Att 2 ReRoof Portions of Various Bldgs Drawings.pdf
PDF 6 MB Posted
- Attached to
- Z2DA--623-23-121 Reroof portions of various Bldgs (53. 24. 1E) Construction (VA-26-00004686)
- Solicitation number
- 36C25925R0097
About this file
This is a Request for Proposal (RFP) for re-roofing portions of various buildings at the Jack C. Montgomery VA Medical Center in Muskogee, Oklahoma. The project (VA Project Number 623-23-121) involves replacing roofing systems for Buildings 1E, 24, 53, and 54, with specific requirements including removing and replacing existing roofing systems to meet ASHRAE 90.1 energy requirements (R-25 continuous insulation), replacing perimeter and penetration flashings, installing a permanent OSHA-compliant guardrail system, removing unnecessary roof penetrations, replacing roof drain hardware, and updating lightning protection systems.
The comprehensive project documents include 24 total sheets covering architectural, structural, environmental, plumbing, mechanical, and electrical aspects of the re-roofing work. The scope spans multiple buildings with varying roof configurations, and requires coordination with existing mechanical equipment, electrical systems, and site conditions. The project is fully sprinklered and designed to 100% issued for construction standards, with detailed specifications for roofing materials, insulation, drainage systems, and integration with existing building infrastructure. The estimated project was prepared by Spur Design, LLC and is dated February 5, 2025, with an expected construction timeline not explicitly specified in the documents.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C25925R0097 0002.docx | DOCX document | |
| Site Visit Attendance.pdf | ||
| Design Narrative Environmental.pdf | ||
| VA 14 91 82.pdf | ||
| 36C25925R0097 0001.docx | DOCX document | |
| Site Visit Meeting Doc.pdf | ||
| 36C25925R0097.docx | DOCX document | |
| Att 4 852.219-75 LOS Certification.docx | DOCX document | |
| Att 3 EOVAHCS PCRA v2 - ReRoof pt4.pdf | ||
| Att 1 IFC Specifications.pdf | ||
| Att 5 Prime and Sub Contractor Construction Breakdown.xlsx | XLSX spreadsheet | |
| Att 6 Past Performance Questionnaire_Blank_Fillable PDF.pdf |
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th in c h o n e fo o t
A
B
C
D
E
F
Veterans Health
Administration
VA FORM 08-6231
DRAWING TITLE PROJECT TITLE
LOCATION
DATE CHECKED DRAWN
PROJECT NUMBERCONSULTANTS:
DRAWING #
U.S. DEPARTMENT OF VETERANS AFFAIRS
VA HEALTH CARE SYSTEM APPROVAL:
ARCHITECT:
SPUR DESIGN, LLC
312 SW 25TH STREET
Oklahoma City, OK 73109
(405) 842-6100
EXP. 06/30/2025
EXP. 06/30/2025
MECH / ELEC / PLUMB ENGINEER
SPUR DESIGN
2519 MADISON AVE, STE 100
KANSAS CITY, MO 64108
(913) 369-7200
FULLY SPRINKLERED
INDUSTRIAL HYGENIST
RIVERFRONT SAFETY & HEALTH
11140 SOUTH TOWN SQUARE, STE 100
ST. LOUIS, MO 63123
(713) 864-2900
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
STAMP:
DRAWING NUMBER
BUILDING NUMBER
STRUCTURAL ENGINEER
H2B ENGINEERS
1225 N. LOOP WEST, STE 800
HOUSTON, TX 77008
(713) 864-2900
ARCH REG. NO. CA02295
ENGR REG. NO. CA7127
/4
/2
:3
:3
A
M
COVER SHEET
ZDL 01 OF 24AJS
100% ISSUED FOR CONSTRUCTION
RE-ROOF PORTIONS OF VARIOUS
BUILDINGS
VA PROJECT NUMBER: 623-23-121
RE-ROOF PORTIONS OF
VARIOUS BUILDINGS
02/05/25
623-23-121
JACK C. MONTGOMERY VAMC
1101 HONOR HEIGHTS DRIVE
MUSKOGEE, OK 74401
JACK C. MONTGOMERY VAMC
1101 HONOR HEIGHTS DRIVE
MUSKOGEE, OK 74401
100% ISSUED FOR CONSTRUCTION
GI000
1E, 24, 53, & 54
SPUR #: 2093.13
SHEET INDEX
SEQUENCE SHEET NUMBER SHEET NAME
[01] GENERAL
01 GI000 COVER SHEET
02 GI001 GENERAL INFORMATION
03 GI002 ICRA CONSTRUCTION DETAILS
[02] ENVIRONMENTAL
04 HA100 KNOWN ENVIRONMENTAL HAZARDS - IMPACTED ROOF SYSTEMS
[03] STRUCTURAL
05 SA001 STRUCTURAL GENERAL NOTES
06 SF101 ROOF FRAMING PLAN
07 SF102 ROOF FRAMING PLAN
08 SF501 STRUCTURAL DETAILS
[04] ARCHITECTURAL
09 AS001 ARCHITECTURAL SITE PLAN
10 AE101 BUILDINGS 1E & 24 - ROOF PLANS
11 AE102 BUILDING 53 & 54 - ROOF PLANS
12 AE501 SECTION DETAILS
LOCATION
PLAN
AREA
PLAN
N N
PROJECT LOCATION
MUSKOGEE VAMC
W. OKMULGEE STREET
N
T
H S
T R
E E
T
N
N
D S
T R
E E
T
N
T
H S
T R
E E
T
W. SHAWNEE STREET
N
T
H S
T R
E E
T
PARK BLVD
JACK C.
MONTGOMERY VA
MEDICAL CENTER
1. REMOVE AND REPLACE ROOFING SYSTEMS THAT MEET
ENERGY REQUIREMENTS.
A. ROOFING INSULATION VALUE OF R-25 CONTINUOUS
INSULATION IS REQUIRED BY ASHRAE 90.1.
2. REPLACE ALL PERIMETER AND PENETRATION FLASHINGS.
3. INSTALL A PERMANENT GUARD RAIL SYSTEM THAT MEETS
OSHA 1910.29(B) AND OSHA 1926 SUBPART M.
4. REMOVE ALL UNNECESSARY PENETRATIONS AND
PERMANENTLY CLOSE AND SEAL.
5. REPLACE ALL ROOF DRAIN HARDWARE, RINGS, GUTTERS,
AND DOWNSPOUTS DOWN TO CAST IRON PIPE.
6. INSTALL OR REPLACE LIGHTNING PROTECTION SYSTEMS
AS NEEDED.
7. REPLACE, REFURBISH, OR PRESERVE ROOF MOUNTED
EXHAUST FANS AND VENTS.
SHEET INDEX
SEQUENCE SHEET NUMBER SHEET NAME
[05] PLUMBING
13 P-000 PLUMBING LEGEND
14 PD100 PLUMBING ROOF DEMO PLANS
15 PL100 PLUMBING ROOF PLANS
16 P-600 PLUMBING DETAILS AND SCHEDULES
[06] MECHANICAL
17 M-000 LEGEND AND ABBREVIATIONS
18 M-100 MECHANICAL ROOF PLANS
19 M-600 MECHANICAL DETAILS & SCHEDULES
[07] ELECTRICAL
20 E-001 ELECTRICAL LEGEND AND ABBREVIATIONS
21 E-101 BUILDING 1E - ROOF PLANS
22 E-102 BUILDING 24 - ROOF PLANS
23 E-103 BUILDING 53 & 54 - ROOF PLANS
24 E-501 ELECTRICAL DETAILS
TOTAL SHEETS: 24
SCOPE OF WORK SUMMARY
NUMBER REVISION DESCRIPTION DATE
ABBREVIATIONS CODES STANDARDS AND EXECUTIVE ORDERS
4' -0
M
A X
4' -0
M
A X
2' -1
0" M
A X
2' -3
M
IN
1'-6" MIN
1. GENERAL CONTRACTOR TO PROVIDE METAL SUPPORT
BLOCKING FOR ALL WALL MOUNTED ACCESSORIES,
FIXTURES, AND EQUIPMENT.
2. PROVIDE ADA SUPPORT BRACKETS PLACED AT ALL OPEN
COUNTERTOPS @ 36"-48" MAX ON CENTER.
3. SPECIFIED MAXIMUMS ARE MEASURED FROM AFTER
FINISHED FLOOR TO THE OPERABLE PART OF THE FIXTURE.
4. FIXTURES SHOWN ARE REPRESENTATIONAL ONLY. NOT ALL
FIXTURES MAY BE USED. REFER TO SPECIFICATIONS FOR
FIXTURE TYPES USED IN THIS PROJECT.
5. FIXTURES MAY OVERLAP WAINSCOT. WHERE APPLICABLE,
BACKING TO BE PROVIDED AS SHIM FOR FLUSH
APPLICATION. SHIM TO MATCH SCHEDULED WALL FINISH.
6" MAX
9" M
IN
SHOWER
VA TOILET ROOM
TURNING RADIUS
DRINKING
FOUNTAIN
PAPER TOWEL
DISPENSER
SANITARY
NAPKIN
DISPENSER
4' -0
"M A
X
WASTE
RECEPTACLE
LAVATORY
WITH MIRROR
ON CENTER
WALL
4' -0
M
A X
SOAP
DISPENSER
2' -1
0" M
A X
T O
B .O
. R E
F
LE
C T
IV
E
S U
R F
A C
E
3' -4
"M A
X
17 MIN
2' -3
M
IN
3' -0
M
A X
1'-6" MIN
WALL
2' -9
3' -0
3' -2
4' -0
2'-0" MIN
8" MIN
WALL
LAVATORY
WITH APRON
1' -5
M
A X
1'-6" MIN
URINAL
WALL
1'-5" - 1'-7" (AMBULATORY)
1'-4" - 1'-6" (WHEELCHAIR)
CLEAR FLOOR
5'-6"
CLEAR FLOOR
6'-0"
3'-0" MIN
2' -9
3' -0
1'-0" MIN
3'-6" MIN 1'-0"MAX
4'-6" MIN
1' -5
'-7
1' -6
M
IN
A N
S I I
C C
A
7.
1)
1' -3
M
IN
A D
A /A
B A
2' -9
3' -0
WALL
WALL
WALL HOOK
7' -0
CLOCK
WALL
FINISHED FLOOR
FIRE EXTINGUISHER
CABINET
WEIGHT > 40LBS
FIRE EXTINGUISHER
CABINET
WEIGHT < 40LBS
4' -0
"M A
X
4' -0
M
A X
TOILET SEAT
COVER
DISPENSER
BABY
CHANGING
STATION
CLEAR FLOOR SPACE
@ WATER CLOSET
5'-6"
2'-6"
4' -0
2'-6"
4' -0
HANDRAILS AND
BUMPER GUARDS
FIXTURE MOUNTING HEIGHTS AND CLEARANCES - N/A
DOOR AND FIXTURE CLEARANCES - N/A
MATERIALS LEGEND
PURPOSE: THE PUBLIC BUILDINGS AMENDMENT ACT OF 1988, PUBLIC LAW (PUB. L.) 100-678 REQUIRES FEDERAL AGENCIES TO FOLLOW NATIONAL RECOGNIZED "MODEL" BUILDING CODES. THE FEDERAL PARTICIPATION IN THE DEVELOPMENT AND USE OF VOLUNTARY STANDARDS, OFFICE OF MANAGEMENT AND BUDGET (OMB) CIRCULAR A-119, REQUIRES ALL EXECUTIVE AGENCIES TO RELY ON VOLUNTARY STANDARDS, BOTH DOMESTIC AND INTERNATIONAL, WHENEVER FEASIBLE, AND TO PARTICIPATE IN
VOLUNTARY STANDARD BODIES.
GENERAL: VA HAS ADOPTED THE LATEST EDITION OF THE FOLLOWING CODES AND STANDARDS AS A MINIMUM FOR ALL PROJECTS PERFORMED IN THE MODERNIZATION, ALTERATION, ADDITION, OR IMPROVEMENT OF ITS REAL PROPERTY AND THE CONSTRUCTION OF NEW STRUCTURES. VA DESIGN MANUALS AND MASTER SPECIFICATIONS SPECIFY OTHER CODES AND STANDARDS THAT VA FOLLOWS ON ITS PROJECTS. REFERENCE RELEVANT ADDENDA FOR EACH OF THE ADOPTED CODES AND STANDARDS:
• VA DIRECTIVES, DESIGN MANUALS, MASTER SPECIFICATIONS, VA NATIONAL CAD STANDARD APPLICATION GUIDE, AND OTHER GUIDANCE ON THE TECHNICAL
INFORMATION LIBRARY (TIL) (HTTP://WWW.CFM.VA.GOV/TIL/).
• 2024 INTERNATIONAL BUILDING CODE (IBC) (ONLY WHEN SPECIFICALLY REFERENCED IN VA DESIGN DOCUMENTS, SEE NOTES BELOW)
• 2024 INTERNATIONAL EXISTING BUILDING CODE (IEBC) (IF APPLICABLE)
• 2024 NFPA 101 LIFE SAFETY CODE (SEE NOTES BELOW)
• 2024 NATIONAL FIRE CODES (NFPA)
• OCCUPATIONAL, SAFETY AND HEALTH ADMINISTRATION (OSHA) STANDARDS.
• 2023 VA SEISMIC DESIGN REQUIREMENTS, H-18-8
• 2024 INTERNATIONAL MECHANICAL CODE
• 2023 NATIONAL ELECTRICAL CODE (NEC), NFPA 70
• 2024 INTERNATIONAL PLUMBING CODE (IPC)
• 2022 SAFETY CODE FOR ELEVATORS AND ESCALATORS, AMERICAN SOCIETY OF MECHANICAL ENGINEERS (ASME) A 17.1.
• ARCHITECTURAL BARRIERS ACT (ABA) STANDARDS INCLUDING VA SUPPLEMENT, VA BARRIER FREE DESIGN STANDARD (PG-18-13)
• 2022 ANSI ICC A117.1 ACCESSIBLE AND USABLE BUILDINGS AND FACILITIES
• 2022 BUILDING CODE REQUIREMENTS FOR STRUCTURAL CONCRETE AND COMMENTARY, AMERICAN CONCRETE INSTITUTE AND COMMENTARY (ACI 318-19)
• 2023 STEEL CONSTRUCTION MANUAL (16TH EDITION), AMERICAN INSTITUTE OF STEEL CONSTRUCTION (AISC)
• ENERGY POLICY ACT OF 2005 (EPACT)
• 2007 DOE INTERIM FINAL RULE: ENERGY CONSERVATION STANDARDS FOR NEW FEDERAL, COMMERCIAL AND MULTI-FAMILY HIGH-RISE RESIDENTIAL BUILDINGS AND
NEW LOW-RISE RESIDENTIAL BUILDINGS, 10 CFR PARTS 433, 434 AND 435.
• 2006 FEDERAL LEADERSHIP IN HIGH PERFORMANCE AND SUSTAINABLE BUILDINGS: MEMORANDUM OF UNDERSTANDING (MOU)
• 2018 EXECUTIVE ORDER 13834: EFFICIENT FEDERAL OPERATIONS
• 2021 THE PROVISIONS FOR CONSTRUCTION AND SAFETY SIGNS. STATED IN THE GENERAL REQUIREMENTS SECTION 010000 OF THE VA MASTER CONSTRUCTION
SPECIFICATION.
• 2022 VENTILATION FOR ACCEPTABLE INDOOR AIR QUALITY – ASHRAE STANDARD 62.1
• 2022 SAFETY STANDARD FOR REFRIGERATION SYSTEMS – ASHRAE STANDARD 15
• 2024 PHYSICAL SECURITY AND RESILIENCY DESIGN MANUAL
LOCAL CODES: AS AN AGENCY OF THE FEDERAL GOVERNMENT, VA IS NOT SUBJECT TO LOCAL IMPOSITION OF CODE ENFORCEMENT PROCEDURES (DRAWING REVIEWS, BUILDING PERMITS, INSPECTIONS, FEES, ETC.). VA MUST FUNCTION AS THE AUTHORITY HAVING JURISDICTION (AHJ) AND THUS HAS THE RESPONSIBILITY TO GUARD PUBLIC HEALTH AND SAFETY THROUGH ENFORCING ITS ADOPTED CODES. HOWEVER, LOCAL AUTHORITIES SHOULD BE NOTIFIED ABOUT PLANNED PROJECTS AND GIVEN OPPORTUNITY TO REVIEW DRAWINGS PROVIDED THAT VA DOES NOT PAY FOR REVIEW OR INSPECTION FEES.
NOTES:
1. NFPA 101 PRIMARILY ADDRESSES LIFE SAFETY AND FIRE PROTECTION FEATURES WHILE THE IBC ADDRESSES A WIDE RANGE OF CONSIDERATIONS, INCLUDING, BUT
NOT LIMITED TO, STRUCTURAL STRENGTH, SEISMIC STABILITY, SANITATION, ADEQUATE LIGHT AND VENTILATION, AND ENERGY CONSERVATION. VA BUILDINGS MUST MEET THE REQUIREMENTS OF NFPA 101 AND DOCUMENTS REFERENCED BY NFPA 101 IN ORDER TO COMPLY WITH THE ACCREDITATION REQUIREMENTS OF THE JOINT COMMISSION. THEREFORE, DESIGNS SHALL COMPLY WITH THE REQUIREMENTS OF THE LATEST EDITION OF NFPA 101 AND DOCUMENTS REFERENCED THEREIN.
DESIGN FEATURES NOT ADDRESSED BY NFPA 101 OR DOCUMENTS REFERENCED THEREIN SHALL COMPLY WITH THE REQUIREMENTS OF THE LATEST EDITION OF THE IBC OR AS OTHERWISE ADDRESSED ABOVE IN THIS PROGRAM GUIDE. FOR DESIGN FEATURES THAT ARE ADDRESSED BY BOTH THE IBC AS WELL AS NFPA 101 OR A DOCUMENT REFERENCED BY NFPA 101, THE REQUIREMENTS OF NFPA 101 OR THE DOCUMENT REFERENCED BY NFPA 101 SHALL BE USED EXCLUSIVELY (THIS APPLIES
EVEN IF THE IBC REQUIREMENTS ARE DIFFERENT).
2. CONFLICTS BETWEEN NATIONALLY RECOGNIZED CODES AND STANDARDS AND VA REQUIREMENTS – SHOULD A CONFLICT EXIST BETWEEN VA REQUIREMENTS AND VA ADOPTED NATIONALLY RECOGNIZED CODES AND STANDARDS, THE CONFLICT SHALL BE BROUGHT TO THE ATTENTION OF VA. THE RESOLUTION OF THE CONFLICT SHALL BE MADE BY THE AUTHORITY HAVING JURISDICTION FOR VA TO ENSURE A CONSISTENCY SYSTEM WIDE.
ASHRAE 90.1 - 2022 EDITION
BUILDING LOCATION: MUSKOGEE, OK - MUSKOGEE COUNTY
CLIMATE ZONE (TABLE ANNEX 1-1): ZONE 3A
INTERIOR DESIGN CONDITIONS:
THE INTERIOR DESIGN TEMPERATURES FOR HEATING AND COOLING AS DEPICTED IN THE PROJECT DESIGN CONDITIONS SCHEDULE IN THE MECHANICAL CONTROL DRAWINGS SHALL BE THE MAXIMUM
AND MINIMUM VALUES FOR THE ASSOCIATED TEMPERATURE CONTROL ZONES.
BUILDING ENVELOPE REQUIREMENTS (5.5)
BUILDING ENVELOPE REQUIREMENTS FOR CLIMATE ZONE 3 (A,B,C)
ROOFS REQUIRED DESIGNED
INSULATION: R-25 c.i. R- 33 c.i.
METAL BUILDINGS: R-10 + R-19 FC N/A
ATTIC AND OTHER: R-38 N/A
WALLS, ABOVE GRADE
MASS: R-7.6 c.i. N/A METAL BUILDING: R-0 + R-9.8 c.i. N/A STEEL-FRAMED: R-13 + R-5 c.i. N/A
WOOD-FRAMED AND OTHER: R-13 N/A
WALL, BELOW GRADE
BELOW-GRADE WALL: NR N/A
FLOORS
MASS: R-10 c.i. N/A
STEEL-FRAMED: R-30 N/A
WOOD-FRAMED AND OTHER: R-30 N/A
SLAB-ON-GRADE FLOORS
UNHEATED SLABS: NR N/A
HEATED SLABS: R-15 for 24 in. N/A
OPAQUE DOORS
SWINGING: U-0.370 N/A
NONSWINGING: U-0.310 N/A
FENESTRATION (TABLE 5.5-4):
VERTICAL FENESTRATION, U-FACTOR
FIXED: U-0.36 N/A
OPERABLE: U-0.45 N/A
ENTRANCE DOOR: U-0.63 N/A
DEFINITIONS
c.i = CONTINUOUS INSULATION Ls = LINEAR SYSTEM
NR = NO (INSULATION) REQUIREMENT
ENERGY REQUIREMENTS
N
1. DRAWINGS ARE PART OF A COMPLETE DOCUMENTS SET. CONTRACTOR SHALL CONFIRM
ALL ITEMS REQUIRED BASED UPON THE OVERALL DESIGN INTENT OF THE ENTIRE
DOCUMENT SET.
2. CONTRACTOR SHALL VERIFY ALL EXISTING CONDITIONS, PRIOR TO BEGINNING ANY WORK,
TO CONFIRM THE ACCURACY OF THE DRAWINGS AND REPORT ANY DISCREPANCIES TO
THE ARCHITECT. DO NOT SCALE THE DRAWINGS. FIELD VERIFY ALL DIMENSIONS AND
EXISTING STRUCTURAL CONDITIONS.
3. ALL AREAS NOT INVOLVED IN THE SCOPE OF WORK FOR THIS PROJECT SHALL BE KEPT
CLEAN AND FREE OF OBSTRUCTIONS AT ALL TIMES.
4. ERECT BARRICADES AND WARNING SIGNS TO DIVERT AND WARN PASSERS-BY OF THE
CONSTRUCTION WORK. PROVIDE DUST PROOFING ENCLOSURES TO SEPARATE WORK
AREAS FROM THE EXISTING FACILITIES AS NECESSARY.
5. ALL TRASH AND DEBRIS TO BE REMOVED ON A DAILY BASIS. TRASH ENCLOSURES MUST BE
COVERED AT ALL TIMES.
6. PROVIDE PROTECTION FOR ALL EXISTING SURFACES AND CONDITIONS TO REMAIN IN
PLACE DURING THE SCOPE OF WORK. SHOULD ANY DAMAGE OCCUR, PATCH AND REPAIR
ANY DAMAGE TO ADJACENT FINISHES TO MATCH EXISTING.
7. ANY DAMAGE CAUSED TO THE BUILDING OR OWNER EQUIPMENT SHALL BE REPAIRED OR
REPLACED BACK TO ITS ORIGINAL CONDITIONS AT NO ADDITIONAL COST TO THE OWNER.
8. CONTRACTOR AND SUBCONTRACTORS ARE REQUIRED TO COORDINATE WITH OTHER
DISCIPLINES TO INSTALL COMPLETE AND OPERATIONAL SYSTEMS. DRAWINGS, AS A
WHOLE, REPRESENT A COMPLETE SET AND DEPICT REQUIREMENTS FOR COMPLETE AND
OPERATIONAL SYSTEMS. INDIVIDUAL DRAWINGS MAY NOT DEPICT COMPLETE AND
ACCURATE INFORMATION TO COORDINATE COMPLETE AND OPERATIONAL SYSTEMS, BUT
DO SO AS AN ENTIRE DOCUMENT TO BE REFERENCED WITH OTHER INDIVIDUAL DRAWINGS.
CONTRACTOR AND SUBCONTRACTORS ARE REQUIRED TO REFERENCE OTHER SHEETS
AND SPECIFICATIONS AS AN ENTIRE SET OF CONSTRUCTION DOCUMENTS THAT REFLECT
WORK REQUIRED TO ACHIEVE A COMPLETE AND OPERATIONAL GOAL. LACK OF
COORDINATION AND REVIEW OF DRAWINGS AND SPECIFICATIONS AS AN ENTIRE
DOCUMENT TO INSTALL COMPLETE AND OPERATIONAL SYSTEMS, BEING OBVIOUS AND
TYPICAL INDUSTRY STANDARD, IDENTIFIED IN THE DRAWINGS AND SPECIFICATIONS, SHALL
NOT BE IN ANY WAY AN ADDITIONAL COST TO THE GOVERNMENT.
9. CONTRACTOR SHALL SUBMIT A REQUEST, IN WRITING, TO INTERRUPT ANY SUCH SERVICES
TO COR (CONTRACTING OFFICER’S REPRESENTATIVE) 48 HOURS IN ADVANCE OF
PROPOSED INTERRUPTION. REQUEST SHALL STATE REASON, DATE, EXACT TIME OF, AND
APPROXIMATE DURATION OF SUCH INTERRUPTION. MAJOR INTERRUPTIONS OF ANY
SYSTEM MUST BE REQUESTED, IN WRITING, AT LEAST 60 CALENDAR DAYS PRIOR TO THE
DESIRED TIME AND SHALL BE PERFORMED AS DIRECTED BY THE COR. MAJOR
INTERRUPTIONS SHALL BE COORDINATED WITH OTHER MAJOR INTERRUPTIONS AND MAY
NOT BE SCHEDULED FOR ONE DISCIPLINE MORE THAN TWICE THROUGHOUT THE OVERALL
CONSTRUCTION SCHEDULE UNLESS REQUESTED IN WRITING AND APPROVED BY THE COR.
CONTRACTOR WILL BE ADVISED, IN WRITING, OF APPROVAL OF REQUEST, OR OF WHICH
OTHER DATE AND/OR TIME SUCH INTERRUPTION WILL CAUSE THE LEAST INCONVENIENCE
TO OPERATIONS OF THE MEDICAL CENTER. INTERRUPTION TIME APPROVED BY THE
MEDICAL CENTER MAY OCCUR AT TIMES OTHER THAN CONTRACTOR'S NORMAL WORKING
HOURS. SCHEDULE INTERRUPTION MAY BE ON WEEKENDS OR LATE HOURS AND MAY NOT
BE AN ADDITIONAL COST TO THE GOVERNMENT. COORDINATE ALL INTERRUPTIONS THAT
MAY AFFECT THE NORMAL OPERATION OF THE FACILITY WITH THE COR WHEN SUBMITTING
THE CONSTRUCTION SCHEDULE OR UPDATES TO THE CONSTRUCTION SCHEDULE.
10. NO ASBESTOS CONTAINING MATERIALS ARE TO BE USED ON THIS PROJECT. SPUR DESIGN, THE A/E OF RECORD, CAN CERTIFY THAT NO ASBESTOS CONTAINING BUILDING MATERIALS
(ACBM) OR LEAD BASED PAINT (LBP) PRODUCTS WERE DESIGNED/SPECIFIED AS BUILDING
MATERIAL IN ANY OF THE CONSTRUCTION DOCUMENTS.
13. REFER TO THE DESIGN BINDER FOR THE ICRA INFORMATION DOCUMENTATION.
GENERAL NOTES
AREA NAME
150 SF
A101
A101
SIM
A
00.0
A101
1 1
A101
LEVEL NAME
00'-00"
00'-00" 4B
3A
FIBERGLASS BATT
INSULATION
RIGID INSULATION
CONCRETE / PRECAST
CONCRETE
EARTH / SOIL
SAND, EIFS FINISH, OR
PLASTER FINISH
GYPSUM BOARD FINISH
BRICK
CONCRETE MASONRY
UNIT
STONE / CAST STONE
GYPSUM BOARD SECTION
EXTERIOR SHEATHING
BOARD SECTION
PLYWOOD SECTION
CLEAN UTILITY
000A
150 SF
/1 A101
X0000
6"2' -1
0"
'-2
ROOM TAG
AREA TAG
SPECIALTY EQUIPMENT TAG
DOOR TAG
KEYED NOTE TAG
WALL TAG
WINDOW TAG
A101
SIM
A101
SIM
A
ACB ACOUSTIC CEILING BAFFLE
ACP ACOUSTIC CEILING PANEL
ACST ACOUSTIC
ADA AMERICANS WITH DISABILITIES ACT
ACT ACOUSTICAL CEILING TILE
ADDL ADDITIONAL
ADDN ADDITION
ADJ ADJACENT, ADJOINING, OR
ADJUSTABLE
ADMIN ADMINISTRATION
AE ARCHITECT/ENGINEER
AF ACCESS FLOORING
AFF ABOVE FINISHED FLOOR
AFG ABOVE FINISHED GRADE
AHJ AUTHORITY HAVING JURISDICTION
AIA AMERICAN INSTITUTE OF
ARCHITECTS
ALT ALTERNATE
ALT NO ALTERNATE NUMBER
ALUM ALUMINIUM (TRIM)
AMT AMOUNT
APPROX APPROXIMATE
ARCH ARCHITECT
ASC ABOVE SUSPENDED CEILING
AT ACOUSTIC CEILING TILE
AVG AVERAGE
B
BD BOARD
BG BUMPER GUARD
BLDG BUILDING
BLKG BLOCKING
BLT IN BUILT-IN
BOS BOTTOM OF STEEL
BOT BOTTOM
BRKT BRACKET
BTWN BETWEEN
C
CAB CABINET
CAV CAVITY
CBB CONCRETE BACKER BOARD
C/C CONTRACTOR PROVIDED /
CONTRACTOR INSTALLED
CD CONSTRUCTION DOCUMENTS
CFM CUBIC FEET PER MINUTE
CFS CUBIC FEET PER SECOND
CG CORNER GUARD
CH BD CHALKBOARD
CIP CAST-IN-PLACE
CJ CONTROL JOINT
CL CENTERLINE
CLG CEILING
CLG HT CEILING HEIGHT
CLR CLEAR
CMU CONCRETE MASONRY UNIT
CO CONTRACTING OFFICER
COL COLUMN
COMM COMMUNICATION
CONC CONCRETE
CONT CONTINUOUS
COORD COORDINATE
COR CONTRACTING OFFICER'S
REPRESENTATIVE
CP CONTRACTOR PROVIDED
CPT CARPET/CARPET TILE
CS CONCRETE SEALED
CSWK CASEWORK
CT CERAMIC TILE
CTB CERAMIC TILE BASE
CTR CENTER
CU FT CUBIC FEET
D
DBL DOUBLE
DEMO DEMOLITION
DEPT DEPARTMENT
DET DETAIL
DIA DIAMETER
DIR DIRECTION
DIST DISTANCE
DOC DOCUMENT
DR DOOR
DS DOWNSPOUT
DWG DRAWING
DWP DIMENSIONAL WALL PANEL
E
EA EACH
EJ EXPANSION JOINT
EL ELEVATION
ELEV ELEVATOR
ENTR ENTRANCE
EPY EPOXY FLOORING
EQ EQUAL
ETR EXISTING TO REMAIN
EX EXISTING
EXP EXPOSED
EXT EXTERIOR
F
FAB FABRIC
FED FEDERAL
FF FINISH FACE
FF EL FINISH FLOOR ELEVATION
FIN FINISH
FIN BS FINISH BOTH SIDES
FIN FLR FINISH FLOOR
FIN GR FINISH GRADE
FIXT FIXTURE
FLDG FOLDING
FLEX FLEXIBLE
FLG FLOORING
FLMT FLUSH MOUNT
FLR FLOOR
FOC FACE OF CONCRETE
FOM FACE OF MASONRY
FP FIRE PROTECTION
FR FIRE RESISTANT
FT FEET
FTG FOOTING
FV FIELD VERIFY
FWC FABRIC WALL COVERING
G
GDR GUARDRAIL
GL GLASS/GLAZING
GRAN GRANITE
GR FL GROUND FLOOR
GT GROUT
GSM GALVANIZED SHEET METAL
GYP BD GYPSUM BOARD
H
HDW HARDWARE
HEPA HIGH EFFICIENCY
PARTICULATE AIR (FILTER)
HM HOLLOW METAL
HORIZ HORIZONTAL
HR HANDRAIL
HT HEIGHT
I
IBC INTERNATIONAL BUILDING CODE
INSUL INSULATION
INT INTERIOR
ILO IN LIEU OF
J
J-BOX JUNCTION BOX
L
LAV LAVATORY
LBS POUND
LDG LANDING
LF LINEAR FEET (FOOT)
LIN LINEAR
LN LINOLEUM
LOC LOCATION
LT LIGHT
LVR LOUVER
LVT LUXURY VINYL TILE
M
MAT CARPET MAT / WALK-OFF MAT
MATL MATERIAL
MAX MAXIMUM
MECH MECHANICAL
MEMB MEMBRANE
MFR MANUFACTURER
MID MIDDLE
MIL STD MILITARY STANDARD
MIN MINIMUM
MISC MISCELLANEOUS
MO MASONRY OPENING
MOD MODIFY
MTG MOUNTING
MTL METAL
MVBL MOVABLE
N
NA NOT APPLICABLE
NIC NOT IN CONTRACT
NO NUMBER
NOM NOMINAL
NTS NOT TO SCALE
O
OA OVERALL
OC ON CENTER
OD OUTSIDE DIAMETER
OPNG OPENING
OPP OPPOSITE
OPR OPERABLE
ORD OVERFLOW ROOF DRAIN
ORIG ORIGINAL
P
P PAINT
PA PUBLIC ADDRESS
PBD PARTICLE BOARD
PCF POUNDS PER CUBIC FOOT
PCT PERCENT
PERF PERFORATED
PERIM PERIMETER
PERP PERPENDICULAR
PL PROPERTY LINE
PLAM PLASTIC LAMINATE
PLBG PLUMBING
PNL PANEL
PR PAIR
PRB PROFILE BASE
PRKG PARKING
PSF POUNDS PER SQUARE FOOT
PSI POUNDS PER SQUARE INCH
PT PORCELAIN TILE
PWR POWER
Q
QA QUALITY ASSURANCE
QC QUALITY CONTROL
QTY QUANTITY
QT QUARRY TILE
REFERENCE SYMBOLS IDENTIFICATION TAGS
NOTE: NOT ALL ABBREVIATIONS OR SYMBOLS WILL BE UTILIZED FOR THIS PROJECT.
GRID HEAD AND
LINE
LEVEL INDICATOR
MATCH LINE AND
VIEW REFERENCE
NORTH ARROW W/
PROJECT NORTH
SPOT ELEVATION
DETAIL
SECTION
WALL
SECTION
BUILDING
SECTION
DETAIL
ELEVATION
INTERIOR
ELEVATION
BUILDING
ELEVATION
1 1
6'- 0"
5'- 6"
BARIATRIC TOILET ROOM
TURNING RADIUS
CLEAR FLOOR SPACE
@ ADA LAVATORY
CLEAR FLOOR SPACE @ ADA
DRINKING FOUNTAIN
4"
6"
3"
1' -6
6" MAX
7" - 9" 11" MIN
17" - 25"
6' -0
(ANSI ICC A117.1)
39"- 41"
(A N
S I I
C C
A
7.
1)
M
IN
(A N
S I I
C C
A
7.
1)
1"
3' -6
M
A X
5' -0
M
A X
R
RAF RESILIENT ATHLETIC FLOORING
RB RUBBER BASE/RESILIENT BASE
RCP REFLECTED CEILING PLAN
RD ROOF DRAIN
REC RECESSED
REF REFERENCE
REM REMOVABLE
REP REPAIR
REPL REPLACE
REQ REQUIRE
REQD REQUIRED
RES RESINOUS FLOORING
RES-W RESINOUS / EPOXY WALL / CEILING
RF RUBBER FLOORING
RFG ROOFING
RM ROOM
RO ROUGH OPENING
RP RESIN PANEL
RSF RESILIENT SHEET FLOORING
RV ROOF VENT
RWC RIGID VINYL WALLCOVERING
S
SC SPECIALTY COATING
SD STATIC DISSIPATIVE FLOORING/TILE
SCHED SCHEDULE
SECT SECTION
SF SQUARE FOOT (FEET)
SGL SINGLE
SIM SIMILAR
SJ SCORED JOINT
SLNT SEALANT
SM SHEET METAL
SPEC SPECIFICATION
SQ SQUARE
SQ IN SQUARE INCH
SQ YD SQUARE YARD
SS SOLID SURFACE
ST STONE
STD STANDARD
STOR STORAGE
SV SHEET VINYL (ROLLED OR TILE)
SWC STAINLESS STEEL WALLCOVERING
T
TEL TELEPHONE
TEMP TEMPORARY
TER TERRAZZO
TOF TOP OF FOOTING/ FOUNDATION
TOM TOP OF MASONRY
TOS TOP OF SLAB/ STEEL
U
UNO UNLESS NOTED OTHERWISE
UTIL UTILITY
V
VAR VARIES
V/C VA PROVIDED / CONTRACTOR
INSTALLED
VCT VINYL COMPOSITION TILE
VFAT VINYL-FACED ACOUSTICAL TILE
VP VENEERED PLASTER
VT VINYL TILE
V/V VA PROVIDED / VA INSTALLED
VWC VINYL WALLCOVERING
VWF VINYL WALL FABRIC
W
W/ WITH
W/O WITHOUT
W/C WATER CLOSET
WC WHEELCHAIR
WD WOOD
WFAB WALL FABRIC
WPM WATERPROOF MEMBRANE
WSF WELDED SHEET FLOOR
X
X BRACE CROSS BRACE
TRUE
NORTH
18" MIN
M
IN
FRONT APPROACH,
PULL SIDE
36" MIN
M
IN
HINGE APPROACH,
PULL SIDE
HINGE APPROACH,
PULL SIDE
*12" MIN48
M
IN
FRONT APPROACH,
PUSH SIDE
M
IN
HINGE APPROACH,
PUSH SIDE
22" MIN 24" MIN
*4 8"
M
IN
LATCH APPROACH,
PULL SIDE
24" MIN*4
2"
M
IN
LATCH APPROACH,
PUSH SIDE
*IF BOTH CLOSER
AND LATCH ARE
PROVIDED
*54" MIN IF CLOSER
IS PROVIDED
*48" IF CLOSER IS
PROVIDED
FRONT APPROACH,
PUSH SIDE
M
IN
42" MIN
**48" MIN IF BOTH CLOSER
AND LATCH PROVIDED
M
IN
th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th in c h o n e fo o t
A
B
C
D
E
F
Veterans Health
Administration
VA FORM 08-6231
DRAWING TITLE PROJECT TITLE
LOCATION
DATE CHECKED DRAWN
PROJECT NUMBERCONSULTANTS:
DRAWING #
VA HEALTH CARE SYSTEM APPROVAL:
ARCHITECT:
SPUR DESIGN, LLC
312 SW 25TH STREET
Oklahoma City, OK 73109
(405) 842-6100
EXP. 06/30/2025
EXP. 06/30/2025
MECH / ELEC / PLUMB ENGINEER
SPUR DESIGN
2519 MADISON AVE, STE 100
RIVERFRONT SAFETY & HEALTH
11140 SOUTH TOWN SQUARE, STE 100
ST. LOUIS, MO 63123
(713) 864-2900
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
STAMP:
DRAWING NUMBER
BUILDING NUMBER
STRUCTURAL ENGINEER
H2B ENGINEERS
1225 N. LOOP WEST, STE 800
HOUSTON, TX 77008
(713) 864-2900
ARCH REG. NO. CA02295
ENGR REG. NO. CA7127
/4
/2
:3
:3
A
M
GENERAL INFORMATION
ZDL 02 OF 24AJS
100% ISSUED FOR CONSTRUCTION
RE-ROOF PORTIONS OF
VARIOUS BUILDINGS
02/05/25
623-23-121
JACK C. MONTGOMERY VAMC
1101 HONOR HEIGHTS DRIVE
MUSKOGEE, OK 74401
GI001
1E, 24, 53, & 54
SPUR #: 2093.13NUMBER REVISION DESCRIPTION DATE
OUTSIDE OF BUILDING
WEEKLY CHANGED
HEPA FILTER
HEPA NEGATIVE
AIR UNIT
WEEKLY CHANGED
(OR MORE AS
NEEDED) PRE FILTER
FIRE RATED PLYWOOD
F
LE
X D
U C
T
SUPPLY DUCTS EITHER KEEP
RUNNING OR COVER WHEN
RUNNING TO KEEP DUST OUT.
TAPE ALL SERVICES
TO PROTECT AGAINST
CONTAMINATION A
O
V
FIRE EXTINGUISHER ON PORTABLE
FLOOR BRACKET (ILSM MAY REQUIRE
MORE THAN ONE)
SUSPENDED PLASTIC
ZIPPER WALL
CURTAIN BARRIER
6 MIL PLASTIC
TEMPORARY DIGITAL MANOMETER FOR NEGATIVE
PRESSURE MONITORING OUTSIDE OF ICRA BARRIER
FOR VA'S INSPECTION. INDICATOR SHALL BE AT -0.01
OR GREATER (VERIFY DAILY). IF NOT, VERIFY ALL
OPENINGS, SUCH AS DOOR CLOSED, AND/OR CHANGE
OUT NEGATIVE AIR PRE-FILTER.
PROVIDE STICKY MAT, DRY MAT, WET MAT
(CHANGED END OF SHIFT OR MORE IF
NECESSARYTO MAINTAIN CLEANLINESS)
PROVIDE WIPES AND SPRAY FOR WET MAT
POST ICRA ILSM FIRE
INSPECTION SHEETS
CONTAINER VISIBLE
TO PUBLIC
COVER ALL RETURNS AT THE
GRATE/DIFFUSERS
OPTIONAL EXHAUST DUCTS
(COVER THE GRATES AND THE DIFFUSERS)
E
DOOR OPENING
VENT TO OUTSIDE ROUTE
TO BE APPROVED BY COR.
FIRE PULL STATION WITH AUDIO/
VISUAL
ILSM SIGNAGE
ICRA BARRIER, SEE PLANS FOR TYPE AND LOCATION
GI002
GI002
PLASTIC WINDOW
SWIVEL CASTERS
WITH TWO LOCKING
BRAKES
MOBILE CART
A D
JU
S
T A
B
LE
H E
IG
H
T
HEPA NEGATIVE AIR
UNIT
EXISTING WALL
EXISTING CEILING
FLEX DUCT
HEATED DETECTOR CUT-OFF
BASIS OF DESIGN: HEPA NEGATIVE AIR UNIT
INTEGRAL WITH EDGEGUARD BARRIER SYSTEM.
FIRE RATED PLYWOOD (TEMP.
REMOVE GLASS PANEL)
EXISTING WINDOW FRAME
TYPE A OR C ICRA BARRIER,
SEE PLANS FOR TYPE AND
LOCATION
TYPE B OR D ICRA BARRIER,
SEE PLANS FOR TYPE AND
LOCATION
EXISTING CEILING
EXISTING CONCRETE SLAB FLOOR OR
ROOF ASSEMBLY
FINISHED FLOORING TO BE KEPT
CLEAN. FLOORS NOT BEING
REPLACED MUST BE PROTECTED.
COVER WITH ROSIN PAPER/ FIRE
RATED PLYWOOD.
WHEN WORKING ABOVE CEILING WITH
BARRIERS THAT TERMINATE AT CEILING,
PROVIDE PLASTIC ENCLOSURE IN
PLENUM SPACE.
XXXXXX
XXXXXX
XXXXXX
A .F
.F
4' -0
THIS IS A RESTRICTED AREA
AREA UNDER CONSTRUCTION
PERSONNEL ENTERING MUST HAVE: HARD HAT,
SAFETY GLASSES AND PROPER I.D.
COMING SOON!!
--DESCRIPTION ON NEWLY PROPOSED OCCUPANCY--
ICRA, ISLM, WATCH,
MISC. FORMS
PAPER CADDY
INDICATOR
(REFER TO
PLAN AND
ELEVATION)
3 5/8" INSULATED WALL WITH 16
GAUGE METAL STUDS @ 16" O.C.
WALL TO EXTEND TO UNDERSIDE
OF DECK
5/8" FIRE RESISTANT GYPSUM
BOARD - BOTH SIDES
EXISTING CEILING SYSTEM
BASE - TO MATCH EXISTING
AREA
EXISTING FLOOR
UNDERSIDE OF EXISTING DECK
C E
IL
IN
G H
E
IG
H T
V A
R
IE
S F
IE
L D
V E
R
IF
Y
W A
L L
H E
IG
H
T V
A R
IE
S
F
IE
L D
V E
R
IF
Y
5/8" FIRE RESISTANT GYPSUM
BOARD - BOTH SIDES
EXISTING CEILING SYSTEM
BASE - TO MATCH EXISTING
AREA
EXISTING FLOOR
UNDERSIDE OF EXISTING DECK
C E
IL
IN
G H
E
IG
H T
V A
R
IE
S F
IE
L D
V E
R
IF
Y
/2
3 5/8" 16 GAUGE METAL STUDS @
16" O.C. WALL TO EXTEND TO
UNDERSIDE OF DECK
CB
3 5/8" INSULATED WALL WITH 16
GAUGE METAL STUDS @ 16" O.C.
(2) LAYERS 5/8" GYPSUM BOARD
EACH SIDE. WALL TO EXTEND TO
UNDERSIDE OF DECK
5/8" FIRE RESISTANT GYPSUM
BOARD - BOTH SIDES
EXISTING CEILING SYSTEM
BASE - TO MATCH EXISTING
AREA
EXISTING FLOOR
UNDERSIDE OF EXISTING DECK
C E
IL
IN
G H
E
IG
H T
V A
R
IE
S F
IE
L D
V E
R
IF
Y
W A
L L
H E
IG
H
T V
A R
IE
S
F
IE
L D
V E
R
IF
Y
D
FIRE RESISTANT SEALANT, BOTH
SIDES
FIRE RESISTANT SEALANT, BOTH
SIDES
FIRE RESISTANT SEALANT, BOTH
SIDES
1-HR RATED AND SMOKE RATED
U.L. DESIGN NO. U404
SMOKE RATED 2-HR RATED AND SMOKE
RATED
U.L. DESIGN NO. U404A
PLASTIC SHEET BARRIER
NON RATED
PLASTIC SHEET
BARRIER
EXISTING WALL
ASSEMBLY
EXISTING CEILING
BOTTOM SEALING RUNNER
TOP SEALING RUNNER
SUPPORT POLES,
QUANTITY PER MANUF.
RECOMMENDATIONS
CONTROLS DEFINED BELOW FOR THE LEVEL OF PRECAUTIONS IDENTIFIED FOR THE ACTIVITY MUST BE IN PLACE BEFORE THE ACTIVITY BEGINS AND MAINTAINED UNTIL WORK IS COMPLETED AND THE AREA IS ACTIVATED. CONTROL MEASURES FOR EACH PRECAUTION LEVEL MUST ALSO INCLUDE THE CONTROL MEASURES IN THE PRECEDING LEVEL(S). AS THE ACTIVITY PROGRESSES, A FULL RE-
EVALUATION OF REMAINING ACTIVITY TYPE AND PATIENT RISK IS REQUIRED PRIOR TO
DOWNGRADING THE LEVEL OF PRECAUTIONS.
LEVEL I:
1. PERFORM WORK ACTIVITY IN A MANNER THAT DOES NOT CREATE DUST.
2. IMMEDIATELY REPLACE ANY CEILING TILE, CLOSE ACCESS PANELS, ETC., UPON COMPLETION
OF WORK.
3. ANY MATERIALS AND EQUIPMENT BEING BROUGHT INTO THE FACILITY MUST BE FREE OF
CONTAMINANTS AND LOOSE MATERIAL.
LEVEL II:
ALL CONTROL MEASURES IN LEVEL I AND THE FOLLOWING:
1. PROVIDE ACTIVE MEANS TO CONTROL AIRBORNE DUST FROM DISPERSING INTO OCCUPIED
AREAS AND/OR WATER MIST SURFACE TO CONTROL DUST (E.G., MOBILE DUST CONTAINMENT
CART OR SOME OTHER SYSTEM).
2. IF WORK SITE CONTAINED, MUST BE NEUTRAL OR NEGATIVELY PRESSURIZED.
3. ENSURE WORKER CLOTHING IS CLEAN AND FREE OF VISIBLE DUST BEFORE LEAVING THE
WORK AREA.
4. REMOVE/ISOLATE/TAPE OFF AIR DIFFUSERS (SUPPLY AND RETURN) TO PROTECT THE HVAC
SYSTEM FROM DUST AND REDUCE AIR TURBULENCE. REBALANCE SYSTEM TO ADDRESS
DIFFUSER ISOLATION.
5. WHEN THE WORK INVOLVES OR IMPACTS POTABLE WATER SYSTEMS INCLUDING
STAGNATION DUE TO REDUCED USAGE, THE PIPING SHALL BE FLUSHED TWICE A WEEK OR
ISOLATED FROM THE MAIN SYSTEM.
6. SEAL/CLOSE DOORS TO PREVENT DUST MIGRATION. MAY PUT ZIPPER PLASTIC BARRIER
OVER DOOR.
7. CONSIDER HEPA CART USE.
8. CONTAIN ALL TRASH AND DEBRIS IN THE WORK AREA. PERFORM DAILY CLEANING AND
DISPOSAL OF TRASH (COVERED) FROM WORK AREA USING AN IDENTIFIED EXIT ROUTE.
9. ANY EQUIPMENT, TOOLS, OR MATERIALS REMOVED FROM THE WORK AREA MUST BE IN
SEALED CONTAINERS AND/OR CLEANED OF DUST AND DEBRIS PRIOR TO REMOVAL FROM THE
AREA.
10. NONPOROUS/SMOOTH AND CLEANABLE CONTAINERS (WITH A HARD LID) MUST BE USED TO
TRANSPORT TRASH AND DEBRIS FROM THE CONSTRUCTION AREAS. THESE CONTAINERS
MUST BE DAMP-WIPED CLEANED AND FREE OF VISIBLE DUST/DEBRIS BEFORE LEAVING THE
CONTAINED WORK AREA.
11. INSTALL A STICKY (DUST COLLECTION) MAT AT ENTRANCE OF CONTAINED WORK AREA
BASED ON FACILITY POLICY. STICKY MATS MUST BE CHANGED ROUTINELY AND WHEN VISIBLY
SOILED.
12. MAINTAIN CLEAN SURROUNDINGS WHEN AREA IS NOT CONTAINED BY DAMP MOPPING OR
HEPA VACUUMING SURFACES AT LEAST DAILY.
LEVEL III:
ALL CONTROL MEASURES IN LEVELS I AND II AND THE FOLLOWING:
1. ENSURE AVAILABILITY OF EQUIPMENT FOR CLEANING HANDS.
2. CONSTRUCT AND COMPLETE CRITICAL BARRIERS MEETING NFPA 241 REQUIREMENTS.
BARRIERS MUST EXTEND TO THE CEILING OR IF CEILING TILE IS REMOVED, TO THE DECK
ABOVE.
3. ALL (PLASTIC OR HARD) BARRIER CONSTRUCTION ACTIVITIES MUST BE COMPLETED IN A
MANNER THAT PREVENTS DUST RELEASE. PLASTIC BARRIERS MUST BE EFFECTIVELY
AFFIXED TO FLOOR AND CEILING (OR FLOOR/ROOF DECK ABOVE) AND SECURE FROM
MOVEMENT OR DAMAGE.
4. SEAL ALL PENETRATIONS IN CONTAINMENT BARRIERS, INCLUDING FLOORS AND CEILING,
USING APPROVED MATERIALS (UL SCHEDULE FIRESTOP IF APPLICABLE FOR BARRIER TYPE).
5. MAINTAIN .01 INCHES /WATER GAUGE NEGATIVE PRESSURIZATION OF THE ENTIRE
WORKSPACE BY USE OF HEPA EXHAUST AIR SYSTEMS DIRECTED OUTDOORS (UNLESS A
WORK SPECIFIC WAIVER IS APPROVED BY VHA’S OFFICE OF HEALTHCARE ENGINEERING);
THIS MUST BE MAINTAINED CONTINUOUSLY 24/7 FOR THE DURATION OF THE PROJECT.
EXHAUST DISCHARGED DIRECTLY TO THE OUTDOORS THAT IS 25 FEET OR GREATER FROM
ENTRANCES, AIR INTAKES AND WINDOWS IS NOT REQUIRED TO BE HEPA-FILTERED.
EXHAUSTING DISCHARGED AIR INTO SHARED OR RECIRCULATING HVAC SYSTEMS, OR OTHER
SHARED EXHAUST SYSTEMS (E.G., BATHROOM EXHAUST) IS PROHIBITED.
6. INSTALL A DIFFERENTIAL PRESSURE SENSING DEVICE (E.G., MAGNEHELIC, MANOMETER, OR
DIGITAL MONITORING) ON EXTERIOR OF WORK CONTAINMENT TO CONTINUALLY MONITOR
AND DOCUMENT NEGATIVE PRESSURIZATION. THE “BALL IN THE WALL” OR SIMILAR
APPARATUS ARE NOT ACCEPTABLE.
LEVEL IV:
ALL CONTROL MEASURES IN LEVELS I, II AND III AND THE FOLLOWING:
1. BARRIERS MUST BE HARD BARRIERS UNLESS TEMPORARY TO INSTALL FINAL BARRIER.
2. CONTAINMENT MUST INCLUDE AN ANTEROOM TO ENSURE PRESSURE CONTROL. ANTEROOM
MUST BE LARGE ENOUGH FOR EQUIPMENT STAGING, CART CLEANING, WORKERS’ PPE AND
CLEANING.
3. WORKER CLOTHING AND/OR PPE MUST BE REMOVED OR CLEAN AND FREE OF VISIBLE DUST
BEFORE LEAVING THE WORK AREA ANTEROOM. HEPA VACUUMING OF CLOTHING OR USE OF
COVER SUITS IS ACCEPTABLE.
4. WORKERS MUST WEAR SHOE COVERS OR HAVE A METHOD TO CLEAN SHOES IN ANTEROOM.
SHOE COVERS MUST BE REMOVED PRIOR TO EXITING THE ANTEROOM TO THE OCCUPIED
SPACE (NON-WORK AREA). DAMAGED SHOE COVERS MUST BE CHANGED IMMEDIATELY.
GENERAL ICRA NOTES - LEVEL OF PRECAUTIONS & CONTROL MEASURES
CONTROLS DEFINED BELOW SHALL BE COMPLETED UPON COMPLETION OF THE ACTIVITY AND
INSPECTED PRIOR TO TERMINATING MEASURES DEFINED IN TABLE 5.
LEVELS I -II:
CLEANING:
1. CLEAN WORK AREAS INCLUDING ALL ENVIRONMENTAL SURFACES, HIGH HORIZONTAL
SURFACES AND FLOORING MATERIALS.
2. CHECK ALL SUPPLY AND RETURN AIR REGISTERS FOR DUST ACCUMULATION ON UPPER
SURFACES AS WELL AS AIR DIFFUSER SURFACES.
HVAC SYSTEMS:
1. REMOVE ISOLATION OF HVAC SYSTEM IN AREAS WHERE WORK IS BEING PERFORMED.
VERIFY THAT HVAC SYSTEMS ARE CLEAN AND OPERATIONAL.
2. VERIFY THE HVAC SYSTEMS MEET ORIGINAL AIRFLOW AND AIR EXCHANGE DESIGN
SPECIFICATIONS.
WATER SYSTEMS:
1. UNTIL THE POTABLE WATER SYSTEM IS ACTIVATED AND IN USE, FLUSHING SHALL
CONTINUE AT LEAST TWICE PER WEEK IN ACCORDANCE WITH VHA DIRECTIVE 1061.
LEVELS III - IV:
CONSTRUCTION AREAS MUST BE INSPECTED BY AN INFECTION PREVENTIONIST AND
ENGINEERING REPRESENTATIVE (AND OTHERS AS DETERMINED BY THE FACILITY) FOR FINAL
ACTIVITY/PROJECT CLOSE OUT AND REMOVAL OF INFECTION PREVENTION AND CONTROL
MEASURES.
WORK AREA CLEANING:
1. CLEAN WORK AREAS INCLUDING ALL ENVIRONMENTAL SURFACES, HIGH HORIZONTAL
SURFACES AND FLOORING MATERIALS.
2. CHECK ALL SUPPLY AND RETURN AIR REGISTERS FOR DUST ACCUMULATION ON UPPER
SURFACES AS WELL AS AIR DIFFUSER SURFACES.
REMOVAL OF CRITICAL BARRIERS:
1. CRITICAL BARRIERS MUST REMAIN IN PLACE DURING ALL WORK INVOLVING DRYWALL
REMOVAL, CREATION OF DUST AND ACTIVITIES BEYOND SIMPLE TOUCH-UP WORK. THE
BARRIER MAY NOT BE REMOVED UNTIL A WORK AREA CLEANING HAS BEEN PERFORMED.
ADDITIONAL CLEANING MAY BE NEEDED AFTER REMOVAL OF BARRIER.
2. ALL (PLASTIC OR HARD) BARRIER REMOVAL ACTIVITIES MUST BE COMPLETED IN A MANNER
THAT PREVENTS DUST RELEASE. USE THE FOLLOWING PRECAUTIONS WHEN REMOVING
HARD BARRIERS:
1. CAREFULLY REMOVE SCREWS AND PAINTER TAPE.
2. IF DUST WILL BE GENERATED DURING SCREW REMOVAL, USE HAND-HELD HEPA
VACUUM.
3. DRYWALL CUTTING IS PROHIBITED DURING REMOVAL PROCESS.
4. CLEAN ALL STUD TRACKS WITH HEPA VACUUM BEFORE REMOVING OUTER HARD
BARRIER.
5. USE A PLASTIC BARRIER TO ENCLOSE AREA IF DUST COULD BE GENERATED.
NEGATIVE AIR REQUIREMENTS:
1. THE USE OF NEGATIVE AIR MUST BE DESIGNED TO REMOVE CONTAMINANTS FROM THE
WORK AREA.
2. NEGATIVE AIR DEVICES (FANS, FILTERS, MONITORING AND DOCUMENTATION EQUIPMENT)
MUST REMAIN OPERATIONAL AT ALL TIMES AND IN PLACE FOR A PERIOD AFTER COMPLETION
OF DUST CREATING ACTIVITIES TO REMOVE CONTAMINANTS FROM THE WORK AREA AND
BEFORE REMOVAL OF CRITICAL BARRIERS.
HVAC SYSTEMS:
1. UPON REMOVAL OF CRITICAL BARRIERS, REMOVE ISOLATION OF HVAC SYSTEM IN AREAS
WHERE WORK IS BEING PERFORMED.
2. VERIFY THAT HVAC SYSTEMS ARE CLEAN AND OPERATIONAL.
3. VERIFY AND DOCUMENT THROUGH A TAB THE HVAC SYSTEMS MEETS ORIGINAL AIRFLOW
AND AIR EXCHANGE DESIGN SPECIFICATIONS.
WATER SYSTEMS:
UNTIL THE POTABLE WATER SYSTEM IS ACTIVATED AND IN USE, FLUSHING SHALL CONTINUE AT
LEAST TWICE PER WEEK IN ACCORDANCE WITH VHA DIRECTIVE 1061.
MINIMUM INFECTION PREVENTION AND CONTROL MEASURES REQUIRED
UPON COMPLETION OF THE ACTIVITY
INSPECTIONS AND NON-INVASTIVE ACTIVITES
MATRIX OF PRECAUTIONS FOR CONSTRUCTION & RENOVATION
CATEGORY A
INCLUDES BUT NOT LIMITED TO:
• WORK CAN BE COMPLETED IN A SINGLE SHIFT, DOES NOT EXCEED 10 HOURS, AND DOES NOT CREATE DUST OR DEBRIS.
• PATIENTS AND/OR EMPLOYEES MAY BE IN THE AREA DEPENDING ON THE ACTIVITY.
• REMOVAL OF CEILING TILE OR ACCESS TO MECHANICAL OR ELECTRICAL CHASE FOR VISUAL INSPECTION LIMITED TO 1 TILE
PER 50 SQUARE FEET WITH LIMITED EXPOSURE TIME (NOT TO EXCEED AN HOUR FOR EACH TILE) WITHIN THE SHIFT.
• MINOR INTERIOR UPDATES (E.G., REPLACING FLOOR OR CEILING TILES, CARPENTRY WORK TO INCLUDE HANGING SIGNAGE, AND PAINTING WITHOUT SANDING) THAT DO NOT CREATE DUST OR DEBRIS.
• LIMITED BUILDING SYSTEM MAINTENANCE SUCH AS PLUMBING ON POTABLE SYSTEMS LIMITED TO FAUCET REPLACEMENT
ETC. AND ELECTRICAL WORK SUCH AS REPLACEMENT OF BULBS, RECEPTACLES, OR SWITCHES.
SMALL SCALE, SHORT DURATION ACTIVITIES WHICH CREATES MINIMAL DUSTCATEGORY B
INCLUDES BUT NOT LIMITED TO:
• PROLONGED INSPECTION AND WORK THAT MAY TAKE LONGER THAN A SINGLE SHIFT BUT NOT EXCEEDING A WEEK.
• PATIENTS AND EMPLOYEES ARE NOT TO BE IN THE AREA UNTIL ACTIVITY IS COMPLETED.
• WORK THAT CREATES MINIMAL DUST AND DEBRIS.
• INTERIOR FINISH OR SURFACE REPAIRS, UPDATES, OR MODIFICATIONS SUCH AS REPAIR OF FIREWALLS AND BARRIERS, AND
NEW FLOORING THAT PRODUCES MINIMAL DUST AND DEBRIS. CONTROLLED SANDING ACTIVITIES (E.G., WET OR DRY
SANDING) THAT PRODUCE MINIMAL DUST AND DEBRIS.
• PLUMBING WORK SUCH AS INSTALLATION OR REPLACEMENT OF A SINGLE FIXTURE OR PIPING FOR A SINGLE FIXTURE. ANY
WORK ON SANITARY PLUMBING INCLUDING SNAKING OF DRAINS.
• ELECTRICAL WORK SUCH AS INSTALLATION OF CABLING/WIRING/CONDUIT FOR A SINGLE DEVICE, INSTALLATION OF NEW
DEVICE SUCH AS A LIGHT FIXTURE THAT PRODUCES MINIMAL DUST AND DEBRIS.
• AIR HANDLER AND/OR FAN SHUTDOWN/STARTUP AND HVAC WORK SUCH AS REPLACEMENT OF A SINGLE DIFFUSER, SINGLE
TERMINAL UNIT OR A SINGLE DEVICE THAT PRODUCES MINIMAL DUST AND DEBRIS.
WORK THAT GENERATES A MODERATE TO HIGH LEVEL OF DUST OR REQUIRES
DEMOLITION OR REMOVAL OF ANY FIXED BUILDING COMPONENTS OR ASSEMBLIES
INCLUDES BUT NOT LIMITED TO:
• WORK REQUIRING LONGER THAN A SINGLE WEEK TO COMPLETE BUT NOT EXCEEDING 6 MONTHS.
• PATIENTS AND EMPLOYEES ARE NOT TO BE IN THE AREA UNTIL ACTIVITY IS COMPLETED.
• DEMOLITION/REMOVAL OF EXISTING FLOOR COVERING, CASEWORK, LAY-IN CEILING, OR OTHER ARCHITECTURAL ELEMENTS.
• DEMOLITION/REMOVAL OF MORE THAN 32 FT2 OF DRYWALL/FRAMING, HARD CEILINGS, AND DOORS/FRAMING AND MINIMAL
INFRASTRUCTURE SUCH AS ELECTRICAL CIRCUITS AND BRANCH PIPING.
• INSTALLATION OF NEW WALLS, CEILINGS AND DOORS INCLUDING FRAMING, DRYWALL/PLASTER AND ASSOCIATED WORK.
• PLUMBING WORK SUCH AS THE INSTALLATION OF NEW SINKS, SHOWERS AND TOILETS AND ASSOCIATED PLUMBING.
• SHUT DOWN OF SECTIONS OF POTABLE WATER SYSTEMS.
• ELECTRICAL WORK SUCH AS INSTALLATION OF CONDUIT AND WIRE FOR LIGHTING, RECEPTACLES AND SWITCHES, THE INSTALLATION OF CONDUIT AND WIRE FOR NEW DEVICES SUCH AS TERMINAL UNITS, FANS ETC.
• MODIFICATION OF EXISTING FIRE ALARM AND SUPPRESSION SYSTEMS.
• MECHANICAL WORK SUCH AS THE INSTALLATION OF DUCTWORK, DIFFUSERS, AND TERMINAL UNITS FOR AN AREA.
MAJOR DEMOLITION AND CONSTRUCTION PROJECTS
INCLUDES BUT NOT LIMITED TO:
• WORK DURATION EXCEEDING 6 MONTHS; PATIENTS AND EMPLOYEES NOT TO BE IN THE AREA UNTIL ACTIVITY IS COMPLETED.
• LARGE-SCALE DEMOLITION OF BUILDING COMPONENTS AND INFRASTRUCTURE INCLUDING REMOVAL OF MULTIPLE DOORS, WALLS, FRAMING, CEILINGS, FLOORING, PIPING, ELECTRICAL AND HVAC.
• THE INSTALLATION BUILDING COMPONENTS SUCH AS NEW WALLS, CEILINGS AND DOORS INCLUDING FRAMING, DRYWALL AND
ASSOCIATED PLASTER WORK.
• PLUMBING WORK SUCH AS THE INSTALLATION OF: NEW MEDICAL GAS SYSTEMS, STEAM/HEATING HOT WATER, CONDENSATE
SYSTEMS, MULTIPLE SINKS, SHOWERS AND TOILETS INCLUDING ASSOCIATED PLUMBING.
• SHUTDOWN OF POTABLE WATER, STEAM/HEATING HOT WATER, CONDENSATE, AND MEDICAL GAS SYSTEMS.
• ELECTRICAL WORK SUCH AS INSTALLATION OF ELECTRICAL FEEDERS, DISTRIBUTION PANELS, CONDUIT AND WIRE FOR
LIGHTING, RECEPTACLES AND SWITCHES, THE INSTALLATION OF CONDUIT AND WIRE FOR NEW DEVICES SUCH AS TERMINAL
UNITS, FANS, ELECTRICAL SHUTDOWN OF MULTIPLE PANELS, ETC.
• INSTALLATION OF FIRE ALARM AND SUPPRESSION SYSTEMS.
• MECHANICAL WORK SUCH AS THE INSTALLATION OF AIR HANDLING EQUIPMENT, ASSOCIATED DUCTWORK, DIFFUSERS, HEAT
EXCHANGERS, TERMINAL UNITS AND CONTROLS.
CATEGORY C
CATEGORY D
LOW RISK
PATIENT RISK GROUPS
MEDIUM RISK HIGH RISK HIGHEST RISK
• PUBLIC HALLWAYS AND
GATHERING AREAS NOT
IN CLINICAL AREAS
• OFFICE AREAS NOT IN
CLINICAL AREAS
• BREAKROOMS NOT IN
CLINICAL AREAS
• BATHROOMS OR LOCKER
ROOMS NOT IN CLINICAL
AREAS
• MECHANICAL/ELECTRICAL
ROOMS NOT IN CLINICAL
AREAS
• EMS CLOSETS NOT ON
CLINICAL UNITS
• WAITING AREAS
• CLINICAL ENGINEERING
(BIOMEDICAL/ STORAGE
CLOSETS FOR ITEMS
USED ON A CLINICAL
UNIT.)
• MATERIALS
MANAGEMENT/LOGISTICS/
TSS
• STERILE PROCESSING
DEPARTMENT – DIRTY
SIDE
• KITCHEN, CAFETERIA,
GIFT SHOP, COFFEE
SHOP, AND FOOD KIOSKS
• PATIENT CARE ROOMS AND
AREAS
• ALL ACUTE CARE UNITS,
INCLUDING MENTAL HEALTH
• ALL OUTPATIENT UNITS AND
CLINICS
• EMERGENCY DEPARTMENT
• DOMICILIARIES AND
TRANSITIONAL RESIDENCES
• EMPLOYEE HEALTH
• PHARMACY – GENERAL
WORK ZONE
• MEDICATION ROOMS AND
CLEAN UTILITY ROOMS
• IMAGING SUITES –
DIAGNOSTIC IMAGING
• LABORATORY
• ALL TRANSPLANT UNITS
• ALL INTENSIVE CARE UNITS
• ALL ONCOLOGY UNITS AND
CHEMOTHERAPY/INFUSION
CENTERS
• OR THEATERS AND
RESTRICTED AREAS
• HEMODIALYSIS UNITS
• PROCEDURAL ROOMS*
• PHARMACY COMPOUNDING
AREA
• STERILE PROCESSING
DEPARTMENT – CLEAN SIDE
• TRANSFUSION SERVICES
• IMAGING SUITES –
INTERVENTIONAL IMAGING
• DEDICATED ISOLATION
WARDS/UNITS FOR
INFECTIOUS DISEASES
RISK RELATED GROUP TYPE A TYPE B TYPE C TYPE D
LOW RISK GROUP
MEDIUM RISK GROUP
HIGH RISK GROUP
HIGHEST RISK GROUP
I
I
I
II
II
II
II
III
II
III
IV
IV
III
IV
IV
IV
CONSTRUCTION PROJECT TYPE
NOTE: AN INFECTION PREVENTION AND CONTROL PERMIT IS REQUIRED FOR LEVEL III AND LEVEL IV. CONSULT WITH INFECTION
PREVENTION AND CONTROL FOR LEVEL I AND LEVEL II.
NON-PATIENT CARE
AREAS SUCH AS:
PATIENT CARE SUPPORT
AREAS SUCH AS:
PATIENT CARE
AREAS SUCH AS:
PROCEDURAL, INVASIVE,
STERILE SUPPORT AND HIGHLY
COMPROMISED PATIENT CARE
AREAS SUCH AS:
th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th in c h o n e fo o t
A
B
C
D
E
F
Veterans Health
Administration
VA FORM 08-6231
DRAWING TITLE PROJECT TITLE
LOCATION
DATE CHECKED DRAWN
PROJECT NUMBERCONSULTANTS:
DRAWING #
VA HEALTH CARE SYSTEM APPROVAL:
ARCHITECT:
SPUR DESIGN, LLC
312 SW 25TH STREET
Oklahoma City, OK 73109
(405) 842-6100
EXP. 06/30/2025
EXP. 06/30/2025
MECH / ELEC / PLUMB ENGINEER
SPUR DESIGN
2519 MADISON AVE, STE 100
RIVERFRONT SAFETY & HEALTH
11140 SOUTH TOWN SQUARE, STE 100
ST. LOUIS, MO 63123
(713) 864-2900
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
STAMP:
DRAWING NUMBER
BUILDING NUMBER
STRUCTURAL ENGINEER
H2B ENGINEERS
1225 N. LOOP WEST, STE 800
HOUSTON, TX 77008
(713) 864-2900
ARCH REG. NO. CA02295
ENGR REG. NO. CA7127
/4
/2
:3
:3
A
M
ICRA CONSTRUCTION DETAILS
ZDL 03 OF 24AJS
100% ISSUED FOR CONSTRUCTION
RE-ROOF PORTIONS OF
VARIOUS BUILDINGS
02/05/25
623-23-121
JACK C. MONTGOMERY VAMC
1101 HONOR HEIGHTS DRIVE
MUSKOGEE, OK 74401
GI002
1E, 24, 53, & 54
SPUR #: 2093.13
1/2" = 1'-0"
GENERAL ICRA CONSTRUCTION PLAN LAYOUT13/8" = 1'-0"
ICRA MOBILE CONTAINMENT CART23/8" = 1'-0"
SECTION AT ICRA CONSTRUCTION PLAN3
3/8" = 1'-0"
ICRA ELEVATION4
3/4" = 1'-0"
ICRA BARRIER WALL TYPES5
re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th in c h o n e fo o t
Veterans Health
Administration
VA FORM 08-6231
DRAWING TITLE PROJECT TITLE
LOCATION
DATE CHECKED DRAWN
PROJECT NUMBERCONSULTANTS:
DRAWING #
VA HEALTH CARE SYSTEM APPROVAL:
ARCHITECT:
SPUR DESIGN, LLC
312 SW 25TH STREET
Oklahoma City, OK 73109
(405) 842-6100
ARCH COA REG. NO. CA02295 EXP. 06/30/2025
ENGR COA REG. NO. CA7127 EXP. 06/30/2025
CIVIL/STRUCTURAL ENGINEER
H2B
1225 NORTH LOOP WEST, STE 800
HOUSTON, TX 77008
(713) 864-2900
MECH / ELEC / PLUMB / TECH ENGINEER
SPUR DESIGN
312 SW 25TH ST
OKLAHOMA CITY, OK 73109
(405) 842-6100
FIRE PROTECTION ENGINEER
POOLE FIRE PROTECTION, INC.
19910 WEST 161ST STREET
OLATHE, KANSAS 66062
(913) 829-8690
FULLY SPRINKLERED
INDUSTRIAL HYGENIST
RIVERFRONT SAFETY & HEALTH
11140 S TOWN SQUARE, STE 100
ST. LOUIS, MO 63123
(314) 917-0148
PHYSICAL SECURITY
FORCE PROTECT
10901 FRONT BEACH RD, UNIT 1415
PANAMA CITY BEACH, FL 32407
(502) 836-4232
1 2 � 4 � 6 � 8 �
1 2 � 4 � 6 � 8 �
STAMP:
DRAWING NUMBER
BUILDING NUMBER
7/ 3/
:4
8:
A M
KNOWN ENVIRONMENTAL HAZARDS -
IMPACTED ROOF SYSTEMS
CD 4 OF 24JR
RE-ROOF PORTIONS OF
VARIOUS BUILDINGS
2/05/2025
623-23-121
JACK C. MONTGOMERY VAMC
1101 HONOR HEIGHTS DRIVE
MUSKOGEE, OK 74401 HA100
1E, 24, 53, & 54
SPUR #: 2093.08No. REVISION DESCRIPTION DATE
BLDG 1E ROOF
BLDG 24
ROOF ABOVE
1/8" = 1'-0"
ROOF PLAN - BUILDING 1E4
1/8" = 1'-0"
ROOF PLAN - BUILDING 53 LOW ROOF A11/8" = 1'-0"
ROOF PLAN - BUILDING 53 LOW ROOF B2
N
1/8" = 1'-0"
ROOF PLAN - BUILDING 543
KNOWN HAZARDOUS MATERIAL KEYNOTES
ON NIGHTS AND WEEKENDS, REMOVE GRAVEL BALLAST AND TAR ROOF SYSTEM ON BUILDINGS
24 AND 53A USING OUTDOOR METHODS AND MANUAL MEANS IN ACCORDANCE WITH NEA FOR
NON-FRIABLE ASBESTOS INCLUDED UNDER OSHA'S ASBESTOS RULES FOR REMOVAL. USE
TRAINED EMPLOYEES IN ACCORDANCE WITH STATE REQUIREMENTS, 8,700 SF OF ROOF
SYSTEM TOTAL. REMOVE ALL ASSOCIATED ROOFING SYSTEM COMPONENT SEALS TO INCLUDE
ITEMS SUCH AS FLASHING AND CAULK AT EQUIPMENT HUBS AND WALL EDGES, SCUPPERS,
PENETRATIONS, SUPPORTS, DRAINS, VENTS AND PARAPET WALL COVERING AND UNDERLYING
INSULATION TO BARE CONCRETE DECK BELOW. COORDINATE SEQUENCES OF REMOVAL TO
MITIGATE POTENTIAL FOR WATER INTRUSION. WORK TO INCLUDE A MINIMUM OF 2
MOBILIZATIONS. REFER TO PROJECT DRAWINGS FOR THROUGH ROOF PENETRATIONS,
DESCRIPTION OF ROOF MATRIX, LOCATIONS AND EXTENTS.
SUSPECT ROOFING MATERIALS ON THESE OTHER BUILDINGS WERE NON-DETECTED FOR
ASBESTOS. IF, DURING THE COURSE OF CONSTRUCTION, ADDITIONAL SUSPECT MATERIALS
ARE UNCOVERED, STOP WORK AND REPORT TO COR IMMEDIATELY. REFER TO
ENVIRONMENTAL PROJECT NARRATIVE WITH ASSOCIATED TABLES FOR SUSPECT MATERIALS
IDENTIFIED AND TESTED.
STRUCTURAL STEEL BEAM WITH LBP, PROTECT AS NECESSARY.
A1
A2
A2
A2
A1
B24 ROOF
ACCESS
BUILDING
24 ROOF
BLDG 1E
ROOF
BELOW
1/8" = 1'-0"
ROOF PLAN - BUILDING 245
A1
L1
100% ISSUED FOR CONSTRUCTION
A2
L1
VISUAL KEY
AREAS WITH KNOWN ASBESTOS ROOFING MATERIALS
N N
N
GENERAL NOTES
THE STRUCTURAL DRAWINGS DEPICT THE STRUCTURE IN ITS FINAL CONSTRUCTED CONFIGURATION.
NEITHER CONSTRUCTION MEANS AND METHODS NOR CONSTRUCTION SAFETY ARE PART OF THE
STRUCTURAL ENGINEER’S EXPERTISE OR SCOPE OF WORK. THE GENERAL CONTRACTOR AND THEIR
SUBCONTRACTORS ARE FULLY RESPONSIBLE FOR THE MEANS AND METHODS USED TO CONSTRUCT
THE STRUCTURE AND FOR FULL COMPLIANCE WITH ALL JOB SAFETY RELATED REGULATIONS AND CONDITIONS AT THE SITE. LIMITED SITE VISITS, IF ANY, BY THE STRUCTURAL ENGINEER ARE SOLELY
TO OBSERVE COMPLETED PARTS OF THE STRUCTURE. THE STRUCTURAL ENGINEER IS NEITHER
QUALIFIED TO OBSERVE NOR COMMENT ON CONSTRUCTION MEANS AND METHODS AND JOB SITE
SAFETY.
CONTRACTOR SHALL VERIFY ALL DIMENSIONS AND SITE CONDITIONS PRIOR TO
FABRICATION/CONSTRUCTION. NOTIFY STRUCTURAL ENGINEER AND ARCHITECT OF ANY
DISCREPANCIES PRIOR TO FABRICATION/CONSTRUCTION. CONTRACTOR IS RESPONSIBLE FOR ALL
WORK FITTING AS INTENDED BY THE DRAWINGS AND SPECIFICATIONS.
PRINCIPAL OPENINGS ARE SHOWN ON THE DRAWINGS. SEE ARCHITECTURAL, MECHANICAL AND
ELECTRICAL DRAWINGS FOR OPENINGS, SLEEVES, CURBS, INSERTS, DEPRESSIONS, ETC NOT SHOWN.
ALL DETAILS ARE TYPICAL UNLESS NOTED OTHERWISE. DETAILS SHALL APPLY TO SIMILAR AND LIKE
CONDITIONS.
SHOP DRAWINGS SHALL BE NEW DRAWINGS PRODUCED BY THE CONTRACTOR, ILLEGIBLE
REPRODUCTIONS OF THE DESIGN DRAWINGS WILL BE REJECTED. ELECTRONIC FILES MAY BE
REQUESTED FROM THE ENGINEER OF RECORD FOR THE PURPOSE OF PREPARING SHOP DRAWINGS.
THE CONTRACTOR WILL BE REQUIRED TO SIGN AN INDEMNITY STATEMENT PRIOR TO TRANSMISSION
OF THE ELECTRONIC FILES TO THE CONTRACTOR. THE USE OF REPRODUCTIONS OF THESE
CONTRACT DRAWINGS BY ANY CONTRACTOR, SUBCONTRACTOR, ERECTOR, FABRICATOR, OR
MATERIAL SUPPLIER IN LIEU OF PREPARATION OF SHOP DRAWINGS SIGNIFIES THEIR ACCEPTANCE OF ALL INFORMATION SHOWN HEREIN AS CORRECT, AND OBLIGATES THEMSELF TO ANY JOB EXPENSE, REAL OR IMPLIED, ARISING DUE TO ANY ERRORS OR OMISSIONS THAT MAY OCCUR HEREIN.
THIS PROJECT CONSISTS OF A MODIFICATION TO AN EXISTING BUILDING. INFORMATION ON EXISTING
CONDITIONS HAS BEEN TAKEN FROM THE ORIGINAL DESIGN DRAWINGS AND SHOWN ON THESE
DRAWINGS. THESE DRAWINGS WERE ASSUMED TO BE “AS-BUILT” DRAWINGS SINCE EXISTING
CONDITIONS WERE NOT ACCESSIBLE OR SINCE FIELD OBSERVATION OF EXISTING CONDITION IS
BEYOND THE ENGINEER’S SCOPE OF WORK DURING THE DESIGN PHASE OF THIS PROJECT. THE
ACCURACY OF THIS INFORMATION HAS NOT BEEN VERIFIED.
BUILDING CODE: INTERNATIONAL BUILDING CODE, 2024 EDITION; MINIMUM DESIGN
LOADS AND ASSOCIATED CRITERIA FOR BUILDINGS AND OTHER STRUCTURES,
ASCE 7-22.
DEAD LOAD:
ANY CHANGES IN CONSTRUCTION MATERIALS FROM THOSE SHOWN ON
THE ARCHITECTURAL OR STRUCTURAL DRAWINGS SHALL BE REPORTED BY
THE CONTRACTOR TO THE STRUCTURAL ENGINEER FOR VERIFICATION OF
LOAD CARRYING CAPACITY OF THE STRUCTURE.
LIVE LOAD:
ROOF: 20 PSF
GUARDRAILS: 200 LB CONCENTRATED LOAD, 50 PLF UNIFORM
LOAD
LIVE LOAD REDUCTIONS HAVE BEEN APPLIED IN ACCORDANCE WITH THE
BUILDING CODE, UNLESS NOTED OTHERWISE.
WIND LOAD:
INTERNATIONAL BUILDING CODE, 2024 EDITION
VELOCITY (ULT) : 119 MPH THREE SECOND GUST
EXPOSURE: C
RISK CATEGORY: IV
INTERNAL PRESSURE COEFFICIENT, Gcpi: +/- 0.18 TERRAIN FACTOR Kzt; 1.55 GROUND ELEVATION FACTOR Ke: 0.97
EFFECTIVE WIND AREA ft²
20 ft² 50 ft² 100 ft²
ZONE
+/- 81
COMPONENTS AND CLADDINGROOF DESIGN GROSS
PRESSURES, WIND ONLY (PSF)
+/- 107
+/- 140
+/- 74
+/- 98
+/- 123
+/- 68
+/- 90
+/- 107 a = 11'-0"
SEISMIC LOAD:
RISK CATEGORY: IV
SEISMIC IMPORTANCE FACTOR (I): 1.5
MAPPED SPECTRAL RESP ACCEL (Ss/S1): 0.2g/0.087g
SITE CLASS: D
SPECTRAL RESPONSE COEFF (Sds/Sd1): 0.17g/0.12g
SEISMIC DESIGN CATEGORY: C
1' +/- 50 +/- 50 +/- 50
1' a a a a
STRUCTURAL STEEL
1. ALL STRUCTURAL STEEL DESIGN, DETAILING, FABRICATION AND ERECTION SHALL CONFORM TO
LOAD RESISTANCE FACTOR DESIGN (LRFD) ACCORDING TO THE LATEST AISC SPECIFICATION.
2. ALL WELDING SHALL CONFORM TO THE STANDARDS OF THE LATEST EDITION OF THE STEEL
CONSTRUCTION MANUAL OF THE AMERICAN INSTITUTE OF STEEL CONSTRUCTION, AND THE
AMERICAN WELDING SOCIETY ANSI/AWS D1.1 STRUCTURAL WELDING CODE-STEEL. WELDING OF
REINFORCING BARS SHALL COMPLY TO THE AMERICAN WELDING SOCIETY AWS D.1.4. SHORT
CIRCUIT TRANSFER FOR THE GAS METAL ARC WELDING PROCESS IS NOT PERMITTED.
3. ELECTRODES FOR ALL FIELD AND SHOP WELDING SHALL BE CLASS E70XX. ELECTRODES FOR MOMENT CONNECTIONS SHALL BE CLASS E7018 WITH A CHARPY TOUGHNESS OF AT LEAST 20 FT-
LBS AT -20 DEGREES FAHRENHEIT.
4. ALL STRUCTURAL STEEL ROLLED SHAPES SHALL CONFORM TO ASTM A992, AND ALL ANGLES, BARS, CHANNELS AND PLATES SHALL CONFORM TO ASTM A36. ALL SQUARE AND RECTANGULAR TUBE (Fy 46KSI) SHALL CONFORM TO ASTM A500 GRADE B AND ROUND PIPES (Fy 36KSI) SHALL CONFORM TO ASTM A53 GR B. ALL COLD-FORMED GIRTS AND PURLINS SHALL CONFORM TO ASTM A570M GR 55.
5. TYPICAL CONNECTIONS ARE INDICATED ON THE DRAWINGS.
6. ALL MISCELLANEOUS WELDS (FIELD OR SHOP) SHALL BE MINIMUM SIZE FILLET ALL AROUND IN
ACCORDANCE WITH AISC 360. WELDING OF CONTINUOUS MEMBERS SHALL BE A MINIMUM OF 2
INCHES OF 3/16 INCH FILLET STITCH WELDS AT 12 INCHES OC, STAGGERED EACH SIDE, UNLESS
OTHERWISE NOTED. COLUMN BASE PLATES, CAP PLATES AND STIFFENER PLATES SHALL BE
WELDED ALL AROUND.
7. ALL CONNECTION BOLTS FOR STRUCTURAL STEEL MEMBERS SHALL CONFORM TO ASTM F3125, GRADE A325, TYPE 1 EXCEPT WHERE NOTED OTHERWISE. MINIMUM SIZE SHALL BE 3/4 INCH
DIAMETER UNLESS NOTED OTHERWISE. BOLTS SHALL BE DIRECT TENSION INDICATING BOLTS
CONFORMING TO ASTM F3125, GRADE F1852 WITH HARDENED WASHERS UNDER THE NUT AND
SACRIFICIAL SPLINES. HEX NUTS SHALL CONFORM TO ASTM A563 AND WASHERS SHALL CONFORM
TO ASTM F436.
8. ALL STRUCTURAL STEEL WHICH IS OUTSIDE THE BUILDING ENVELOPE SHALL BE HOT DIPPED GALVANIZED. ZINC COATING SHALL MEET THE REQUIREMENTS OF ASTM 123-73, WITH A MINIMUM COATING GRADE OF GR60 AND SHALL BE APPLIED AFTER FABRICATION. ALL FIELD WELDS SHALL
BE GROUND SMOOTH AND TOUCHED UP WITH ZINC RICH PAINT.
9. THE GENERAL CONTRACTOR AND THEIR SUBCONTRACTOR’S SHALL COMPLY TO OSHA 29 CFR 1926
SUBPART R, SAFETY STANDARDS FOR STEEL ERECTION.
10. AS SCOPE AND PERFORMANCE DOCUMENTS, THE DRAWINGS AND SPECIFICATIONS DO NOT
INDICATE OR DESCRIBE ALL OF THE WORK REQUIRED FOR THE PERFORMANCE AND COMPLETION
OF THIS WORK. THE CONTRACTOR SHALL BE SOLELY RESPONSIBLE FOR THE FABRICATION AND
INSTALLATION OF ALL MISCELLANEOUS METAL ITEMS INDICATED, DESCRIBED, OR IMPLIED ON THE STRUCTURAL AND/OR THE ARCHITECTURAL DRAWINGS. MISCELLANEOUS STEEL ITEMS, WITHIN AN ASSEMBLY AND NOT ATTACHED TO THE STRUCTURE, ARE THE RESPONSIBILITY OF THE GENERAL
CONTRACTOR AND THEIR SUBCONTRACTORS WHETHER THEY ARE SHOWN OR NOT SHOWN ON
THE ARCHITECTURAL OR STRUCTURAL DRAWINGS. SUCH ASSEMBLIES INCLUDE BUT ARE NOT
LIMITED TO, EXTERIOR AND INTERIOR WALL ASSEMBLIES, CEILING ASSEMBLIES, PARTITION
ASSEMBLIES, SHELF AND CABINET ASSEMBLIES AND ALL OTHER SIMILAR ASSEMBLIES. ANY
MISCELLANEOUS METAL ITEMS INDICATED ON THE ARCHITECTURAL DRAWINGS AND NOT SHOWN
ON STRUCTURAL DRAWINGS SHALL BE A MINIMUM OF L4x4x1/2”, C7x9.8, 3/8” PLATE OR HSS4x4x3/8”
UNLESS OTHERWISE APPROVED BY THE STRUCTURAL ENGINEER.
11. DECK SHALL BE CORRUGATED DECK CONFORMING TO ASTM A653 WITH Fy=50 KSI. DECK SHALL BE GALVANIZED, CONFORMING TO ASTM A924, WITH A MINIMUM ZINC COATING GRADE OF G60.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .