s SYaaS during the Period of Performance (PoP) to a condition ready for its ordinary and intended use at VA Facilities. Services provided under this Contract do not cover third party products supplied or used by VAMCs or include consumables (paper, optical media, ribbons, cards, format tapes, toner cartridges, cleaning pads, etc.) ordinarily intended to be exhausted in the normal operation of the Contractor’s SYaaS by VA personnel at their clinical locations. Detailed descriptions of the activities and requirements are included in Sections 2.1 through 8.5.10 below. What will be monitored.
1. PURPOSE
This Quality Assurance Surveillance Plan (QASP) provides a systematic method to evaluate performance for the stated contract. This QASP explains the following:
What will be monitored:
How monitoring will take place.
Who will conduct the monitoring.
How monitoring efforts and results will be documented.
This QASP does not detail how the contractor accomplishes the work. Rather, the QASP is created with the premise that the contractor is responsible for management and quality control actions to meet the terms of the contract. It is the Government’s responsibility to be objective, fair, and consistent in evaluating performance.
This QASP is a “living document” and the Government may review and revise it on a regular basis. However, the Government shall coordinate changes with the contractor. Copies of the original QASP and revisions shall be provided to the contractor and Government officials implementing surveillance activities.
2. GOVERNMENT ROLES AND RESPONSIBILITIES
The following personnel shall oversee and coordinate surveillance activities.
a. Contracting Officer (CO) - The CO shall ensure performance of all necessary actions for effective contracting, ensure compliance with the contract terms, and shall safeguard the interests of the United States in the contractual relationship. The CO shall also assure that the contractor receives impartial, fair, and equitable treatment under this contract. The CO is ultimately responsible for the final determination of the adequacy of the contractor’s performance.
Assigned Contracting Officer (CO):
Organization or Agency: U.S. Department of Veterans Affairs
b. Contracting Officer’s Representative (COR) - The COR is responsible for technical administration of the contract and shall assure proper Government surveillance of the contractor’s performance. The COR shall keep a quality assurance file. The COR is not empowered to make any contractual commitments or to authorize any contractual changes on the Government’s behalf.
Assigned COR(S): Dawn Knox
3. CONTRACTOR REPRESENTATIVES
The following employees of the contractor serve as the contractor’s program manager for this contract.
a. Program Manager – As assigned by facility
b. Other Contractor Personnel - As assigned by facility
4. PERFORMANCE STANDARDS
Performance standards define desired services. The Government performs surveillance to determine if the contractor exceeds, meets or does not meet these standards. The Government shall use these standards to determine contractor performance and shall compare contractor performance to the Acceptable Quality Level
(AQL).
5. INCENTIVES/RATING STANDARDS
The Government shall use favorable contractor performance evaluations as incentives. The Government shall report unfavorable contractor performance as disincentives. Disincentives shall include documentation of any performance issues. If repetitive or consistent the government shall take further corrective action or begin termination procedures. Incentives shall be based on exceeding, meeting, or not meeting performance standards.
6. METHODS OF QA SURVEILLANCE
Various methods exist to monitor performance. The COR shall use the surveillance methods listed below in the administration of this QASP.
a. DIRECT OBSERVATION: Surveillance results must be able to support action taken by the COR/Contracting Officer when nonperformance or unacceptable performance occurs.
b. REPORTS: Reports will be generated by the contractor which the COR will use to track progress of maintenance.
Performance Objective
Performance Standards
PWS
Reference
Acceptable Quality Level
(AQL)
Method of Surveillance
Incentives/ Disincentives
1. Installation Follow standardized installation procedure for consistency and quality
Section 4.2.8
Satisfactory or higher
Direct Observation
2. Post installation
Perform thorough testing and inspection after installation to verify lifts operate correctly and safely
Satisfactory or higher
Direct Observation
3.
Maintenance and support
Preventive maintenance schedule to ensure lifts remain in optimal conditions
Satisfactory or higher
Reports
7. RATINGS
Metrics and methods are designed to determine if performance exceeds, meets, or does not meet a given standard and acceptable quality level. A rating scale shall be used to determine a positive, neutral, or negative outcome. The following ratings shall be used:
8. DOCUMENTING PERFORMANCE
a. ACCEPTABLE PERFORMANCE
The Government shall document positive performance. Any report may become a part of the supporting documentation for any contractual action.
b. UNACCEPTABLE PERFORMANCE
When unacceptable performance occurs, the COR shall work with the Contracting Officer (CO) inform the contractor. This will normally be in writing unless circumstances necessitate verbal communication. In any case, the COR shall document the discussion and place it in the COR file. In order to assure that the contractor receives impartial, fair, and equitable treatment under this contract, the COR will work with the contractor to increase performance to an acceptable level.
When the COR and CO determines formal written communication is required, the COR and CO shall prepare a Contract Discrepancy Report (CDR) and present it to the contractor's program manager for corrective action.
The contractor shall acknowledge receipt of the CDR in writing. The CDR will specify if the contractor is required to prepare a corrective action plan to document how the contractor shall correct the unacceptable performance and avoid a recurrence. The CDR will also state how long after receipt the contractor has to present this corrective action plan to the COR. The Government shall review the contractor's corrective action plan to determine acceptability.
Any CDRs may become a part of the supporting documentation for any contractual action deemed necessary by the CO.
9. FREQUENCY OF MEASUREMENT
a. Frequency of Measurement.
See above Acceptable Quality Level & Method of Surveillance located in the Performance Standards
During contract performance, the COR will periodically analyze whether the frequency of surveillance is appropriate for the work being performed.
b. Frequency of Performance Assessment Meetings.
The COR shall meet with the contractor as needed to assess performance and shall provide a written assessment.
Signature – Contractor