The document is a Geotechnical Investigation Report for the 30,000 Gallon Fuel Oil Tank at the Bronx Boiler Replacement Project, prepared by Pillori Associates, P.A. The investigation involved drilling two borings (B-1 and B-2) on the southwest quadrant of the Bronx Veterans Hospital campus on November 26, 2024, to assess subsurface soil and rock conditions for new fuel tank foundations.
The report details the site's stratigraphy, which consists of a surface layer of miscellaneous fill, followed by glacial till in one boring and decomposed bedrock. The soil was classified using the Unified Soil Classification System, with fill material categorized as loose to compact and nominally unsatisfactory for bearing. The investigation recommends a minimum footing depth of 40 inches below finished grade, with an allowable bearing pressure of 4 tons per square foot for consistency. The report provides specific engineering recommendations for excavation, backfill, and rock removal, noting that conventional excavation equipment can penetrate the decomposed rock, but deeper excavations will require additional techniques like chipping or drilling.
View the file
Other files for this federal contract opportunity
Show all 25
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PILLORI ASSOCIATES, P.A.
Geotechnical Engineering
GEOTECHNICAL INVESTIGATION REPORT
Bronx Boiler Replacement Project
30,000 Gallon Fuel Oil Tank Bronx, NY
(revised)
Prepared For:
Miller-Remick, LLC 1010 Kings Highway South – Bldg. #2
Cherry Hill, NJ 08034
Prepared By:
Pillori Associates, P.A.
71 Route 35 Laurence Harbor, New Jersey 08879
January 2025
Project # 220409
PILLORI ASSOCIATES, P.A.
71 Route 35, Laurence Harbor, NJ 08879 • Tel: (732) 335-0059 • Fax: (732) 335-8515 www.pilloriassociates.com • e-mail: office@pilloriassociates.com
January 14, 2025 Via email: DJewell@miller-remick.com
Miller-Remick, LLC 1010 Kings Highway South – Bldg. #2 Cherry Hill, NJ 08034
Attn: Dan Jewell, PE, Project Manager
Re: Geotechnical Investigation Report 30,000 Gallon Fuel Oil Tank
Bronx Boiler Replacement Project, Bronx, NY
Gentlemen:
Presented herein is the geotechnical engineering report for the referenced project. We are confident that the subsurface information and engineering recommendations contained herein will meet the needs of the project. Thank you for the opportunity to be of service.
Please call if you have any questions or if we can be of further assistance.
Sincerely, Pillori Associates, PA greg
GP NYS PE
TABLE OF CONTENTS
INTRODUCTION
PROJECT DESCRIPTION
GEOTECHNICAL INVESTIGATION
STRATIGRAPHY
SEISMIC EVALUATION AND CRITERIA
GEOTECHNICAL ENGINEERING EVALUATION
ENGINEERING RECOMMENDATIONS
CONVENTIONAL SPREAD/STRIP FOOTINGS & RETAINING WALLS
EXCAVATION AND DEWATERING
BACKFILL
ROCK REMOVAL AND STABILIZATION
CLOSURE
LIST OF ATTACHMENTS
Boring Location Plan Drawing No. 1 Boring Logs B-1 and B-2 Soil Classification Chart
71 Route 35, Laurence Harbor, NJ 08879 • Tel: (732) 335-0059 • Fax: (732) 335-8515 www.pilloriassociates.com • e-mail: office@pilloriassociates.com
Introduction
This report presents the results of our supplemental geotechnical engineering investigation conducted for the 30,000 Fuel Oil Tank (location D-2) Bronx Boiler Replacement project. This work was performed in general accordance with the consultant service agreement included under Purchase Order # Pillori 0499-0154 #00, dated November 5, 2024. The purpose of this investigation was to identify the subsurface soil/rock conditions at an alternative location in order to determine the relative soil parameters for the design and construction of new foundations for the fuel tank project.
Project Description
The project site is located on the southwest quadrant of the Bronx Veterans Hospital campus, in the Bronx, New York, as shown in Figure 1. Specifically, the additional borings associated with this supplemental geotechnical engineering report were located across from Building 16 in a wooded area above a retaining wall.
Geotechnical Investigation
The geotechnical investigation consisted of drilling 2 borings. PG Environmental Services, Inc drilled borings, B-1 and B-2, on November 26, 2024, using a portable drill rig. Both borings were advanced through a surface layer of controlled fill, terminating upon refusal on decomposed bedrock at completion depths of 8'-11" and 13'-9" below the existing grade. In the borings, Standard Penetration Tests (SPTs) were performed within the overburden soil at continuous 2-foot intervals in accordance with procedures specified in ASTM D1586.
Full-time special inspection was provided by Pillori Associates to locate the explorations in the field, direct drilling and sampling activities, and maintain continuous logs of the explorations. Soil/rock types observed in the borings were visually classified according to the Unified Soil Classification System (USCS) and the New York City Building Code (NYCBC). The boring locations are shown on the Boring Location Plan, Drawing No. 1, attached to this report.
At the conclusion of the investigation program, the soil samples were delivered to our soil laboratory for re-examination and further classification. The individual sample classifications were combined according to soil group and geologic origin, and their descriptions were recorded on finalized logs. The final logs of the borings are attached to this report along with the Unified Soils Classification System chart.
Figure 1 Site Vicinity Map
SITE
Pillori Associates 2 220409
Stratigraphy
In general, the subsurface conditions consisted of a surface layer of miscellaneous fill, overlying very dense glacial till and/or decomposed Gneiss bedrock. Detailed descriptions of the subsurface stratigraphy encountered in the borings are presented on boring logs attached to this report. Generalized descriptions are presented below in order of increasing depth.
Fill (F): A miscellaneous fill layer was encountered at the ground surface at both boring locations. The heterogeneous mixture of sand, silt and gravel was loose to compact in terms of relative density and was classified as nominally unsatisfactory bearing material, Class 7 material, in accordance with the NYCBC.
Glacial Till (GT): Glacial till was encountered below the fill layer in boring B-2. The layer was 2 feet thick, compact to very compact in terms of relative density, and was classified as SP, 3a material, in accordance with the USCS and the NYCBC, respectively.
Decomposed Rock (DR): The top of decomposed bedrock was encountered at the termination depth in both borings. This was the same decomposed rock layer encountered in the borings during the previous investigation on March 15, 2023. The decomposed rock was previously classified as “Soft Rock” Class 1d material, in accordance with the
NYCBC.
Groundwater: Groundwater was found trapped above the decomposed bedrock in each of the borings. We believe groundwater levels and will generally vary from 1 to 2 feet above the decomposed rock layer during heavy rains and seasonal wet periods.
Seismic Evaluation and Criteria
The proposed structure must be designed in accordance with all applicable New York City Building Code seismic design criteria. The site classes are based on the average soil/rock properties in the upper 100 feet. The soil and rock encountered in the borings most closely resembles “Hard Rock,” Site Class A. The profile is based on Section
1613.3.2 and Table 1613.3.4.1 of the 2022 NYCBC. Peak accelerations may be estimated using Table 1816.2.1 of the 2022 NYCBC and values for site coefficients Fa and Fv may be estimated using Tables 1613.3.3(1) and 1613.3.3(2), respectively. The soil underlying the site was classified as “Liquefaction Evaluation Not Required” in accordance with Section 1816 of the NYCBC.
Geotechnical Engineering Evaluation
A substantial fill layer was encountered at the ground surface in both borings. Given the proximity of the borings to existing retaining walls, we suspect the fill was placed as backfill subsequent to the wall construction. Blow counts from the SPT sampling indicated that the fill was placed and compacted in a controlled manner, and as such the fill material was considered suitable for support for the new tank and containment walls.
Pillori Associates 3 220409
Footing elevations for the proposed construction were not know at the time of this writing, so allowable bearing pressures and other geotechnical design parameters are provided below for each of the soil materials encountered in the borings. A minimum footing depth of 40 inches below finished outside grade is recommended for all new foundations for frost protection.
Excavations for footing subgrades are expected to encounter a variety of materials, including controlled compacted fill, dense glacial till, and/or decomposed bedrock, depending on selected design subgrade elevations. Based on the SPT blow counts, the surface fill possesses an allowable bearing pressure of 4 tons per square foot, the glacial till possesses an allowable bearing pressure of 6 tsf, and the underlying decomposed rock possesses an allowable bearing pressure of 8 tsf. For consistency and ease of construction, we recommend that all foundations be dimensioned for an allowable bearing pressure of 4 tsf, given the nature of the proposed construction.
Because the glacial till and underlying decomposed rock are relatively impermeable, water will tend to collect within foundation excavations that extend below the fill layer.
Foundation subgrades that become wet can be dewatered locally by pumping from trenches or sump pits located throughout the excavations.
Ground slabs can be designed as a slabs-on-grade, provided the subgrade soils are re-compacted after final excavation. A crushed stone layer and suitable vapor barrier should be installed beneath the slabs to act as a capillary break and prevent groundwater from permeating through the slabs.
Engineering Recommendations
Conventional Spread/Strip Footings & Retaining Walls
As mentioned above, new footings can be designed for a variety of soil/rock conditions that may be encountered across the construction footprints. The geotechnical engineer performing the controlled inspections of the footing subgrades should make the final footing selection in the field. The following parameters may be utilized in the design of footings and containment walls.
Table 1 – Earth Pressure Design Criteria
Allowable Bearing Pressure – (Class 7) 4 tsf
Allowable Bearing Pressure – (Classes 3a,) 6 tsf Allowable Bearing Pressure – (Class 1d) 8 tsf
Equivalent Fluid Pressure - Below Top of Rock (γKO) 80 pcf Equivalent Fluid Pressure - Above Top of Rock (γKO) 50 pcf
Prior to the placement of reinforcing steel, the footing subgrades should be thoroughly cleaned of loose soil and rock fragments, mud, debris and all other deleterious material.
Pillori Associates 4 220409
An engineer licensed in the State of New York should inspect the prepared subgrade.
Foundation settlements will be negligible for footings designed for the recommended bearing pressures.
Excavation and Dewatering
Temporary, shallow excavations with vertical sides less than 4 feet high will generally be stable, although there is a potential for sloughing. Temporary excavation sides greater than 4 feet in depth may be sloped back at an inclination of 1.5:1 (horizontal to vertical).
Some sloughing or erosion of surface soils should be anticipated. All applicable safety requirements and regulations, including OSHA requirements should be met.
Dewatering, if required, during construction can be handled by periodic pumping from low spots or seepage pits installed below subgrade elevation.
Backfill
All compact fill and backfill placed beneath the floor slabs, sidewalks, and used for backfilling foundation walls and utility trenches should be performed in a controlled manner using the onsite natural soil free of organic matter debris or imported Select Fill meeting the grainsize requirements in Table 2 below. The fill material should be placed in 8-inch loose lifts and compacted to 95% of the maximum dry density as determined in ASTM D1557. Compaction can be performed using walk-behind-vibratory plate, vibratory roller, or “jumping jack” type compactors. Lift thickness may be increased to 12 inches for larger compaction equipment. Imported fill material, if required, should be approved prior to its use.
Table 2 – Select Fill
Sieve Size Percent Passing 4 in 100
3/4 in 100 - 80 No. 4 80 – 60 No. 40 60 – 30 No. 200 <15
Rock Removal and Stabilization
Conventional excavation equipment will be able to penetrate the decomposed rock and about 1 or 2 feet into the underlying sound bedrock; however, deeper excavations will require chipping, and/or drilling and splitting. Line drilling will be required to reduce vibrations and control breakouts along the property lines and/or limits of excavation. Line drilling should not be performed above the footing elevations adjacent to the neighboring foundation walls – only below the footing elevations and along open lot lines.
Pillori Associates 5 220409
Closure
This report presents the results of the geotechnical investigation performed for the Bronx Boiler Replacement project, New York. This report is not a bid document, and any contractor reviewing this report must draw his own conclusions regarding specific construction techniques to be used on this project.
A
35'-11
40.1 2'-4"
4'-0"
6'-5"
B3
B6
B4
13'-10
17'-2"
39.8
39.6 39.5
39.3
2'-4"
5'-8"
17'-0"
6'-0"
71 Route 35, Laurence Harbor, NJ 08879 Geotechnical Engineering
PILLORI ASSOCIATES, P.A.
AutoCAD SHX Text B-1
AutoCAD SHX Text B-2
AutoCAD SHX Text B-1
AutoCAD SHX Text
BORING LOCATION
AutoCAD SHX Text
SCALE: 1" = 20'
AutoCAD SHX Text
LEGEND
AutoCAD SHX Text Job No.:
AutoCAD SHX Text Date:
AutoCAD SHX Text Dwg No.
AutoCAD SHX Text Title:
AutoCAD SHX Text Project:
AutoCAD SHX Text
BORING LOCATION PLAN
AutoCAD SHX Text
BRONX VA NEW GAS TANK
AutoCAD SHX Text
BRONX, NEW YORK
AutoCAD SHX Text 1/6/2025
AutoCAD SHX Text 220409
AutoCAD SHX Text
S-1
S-2
S-3
S-4
S-5
1-2-10-50/6"
FILL
(7)
8'-11" 139.08'
F
PILLORI ASSOCIATES, P.A. Geotechnical Engineering
SOIL DESCRIPTIONSAMPLES
Blows / 6"
Depth Feet Number
Classification Depth
Elevation
Project No.:
Project:
Date:
Contractor:
Strata
Boring No.:
Sheet:
Ground El:
Groundwater Depth:
220409
Bronx VA New Gas Tanks Bronx, New York
11/26/2024 PG Environmental
B-1 +148 +/-
NA
Dark Brown coarse to fine Sand, some Silt with medium Gravel in tip
Tan coarse to fine Sand, trace Silt, some medium to fine Gravel
Tan coarse to fine Sand and medium to fine Gravel, trace Silt
Medium to fine Gravel, some Tan coarse to fine Sand, trace Silt
Refusal on possible Decomposed Rock at a depth of 8'-11" from grade
End of Boring
32-28-25-23
29-23-35-18
22-26-28-21
65/5"
S-1
S-2
S-3
S-4
S-5
2-2-15-24
FILL
(7)
13'-9" 138.25
F
PILLORI ASSOCIATES, P.A. Geotechnical Engineering
SOIL DESCRIPTIONSAMPLES
Blows / 6"
Depth Feet Number
Classification Depth
Elevation
Project No.:
Project:
Date:
Contractor:
Strata
Boring No.:
Sheet:
Ground El:
Groundwater Depth:
220409
Bronx VA New Gas Tanks Bronx, New York
11/26/2024 PG Environmental
B-2 +152 +/-
NA
Brown coarse to fine Sand, little Silt, little medium to fine Gravel
Brown medium to fine Sand, little Silt, little medium to fine Gravel
Brown coarse to fine Sand and medium to fine Gravel, little Silt
32-28-25-23
33-15-14-16
12-8-12-11
12-17-15-11
S-6 18-15-12-12
S-7 7-11-25-50/3"
Brown medium to fine Sand, little Silt, little medium to fine Gravel
Brown coarse to fine Sand, some Silt with Schist fragments
Refusal on possible Decomposed Rock at a depth of 13'-9" from grade
End of Boring
GT
SP
(3a)
12'-0" 140.0
| 220409 Investigation Report - Fuel Tank |
| 220409 - BRONX VA - NEW GAS TANK BORINGS 1-6-2024.pdf |
| Sheets and Views |
| 220409 - BRONX VA - NEW GAS TANK BORINGS-BLP |
| 220409 - BRONX VA - NEW GAS TANK BORINGS-Boring Log 1 |
| 220409 - BRONX VA - NEW GAS TANK BORINGS-Boring Log 2 |
Soil Classification Chart
File details come from the government source that posted it. Updated .