36C24626Q0351 0006.docx
DOCX document 35 KB Posted
- Attached to
- 6515--Patient Ceiling Lift System Federal contract opportunity
- Solicitation number
- 36C24626Q0351
About this file
This is a Standard Form 30 amendment to solicitation 36C24626Q0351 for Patient Ceiling Lift Systems issued by the Department of Veterans Affairs (VA) Network Contracting Office 6 in Hampton, Virginia. The amendment, effective February 27, 2026, updates quantities for ceiling lift installations across multiple VA Medical Center departments. Line item 0006 (Lifts) increased from 45 to 50 units, bringing the total lift requirement from 106 to 117 units. Corresponding quantity updates were made to line items 0011 (Installation) and 0012 (Deinstallation/Removal), both adjusted to 117 units. The amendment incorporates questions and answers posted on February 27, 2026, related to site visit clarifications. All other terms and conditions remain unchanged.
The price/cost schedule outlines 13 line items covering ceiling lift systems with motors capable of lifting 650 pounds (or 825 pounds in specific locations), CLM (Ceiling Lift Motor), scales, and three-year warranties with five-year battery warranties across multiple facility locations including 4-East, ICU, CLC, Palliative Care, PT Gym areas, and SCI departments. Additional services include education and training, BioMed technician troubleshooting, installation/deinstallation, and Virginia Certified Engineer stamped drawings. The solicitation requires Level II infection control risk assessment measures for most areas with Level III ICRA required for the ICU. The contractor is responsible for drywall repair, painting, ceiling tile replacement, proper fire barrier resealing, annual preventative maintenance for three years post-acceptance, and coordinating work scheduling with the Contracting Officer's Representative to accommodate patient relocation. Delivery is to Hampton VAMC, with bids due no later than March 3, 2026, at 12:00 PM EST.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 36C24626Q0351 0008.docx | DOCX document | |
| 36C24626Q0351 0007.docx | DOCX document | |
| 36C24626Q0351 0005.docx | DOCX document | |
| 36C24626Q0351 0004.docx | DOCX document | |
| RFQ 36C24626Q0351- Patient Ceiling Lifts.docx | DOCX document | |
| 36C24626Q0351 0003.docx | DOCX document | |
| 36C24626Q0351 0002.docx | DOCX document | |
| 36C24626Q0351 0001.docx | DOCX document | |
| Att D VHA ICRA-1.2 Oct 1 2024.pdf | ||
| Att A Wage Determination 2015-4341.pdf | ||
| 36C24626Q0351_1.docx | DOCX document | |
| Att C QUALITY ASSURANCE SURVEILLANCE PLAN.pdf | ||
| Att B Installation or Relocation Checklist.pdf |
Show all 13
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
5. PROJECT NUMBER (if applicable)
CODE
7. ADMINISTERED BY
2. AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER
3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE OF PAGES
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED
BPA NO.
1. CONTRACT ID CODE
FACILITY CODE
CODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV. 11/2016)
is required to sign this document and return ___________ copies to the issuing office.
is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO:
Specify authority)
THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER
16A. NAME AND TITLE OF CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30
PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer) 02-27-2026 Jerry Mann Department of Veterans Affairs Network Contracting Office 6 100 Emancipation Drive Hampton VA 23667 James Risobn Department of Veterans Affairs Network Contracting Office 6 100 Emancipation Drive Hampton VA 23667 To all Offerors/Bidders
36C24626Q0351
X X X See CONTINUATION Page Amendment: Site Visit Questions and Answers X The purpose of this amendment is to do the following:
1. Qty update on line item 0006 (Lifts) from 45 EA to 50 EA bringing the number of lifts needing replaced to 117 EA.
2. Qty update on line item 0011 (Instillation) from 106 EA to 117 EA.
3. Qty update on line item 0012 (Deinstallation/Removal) from 106 EA to 117 EA See PRICE/COST SCHEDULE: A.1 for updated quantities and locations.
4. Posting on 02-27-2026 Question /Answer.
All other terms and conditions remain the same.
Jerry Mann Contracting Officer
CONTINUATION PAGE
A.1 PRICE/COST SCHEDULE
ITEM INFORMATION
| ITEM NUMBER |
| DESCRIPTION OF SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 7.00 |
| EA |
| __________________ |
| __________________ |
4-EAST: 4m x 4m room covering system: Lift+ Motor (650 lbs.), CLM, Scale, Service (3-year warranty, 5 years on batteries)
* Increased number of lifts needed from 4 EA to 7 EA.
PRINCIPAL NAICS CODE: 339113 - Surgical Appliance and Supplies Manufacturing PRODUCT/SERVICE CODE: 6515 - Medical and Surgical Instruments, Equipment, and Supplies
| 2.00 |
| EA |
| __________________ |
| __________________ |
ICU: 4m x 4m room covering system, Lift + Motor (650 lbs.), CLM, Scale, Service (3-year warranty, 5 years on batteries)
| 46.00 |
| EA |
| __________________ |
| __________________ |
CLC: 7) 4m x 3m systems, (7) 5m x 3m systems, (30) 3m x 5m systems, (2) 3m straight track, (43) Lift + motor 650 lbs., (3) Lifts + Motor 825 lbs., CLM, Scale, Service (3 year warranty, 5 years on batteries)
| 7.00 |
| EA |
| __________________ |
| __________________ |
PALLIATIVE CARE: Bld 114 4m x 4m room covering system: Lift + Motor (650 lbs.), CLM, Scale, Service (3-year warranty, 5 years on batteries)
| 2.00 |
| EA |
| __________________ |
| __________________ |
PT Gym (GB122) 5m x 4m room covering system: Lift + Motor (650 lbs.), CLM, Scale, Service (3- year warranty, 5 years on batteries)
| 50.00 |
| EA |
| __________________ |
| __________________ |
SCI: (40) 4m x 4m systems, (2) 8m straight tracks, (6) 5m x 3m systems, (1) 5m x 5m system: Lift + Motor (650 lbs.), (1) 8m x 3m system: CLM, Scale, Service (3 year warranty, 5 years on batteries)
| 1.00 |
| EA |
| __________________ |
| __________________ |
PT GYM (GB123) (KT/OT area) has 1 additional lift 5m x 4m room covering system: Lift + Motor (650 lbs.), CLM, Scale, Service (3- year warranty, 5 years on batteries)
| 2.00 |
| EA |
| __________________ |
| __________________ |
(SCI) Room A131 in Building 137 has 2 Additional lifts 5m x 4m room covering system: Lift + Motor (650 lbs.), CLM, Scale, Service (3- year warranty, 5 years on batteries)
| 5.00 |
| EA |
| __________________ |
| __________________ |
Additional Education - 1 day (8 hrs per day)
| 1.00 |
| EA |
| __________________ |
| __________________ |
BioMed Training 8-hour onsite troubleshooting class for up to 6 technicians.
| 117.00 |
| EA |
| __________________ |
| __________________ |
Certified Instillation of Ceiling Lift Systems
| 117.00 |
| EA |
| __________________ |
| __________________ |
Deinstallation and removal of all existing lift rails and motors.
| 1.00 |
| EA |
| __________________ |
| __________________ |
Virginia Certified Engineer Stamped Drawings
| GRAND TOTAL |
| __________________ |
A.2 DELIVERY SCHEDULE
| ITEM NUMBER |
| SHIPPING INFORMATION |
| QUANTITY |
| DELIVERY DATE |
| 0001 to 0013 |
| SHIP TO: |
| Hampton VAMC |
100 Emancipation Drive Hampton, VA 23667
USA
TBD
| MARK FOR: |
| Anthony Boskovic-Sceusa |
757-778-3293 anthony.boskovic-sceusa.gov
RFQ 36C24626Q0351
Patient Ceiling Lift Question Answers Questions will be in “Black” and Answers will be in “Red”.
02-20-2026 Pre-Site Visit Questions and Answers Question 1: Where should we meet at?
Answer: All participants will meet in front of BLDG 63 (Security Office) at 9 AM (EST).
Question 2: Can you clarify the bid due date?
Answer: All bids will be due NLT 03-03-2026 at 12 PM (EST).
Question 3: Will facility drawings be provided for walkthrough?
Answer: Yes, floor plan drawings will be available at the Site Visit.
02-24-2026 Site Visit Questions and Answers Question 1: Contractor will be responsible for adhering/implementing all infection control requirements as determined by the infection control risk assessment (ICRA).
We provide up to Level II ICRA measures as standard. If measured above Level II will be required, please confirm the total number of rooms and the specific ICRA level applicable so that we can accurately incorporate those requirements into our pricing.
Historically, Level II has been sufficient in VA installations; however, escalation to Level III or above significantly impacts cost and scheduling, so clarification is needed.
Answer: The Lifts located in our ICU department (total of two) fall under level III ICRA. The rest will be under Level II.
Question 2: Each room where lifts are installed shall be returned to original condition, excluding the newly installed ceiling lift. Holes in the wall must be patched with appropriate materials. Any damaged ceiling tiles must be provided and replaced by the contractor. New ceiling tiles must match existing. Ceiling tile information will be provided by VA engineering team.
For rooms with hardpan ceilings, will drywall repair and painting be the responsibility of the VA or the awardee?
Answer: Drywall repair and painting will be the responsibility of the awardee. The contractor must ensure that each room is returned to its original condition, excluding the newly installed ceiling lift. This includes patching holes with appropriate materials and replacing any damaged ceiling tiles.
Question 3: Ceiling lift motors shall be capable of lifting at least 650, or more pounds, as specified on the Location list.
The price cost schedule calls out a 605-pound capable motor. Please confirm whether the required specification is 605 lbs. or 650 lbs.
Answer: The required specification for the ceiling lift motor capacity is 650 pounds.
Question 4: Maintenance and inspection shall be provided for 3 years from date of final acceptance.
Please confirm whether this requirement includes annual preventative maintenance for each lift.
Answer: Yes, the requirement includes annual preventative maintenance for each lift for three years from the date of final acceptance.
Question 5: Provide three (3) years of warranty on tracks, installation, motors, and other parts including the price of parts, labor and travel, or ten (10) years of warranty as long as the manufacturer is performing the preventative maintenance annually.
Should the quote include the 10-year warranty and 10-year preventative maintenance?
Answer: The Quote Should also include the ten-year warranty. Not the 10-year preventative maintenance.
Question 6: During the walkthrough, it was mentioned that there were to be 10 additional lifts being added to the solicitation. Will the solicitation be revised to reflect this or should we quote based on the 106 lifts currently listed?
Answer: The solicitation will be revised to include an additional 6 lifts, not the 10 mentioned during the site visit. Please revise the quote to reflect a total of 112 lifts.
02-25-2026 Site Visit Questions and Answers
Question 1: Prevailing wage applies, will certified payroll be required?
Answer: NO
Question 2: Is a loading dock available to receive product at each building or will there be a central receiving area?
Answer: Some buildings have loading dock capabilities which are made at truck height. However, the awardee should make provisions in case the delivery of material using the docks becomes unavailable.
Question 3: If so, is the loading dock ground level or truck-high?
Answer: The loading docks at some of the buildings are truck high.
Question 4: Can the facility accept and store product until installation begins?
Answer: The Hampton VA Medical Center does not ship or receive products; this is the responsibility of the awardee. The facility cannot accept and store products until installation begins.
Question 5: If facility cannot accept and store product, will Arjo need to have installers on site to receive products for each building?
Answer: Yes, if the facility cannot accept and store products, the installers will need to be on-site to receive products at each building.
Question 6: Is there space for mobile storage units if facility cannot store product?
Answer: Yes, there are spaces for mobile storage units. We have a laydown area, and it will be coordinated once awarded.
Question 7: Are Payment or performance bonds required?
Answer: NO
Question 8: Is a pre-installation orientation required? Ask for details such as can the orientation be completed the morning of the first day of installation.
Answer: Pre-installation orientation is required and can be completed the morning of the first day of installation.
Question 9: What level of seismic install/bracing is required if any?
Answer: For seismic install/bracing, see general requirements section C.I.5 in the SOW.
Question 10: What are the ICRA requirements for each building/unit to receive lifts?
Answer: All areas will fall under Level II ICRA except for the ICU, which will fall under Level III.
Question 11: Is there a schedule for when work will begin and in which building(s)?
Answer: Work needs to be phased to accommodate patient relocation. Work with the COR (Contracting Officer's Representative) to facilitate this plan.
Question 12: Please confirm that lift company is responsible for drywall/firewall/smoke-barrier re-patch?
Answer: Yes, the lift company is responsible for patching holes in walls and ensuring that any penetration of fire barriers are properly resealed as per the SOW.
Question 13: Which rooms have lift systems that connect 2 rooms to each other and in which building?
Answer: There are no rooms with lift systems that connect two rooms to each other.
Question 14: Contractor to include BioMed Maintenance training - how many BioMed Employees will need to included in this training?
Answer: A minimum of 5 BioMed personnel will need to be included in the training.
Question 15: Please confirm lift count is now 116 up from 106?
Answer: The correct number of additional lifts needed is 6 bringing the total number of lifts to 112 lifts.
Question 16: When dismounting existing lift systems, how high above ceiling is the demo to reach? 3" above ceiling? Completely to deck?
Answer: Demo is to include the removal of all attachment points of the lift, to the area below where it is affixed.
Question 17: How often is "on-going education and support for users" after initial installation?
Answer: Ongoing education and support are not needed after final acceptance.
Question 18: When will RFI responses be posted?
Answer: Yes
02-27-2026 Site Visit Questions and Answers
Question 1: Would the Government like to proceed with the 10‑year extended warranty option, which requires the preventative maintenance component to be included to meet OEM standards?
Answer: At this time, we are looking to stay with the three‑year warranty as stated in the SOW and do not wish to proceed with the 10‑year option.
36C246Q0351 Patient Ceiling Lift Systems