The images depict a construction site safety monitoring setup with multiple elements related to infection control and pressure management. The first image shows a sealed entry point with danger signs for a construction area and hard hat zone, featuring a manometer displaying a -0.045 pressure reading. Various documents are posted, including ILSM (Infection Control Log Sheet), sign-in sheet, PCRA (Precaution Risk Assessment), and ICRA (Infection Control Risk Assessment) documents.

The second and third images show a Dwyer DigiMag digital pressure monitoring device installed on an edge guard. The accompanying text indicates the device is connected to the positive side (+) to provide accurate room pressure readings, with instructions that the HEPA filter machine should be blowing out of the room. The device is mounted with clear tubing and appears to be part of a precise environmental control system for maintaining specific air pressure conditions in a controlled construction or medical environment.

View the file

Other files for this federal contract opportunity

Other files attached to 578-25-013 Joliet VFD Replacement, newest first.
File Type Posted
S06 Amendment A0003.docx DOCX document
P09 Revised SOW 9.18.25.docx DOCX document
S02 2nd Prebid Site Visit Sign-In Sheet 9.17.25.pdf PDF
Att-18 M2.3 PART SCND FLR NEW WRK PLN-DUCTWRK.PDF PDF
S06 Amendment A0002.docx DOCX document
S05 Pre-Bid RFIs 9.15.25.xlsx XLSX spreadsheet
S02 Prebid Site Visit Sign-In Sheet 9.3.25.pdf PDF
S05 Pre-Bid RFIs 8.27.25.xlsx XLSX spreadsheet
S06 Amendment A0001.docx DOCX document
Att-4 Hines COVID-19 Guidelines.pdf PDF
Att-5 Safety and Health During Construction Activities.pdf PDF
Att-10 Pre-Construction Checklist.pdf PDF
Att-12 Interim Life Safety Measures -ILSM-.pdf PDF
Att-13 Infection Control Risk Assessment -ICRA 1-3-.pdf PDF
Att-14 Joliet CBOC Floor Plans.pdf PDF
Att-16 Joliet CBOC Mechanical Drawings.pdf PDF
Att-1 Contractor Badging Forms.pdf PDF
Att-2 Emergency Contact List.pdf PDF
Att-17 Specifications Book.pdf PDF
S02 Solicitation 36C25225B0023.docx DOCX document
Att-8 Above Ceiling Entry and Wall Construction Permits.pdf PDF
P07 Wage Determination.pdf PDF
Att-3 No Smoking Policy 10-1-19.pdf PDF
Att-7 Cutting Welding and Other Hot Work.pdf PDF
Att-9 OIT Horizontal Cable Requirements.pdf PDF
Att-11 Pre-Construction Risk Assessment -PCRA 1-1-.pdf PDF
Att-15 Current Conditions Photos.pdf PDF
Show all 27

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

VHAHINDoyleL Text Box Entrance

VHAHINDoyleL Text Box Manometer

VHAHINDoyleL Text Box

ICRA

VHAHINDoyleL Text Box

PCRA

VHAHINDoyleL Text Box

ILSM

VHAHINDoyleL Text Box Sign-in

VHAHINDoyleL Line

VHAHINDoyleL Line

VHAHINDoyleL Line

VHAHINDoyleL Line

VHAHINDoyleL Line

VHAHINSidleB Image

VHAHINSidleB Text Box Dwyer DigiMag Installed on edge guard. Poly is connected to positive side (+) to give accurate reading of room pressure. Hepa filter machine should be blowing out of room.

VHAHINSidleB Image

File details come from the government source that posted it. Updated .