This is a Performance Work Statement (PWS) for High-Altitude Electromagnetic Pulse (HEMP) Hardness Maintenance/Hardness Surveillance (HM/HS) engineering and technical support services at Offutt Air Force Base, Nebraska. The contract shall consist of a transition/base period of one year with four one-year options and a six-month extension. Work shall be performed at Offutt AFB, NE.
The contractor must provide comprehensive HM/HS support for HEMP protection systems in Building 1000 and B500 HEMP Shielded Enclosure (HSE), including preventative maintenance, testing, inspections, corrective maintenance, engineering support, vulnerabilities assessments, and equipment labeling. Key technical requirements include Shielded Effectiveness (SE) testing on a quarterly basis, Continuous Wave Immersion Surveillance (CWIS) testing within 180 calendar days of contract start and each option year using 400+ test frequencies between 100 kHz–1 GHz, and annual ultrasonic shield thickness testing to verify shielding condition. The contractor must maintain detailed HM/HS logs submitted monthly, provide system improvement recommendations within 10 calendar days of service-cycle execution, submit Reliability, Maintainability, and Availability (RMA) reports 45 calendar days prior to end of each option period, complete phenolic labeling within 180 calendar days of contract start, and develop a work plan within 30 calendar days of contract start and each option year. Emergency response capability requires contractor personnel on-site within four hours of notification with a corrective action plan in place within 24 hours. The contractor must furnish all consumable materials, tools, and equipment except HEMP filters and shielded cabinets (Government-provided). All work must comply with MIL-STD-188-125-1A, applicable Technical Orders, and site-specific HM/HS Program Plans. Security requirements include facility and personnel Top Secret/SCI clearances, Anti-Terrorism Level I training, Cyber Awareness training, OPSEC training, and SCIF Standard Operating Procedures training. Contractor personnel require Air Force Common Access Cards (CAC) and compliance with Controlled Unclassified Information (CUI) handling procedures. The Government will monitor performance through quarterly Program Management Reviews and the Contractor Performance Assessment Reporting System (CPARS), with all contractor services identified as mission-essential.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| HEMP Q and A.pdf | ||
| CDRL Listing Ex A.pdf | ||
| Att 4 PWS Feb 2026.pdf | ||
| Solicitation Amendment - FA460026R00020002.pdf | ||
| Site Visit Sign In Sheet.pdf | ||
| FA460026R00020001.pdf | ||
| FA460026R0002.pdf | ||
| Att 3 Price Model Final.xlsx | XLSX spreadsheet | |
| CDRL Listing ExA.pdf | ||
| Att 7 Wage Determination.pdf | ||
| Att 5 HDBK 423 5-15-93.pdf | ||
| Att 2 - NCIC Screening_Pass Request.pdf | ||
| Att 6 SB_Subcontracting Plan Review Checklist.xlsx | XLSX spreadsheet | |
| Att 1 - NDA - Solicitation.pdf |
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Performance Work Statement (PWS)
Offutt Air Force Base
High-Altitude Electromagnetic Pulse (HEMP) Hardness
Maintenance/Hardness Surveillance (HM/HS)
Engineering/Technical
Support and Enhancements
January 2026
TABLE OF CONTENTS
1.0 INTRODUCTION
2.0 SCOPE 4
3.0 GENERAL REQUIREMENTS 4
3.1 Period of Performance 4
3.2 Place of Performance 4
4.0 TECHNICAL REQUIREMENTS 4
4.1 B1000 Support 5
4.1.1 Hardness Maintenance/Hardness Surveillance (HM/HS) for B1000 5
4.1.1.1 HM/HS Maintenance Data Logs 5
4.1.1.2 System Improvement Recommendations 5
4.1.1.3 Vulnerabilities Assessment 5
4.1.1.4 Reliability, Maintainability, and Availability (RMA) 6
4.1.1.5 Phenolic Labeling 6
4.1.1.6 Work Plan 6
4.1.2 Tests, Inspections, and Preventative Maintenance for B1000
4.1.2.1 Shielded Effectiveness (SE) Testing 7
4.1.2.2 Continuous Wave Immersion Surveillance (CWIS) Testing 7
4.1.2.3 Ultrasonic Shield Testing 7
4.1.2.4 Inspections and Maintenance 8
4.2 B500 HEMP Shielded Enclosure (HSE) Support 8
4.2.1 Hardness Maintenance/Hardness Surveillance (HM/HS) for B500 HSE 8
4.2.1.1 HM/HS Maintenance Data Logs 8
4.2.1.2 System Improvement Recommendations 8
4.2.1.3 Vulnerabilities Assessment 8
4.2.1.4 Reliability, Maintainability, and Availability (RMA) 8
4.2.1.5 Phenolic Labeling 9
4.2.1.6 Work Plan 9
4.2.2 Tests, Inspections, and Preventative Maintenance for B1000 10
4.2.2.1 Shielded Effectiveness (SE) Testing 10
4.2.2.2 Continuous Wave Immersion Surveillance (CWIS) Testing 10
4.2.2.3 Ultrasonic Shield Testing 10
4.2.2.4 Inspections and Maintenance 11
4.3 Emergency Calls 11
4.4 Future Growth 11
4.4.1 Upgrades 11
4.4.2 Contractor Support 11
5.0 CONTRACT REQUIREMENTS 11
5.1 Quality Control Plan (QCP) 11
5.2 Program Management Reviews (PMR) 11
5.3 Performance Reporting 12
5.4 Mission Essential 12
5.5 Compliance Standards 12
5.6 Contractor Furnished Items and Responsibilities 12
5.6.1 Materials 12
5.6.2 Equipment 12
5.6.3 Government Provided Support 12
5.6.4 Program Management 12
5.7 Transition Plans
5.7.1 Phase-In Transition Plan 12
5.7.2 Phase-Out Transition Plan 12
5.8 Deliverables 13
6.0 SERVICES SUMMARY (SS) 14
7.0 SECURITY 15
7.1 Security Clearances 15
7.1.1 Facility Clearance 15
7.1.2 Personnel Clearances 15
7.1.3 Interim Clearances 15
7.2 Security Training 15
7.3 Pass and Identification and Base Entry 15
7.4 Retrieving Identification Media 16
7.5 Controlled Unclassified Information (CUI) 16
7.5.1 Certificate Pertaining to Foreign Interests 16
7.5.2 Nondisclosure Agreement (NDA) 16
7.5.3 Reporting Requirements 16
7.5.4 Handling, Transmittal, and Disposal of Information Not Intended for Release 16
7.5.5 Contractor Validation Data 17
7.6 Physical Security 17
7.7 Controlled/Restricted Areas 17
APPENDIX A 18
DEFINITIONS 18
REFERENCES 19
1.0 INTRODUCTION
This PWS describes High-Altitude Electromagnetic Pulse (HEMP) Hardness Maintenance/ Hardness Surveillance (HM/HS) requirements for all HEMP shields in Building 1000, B500 HEMP Shielded Enclosure (HSE) and other potential future locations at Offutt AFB, NE. The HEMP survivability program described in this PWS is not unique to any one weapon or mission system.
The primary objective of a HEMP HM/HS protection program is to ensure survivability from a HEMP event. Since HEMP shield systems are easily rendered ineffective by incorrect usage and/or inadequate life cycle maintenance, a structured methodology of performing tests, inspections, and maintenance shall be performed and documented. The HM/HS Plans and Procedures Manuals, applicable TOs, and MIL-STD-188-125-1A specify maintenance of assets to uphold the designed levels of protection and shall be used by the Contractor performing HM/HS work on Offutt AFB, NE.
2.0 SCOPE
All scope of this PWS is for performing HEMP HM/HS as defined in the identified HM/HS Plan and Procedures Manuals, applicable Technical Orders (TOs), and in accordance with (IAW) MIL-STD-188-125-1A. These services require familiarity with the maintenance and sustainment of HEMP systems. Scope for this effort includes…
- HEMP protection upgrades and modifications
- Preventative Maintenance
- Testing
- Engineering Support and Studies
- Technical Analysis Support, Recommendations, and Solutions for known and unknown issues
- Corrective Maintenance
- Inspections
- Vulnerabilities Assessments
- Equipment labeling
The scope of this effort also extends to future-known potential HEMP locations (B1500 SATCOM and Senior Leader Network (SLN) and other potential unknown locations at Offutt AFB, shielded cabinet support, and rust mitigation as funding allows.
The Contractor shall provide engineering and technician support for HM/HS work. HM/HS actions shall incorporate any infrastructure or structural requirements to support the overall HEMP topology.
The Contractor shall provide all personnel and necessary tools and materials to ensure continuous HM/HS for supported mission systems and meet all requirements outlined in this PWS.
3.0 GENERAL REQUIREMENTS
3.1 Period of Performance. The contract shall consist of a transition/base period of one year with 4 one-year options and a 6-month extension IAW FAR 52.217-8.
Transition Period: TBD Base Period: TBD Option Period 1: TBD Option Period 2: TBD Option Period 3: TBD Option Period 4: TBD 6-Month Ext: TBD
3.2 Place of Performance. The work to be performed under this PWS shall be performed at Offutt AFB, NE.
4.0 TECHNICAL REQUIREMENTS
The HM/HS Program Plans specify maintenance of assets to uphold the designed levels of protection and shall be used by the Contractor performing HM/HS work on Offutt AFB, NE. The HM/HS Program Plans provides the procedures for maintaining hardness critical items and hardness critical assemblies (HCIs/HCAs) consistent with site specific technical orders TO. Should a site TO not exist, Original Equipment Manufacturer (OEM) or vendor manuals shall be used/referenced in the plan.
Per MIL-STD-188-125-1A, HM/HS is the combined preventive maintenance activities that include cleaning, servicing, refurbishment and repairs, inspection, and test activities accomplished on a HEMP protected operational facility to ensure that HEMP hardness is retained throughout the facility life cycle. HM/HS, along with hardness assurance and hardness configuration management, constitutes a total hardness assurance, maintenance, and surveillance program.
The contractor shall conduct and document tests, inspections, and preventative maintenance to ensure HEMP enclosures provide protection IAW MIL-STD-188-125-1A, applicable TOs, the B1000 HM/HS Plans and Procedures Manuals, and the B500 HSE Plans and Procedures Manuals.
Note: Refurbishment- (defined under MIL-HDBK-423 as “preventive” service) level HM/HS differs from service level activity in that refurbishment requires the complete removal and replacement of consumable interfaces (such as fingerstock, keeper seal, gasketing, etc.). This recurring refurbishment-level service shall be required to sustain performance levels for items that comprise the HEMP systems in a manner that reduces the risk for corrective action and lowers the sustainment costs of the systems. Refurbishment-level service shall be supplemented by a series of service level (aka “Preventive Maintenance Inspection (PMI) level”) actions to sustain the performance of those assemblies that are not being removed and replaced during that quarterly or monthly activity.
4.1 B1000 Support (CLIN X001)
4.1.1 Hardness Maintenance/Hardness Surveillance (HM/HS) Support for B1000
• The Contractor shall provide the OEM and Vendor documentation when procuring HCI/HCA products.
• The Contractor shall ensure HM/HS procedures are captured in the HM/HS Program Plans consistent with military handbook (MIL-HDBK-423) and TOs. To ensure proper maintenance actions are captured, the Contractor shall correct and/or revise procedures, as necessary. Updates shall ensure HCIs/HCAs are correctly identified, reflect the correct locations, and revise incorrect or outdate procedures. (CDRL A001)
• The Contractor shall provide all recommended changes or revisions to the HM/HS plan to the Government for review and acceptance within 20 business days of notification that a change or revision is required due to the implementation of a modification, upgrade, or enhancement.
• The Contractor shall perform recurring and systematic refurbishment level HM/HS services IAW the site HM/HS Program Plans, MIL-STD-188-125-1A, and TOs.
• In addition to maintenance actions, the Contractor shall conduct surveillance measures, as described in MIL-
HDBK-423, which shall be required on a systematic basis to validate the performance of the HEMP systems.
• The Contractor shall perform inspections, preventive maintenance (e.g., adjustments or cleaning), corrective maintenance (e.g., repairs or replacements), and testing on the HEMP protection subsystem and/or its HCIs and assemblies. These HM/HS activities are intended to eliminate or detect faults or to preserve specified HEMP protection subsystem performance levels and observe and monitor the condition and performance of the hardening elements. In addition to maintenance actions, surveillance measures as described in MIL-HDBK-423 chapter 20, HM/HS shall be required on a systematic basis to validate the performance of HEMP systems.
4.1.1.1 HM/HS Maintenance Data Logs. The contractor shall document all work including maintenance, surveillance, repairs, replacement, surveillance, and testing via easily accessible HM/HS logs (Maintenance Data) which shall be submitted to the COR monthly. (CDRL A002)
4.1.1.2 System Improvement Recommendations. During performance of the HM/HS service cycle, the Contractor shall identify and document any recommendations for upgrade or modernization in a detailed report to the COR within 10 calendar days of service-cycle project execution. (CDRL A003)
4.1.1.3 Vulnerabilities Assessment. If, during the performance of the HM/HS service cycle, any potential vulnerabilities are discovered, the contractor shall notify the COR as soon as a vulnerability is identified and shall submit a classified report to the COR within five (5) business days providing a detailed description of the issue. (CDRL A004)
4.1.1.4 Reliability, Maintainability, and Availability (RMA) The Contractor shall provide RMA metrics on HEMP HCIs/HCAs to include filter elements, Metal Oxide Varistors (MOVs), door finger stock and bladders, and supporting door hardware (controllers, valves, air compressors).
The Contractor shall provide a Controlled Unclassified Information (CUI) HEMP RMA spreadsheet/report, in a format that the Government can manipulate at each of the Program Management Review (PMR) meetings for each location in this PWS, and a rollup spreadsheet/report no later than (NLT) 45 calendar days prior to the end of each contract option period of performance. (CDRL A005)
The report shall include, at a minimum:
Power Filters: Record location of site, filter size (225A, 480A, etc.), filter type (TECUL, etc.), manufacturer, serial number (SN), Lot (if available), date of installation (if available), dates of testing, time to perform the test, and the number of HEMP technicians required to perform the test.
Filter Cabinets: Record location of site, how long to remove access panel, how long to inspect, clean or replace HEMP gasket, how long to install the access panel, number of HEMP technicians to perform this task, and performance data for filter insert heat tests.
MOVs: Record the location of site, manufacturer, SN, Lot (if available), date of installation, date of replacement (when appropriate), date of test, time to perform test, number of HEMP technicians required to perform testing, and performance data.
Air Bladder Doors: Record the location of site, manufacturer, date of installation, date of inspections for maintenance, maintenance performed (cleaning, replace air gasket, compressor maintenance, controllers, air valves, etc.), time to perform this maintenance, number of HEMP technicians required to perform this task, and Shielded Effectiveness (SE) door test data.
Fingerstock Doors: Record the location of site, manufacturer, date of installation, date of inspections for maintenance, maintenance performed (cleaning, replace fingerstock, etc.), time to perform this maintenance, and number of HEMP technicians required to perform this task, and SE door check data.
The Contractor’s RMA spreadsheet/report shall capture and present Failure Trends and Contractor’s recommendations for increased/reduced refurbishments. The Contractor shall incorporate additions, changes, and/or edits to the RMA spreadsheet/report as deemed necessary by the COR to capture pertinent data related to the overall management of the HEMP Portfolio.
4.1.1.5 Phenolic Labeling. The contractor shall provide phenolic labeling containing the equipment identification number and the shielded cabinet number. This shall be submitted and approved by the COR.
Phenolic labeling shall be accomplished NLT 180 calendar days from the full performance start date . (CDRL A006)
4.1.1.6 Work Plan. The Contractor shall propose a plan to perform HM/HS actions for all HCI/HCA at the respective sites. The Contractor’s HM/HS performance plan is due 30 calendar days after contract start date and within 30 calendar days of each exercised option year. The plan shall include standard maintenance practices and procedures necessary to perform HM/HS services. Unless stated otherwise, the work plan shall include, but shall not be limited to, the following: (CDRL A007)
(1) Contractor Personnel (e.g. PGM, PM, Quality, etc.)
(2) Personnel Certifications (e.g. Asbestos Abatement Certified, OSHA certified)
(3) Times and durations of maintenance
(4) Recovery times to normal operation
(5) Description of HM/HS tasks
(6) How the Contractor will perform the work
(7) Schedule of HM/HS tasks (i.e. servicing doors, shield inspection)
(8) Material data sheets
4.1.2 Testing, Inspections, and Preventative Maintenance for B1000 The contractor shall conduct and document tests, inspections, and preventative maintenance to ensure HEMP enclosures provide protection IAW MIL-STD-188-125-1A and the B1000 HM/HS Plans and Procedures Manuals.
4.1.2.1 Shielded Effectiveness (SE) Testing. As described by the B1000 HM/HS Plans and Procedures, the Contractor shall perform SE testing to verify HEMP door protection on a quarterly basis and provide the results in a classified report and submit to the COR within 10 business days of execution. (CDRL A008)
SE Testing shall be required on each of the HM/HS service cycles on refurbished assemblies and associated shielding performance anomalies. Upon completion of each HM/HS service cycle, based on the results, a classified or an unclassified report containing a description of the work accomplished as supporting data regarding items of interest as they relate to services performed, and MIL-STD-188-125-1A. This report impacts shall be submitted to the COR within 10 calendar days of service-cycle project execution. (CDRL A008)
4.1.2.2 Continuous Wave Immersion Surveillance (CWIS) Testing. IAW Chapter 8 of the B1000 HM/HS Plans and Procedures Manual, the Contractor shall perform localized CWIS, within 180 calendar days of the start of the contract and within 180 calendar days of the start of each exercised option year, using Shielded Effectiveness (SE) test methodologies from Appendix A and C of the MIL-STD-188-125-1A. The Contractor shall conduct surveillance testing IAW the following:
A minimum requirement of 400 test frequencies between 100 kHz – 1 GHz
Test minimum requirement 25% per shielded side, i.e., 25% of west wall / 25% of east wall / 25% of north wall / 25% of south wall / 25% of bottom shield / 25% of shielded roof.
The maximum distance between test points shall be no greater than 40 feet.
For areas that are not accessible to accomplish CWIS testing, the Contractor shall use Shield Enclosure Leak Detection (SELDS) testing.
The Contractor shall submit a CUI report NLT 20 calendar days from end of testing. Should there be any vulnerabilities identified, the Contractor shall notify the COR as soon as a vulnerability is identified and submit a classified report to the COR NLT 20 calendar days from the end of testing. (CDRL A009)
4.1.2.3 Ultrasonic Shield Test. The overarching objective of this effort is to provide annual analysis of the thickness of the B1000 HEMP Shield in B1000. Given the configuration of the HEMP shield topology, ultrasonic thickness testing shall be performed annually to verify the overall condition of shielding construction materials.
Reference Section 8.1 of MIL-HDBK-423:
"Since nearly any thickness of metal will provide sufficient shielding, it is likely that any sort of shielding effectiveness test method, with the exception of magnetic field testing, may give passing results even though the shield material is badly degraded / suffering from loss of material. In other words, a shield thickness survey might be the ideal tool to identify degraded / thin areas of the shield. " The Contractor shall provide all material required to perform ultrasonic thickness testing on accessible HEMP shield surfaces within B1000 at Offutt AFB, develop, and deliver a comprehensive technical report containing the results of ultrasonic testing, to include measured depths of accessed shield surfaces, in a tabular format.
This effort shall target shield surfaces that can be safely accessed and are free of obstructions. A modern ultrasonic thickness gauge instrument shall be used to record information on shield surfaces.
No Vulnerabilities – The contractor shall submit a CUI report to the COR NLT 20 calendar days from end of testing.
(CDRL A010)
Vulnerabilities – The contractor shall notify the COR as soon as a vulnerability is identified and shall submit a classified report to the COR NLT 20 calendar days from the end of testing. (CDRL A010)
4.1.2.4 Inspections and Maintenance. The contractor shall perform preventive maintenance inspection procedures required to ensure the continued effectiveness of the B1000 HEMP Shield as described by the B1000 HM/HS Plans and Procedures Manual. The Contractor shall complete all inspection steps before performing any corrective maintenance or service actions. All work shall be documented via easily accessible HM/HS logs (Maintenance Data) which shall be submitted to the COR monthly. (CDRL A002)
4.2 B500 HSE Support (CLIN X0004)
4.2.1 Hardness Maintenance/Hardness Surveillance (HM/HS) Support for B500 HSE
• The Contractor shall provide the OEM and Vendor documentation when procuring HCI/HCA products.
• The Contractor shall ensure HM/HS procedures are captured in the HM/HS Program Plans consistent with military handbook (MIL-HDBK-423) and TOs. To ensure proper maintenance actions are captured, the Contractor shall correct and/or revise procedures, as necessary. Updates shall ensure HCIs/HCAs are correctly identified, reflect the correct locations, and revise incorrect or outdate procedures. (CDRL A001)
• The Contractor shall provide all recommended changes or revisions to the HM/HS plan to the Government for review and acceptance within 20 business days of notification that a change or revision is required due to the implementation of a modification, upgrade, or enhancement unless otherwise directed by the Government.
(CDRL A001)
• The Contractor shall perform recurring and systematic refurbishment level HM/HS services IAW the site HM/HS Program Plans, MIL-STD-188-125-1A, and TOs.
• In addition to maintenance actions, the Contractor shall conduct surveillance measures, as described in MIL- HDBK-423, which shall be required on a systematic basis to validate the performance of the HEMP systems.
• The Contractor shall perform inspections, preventive maintenance (e.g., adjustments or cleaning), corrective maintenance (e.g., repairs or replacements), and testing on the HEMP protection subsystem and/or its HCIs and assemblies. These HM/HS activities are intended to eliminate or detect faults or to preserve specified HEMP protection subsystem performance levels and observe and monitor the condition and performance of the hardening elements. In addition to maintenance actions, surveillance measures as described in MIL-HDBK-423 paragraph 2.0 HM/HS shall be required on a systematic basis to validate the performance of HEMP systems.
4.2.1.1 HM/HS Maintenance Data Logs. The contractor shall document all work including maintenance, surveillance, repairs, replacement, surveillance, and testing via easily accessible HM/HS logs (Maintenance Data) which shall be submitted to the COR monthly. (CDRL A002)
4.2.1.2 System Improvement Recommendations. During performance of the HM/HS service cycle, the Contractor shall identify and document any recommendations for upgrade or modernization in a detailed report to the COR within 10 calendar days of service-cycle project execution. (CDRL A003)
4.2.1.3 Vulnerabilities Assessment. If, during the performance of the HM/HS service cycle, any potential vulnerabilities are discovered, the contractor shall notify the COR as soon as a vulnerability is identified and shall submit a classified report to the COR within five (5) business days providing a detailed description of the issue. (CDRL A004)
4.2.1.4 Reliability, Maintainability, and Availability (RMA) The Contractor shall provide RMA metrics on HEMP HCIs/HCAs to include filter elements, Metal Oxide Varistors (MOVs), door finger stock and bladders, and supporting door hardware (controllers, valves, air compressors).
The Contractor shall provide a Controlled Unclassified Information (CUI) HEMP RMA spreadsheet/report, in a format that the Government can manipulate at each of the Program Management Review (PMR) meetings for each location in this PWS, and a rollup spreadsheet/report no later than (NLT) 45 calendar days prior to the end of each contract option period of performance. (CDRL A005) The report shall include, at a minimum:
Power Filters: Record location of site, filter size (225A, 480A, etc.), filter type (TECUL, etc.), manufacturer, serial number (SN), Lot (if available), date of installation (if available), dates of testing, time to perform the test, and the number of HEMP technicians required to perform the test.
Filter Cabinets: Record location of site, how long to remove access panel, how long to inspect, clean or replace HEMP gasket, how long to install the access panel, number of HEMP technicians to perform this task, and performance data for filter insert heat tests.
MOVs: Record the location of site, manufacturer, SN, Lot (if available), date of installation, date of replacement (when appropriate), date of test, time to perform test, number of HEMP technicians required to perform testing, and performance data.
Air Bladder Doors: Record the location of site, manufacturer, date of installation, date of inspections for maintenance, maintenance performed (cleaning, replace air gasket, compressor maintenance, controllers, air valves, etc.), time to perform this maintenance, number of HEMP technicians required to perform this task, and Shielded Effectiveness (SE) door test data.
Fingerstock Doors: Record the location of site, manufacturer, date of installation, date of inspections for maintenance, maintenance performed (cleaning, replace fingerstock, etc.), time to perform this maintenance, and number of HEMP technicians required to perform this task, and SE door check data.
The Contractor’s RMA spreadsheet/report shall capture and present Failure Trends and Contractor’s recommendations for increased/reduced refurbishments. The Contractor shall incorporate additions, changes, and/or edits to the RMA spreadsheet/report as deemed necessary by the COR to capture pertinent data related to the overall management of the HEMP Portfolio.
4.2.1.5 Phenolic Labeling. The contractor shall provide phenolic labeling containing the equipment identification number and the shielded cabinet number. This shall be submitted and approved by the COR.
Phenolic labeling shall be accomplished NLT 180 calendar days from the full performance start date of the start of the contract. (CDRL A006)
4.2.1.6 Work Plan. The Contractor shall propose a plan to perform HM/HS actions for all HCI/HCA at the respective sites. The Contractor’s HM/HS performance plan is due 30 calendar days after contract start date and within 30 calendar days of each exercised option year. The plan shall include standard maintenance practices and procedures necessary to perform HM/HS services. Unless stated otherwise, the work plan shall include, but shall not be limited to, the following: (CDRL A007)
(1) Contractor Personnel (e.g. PGM, PM, Quality, etc.)
(2) Personnel Certifications (e.g. Asbestos Abatement Certified, OSHA certified)
(3) Times and durations of maintenance
(4) Recovery times to normal operation
(5) Description of HM/HS tasks
(6) How the Contractor will perform the work
(7) Schedule of HM/HS tasks (i.e. servicing doors, shield inspection)
(8) Material data sheets
4.2.2 Testing, Inspections, and Preventative Maintenance for B500 HSE The contractor shall conduct and document tests, inspections, and preventative maintenance on buildings to ensure HEMP enclosures provide protection IAW MIL-STD-188-125-1A and the B500 HSE HM/HS Plans and Procedures Manual.
4.2.2.1 SE Testing. As described by the B500 HSE HM/HS Plans and Procedures Manual, the Contractor shall perform SE testing to verify HEMP door protection on a quarterly basis and provide the results in a classified report and submit to the COR within 10 business days of execution. (CDRL A008)
SE Testing shall be required on each of the HM/HS service cycles on refurbished assemblies and associated shielding performance anomalies. Upon completion of each HM/HS service cycle, based on the results, a classified or an unclassified report containing a description of the work accomplished as supporting data regarding items of interest as they relate to services performed, and MIL-STD-188-125-1A. This report impacts shall be submitted to the COR within 10 calendar days of service-cycle project execution. (CDRL A008)
4.2.2.2 CWIS Testing. IAW Chapter 8 of the B500 HSE HM/HS Plans and Procedures Manual, The Contractor shall perform localized CWIS Testing, within 180 calendar days of the start of the contract and within 180 calendar days of the start of each exercised option year, using SE test methodologies from Appendix A and C of the MIL-STD-188-125-1A. The Contractor shall conduct surveillance testing IAW the following:
A minimum requirement of 400 test frequencies between 100 kHz – 1 GHz
Test minimum requirement 25% per shielded side; i.e., 25% of west wall / 25% of east wall / 25% of north wall / 25% of shielded roof.
The maximum distance between test points shall be no greater than 40 feet.
The Contractor shall submit a CUI report NLT 20 calendar days from the end of testing. Should there be any vulnerabilities identified, the Contractor shall notify the COR as soon as a vulnerability is identified and submit a classified report to the COR NLT 20 calendar days from the end of testing. (CDRL A009)
4.2.2.3 Ultrasonic Shield Test. The overarching objective of this effort is to provide annual analysis of the thickness of the B500 HSE at Offutt AFB. Given the configuration of the HEMP shield topology, ultrasonic thickness testing shall be performed annually to verify the overall condition of shielding construction materials.
Reference Section 8.1 of MIL-HDBK-423:
"Since nearly any thickness of metal will provide sufficient shielding, it is likely that any sort of shielding effectiveness test method, with the exception of magnetic field testing, may give passing results even though the shield material is badly degraded / suffering from loss of material. In other words, a shield thickness survey might be the ideal tool to identify degraded / thin areas of the shield. "
The Contractor shall provide all equipment required to perform ultrasonic thickness testing on the accessible B500 HSE at Offutt AFB, develop, and deliver a comprehensive technical report containing the results of ultrasonic testing, to include measured depths of accessed shield surfaces, in a tabular format. This effort shall target shield surfaces that can be safely accessed and are free of obstructions. A modern ultrasonic thickness gauge instrument shall be used to record information on shield surfaces.
No Vulnerabilities - The Contractor shall submit a CUI report to the COR NLT 20 calendar days from end of testing. (CDRL A010)
Vulnerabilities – The Contractor shall notify the COR as soon as a vulnerability is identified and shall submit a classified report to the COR NLT 20 calendar days from the end of testing. (CDRL A010)
4.2.2.4 Inspections and Maintenance. The contractor shall perform the preventative maintenance inspection procedures required to ensure the continued effectiveness of the B500 HSE as described by the B500 H S E HM/HS Plans and Procedures Manual. The Contractor shall complete all inspection steps before performing any corrective maintenance or service actions. All work shall be documented via easily accessible HM/HS logs (Maintenance Data) which shall be submitted to the COR monthly. (CDRL A002)
4.3 Emergency Calls (B1000 - CLIN X003, B500 HSE – CLIN X006) Emergency calls include any situation that is an immediate threat to life, property, environment, security or mission.
This is a Government directed action, started by the COR.
The Contractor personnel shall be able to provide up to 40 hours of on-site support for each identified location (B1000 and B500 HSE). The contractor shall be on site within 4 hours after notification by the Government/COR of an emergency. The emergency issue shall be addressed and a corrective action plan in place within 24 hours (CDRL A011), realizing repair/resolution of the emergency issue may take more than 24 hours.
This will be a Firm Fixed Price (FFP) Contract Line-Item Number (CLIN) and invoicing an emergency service call shall be allowable only when services are rendered.
4.4 Future Growth (CLIN X010)
This is a Government populated value CLIN utilized for future potential efforts that may or may not have been realized at time of award. Future growth taskings utilizing this CLIN value will be Firm-Fixed-Priced. If the need for these future efforts arise, the Contractor shall be asked to provide a priced proposal based on the request. If required, a revised PWS will be provided by the Government.
4.4.1 Upgrades
The Contractor shall apply scientific methods and engineering disciplines to support a variety of engineering and technical services required to identify the need for upgrades and the impact of upgrades to a site. If the potential exists, the Contractor shall provide recommendations to improve functionality or capabilities to improve the HEMP protection capability, technology or testing methods. This recommendation shall be submitted to the COR within the applicable CDRL report and include functionality/capability issue, impact, and the benefits to the Government.
Any recommendation resulting in a change in the requirement shall be approved by the Contracting Officer prior to execution of support.
4.4.2 Contractor Support.
In the event the Government requires Contractor support to design, manufacture, test, ship, remove, and replace HEMP shielded cabinets, a Request for Proposal (RFP) will be submitted by the CO. The Government will review the proposal to determine fair and reasonable pricing prior to modification award.
5.0 CONTRACT REQUIREMENTS
5.1 Quality Control Plan (QCP)
The Contractor shall develop, implement, maintain, enforce, and document a QCP. The QCP shall ensure the Contractor accomplished the requirements at the acceptable quality level and on time. The Contractor shall submit the QCP to the Government for review in its proposal and within 15 calendar days of any changes thereafter to be approved by the COR. The Contractor shall be responsible for overall responsiveness, technical quality of work and management of the Contractor team’s efforts. (CDRL A012)
5.2 Program Management Reviews (PMR)
The Contractor shall conduct PMRs once a quarter. The time and place will be designated by the COR and take place at the Government’s facility. During these reviews, the Contractor shall present data to enable the review of assigned tasks status, schedules, resource expenditures, as well as the technical discussion of any problems incurred and the proposed solutions. The Contractor shall provide presentation material for the PMR five (5) business days prior to the meeting date for review and approval. The Contractor shall prepare meeting minutes of each PMR and provide one soft copy to the COR within 10 business days after the PMR. (CDRL A013)
5.3 Performance Reporting
The Contractor’s performance will be monitored by the Government and reported in the Contractor Performance Assessment Reporting System (CPARS).
5.4 Mission Essential
The Government has identified all Contractor services performed under this PWS as essential Contractor services in support of mission essential functions.
5.5 Compliance Standards
MIL-STD-188-125-1A shall be the compliance document for the implementation of upgrades, preventative maintenance, inspections, and testing for B1000 and B500 HSE. All tasks shall be designed to be in compliance with MIL-STD-188-125-1A test protocols and approved practices. The Contractor shall notify the COR of any test result where technology may not be able to meet full compliance with MIL-STD-188-125-1A protection levels.
5.6 Contractor Furnished Items and Responsibilities
5.6.1 Materials. The Contractor shall possess all consumable maintenance materials and repair parts, including, but not limited to, copper seals, finger stock, and pneumatic parts. The Contractor shall maintain the materials necessary to accomplish HM/HS requirements.
High Altitude Electromagnetic Pulse (HEMP) filters and HEMP shielded cabinets are the only exception to the above statement whereby the Government will provide replacement filters and shielded cabinets, as required to the Contractor. The Contractor will utilize stockpile Government provided filters/shielded cabinets or will purchase said filters as Other Direct Cost.
5.6.2 Equipment. The Contractor shall possess and maintain the necessary equipment (tools included) to accomplish the requirements. Equipment may be Contractor owned or rented. There is no requirement to have possession of the equipment at all times; only when needed to fulfill HM/HS requirements. Required equipment is defined in the HM/HS Plans and Procedures Manuals.
5.6.3 Government Provided Support. The Government will provide work-bench space, storage, and access to computer systems (including unclassified and classified user accounts as verified necessary by the COR in B1000).
5.6.4 Program Management. The Contractor shall identify a Program Manager to serve as the Government’s single Point of Contact and to provide overall leadership and guidance for all Contractor personnel.
5.7 Transition Plan
5.7.1 Phase-In Transition Plan
To minimize any decreases in productivity and to prevent possible negative impacts on additional services, the Contractor shall have personnel on board, provide a feasible, detailed plan that ensures no interruptions to support or degradation of services during the 2-week phase in period.
The contractor’s personnel shall interface with incumbent contractor personnel, Government personnel, and other contractor personnel for purposes of transferring knowledge, lessons learned, and continuity information.
The Contractor shall become familiar with performance requirements in order to commence full performance of services on the contract start date of TBD.
5.7.2 Phase-Out Transition Plan
The Contractor shall provide a Phase-Out Plan that supports the transition of all HM/HS Program responsibilities and requirements within 60 calendar days of the start of the contract. (CDRL A014)
During the phase out period, the HM/HS Contractor shall be fully responsible and accountable for meeting all PWS requirements until the completion of the contract PoP.
The HM/HS Contractor shall establish procedures with the successor Contractor to ensure a smooth transition of all requirements and data without any degradation in service.
The HM/HS Contractor shall ensure that ongoing operations are coordinated with the COR, management, and administrative personnel of the successor Contractor to ensure that mission requirements are met without interruption.
The HM/HS Contractor shall maintain all HM/HS Program data and deliverables through the end of the contract.
All data with unlimited or Government purpose rights shall be made available to the successor HM/HS Contractor.
5.8 Deliverables
The following deliverables will be required from the Contract:
CDRL Name Required PWS Ref.
A001 HM/HS Program Plan Changes or Revisions
(Administrative Data) Submit to the Government for review and acceptance within 20 business days of notification that a change or revision is required due to the implementation of a modification, upgrade or enhancement unless otherwise directed by the Government
4.1.1, 4.2.1
A002 HM/HS Logs All work shall be documented via easily accessible HM/HS logs (Maintenance Data) which shall be submitted to the COR monthly.
4.1.1.1, 4.1.2.4, 4.2.1.1, 4.2.2.4
A003 System Improvement Recommendations (Engineering
Study) Report to the COR within 10 calendar days of service-cycle project execution, any recommendations for upgrade or modernization
4.1.1.2, 4.2.1.2
A004 Vulnerabilities Assessment Report (Engineering Study) Submitted to the COR within five (5) business days 4.1.1.3, 4.2.1.3 A005 Reliability, Maintainability, and Availability (RMA)
Report (Engineering Study) Submit a Controlled Unclassified Information (CUI) RMA NLT 45 calendar days prior to the end of each contract period of performance.
4.1.1.4, 4.2.1.4
A006 Phenolic Labeling Phenolic labeling shall be accomplished NLT 180 calendar days of the start of the contract.
4.1.1.5, 4.2.1.5
A007 Work Plan (Administrative Data) Performance plan is due 30 calendar days after contract start date and within 30 calendar days of each exercised option year.
4.1.1.6, 4.2.1.6
A008 SE Testing Report (Engineering Study) Submitted to the COR within 10 business days of execution
4.1.2.1, 4.2.2.1
A009 CWIS Testing Report (Engineering Study) Perform localized CWIS, within 180 calendar days of the start of the contract and within 180 calendar days of the start of each exercised option year
Submit a CUI report NLT 20 calendar days from end of testing. Should there be any vulnerabilities identified, the Contractor shall notify the COR as soon as a vulnerability is identified and submit a classified report to the COR NLT 20 calendar days from the end of testing
4.1.2.2, 4.2.2.2
A010 Ultrasonic Shield Test Report (Engineering Study) No Vulnerabilities - Submit Controlled Unclassified Information (CUI) report NLT 20 calendar days from end of testing.
Vulnerabilities - Notify the COR as soon as a vulnerability is identified and submit a classified report to the COR NLT 20 calendar days from the end of testing.
4.1.2.3, 4.2.2.3, A011 Emergency Call Corrective Action Plan Contractor shall be on site within 4 hours after notification by the Government/COR of an emergency. The emergency issue shall be addressed and a corrective action plan in place within 24 hours
4.3
A012 Quality Control Plan (Administrative Data) Submit the QCP to the Government for review with its proposal and within 15 calendar days of any changes thereafter to be approved by the COR.
5.1
A013 PMR Material (Administrative Data)
PMR Minutes (Administrative Data)
Provide presentation material five (5) business days prior to the meeting date Provide one soft copy to the COR within 10 business days after the PMR.
5.2
A014 Phase-Out Transition Plan (Administrative Data) Submit within 60 calendar days of the start of the contract.
5.7.2
6.0 SERVICES SUMMARY (SS)
The SS is a list of Performance Objectives and Performance Thresholds that will be regularly verified by Government personnel. Each Performance Objective represents a significant task as identified in the PWS by the Government at the time of contract award. The Performance Threshold represents the minimum acceptable level of performance. The Performance Objectives and Performance Thresholds represent only the significant tasks of this PWS and do not excuse the Contractor from the performance of other responsibilities identified in this PWS. Performance Objectives will be monitored regularly by Government CORs.
PEFORMANCE
OBJECTIVE
PWS PARA PERFORMANCE THRESHOLD
(PO-1) Emergency Service Call 4.3 The Contractor shall be on site within 4 hours after notification of an Emergency. The Emergency issue shall be addressed and a corrective action plan in place within 24 hours; however, it may take more than 24 hours to correct the discrepancy.
(PO- 2) HM/HS Logs 4.1.1.1, 4.1.2.4, 4.2.1.1, 4.2.2.4
Submitted to the COR monthly. No more than three late documents per year, or period of performance if less than one
(1) year and no more than two (2) business days late. No more than two sets of corrections/edits and all corrections must be accomplished within ten (10) business days or other such time period as established.
(PO-3) Tests and Reports 4.1.1.2, 4.1.1.3, 4.1.1.4, 4.1.2.1, 4.1.2.2, 4.1.2.3 4.2.1.2, 4.2.1.3, 4.2.1.4, 4.2.2.1, 4.2.2.2, 4.2.2.3
Reports completed in an accurate, timely manner in compliance with the requirements. No more than three late documents per year, or period of performance if less than one
(1) year and no more than two (2) business days late.
(PO-4) Administrative Data 4.1.1, 4.1.1.6, 4.2.1, 4.2.1.6, 5.1, 5.2, 5.7.2
Data completed in an accurate, timely manner in compliance with the requirements. No more than three late documents per year, or period of performance if less than one (1) year, per TO and no more than two (2) business days late.
7.0 SECURITY
7.1 Security Clearances
7.1.1 Facility Clearance. The Contractor shall, at time of award, have a Facility Clearance (FCL). Additional information for the above may be found at the following web address: https://www.dcsa.mil/Personnel- Vetting/Background-Investigations-for-Applicants/Investigations-Clearance-Process/.
7.1.2 Personnel Clearances. The Contractor personnel shall be required to obtain and maintain a Top Secret/ Sensitive Compartmented Information (SCI) level security clearance (facility and employee) with Intelligence Community Directive (ICD) 704 eligibility. Information that must be provided to obtain this Personnel Security Clearance is found on the Standard Form (SF) 86 form at the following web address:
https://www.opm.gov/forms/pdf_fill/sf86/.
7.1.3 Interim Clearances. Interim security clearances shall be sought for those employees awaiting adjudication for their clearance. Contractor employees awaiting clearances shall always be under escort by the Contractor with the appropriate clearance. The Government reserves the right to provide escorts for the Contractor when practical. These situations will be considered on an infrequent, case by case basis.
7.2 Security Training
IAW DoDI O-2000.16, a Contractor with employees performing work on a Department of Defense (DoD) installation shall meet DoD Anti-Terrorism (AT) Level I Training requirements. AT Level 1 Awareness Training will be found online at the web address provided by the COR. The Contractor shall submit certificates of completion to the COR and to the CO, within 30 calendar days after the contract start date. All new employees who begin performance under this PWS during the contract period of performance shall submit certificates of completion within 30 calendar days of performance start date and within 30 calendar days after the start of each exercised option year.
IAW DoDM 8140.03, Cyberspace Workforce Qualification and Management Program, Contractors with access to DoD Information Technology systems shall be required to receive and complete Cyber Awareness Training before being granted access to these system(s) and annual Cyber Awareness Training to retain access. DoD Cyber Awareness training will be found online at the web address provided by the COR. Certificates shall be submitted to the COR within 30 calendar days of performance start date and within 30 calendar days after the start of each exercised option year.
IAW CJCSI 3213.01D, Joint Staff Operations Security (OPSEC) Training shall be completed by Contractor personnel. OPSEC Training is an annual overview of security policies and procedures in order to equip cleared Contractor personnel with a basic understanding of how to safeguard information and apply security principles in their daily operations. OPSEC training will be found online at the web address provided by the COR. Certificates shall be submitted to the COR within 30 calendar days of performance start date and within 30 calendar days after the start of each exercised option year.
IAW SI 301-19 SCI Security Administration Contractor personnel working within a Sensitive Compartmented Information Facility (SCIF) environment shall complete annual training on SCIF Standard Operating Procedures (SOP) and SCIF Emergency Action Procedures (EAP). This information establishes procedures for SCIF personnel for the safeguarding, evacuation and or destruction of SCI and other classified material during emergencies. SCI training will be found online at the web address provided by the COR. Certificates shall be submitted to the COR within 30 calendar days of performance start date and within 30 calendar days after the start of each exercised option year.
7.3 Pass and Identification and Base Entry
An Air Force Common Access Card (CAC) shall be required for all employees. A security background check shall be required to obtain a CAC, and this process takes approximately two weeks. The Contractor shall ensure the pass and identification items required for contract performance are obtained and renewed (as required) for employees and non-Government owned vehicles. Contractors shall access the base using the Contractor gate (south entrance) and are subject to vehicle search. Contractors shall be responsible for escorting all material trucks required for the contract from the Contractor gate to the job site and back off base. Pertinent information from this plan can be made available at the Contractor’s request. The Contractor shall maintain a current listing of employees. The list shall include each employee's name and driver’s license number, and the list shall be provided to the COR within 10 calendar days after contract award. The list shall be updated within a week when an employee's status or information changes.
7.4 Retrieving Identification Media
The Contractor shall retrieve all Government identification media, including vehicle passes from employees who depart for any reason before the contract expires. e.g. terminated for cause, retirement, etc. At contract completion, the Contractor shall turn in badges for all employees under the contract to the COR for final payment to be made.
7.5 CUI
All drawings and specifications pertaining to B1000, B500, and all HM/HS related buildings on Offutt AFB are CUI. The scope given in this PWS directs that the Contractor use CUI documents to create additional CUI documents. Therefore, compliance with Governmental guidance on handling unclassified but sensitive information shall be mandatory. Any references to USSTRATCOM, 55th Wing Command Post, or Offutt AFB shall be removed from all Contractor unclassified or CUI drawings. Products may not be labeled in a way that refers to sensitive missions or equipment, special access controls, or similar designations. Contractor’s submittals shall only display the room number. The prime Contractor shall be responsible for compliance to the guidance of all sub-Contractors and/or employees supporting this contract. The Government shall require any of the below forms to be submitted by sub-Contractors.
Compliance with Governmental guidance on handling unclassified but sensitive shall be mandatory.
7.5.1 Certificate Pertaining to Foreign Interests
SF 328 (https://www.gsa.gov/portal/forms/download/116238) shall be completed and submitted to the CO prior to obtaining CUI design documents. The form shall be signed by the company president or general manager on behalf of the company and employees. Companies shall require approval from Government security representatives prior to obtaining CUI documents. The Government reserves the right to deny an Offeror CUI documents, establishing the Offeror as unqualified to perform the work.
7.5.2 Nondisclosure Agreement (NDA)
An NDA shall be completed and submitted to the CO prior to obtaining CUI documents. The form shall be signed by the company president or general manager on behalf of the company and employees. For individuals requiring submittal of SF 328, the NDA and SF328 shall be submitted together. Once the contract is awarded, all employees working on the project shall be required to sign an NDA.
7.5.3 Reporting Requirements
Contractor personnel shall report to the Guardian Control Center, (402) 912-0377, or the COR any information or circumstances of which they are aware that may pose a threat to the security of DoD personnel, Contractor personnel, resources, and classified or unclassified defense information. Contractor employees shall be briefed by their immediate supervisor upon initial on-base assignment.
7.5.4 Handling, Transmittal, and Disposal of Information Not Intended for Release Contractor personnel shall comply with guidance outlined in DoDI 8582.01, Security of Non-DoD Information Systems Processing Unclassified Nonpublic DOD Information and DoDM 5200.1, Volume 4, DoD Information Security Program: CUI. In DoDI 8582.01, the Contractor shall reference section 3.2 Information System Safeguards.