Att_7_Proposed_Equals.doc

DOC document 52 KB Posted

Attached to
Project Title: SAFR EPPLETON HALL MOORINGS REPLACE Federal contract opportunity
Solicitation number
140P8622R0017
Issued by
Department of the Interior National Park Service Pacific West Region

View the file

Other files for this federal contract opportunity

Other files attached to Project Title: SAFR EPPLETON HALL MOORINGS REPLACE, newest first.
File Type Posted
Amd_3_att_01_27_00_-_Definition_of_Contract_Line_Items_Rev_2_0003.pdf PDF
Amd_3_att__FINAL_-_Contract_Price_Schedule_Rev_2_0003.xlsx XLSX spreadsheet
Amd_3_att_Final_Calculations_Eppleton_Hall_Mooring_Replacements_0003.pdf PDF
Sol_140P8622R0017_Amd_0003.pdf PDF
Amd_3_att_Q_A_3_0003.docx DOCX document
B09_Amd_2_Attachment_140P8622R0017_Q_A_2__0002.pdf PDF
Sol_140P8622R0017_Amd_0002.pdf PDF
Sol_140P8622R0017_Amd_0001.pdf PDF
Amd_1_Replacement_Pages_01_11_00_-_Summary_of_Work_Rev_1_0001.pdf PDF
Amd_1_Replacement_Pgs_01_27_00_-_Definition_of_Contract_Line_Items_Rev_1_0001.pdf PDF
B11_Site_Visit_Sign_In_Sheet_Completed_0001.pdf PDF
Att_9_Vaccination_Certification_Notification.pdf PDF
Att_6_Project_Experience_Form.docx DOCX document
Att_4_Wage_Determination_SF_County_WD_CA20220018_rev_08-04-2022.pdf PDF
B08_140P8622R0017_Request_for_Proposal_docx.pdf PDF
Att_8_Limitation_on_Subcontracting_Report_Template.xlsx XLSX spreadsheet
Sol_140P8622R0017.pdf PDF
Att_5_Past_Performance_Questionnaire.docx DOCX document
Att_3__Structural_Calculations.pdf PDF
Att_10__Certification_of_Vaccination_Form_expires_2-28-25.pdf PDF
Att_2__Drawings.pdf PDF
Att_1_Specifications.pdf PDF
B08_Price_Schedule_Fillable.xlsx XLSX spreadsheet
Show all 23

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PROPOSED EQUALS

In accordance with Provision 52.211-06 (Section L), the following products are being proposed as equals. Provide all attachments required by the provision, as applicable. Use additional sheets of paper as necessary.

Section No.
Paragraph No.
Product/Model No.
Proposed Product/Model No.

A.

By submitting the proposed equal, the contractor certifies that it:

1.

Has investigated the proposed item and determined that it is equal or superior in all respects to that specified.

2.

Will provide, as a minimum, the same warranties for the proposed item as for the item specified.

3.

Has determined that the proposed item is compatible with interfacing items.

4.

Will coordinate the installation of an approved item and make all changes required in other elements of the work because of the substitution.

5.

Waives all claims for additional expenses that may be incurred as a result of the substitution.

B.

The Contractor is encouraged to submit for approval products that exceed accessibility standards, are sustainable and/or made from recycled or environmentally responsible material. Every effort will be made to approve these materials.

File details come from the government source that posted it. Updated .