Att 4 Watercraft Targets DO 1 - Logistics Plan.pdf
PDF 106 KB Posted
- Attached to
- Watercraft Targets IDIQ
- Solicitation number
- FA282325R0004
About this file
This is a Logistics Support Plan delivery order document issued by the 96th Range Support Squadron Mobile Targets Flight (RNRT) at Eglin AFB for the Watercraft Target IDIQ contract, with a start date of August 1, 2024. The contractor must provide a logistics support plan detailing procurement methods, oversight, and management processes for watercraft targets used in test and training operations.
Key requirements include developing a plan tailored to the Statement of Objectives (SOO) that demonstrates the contractor's ability to manage procurement and logistics through delivery. Deliverables include one copy each of the Logistics Support Plan to the Technical Project Manager and Program Manager, with completion required within 21 days after receipt of order (ARO). The contractor must designate a Project Manager within 7 days of order issuance. The document is marked with Distribution Statement D, limiting distribution to DOD and DOD contractors only due to Critical Technology considerations.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| RFIs 23 Jan 25.pdf | ||
| Att 12 Pricing Worksheet.xlsx | XLSX spreadsheet | |
| Att 11 Watercraft Example Project 3.pdf | ||
| Att 9 Watercraft Example Project 1.pdf | ||
| Att 10 Watercraft Example Project 2.pdf | ||
| Att 7 App B Past Perf Ques.docx | DOCX document | |
| Att 8 Subcontractor Consent.docx | DOCX document | |
| Att 6 App A Past Perf Info.docx | DOCX document | |
| Att 5 App C Financial Resp Ques.docx | DOCX document | |
| Att 3 Draft Solicitation FA282325R0004.pdf | ||
| Att 2 Watercraft Targets Ordering Procedures 06.14.24.pdf | ||
| Att 1 Watercraft SOO 10.28.24.pdf |
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Watercraft Target IDIQ Delivery Order 1 for
Logistics Support Plan 1 August 2024
1. Introduction
The 96th Range Support Squadron Mobile Targets Flight (RNRT) is responsible for the daily operation and management of targets, to include watercraft, used in test and training at Eglin AFB Florida.
2. Purpose
The purpose of this delivery order is to provide a logistics support plan for the implementation of a delivery order under the RNRT Watercraft Target IDIQ contract to show regular processes for procurement methods, oversight, and management processes.
3. Scope
The Contractor shall provide a logistics support plan tailored to the SOO that is inherent to each Contractor’s capability related to the Watercraft Target IDIQ contract. The plan shall (although not limited to) provide details of procurement methods, oversight and management methods that will be used to execute the Watercraft Target IDIQ contract.
4. Technical Requirements
The Contractor shall develop and deliver a logistics support plan for the Watercraft Target IDIQ contract at a minimum, considers the following processes and demonstrates the authors understanding and ability to manage procurement and logistics to point of delivery.
4.1. Procurement Methods – Contractor shall define
5. Deliverables
5.1. Logistics Support Plan
TITLE: Watercraft Target Support Plan DISTRIBUTION: One copy each to Technical Project Manager and Program Manager REMARKS: Electronic delivery by email is acceptable
5.2. Delivery Schedule - Estimated completion in twenty-one (21) days ARO
5.3. Document Marking - All documents containing technical information shall be marked as follows unless approved for public release:
Distribution Statement D: Distribution authorized to Department of Defense and U.S.
DoD contractors only (Critical Technology, 19 Aug 2020). Other requests for this document shall be referred to: US Air Force 96 RANSS/RNRT, Eglin AFB FL (850) 883-6949
6. General Information
6.1. Project Management - The Contractor shall designate a Project Manager who shall be responsible for the control and coordination of all work performed on this delivery order. The Contractor shall provide the Project Manager’s name, in writing, to the PCO within 7 days after issuance of delivery order.
6.2. Release of Information - The Contractor shall not release any information to any person, Government agency, or Contractor concerning the delivery order without the approval of the Contracting officer.