Solicitation section 2.3 and 2.8 revisions.docx

DOCX document 15 KB Posted

Attached to
526-22-900 Replace Boiler Plant Construction - Bronx VAMC Federal contract opportunity
Solicitation number
36C77625B0028
Issued by
Department of Veterans Affairs Technology Acquisition Center Austin

About this file

This document is a solicitation amendment for the Department of Veterans Affairs (VA) Bronx VAMC Boiler Plant Replacement project (Solicitation 36C77625B0028). The amendment revises two key sections: Section 2.3 and Section 2.8, focusing on Service-Disabled Veteran-Owned Small Business (SDVOSB) requirements and proposal submission guidelines.

The amendment mandates that all SDVOSB offerors must be certified in the Small Business Search (SBS) database at both offer submission and award, with non-certification resulting in a non-responsive bid. Additionally, joint venture offerors must now provide a comprehensive joint venture agreement and a certification from the certified SDVOSB joint partner, confirming compliance with specific regulatory requirements. Failure to submit the required documentation may render the offer ineligible for award.

View the file

Other files for this federal contract opportunity

Other files attached to 526-22-900 Replace Boiler Plant Construction - Bronx VAMC, newest first.
File Type Posted
Amendment 5 - 36C77625B0028 0005 8-19-2025.pdf PDF
Online Bid Opening Meeting Information.docx DOCX document
Tech Questions Tracker - Bronx 8.14_Responses.docx DOCX document
36C77625B0028 Amendment 0004.docx DOCX document
Construction Wage Rates - Bronx - 8-8-25.pdf PDF
36C77625B0028 Amendment 0003.docx DOCX document
Bronx VAMC Boiler Plant RBM Survey Report - Final.pdf PDF
Tech Questions Tracker - Bronx 8.7_Responses.docx DOCX document
Att 6 - Brand Name Justification - Bronx BP 8-4-25 Revised.pdf PDF
36C77625B0028 Amendment 0002.docx DOCX document
Construction Wage Rates - Bronx - 7-25-25.pdf PDF
36C77625B0028 Amendment 0001.docx DOCX document
Sign in sheet - Repace Bronx Boiler Plant Construction.pdf PDF
Att 1 - Bronx 526-22-900 Replace Boilers Bid Design Review - Specifications - Volume III.pdf PDF
Att 1 - Bronx 526-22-900 Replace Boilers Bid Design Review - Specifications - Volume I.pdf PDF
Att 4 - VHA PCRA 2024 526-22-900 Replace Bronx Boiler Plant.pdf PDF
Att 7 - Limitations on Subcontracting - Construction.docx DOCX document
Att 9 - Bronx Boiler Replacement Investigation Report.pdf PDF
36C77625B0028.docx DOCX document
Att 1 - Bronx 526-22-900 Replace Boilers Bid Design Review - Specifications - Volume II.pdf PDF
Att 2 - Bronx 526-22-900 Replace Boilers Bid Design Review - Drawings.pdf PDF
Att 3 - SOW - Replace Bronx Boiler Plant R12 - 6-16-25.pdf PDF
Att 5 - Construction Wage Rates - Bronx - 7-4-25.pdf PDF
Att 6 - Brand Name Justification - Bronx BP 7-1-25.pdf PDF
Att 8 - Site Visit Instructions.pdf PDF
Show all 25

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Solicitation section 2.3 SDVOSB SET-ASIDE language is revised as follows:

As VetCert is no longer the program of record and the Small Business Search (SBS) is the only up-to-date search database, all SDVOSB offerors shall be listed as certified in the SBS at the time of offer submission and award. Failure to be certified at the time of offer submission and at the time of award will result in the offeror’s bid being non-responsive.

Solicitation Section 2.8 Proposal Requirements, B., l. is revised as follows:

Any offeror submitting a bid as a joint venture must provide a copy of the joint venture agreement, as well as a certification from the certified SDVOSB joint partner, signed by an authorized official of each partner to the joint venture, stating that the parties to the joint venture (1) have entered into a joint venture agreement that fully complies with paragraph (c) of 13 CFR § 128.402 and (2) will perform the contract in compliance with the joint venture agreement. Failure to submit the agreement and certification with the offeror’s bid may result in the offer being deemed nonresponsive and therefore ineligible for award.