36C24626Q0351 0005.docx

DOCX document 35 KB Posted

Attached to
6515--Patient Ceiling Lift System Federal contract opportunity
Solicitation number
36C24626Q0351
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 6

About this file

This is an Amendment to a Solicitation (SF 30 Form) for RFQ 36C24626Q0351 Patient Ceiling Lift Systems issued by the Department of Veterans Affairs Network Contracting Office 6 at Hampton VA Medical Center. The amendment extends the solicitation closure date to March 5, 2026 at 12:00 PM EST and provides answers to pre-site visit and post-site visit questions submitted by potential offerors. The solicitation requires the supply and installation of patient ceiling lift systems across multiple departments and buildings at the Hampton VAMC, including 4-EAST (7 lifts), ICU (2 lifts), Community Living Center (46 lifts), Palliative Care (7 lifts), PT Gym GB122 (2 lifts), Spinal Cord Injury (45 lifts), PT Gym GB123 (1 lift), and SCI Room A131 (2 lifts), for a total of 112 lifts. The scope includes certified installation, deinstallation of existing systems, Virginia-certified engineer-stamped drawings, BioMed training for a minimum of 5 personnel, and three-year maintenance and preventative service with an optional ten-year warranty.

Key clarifications provided in the amendment include: infection control risk assessment (ICRA) Level III applies to ICU lifts while all others are Level II; ceiling lift motors must have a minimum 650-pound capacity; drywall repair and painting are the contractor's responsibility; annual preventative maintenance is included in the three-year service requirement; the ten-year warranty is included in pricing (but not ten-year preventative maintenance); payment and performance bonds are not required; prevailing wage certified payroll is not required; the facility cannot store products prior to installation, so contractors must arrange on-site receipt and storage or utilize mobile storage units in a designated laydown area; and pre-installation orientation must be completed, with the option to conduct it the morning of the first installation day. The delivery destination is Hampton VAMC, 100 Emancipation Drive, Hampton, VA 23667, marked for Anthony Boskovic-Sceusa (757-778-3293).

View the file

Other files for this federal contract opportunity

Other files attached to 6515--Patient Ceiling Lift System, newest first.
File Type Posted
36C24626Q0351 0008.docx DOCX document
36C24626Q0351 0007.docx DOCX document
36C24626Q0351 0006.docx DOCX document
36C24626Q0351 0004.docx DOCX document
RFQ 36C24626Q0351- Patient Ceiling Lifts.docx DOCX document
36C24626Q0351 0003.docx DOCX document
36C24626Q0351 0002.docx DOCX document
36C24626Q0351 0001.docx DOCX document
Att D VHA ICRA-1.2 Oct 1 2024.pdf PDF
Att A Wage Determination 2015-4341.pdf PDF
36C24626Q0351_1.docx DOCX document
Att C QUALITY ASSURANCE SURVEILLANCE PLAN.pdf PDF
Att B Installation or Relocation Checklist.pdf PDF
Show all 13

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

5. PROJECT NUMBER (if applicable)

CODE

7. ADMINISTERED BY

2. AMENDMENT/MODIFICATION NUMBER

CODE

6. ISSUED BY

8. NAME AND ADDRESS OF CONTRACTOR

4. REQUISITION/PURCHASE REQ. NUMBER

3. EFFECTIVE DATE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED

PAGE OF PAGES

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED

BPA NO.

1. CONTRACT ID CODE

FACILITY CODE

CODE

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

E. IMPORTANT:

is extended,

(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.

12. ACCOUNTING AND APPROPRIATION DATA

(REV. 11/2016)

is required to sign this document and return ___________ copies to the issuing office.

is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO:

Specify authority)

THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

15C. DATE SIGNED

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER

Contractor

16C. DATE SIGNED

14. DESCRIPTION OF AMENDMENT/MODIFICATION

16B. UNITED STATES OF AMERICA

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER

16A. NAME AND TITLE OF CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR

STANDARD FORM 30

PREVIOUS EDITION NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)

(If required)

(SEE ITEM 11)

(SEE ITEM 13)

(X)

CHECK

ONE

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

(Signature of person authorized to sign) (Signature of Contracting Officer) 02-27-2026 Jerry Mann Department of Veterans Affairs Network Contracting Office 6 100 Emancipation Drive Hampton VA 23667 James Risobn Department of Veterans Affairs Network Contracting Office 6 100 Emancipation Drive Hampton VA 23667 To all Offerors/Bidders

36C24626Q0351

X X X See CONTINUATION Page Amendment: Site Visit Questions and Answers X The purpose of this amendment is to do the following:

1. To extend solicitation closure date/time to 03-05-2026 at 12 PM EST.

2. To answer the remaining Site Visit questions.

All other terms and conditions remain the same.

Jerry Mann Contracting Officer

CONTINUATION PAGE

A.1 PRICE/COST SCHEDULE

ITEM INFORMATION

ITEM NUMBER
DESCRIPTION OF SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
7.00
EA
__________________
__________________

4-EAST: 4m x 4m room covering system: Lift+ Motor (650 lbs.), CLM, Scale, Service (3-year warranty, 5 years on batteries)

* Increased number of lifts needed from 4 EA to 7 EA.

PRINCIPAL NAICS CODE: 339113 - Surgical Appliance and Supplies Manufacturing PRODUCT/SERVICE CODE: 6515 - Medical and Surgical Instruments, Equipment, and Supplies

2.00
EA
__________________
__________________

ICU: 4m x 4m room covering system, Lift + Motor (650 lbs.), CLM, Scale, Service (3-year warranty, 5 years on batteries)

46.00
EA
__________________
__________________

CLC: 7) 4m x 3m systems, (7) 5m x 3m systems, (30) 3m x 5m systems, (2) 3m straight track, (43) Lift + motor 650 lbs., (3) Lifts + Motor 825 lbs., CLM, Scale, Service (3 year warranty, 5 years on batteries)

7.00
EA
__________________
__________________

PALLIATIVE CARE: Bld 114 4m x 4m room covering system: Lift + Motor (650 lbs.), CLM, Scale, Service (3-year warranty, 5 years on batteries)

2.00
EA
__________________
__________________

PT Gym (GB122) 5m x 4m room covering system: Lift + Motor (650 lbs.), CLM, Scale, Service (3- year warranty, 5 years on batteries)

45.00
EA
__________________
__________________

SCI: (35) 4m x 4m systems, (2) 8m straight tracks, (6) 5m x 3m systems, (1) 5m x 5m system: Lift + Motor (650 lbs.), (1) 8m x 3m system: CLM, Scale, Service (3 year warranty, 5 years on batteries)

1.00
EA
__________________
__________________

PT GYM (GB123) (KT/OT area) has 1 additional lift 5m x 4m room covering system: Lift + Motor (650 lbs.), CLM, Scale, Service (3- year warranty, 5 years on batteries)

2.00
EA
__________________
__________________

(SCI) Room A131 in Building 137 has 2 Additional lifts 5m x 4m room covering system: Lift + Motor (650 lbs.), CLM, Scale, Service (3- year warranty, 5 years on batteries)

5.00
EA
__________________
__________________

Additional Education - 1 day (8 hrs per day)

1.00
EA
__________________
__________________

BioMed Training 8-hour onsite troubleshooting class for up to 6 technicians.

106.00
EA
__________________
__________________

Certified Instillation of Ceiling Lift Systems

106.00
EA
__________________
__________________

Deinstallation and removal of all existing lift rails and motors.

1.00
EA
__________________
__________________

Virginia Certified Engineer Stamped Drawings

GRAND TOTAL
________________

A.2 DELIVERY SCHEDULE

ITEM NUMBER
SHIPPING INFORMATION
QUANTITY
DELIVERY DATE
0001 to 0013
SHIP TO:
Hampton VAMC

100 Emancipation Drive Hampton, VA 23667

USA

TBD

MARK FOR:
Anthony Boskovic-Sceusa

757-778-3293 anthony.boskovic-sceusa.gov

RFQ 36C24626Q0351

Patient Ceiling Lift Question Answers Questions will be in “Black” and Answers will be in “Red”.

02-20-2026 Pre-Site Visit Questions and Answers Question 1: Where should we meet at?

Answer: All participants will meet in front of BLDG 63 (Security Office) at 9 AM (EST).

Question 2: Can you clarify the bid due date?

Answer: All bids will be due NLT 03-03-2026 at 12 PM (EST).

Question 3: Will facility drawings be provided for walkthrough?

Answer: Yes, floor plan drawings will be available at the Site Visit.

02-24-2026 Site Visit Questions and Answers Question 1: Contractor will be responsible for adhering/implementing all infection control requirements as determined by the infection control risk assessment (ICRA).

We provide up to Level II ICRA measures as standard. If measured above Level II will be required, please confirm the total number of rooms and the specific ICRA level applicable so that we can accurately incorporate those requirements into our pricing.

Historically, Level II has been sufficient in VA installations; however, escalation to Level III or above significantly impacts cost and scheduling, so clarification is needed.

Answer: The Lifts located in our ICU department (total of two) fall under level III ICRA. The rest will be under Level II.

Question 2: Each room where lifts are installed shall be returned to original condition, excluding the newly installed ceiling lift. Holes in the wall must be patched with appropriate materials. Any damaged ceiling tiles must be provided and replaced by the contractor. New ceiling tiles must match existing. Ceiling tile information will be provided by VA engineering team.

For rooms with hardpan ceilings, will drywall repair and painting be the responsibility of the VA or the awardee?

Answer: Drywall repair and painting will be the responsibility of the awardee. The contractor must ensure that each room is returned to its original condition, excluding the newly installed ceiling lift. This includes patching holes with appropriate materials and replacing any damaged ceiling tiles.

Question 3: Ceiling lift motors shall be capable of lifting at least 650, or more pounds, as specified on the Location list.

The price cost schedule calls out a 605-pound capable motor. Please confirm whether the required specification is 605 lbs. or 650 lbs.

Answer: The required specification for the ceiling lift motor capacity is 650 pounds.

Question 4: Maintenance and inspection shall be provided for 3 years from date of final acceptance.

Please confirm whether this requirement includes annual preventative maintenance for each lift.

Answer: Yes, the requirement includes annual preventative maintenance for each lift for three years from the date of final acceptance.

Question 5: Provide three (3) years of warranty on tracks, installation, motors, and other parts including the price of parts, labor and travel, or ten (10) years of warranty as long as the manufacturer is performing the preventative maintenance annually.

Should the quote include the 10-year warranty and 10-year preventative maintenance?

Answer: The Quote Should also include the ten-year warranty. Not the 10-year preventative maintenance.

Question 6: During the walkthrough, it was mentioned that there were to be 10 additional lifts being added to the solicitation. Will the solicitation be revised to reflect this or should we quote based on the 106 lifts currently listed?

Answer: The solicitation will be revised to include an additional 6 lifts, not the 10 mentioned during the site visit. Please revise the quote to reflect a total of 112 lifts.

02-25-2026 Site Visit Questions and Answers

Question 1: Prevailing wage applies, will certified payroll be required?

Answer: NO

Question 2: Is a loading dock available to receive product at each building or will there be a central receiving area?

Answer: Some buildings have loading dock capabilities which are made at truck height. However, the awardee should make provisions in case the delivery of material using the docks becomes unavailable.

Question 3: If so, is the loading dock ground level or truck-high?

Answer: The loading docks at some of the buildings are truck high.

Question 4: Can the facility accept and store product until installation begins?

Answer: The Hampton VA Medical Center does not ship or receive products; this is the responsibility of the awardee. The facility cannot accept and store products until installation begins.

Question 5: If facility cannot accept and store product, will Arjo need to have installers on site to receive products for each building?

Answer: Yes, if the facility cannot accept and store products, the installers will need to be on-site to receive products at each building.

Question 6: Is there space for mobile storage units if facility cannot store product?

Answer: Yes, there are spaces for mobile storage units. We have a laydown area, and it will be coordinated once awarded.

Question 7: Are Payment or performance bonds required?

Answer: NO

Question 8: Is a pre-installation orientation required? Ask for details such as can the orientation be completed the morning of the first day of installation.

Answer: Pre-installation orientation is required and can be completed the morning of the first day of installation.

Question 9: What level of seismic install/bracing is required if any?

Answer: For seismic install/bracing, see general requirements section C.I.5 in the SOW.

Question 10: What are the ICRA requirements for each building/unit to receive lifts?

Answer: All areas will fall under Level II ICRA except for the ICU, which will fall under Level III.

Question 11: Is there a schedule for when work will begin and in which building(s)?

Answer: Work needs to be phased to accommodate patient relocation. Work with the COR (Contracting Officer's Representative) to facilitate this plan.

Question 12: Please confirm that lift company is responsible for drywall/firewall/smoke-barrier re-patch?

Answer: Yes, the lift company is responsible for patching holes in walls and ensuring that any penetration of fire barriers are properly resealed as per the SOW.

Question 13: Which rooms have lift systems that connect 2 rooms to each other and in which building?

Answer: There are no rooms with lift systems that connect two rooms to each other.

Question 14: Contractor to include BioMed Maintenance training - how many BioMed Employees will need to included in this training?

Answer: A minimum of 5 BioMed personnel will need to be included in the training.

Question 15: Please confirm lift count is now 116 up from 106?

Answer: The correct number of additional lifts needed is 6 bringing the total number of lifts to 112 lifts.

Question 16: When dismounting existing lift systems, how high above ceiling is the demo to reach? 3" above ceiling? Completely to deck?

Answer: Demo is to include the removal of all attachment points of the lift, to the area below where it is affixed.

Question 17: How often is "on-going education and support for users" after initial installation?

Answer: Ongoing education and support are not needed after final acceptance.

Question 18: When will RFI responses be posted?

Answer: Yes 36C246Q0351 Patient Ceiling Lift Systems

File details come from the government source that posted it. Updated .