Att 11 BEM Overview.pdf
PDF 1 MB Posted
- Attached to
- Western Pacific (WESTPAC) Bulk Petroleum Products Program Federal contract opportunity
- Solicitation number
- SPE602-23-R-0706
- Issued by
- Defense Logistics Agency Energy
View the file
Other files for this federal contract opportunity
Show all 36
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
WARFIGHTER ALWAYS
The Nation’s Combat Logistics Support Agency E s t a b l i s h e d 1 9 6 1
DEFENSE LOGISTICS AGENCY
DLA
Bulk Bid Evaluation Model (BEM)
Darren Dunham/Shanice Whitfield Bulk Petroleum Purchase Analysts
March 22, 2023
WARFIGHTER ALWAYSWARFIGHTER ALWAYS 2
Bulk Petroleum Products
• Manage petroleum products in very large volumes
• Fewer contracts with large dollar values
• Estimated quantity with high minimum lift guarantee (75%)
• Awards on FOB Origin and FOB Destination Basis
• Extensive use of commercial distribution systems
• Distribution may be direct to demand point or through intermediate
Defense Fuel Supply Points (DFSPs)
• Socio-Economic considerations (CONUS only):
– Small Business Set-asides (Price Matching)
– HUBZone Premium Program
– 8(a) reservations
WARFIGHTER ALWAYSWARFIGHTER ALWAYS
Bid Evaluation Model
• Mixed-integer linear optimization program used to find the minimum laid down cost for the entire procurement.
• Laid Down Price includes:
– Offered product price
– All transportation costs
– All additive costs
– All intermediate DFSP distribution costs (fixed and variable)
– Excess throughput charges
– Offer specific evaluation factors
– Base Reference Price evaluation factors
BEM Data
• Enterprise Business System (EBS)
– Requirements and solicitation data
– Amendments
– Contract Awards
• Contract Information System (CIS)
– Amendments (schedule changes)
• Transportation Rates Information System (TRIS)
– Transportation rates
• Offer Entry Tool (OET)
– Initial offers and subsequent revisions
• BEM USER
– Additives, Escalators, DFSP costs, Evaluation factors
Offer Conditions
• Optional
• BEM evaluates complex offers
– Tiered pricing
– Volume restrictions (Minimums and Maximums)
– Multiple load capabilities (modes of transportation)
– Additive injection capabilities
– Offer conditions such as “Either/Or” and “One before Two”
• Conflicting Conditions
– Conditional statements must not conflict with each other (i.e.:
Minimum award by Tanker is 5 million and overall maximum award is 3 million)
Evaluation Example
Offers A: 6,000,000 USG by TT @ $2.95/gal B: 6,000,000 USG by PL @ $3.00/gal C: 1,000,000 USG by PL @ $2.98gal
Requirements Base 1: 3,000,000 gallons received by TT Base 2: 3,000,000 gallons received by TT Base 3: 1,000,000 gallons received by TT
Intermediate Depot Support Available Into X by PL, out by TT to all Req Into Y by PL, out by TT to all Req
PL = Pipeline; TT = Tank Truck
Offer A
6,000,000 USG
@$2.95
Offer C 1,000,000
USG @$2.98
Offer B 6,000,000
USG @$3.00
DFSP X
DFSP Y
Base 3
1,000,000 USG
Base 2 3,000,000
USG
Base 1
3,000,000 USG
.28
.02
.05
.01
.02 .05.02
.04
.02
.04
.20
.23
.06
Req 1 – Offer A (total cost $3.23/gal) Req 2 – Offer A (total cost $3.15/gal) Req 3 – Offer C(total cost $3.04/gal) Total cost: $22,180,000
Req 1 – Offer B (total cost $3.06/gal) Req 2 – Offer C (total cost 3.01/gal) Req 2 – Offer B (total cost $3.04/gal) Req 3 – Offer B(total cost $3.04/gal) Total cost: $21,310,000 $870K Savings Distribution Plan Generated
Evaluated on Offered Price Only: Evaluated on Laid-Down Cost:
NOTE: When determining the vendor in line for award, the lowest laid‐down cost is taken into account. A vendor may appear to be the best award choice for the government based on their offer price being the lowest, but once evaluation costs such as adjustment factors and/or transportation rates are applied, this will determine which vendor (dark grey oval) is the lowest laid down cost for the Government. There are intermediate DFSPs (light grey oval) to requirements locations (orange ovals) that have different transportation costs (light blue oval). The BEM will evaluate the best route based on the cheapest costs along the route.
BEM Rounds
INITIAL OFFERS
OET ROUND 1
INTERIM OFFERS
OET ROUND 2
IPR BEM RUN
MCBEW
FINAL OFFERS
OET ROUND 3
FPR BEM RUN –
MCBEW & LCR (if Price Reduction
Round)
PRICE REDUCTION
ROUND (Optional)
Sequence Of BEM Runs
Small Business Set-Aside Run
HUBZone Run
8(A) Run
Base Run
Optimization Run
Final Forced Run
BEM MCBEW
Laid Down Cost Report (LCR)
Post Award
• Once the solicitation is awarded, award data will be published at SAM.gov | Home
• For questions specific to an offer, please contact the Contracting Officer listed on the solicitation
Contact Information
• For questions concerning the functionality of the Bulk BEM/OET, please contact:
Darren Dunham Darren.M.Dunham@dla.mil
(571) 767-0338
Shanice Whitfield Shanice.Whitfield@dla.mil
(571) 767-8495
WARFIGHTER ALWAYSWARFIGHTER ALWAYS 13
File details come from the government source that posted it. Updated .