About this file
This document is a set of construction plans and specifications for accessibility improvements at Lefferts Pond, a recreation area managed by the U.S. Department of Agriculture Forest Service in the Green Mountain National Forest, Middlebury Ranger District, located in Chittenden, Vermont (Rutland County).
The project scope includes construction of an aggregate surface trail with a precast concrete headwall, furnishing and installation of an accessible floating dock/gangway system, and removal of an existing precast concrete mat. The floating dock specifications require a minimum 15' x 15' platform with ADA-compliant layout, non-skid surface, removable sections weighing 1,500 lbs or less, safety curb, accessible kayak launch with transfer platform and assist features, overhead bars and grab rails, a 5' wide x 30' gangway with railings connected via pin/roller/hinge to a concrete headwall, and a complete anchoring system suitable for seasonal installation and removal. The trail work includes riprap stabilization (Class 1 and Class 3), separation geotextile, trail surface aggregate with 2% crown, and trail bollards to replace existing boulder barricades. Construction must comply with Federal Highway Administration Standard Specifications FP-24, Forest Service supplemental specifications, and all environmental permits. All work must be completed in the dry, with de-watering permitted only between July 1 and October 1 under a U.S. Army Corps of Engineers general permit. Precast concrete must achieve 4,500 PSI compressive strength, and silane waterproofing must be applied to all exposed concrete surfaces. The contractor is responsible for erosion and sediment control planning, spill prevention measures, equipment cleaning to prevent invasive species introduction, and restoration of disturbed areas outside the work limits.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Site Visit_12445526Q0066_260629.pdf | ||
| Att 02_SOW_260623.docx | DOCX document | |
| Amd 0001_12445526Q0066.pdf | ||
| Q and A_12445526Q0066.xlsx | XLSX spreadsheet | |
| Sol_12445526Q0066.pdf | ||
| Att 01_Schedule of Items_260504.docx | DOCX document | |
| Att 02_SOW_260421.docx | DOCX document | |
| Att 04_FSSS_260415.docx | DOCX document | |
| Att 05_Wage Rates_260102.pdf | ||
| HOW TO FOLLOW PROJECTS ON SAM FOR EMAIL ALERTS.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
TRAVEL DIRECTIONS:
SHEET OF
United States Department of Agriculture
Forest Service
LEFFERTS POND
ACCESSIBILITY IMPROVEMENTS
RECOMMENDED BY:
APPROVED:
FOREST ENGINEER
DISTRICT RANGER DATE
DATE
FOREST SUPERVISOR DATE
4/2 1/2
6 1 2:
D
AV
ID
PD
ON
AH
UE
C :\U
SE
RS
\D
AV
ID
PD
ON
AH
UE
\B
OX
\77
TR
AV
EL
MG
MT
\77
DE
VE
LO
PM
EN
T\
_R
OA
DS
\77
_P
RO
JE
CT
S\
FR
2_
LE
FF
ER
TS
\D
RA
FT
IN
FO
\D W
G\
BO
AT
L
AU
NC
H\ 2.D
W G;
STATE OF VERMONT
RUTLAND COUNTY
R-09 EASTERN REGION
GREEN MOUNTAIN NATIONAL FOREST
MIDDLEBURY RANGER DISTRICT
INDEX OF SHEETS
SHEET SHEET TITLE DATE
1 COVERSHEET 4/21/2026
2 NOTES 4/21/2026
3 DETAILS 4/21/2026
4 ACCESSIBLE DOCK & TRAIL PLAN VIEW 4/21/2026
5 ACCESSIBLE DOCK & TRAIL PROFILE & SECTIONS VIEW 4/21/2026
FROM THE JUNCTION OF VERMONT ROUTE 4 AND 7 IN RUTLAND, VT TRAVEL NORTH ON ROUTE 7 FOR
1.9 MILES. TURN RIGHT ONTO EAST PITTSFORD ROAD FOR 3.1 MILES. CONTINUE ON CHITTENDEN
ROAD FOR 2.9 MILES. CONTINUE ON DAM ROAD FOR 1.3 MILES. TURN RIGHT ONTO WILDCAT ROAD FOR
0.9 MILES. TURN LEFT ONTO FOREST ROAD 412. PARKING FOR DAY USE AREA IS LOCATED AT END OF
FOREST ROAD 412. 43.719764, -72.906025
PROJECT LOCATION:
CHITTENDEN, VERMONT
PROJECT
LOCATION
AutoCAD SHX Text
CANADA
AutoCAD SHX Text
ORLEANS
AutoCAD SHX Text
ESSEX
AutoCAD SHX Text
WASHINGTON
AutoCAD SHX Text
LAMOILLE
AutoCAD SHX Text
FRANKLIN
AutoCAD SHX Text
GRAND ISLE
AutoCAD SHX Text
ADDISON
AutoCAD SHX Text
CHITTENDEN
AutoCAD SHX Text
ORANGE
AutoCAD SHX Text
CALEDONIA
AutoCAD SHX Text
WINDSOR
AutoCAD SHX Text
RUTLAND
AutoCAD SHX Text
BENNINGTON
AutoCAD SHX Text
WINDHAM
AutoCAD SHX Text State of
AutoCAD SHX Text
NEW YORK
AutoCAD SHX Text Commonwealth of
AutoCAD SHX Text
MASSACHUSETTS
AutoCAD SHX Text State of
AutoCAD SHX Text
NEW HAMPSHIRE
DRAWN
DESIGNER
STAMPS, LOGOS, AND SEALS
PROJECT NAME
DRAWING TITLE
CHECKED
ARCHIVE NO.
DATE
PROJECT NO.
DRAWING SHEET NO.
DATENO.
REVISION / ISSUE
OFSHEET
United States Department of Agriculture Forest Service
4/2 1/2
6 1 1:
D
AV
ID
PD
ON
AH
UE
C :\U
SE
RS
\D
AV
ID
PD
ON
AH
UE
\B
OX
\77
TR
AV
EL
MG
MT
\77
DE
VE
LO
PM
EN
T\
_R
OA
DS
\77
_P
RO
JE
CT
S\
FR
2_
LE
FF
ER
TS
\D
RA
FT
IN
FO
\D W
G\
BO
AT
L
AU
NC
H\ 2.D
W G;
R-09
EASTERN REGION
LEFFERTS POND
ACCESSIBILITY
IMPROVEMENTS
GREEN MOUNTAIN
NATIONAL FOREST
MIDDLEBURY RANGER DISTRICT
NOTES
4/21/2026
D. DONAHUE
D. DONAHUE
B. AUSTIN
C-01 02 05
SCOPE OF WORK:
1. THE PROJECT WORK SHALL GENERALLY INCLUDE, BUT IS NOT LIMITED TO: CONSTRUCTION OF AGGREGATE SURFACE
TRAIL AND PRECAST CONCRETE HEADWALL, FURNISHING, DELIVERING AND INSTALLING AN ACCESSIBLE FLOATING
DOCK/GANGWAY, AND REMOVING AN EXISTING PRECAST CONCRETE MAT.
GENERAL NOTES:
1. ALL MATERIALS AND CONSTRUCTION SHALL CONFORM TO THE US DEPARTMENT OF TRANSPORTATION FEDERAL
HIGHWAY ADMINISTRATION STANDARD SPECIFICATIONS FOR CONSTRUCTION OF ROADS AND BRIDGES ON FEDERAL
HIGHWAY PROJECTS, FP-24 (U.S. CUSTOMARY UNITS) AND THE FOREST SERVICE SUPPLEMENTAL SPECIFICATIONS.
2. DIMENSIONS, ANGLES, BEARINGS, AND ELEVATIONS OF THE EXISTING TRAIL SHOWN ON THESE PLANS HAVE BEEN
OBTAINED FROM LIMITED FIELD INVESTIGATION. THE CONTRACTOR SHALL BE RESPONSIBLE FOR MAKING FIELD
MEASUREMENTS OF ALL EXISTING FEATURES TO ASSURE CONSISTENCY WITH THE PROPOSED CONSTRUCTION. ANY
DISCREPANCIES IN DIMENSIONS, CHARACTER OR EXTENT OF THE EXISTING FEATURES SHALL BE BROUGHT TO THE
ATTENTION OF THE CONTRACTING OFFICER'S REPRESENTATIVE (COR) BEFORE ADVANCING THE WORK.
3. ALL DIMENSIONS ARE HORIZONTAL OR VERTICAL, AND ARE GIVEN AT 68 DEGREES FAHRENHEIT, UNLESS OTHERWISE
NOTED.
4. THE CONTRACTOR SHALL REVIEW AND UNDERSTAND ALL APPLICABLE ENVIRONMENTAL PERMITS AND SHALL ENSURE
THAT ALL CONSTRUCTION CONDITIONS ARE MET.
5. THE CONTRACTOR SHALL PROVIDE A SPILL PREVENTION PLAN AND SHALL PROVIDE A SPILL KIT ON SITE AT ALL TIMES
DURING CONSTRUCTION. THIS SHALL BE PAID FOR INCIDENTAL TO ALL OTHER CONTRACT ITEMS.
6. TOPOGRAPHIC INFORMATION WAS DEVELOPED FROM A FIELD SURVEY PERFORMED BY THE FOREST SERVICE ON
OCTOBER 26, 2022 USING A TOTAL STATION INSTRUMENT. ELEVATIONS ON THESE PLANS ARE BASED ON AN ARBITRARY
DATUM. HORIZONTAL POSITIONS ARE BASED ON AN ARBITRARY COORDINATE SYSTEM.
7. ALL SOIL MOVING EQUIPMENT SHALL BE THOROUGHLY CLEANED TO MAKE IT FREE OF SOIL, NON-NATIVE INVASIVE
SPECIES OR OTHER DEBRIS THAT COULD CONTAIN OR HOLD SEEDS PRIOR TO BEING DELIVERED TO THE PROJECT SITE.
EQUIPMENT SHALL BE CONSIDERED FREE OF NON-NATIVE OR INVASIVE SPECIES AND OTHER SUCH DEBRIS WHEN A
VISUAL INSPECTION BY THE COR, COMPLETED PRIOR TO THE EQUIPMENT BEING MOVED TO THE SITE, DOES NOT
DISCLOSE SUCH MATERIAL PRESENT. A CURRENT LIST OF NON-NATIVE INVASIVE SPECIES OF CONCERN TO THE FOREST
SERVICE IS AVAILABLE UPON REQUEST.
CONSTRUCTION NOTES:
8. IT IS THE CONTRACTOR'S RESPONSIBILITY TO CONTACT DIG SAFE PRIOR TO ANY EXCAVATION WORK.
9. WORK SHALL BE PLANNED, COORDINATED, AND EXECUTED SO AS TO LIMIT THE IMPACT ON THE LEFFERTS POND
RECREATIONAL AREA.
10. ALL WORK SHALL BE DONE IN THE DRY. THIS MAY BE ACCOMPLISHED BY COMPLETING THE WORK WHEN THE WATER
LEVEL IS BELOW THE CONSTRUCTION AREA OR BY DE-WATERING. IF THE WORK IS ACCOMPLISHED BY DE-WATERING, THEN IS SHALL BE COMPLETED IN ACCORDANCE WITH THE U.S. ARMY CORPS OF ENGINEERS (USACE) GENERAL PERMIT
AND OCCUR BETWEEN JULY 1-OCTOBER 1. CONTRACTOR SHALL BE RESPONSIBLE FOR DEVELOPING A DE-WATERING
PLAN AND SHALL PROVIDE TO COR FOR REVIEW AND APPROVAL PRIOR TO CONSTRUCTION. THIS SHALL BE INCIDENTAL
TO ALL OTHER WORK.
11. THE PROPOSED ALIGNMENT OF THE TRAIL WILL BE STAKED BY THE FOREST SERVICE. FINAL ELEVATION OF THE
PRECAST CONCRETE HEADWALL SHALL BE SET BY THE FOREST SERVICE.
12. REMOVE VEGETATION AND TOPSOIL FROM AREA UNDER THE PROPOSED TRAIL. ALL GRUBBING MATERIAL TO BE
DISPOSED OF OFF NFS LANDS UNLESS OTHERWISE DIRECTED BY COR. PAYMENT FOR CLEARING AND GRUBBING SHALL
BE UNDER BID ITEM 20101.
13. AREAS OUTSIDE THE LIMITS OF PROPOSED WORK DISTURBED BY THE CONTRACTOR'S OPERATIONS SHALL BE
RESTORED BY THE CONTRACTOR TO THEIR ORIGINAL CONDITION AT THE CONTRACTOR'S EXPENSE. CONTRACTOR
SHALL USE APPROPRIATE SEED AS APPROVED BY COR.
14. ALL WASTE MATERIAL, EXCEPT AS NOTED, INCLUDING UNUSED EXCAVATED MATERIAL, SHALL BECOME THE PROPERTY
OF THE CONTRACTOR AND SHALL BE DISPOSED OF OFF U.S. GOVERNMENT (NATIONAL FOREST) LAND AT AN APPROVED
LOCATION. THERE ARE NO GOVERNMENT DISPOSAL SITES OR PITS.
15. THE COLOR OF STONE USED FOR RIP RAP AND TRAIL SURFACE AGGREGATE SHALL BE EITHER EARTH TONES OR
MEDIUM TO DARK GRAY. ALL AGGREGATE SHALL BE APPROVED BY THE COR PRIOR TO PLACEMENT. WHITE AGGREGATE
IS NOT ACCEPTABLE.
TEMPORARY STAGING AREAS:
16. THE PRIMARY STAGING AREA SHALL BE THE LEFFERTS POND SITE PARKING AREA. ANY SECONDARY STAGING AREAS
NEEDED SHALL BE APPROVED BY COR AND SHALL BE USED ONLY FOR THE TEMPORARY STORAGE OF MATERIALS.
VEGETATION UNDER STOCKPILES SHALL BE PROTECT BY GEOTEXTILE FABRIC OR OTHER APPROVED METHOD.
17. STAGING AREAS SHALL BE FREE OF ANY REMAINING CONSTRUCTION MATERIALS AFTER THEIR USE. VEGETATION MUST
BE RE-ESTABLISHED WHERE SOIL HAS BEEN DISTURBED OR WHERE THE EXISTING VEGETATION WAS DAMAGED.
DECOMPACTION OF SOIL MAY BE NECESSARY. SEED WITH APPROPRIATE SEED PER PRIOR NOTES.
EROSION CONTROL NOTES:
18. PRIOR TO STARTING CONSTRUCTION THE CONTRACTOR SHALL SUBMIT AN EROSION AND SEDIMENT CONTROL PLAN
WITH A SCHEDULE OF CONSTRUCTION ACTIVITIES. THE PLAN SHALL BE SITE SPECIFIC AND SHALL BE PAID FOR UNDER
ITEM 15713, "SOIL EROSION & POLLUTION CONTROL".
19. THE CONTRACTOR SHALL PHYSICALLY MARK OFF LIMITS OF NECESSARY ONSITE LAND DISTURBANCE WITH TAPE OR
OTHER METHODS AND REVIEW WITH WORKERS AND SUBCONTRACTORS SO THAT ALL INDIVIDUALS CAN SEE THE AREAS
TO BE PROTECTED.
20. THE CONTRACTOR SHALL MINIMIZE THE AMOUNT OF DISTURBED SOIL EXPOSED TO EROSION FROM WIND AND WATER
BY USING VEGETATIVE AND STRUCTURAL CONTROLS AND PROPER TIMING AND SEQUENCING OF ACTIVITIES.
21. THE CONTRACTOR SHALL DIVERT OFFSITE STORMWATER RUNOFF FROM HIGHLY ERODIBLE AREAS AND STEEP SLOPES
AND CONVEY OFFSITE STORMWATER RUNOFF TO STABLE AREAS. INSTALL SILT FENCE PRIOR TO CLEARING AND
GRUBBING AND INSTALL NECESSARY EROSION AND SEDIMENT CONTROL PRACTICES AS WORK TAKES PLACE. SILT
FENCE SHALL BE INSTALLED ACROSS THE SLOPE, PARALLEL TO CONTOURS, AND TURNED UP AT ENDS.
22. THE CONTRACTOR SHALL DESIGNATE THE RESPONSIBILITIES FOR IMPLEMENTING THE EROSION AND SEDIMENT
CONTROL PLAN TO ONE INDIVIDUAL. THE CONTRACTOR SHALL ENSURE THAT ALL WORKERS UNDERSTAND THE MAJOR
PROVISIONS OF THE EROSION AND SEDIMENT CONTROL PLAN.
23. ALL ITEMS SPECIFIED IN THE EROSION CONTROL PLAN BUT NOT INCLUDED AS A SEPARATE PAY ITEM SHALL BE PAID
FOR UNDER ITEM 15713, "SOIL EROSION & POLLUTION CONTROL".
24. THE CONTRACTOR SHALL APPLY TEMPORARY AND/OR PERMANENT SOIL STABILIZATION MEASURES IMMEDIATELY ON
ALL DISTURBED AREAS WHERE WORK IS DELAYED OR COMPLETED.
25. ALL EARTH STOCKPILES SHALL BE PROTECTED BY SILT FENCE AT THE PERIMETER AND COVERED WITH A BLANKET OF
STRAW MULCH.
26. TEMPORARY EROSION CHECKS SHALL BE INSTALLED AS NECESSARY AND SHALL REMAIN IN PLACE UNTIL PERMANENT
EROSION CONTROL MEASURES HAVE BEEN INSTALLED AND APPROVED BY THE COR. EROSION CHECKS SHALL BE
PERIODICALLY INSPECTED TO INSURE THAT THEY ARE IN GOOD CONDITION AND THAT AN EXCESSIVE BUILDUP OF SILT
AND DEBRIS HAS NOT OCCURRED. NOT WITHSTANDING PERIODIC INSPECTIONS, EROSION CHECKS SHALL BE
INSPECTED BEFORE AND AFTER RAINFALL EVENTS TO INSURE THEY ARE IN GOOD CONDITION BEFORE RAINFALL AND
TO REMOVE EXCESSIVE BUILDUP OF SILT AND DEBRIS AFTER THE STORM EVENT.
27. AFTER THE PERMANENT EROSION CONTROL MEASURES ARE INSTALLED AND APPROVED BY THE COR, TEMPORARY
EROSION CONTROL MEASURES SHALL BE REMOVED AND DISPOSED OF BY THE CONTRACTOR OFF GOVERNMENT LAND.
COST FOR DISPOSAL SHALL NOT BE PAID FOR SEPARATELY, BUT SHALL BE CONSIDERED INCIDENTAL TO INSTALLATION.
28. DURING CONSTRUCTION OF THE FISHING PIER, CONTRACTOR SHALL PROTECT THE STRUCTURE AGAINST SURFACE
WATER RUNOFF AT ALL TIMES THROUGH THE USE OF BERMS, DIVERSION DITCHES, SILT FENCE, TEMPORARY DRAINS
AND/OR ANY OTHER NECESSARY MEASURES TO PREVENT SOIL STAINING OF THE WALL FACE, SCOUR OF THE RETAINING
WALL FOUNDATION OR EROSION OF THE WALL BACKFILL OR INFILL.
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text V
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text T
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text T
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text G
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text U
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text U
AutoCAD SHX Text R
E
2'-0"
(8) #5 REBAR (TYP.)
AS SHOWN
#5 REBAR STIRRUP (TYP.) PER
CSRI "MANUAL OF STANDARD
PRACTICE"
TOP SURFACE SHALL
HAVE BROOM FINISH
PRECAST CONCRETE, CLASS A
NO CHAMFER. TROWEL FINISH IN WAY OF
CONNECTION TO MEET MANUFACTURERS
SPECIFICATIONS. CONNECTION AND
HARDWARE TO GANGWAY TO BE PER
MANUFACTURERS SPECIFICATIONS
1'-0"
3" TYP.
8'-0"
NOTES: PROVIDE A MINIMUM OF 2 LIFTING POINTS. LIFTING POINTS SHALL NOT BE ON THE TOP SURFACE.
(9) #5 REBAR STIRRUP EVENLY
SPACED AS SHOWN (TYP.)
#5 REBAR (TYP.)
GENERAL PRECAST CONCRETE NOTES:
1. THE CONTRACTOR SHALL SUBMIT SHOP DRAWINGS FOR THE PRECAST COMPONENTS FOR
REVIEW AND ACCEPTANCE PRIOR TO FABRICATION. SHOP DRAWINGS SHALL SHOW
DIMESNSIONS, JOINT DETAILS, REINFORCEMENT SIZE AND LOCATION.
2. THE CONTRACTOR SHALL FURNISH ALL LABOR, MATERIALS AND EQUIPMENT REQUIRED TO
PERFORM ALL OPERATIONS IN CONNECTION WITH FABRICATING, DELIVERING, AND
INSTALLATING PRECAST CONCRETE ELEMENTS IN ACCORDANCE WITH THE SPECIFIED
INFORMATION SHOWN ON THE PLANS AND FP-24. ALL PRECAST CONCRETE COSTS SHALL BE
PAID UNDER PAY ITEM TO 57801, " PRECAST STRUCTURAL CONCRETE, CLASS A".
3. CONCRETE SHALL MEET OR EXCEED 4500 PSI COMPRESSIVE STRENGTH BASED ON STANDARD
28-DAY CYLINDER TESTS.
4. REINFORCING STEEL SHALL CONFORM TO ASTM A615, GRADE 60. ALL REINFORCING BAR
DIMENSIONS ON THE DETAILED DRAWINGS ARE TO CENTERS OF BARS EXCEPT WHERE THE
CLEAR DIMENSION IS SHOWN TO FACE OF CONCRETE OR OTHER SURFACE. ALL REINFORCING
STEEL COSTS SHALL BE PAID UNDER PAY ITEM 55401, "REINFORCING STEEL".
5. REINFORCEMENT OF ALL PRECAST ELEMENTS SHALL HAVE A 3" MINIMUM CLEAR COVER ON
ALL FACES.
6. PROVIDE 1'' CHAMFERS ON ALL EXPOSED EDGES OF CONCRETE UNLESS OTHERWISE NOTED.
7. SILANE WATERPROOFING SHALL BE APPLIED TO ALL EXPOSED CONCRETE SURFACES IN
ACCORDANCE WITH MANUFACTURERS RECOMMENDATIONS. SILANE PRODUCTS SHALL BE
APPROVED BY THE C.O.R. ALL COSTS ASSOCIATED WITH SILANE SHALL BE INCIDENTAL TO THE
PRECAST PAY ITEM 57801.
TRAIL CONSTRUCTION NOTES:
1. OPERATE VIBRATORY COMPACTOR OVER SUBGRADE UNTIL NO VISUAL
DISPLACEMENT IS DETECTED (MINIMUM OF THREE PASSES).
2. PLACE AND GRADE TRAIL SURFACE AGGREGATE (TSA) WITH 2% CROWN.
3. TSA SHALL BE AT OPTIMAL MOISTURE CONTENT FOR COMPACTION. TSA
SHALL BE CONSIDERED OF OPTIMAL MOISTURE CONTENT WHEN IT FEELS
DAMP IN THE HAND BUT DOES NOT DRIP WHEN SQUEEZED.
4. COMPACT TSA MATERIAL WITH VIBRATORY COMPACTOR UNTIL NO
DEFORMATION IS VISUALLY DETECTED (MINIMUM OF THREE PASSES).
5. THE FINAL SURFACE SHALL BE HARD UNDER FOOT, AND FREE OF BUMPS,
RIDGES, OR CONCAVITIES.
6. TRAIL SURFACE AGGREGATE SHALL BE PAID UNDER ITEM 39901.
2'-0"
KEYED RIPRAP,
CLASS 3
1.5H (TYP.)
1V
SEPARATION GEOTEXTILE,
NON-WOVEN (TYP.)
6" TRAIL SURFACE
AGGREGATE
5'-0"
FOUNDATION FILL
EXISTING GROUND
FINAL GRADE
SEPARATION GEOTEXTILE,
NON-WOVEN (TYP.)
TRAIL
C
L
5'-0"
2'-0"
LOCKING PIN
(TYP.)
1-1/8" DIA HOLE
FOR LOCKING PIN (TYP.)
1/4
9" X 9" X 1/4" STEEL SQUARE TUBING
PAINTED BROWN
8X8 PRESSURE
TREATED TIMBER
GRANULAR BACKFILL
RESTORE TRAIL SURFACE AGGREGATE
AFTER BOLLARDS ARE SET
EXISTING TRAIL
SURFACE
2'-0" X 2'-0" X 1/4" STEEL PLATE
6" X 12" TYPE 2 REFLECTORIZED
YELLOW OBJECT MARKERS. FRONT SIDE
ONLY. SECURE WITH NO. 10 RUST AND
VANDAL PROOF SELF TAPPING SCREWS.
1" X 9-1/2" GALVANIZED
HITCH PIN
9-1/2"
7/16" DIA. HOLE
DRAWN
DESIGNER
STAMPS, LOGOS, AND SEALS
PROJECT NAME
DRAWING TITLE
CHECKED
ARCHIVE NO.
DATE
PROJECT NO.
DRAWING SHEET NO.
DATENO.
REVISION / ISSUE
OFSHEET
United States Department of Agriculture Forest Service
4/2 1/2
6 1 2:
D
AV
ID
PD
ON
AH
UE
C :\U
SE
RS
\D
AV
ID
PD
ON
AH
UE
\B
OX
\77
TR
AV
EL
MG
MT
\77
DE
VE
LO
PM
EN
T\
_R
OA
DS
\77
_P
RO
JE
CT
S\
FR
2_
LE
FF
ER
TS
\D
RA
FT
IN
FO
\D W
G\
BO
AT
L
AU
NC
H\ 2.D
W G;
R-09
EASTERN REGION
LEFFERTS POND
ACCESSIBILITY
IMPROVEMENTS
GREEN MOUNTAIN
NATIONAL FOREST
MIDDLEBURY RANGER DISTRICT
DETAILS
4/21/2026
D. DONAHUE
D. DONAHUE
B. AUSTIN
C-02 03 05
CONCRETE HEAD WALL SECTION
NOT TO SCALE
CONCRETE HEAD WALL ELEVATION
NOT TO SCALE
ACCESSIBLE DOCK TRAIL TYPICAL SECTION STATIONS
0+9.74 TO 20.50
NOT TO SCALE
TRAIL BOLLARD DETAIL
NOT TO SCALE
LOCKING PIN DETAIL
NOT TO SCALE
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text V
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text T
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text T
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text G
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text U
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text U
AutoCAD SHX Text R
EDGE OF EXISTING TRAIL
REMOVE AND DISPOSE OF EXISTING CONCRETE MAT.
RESURFACE WITH TRAIL SURFACE AGGREGATE TO
BLEND IN WITH ADJACENT GROUND.
PROPOSED RAMP/GANGWAY
FLOATING PLATFORM
ACCESSIBLE
KAYAK CHUTE
RIPRAP, CLASS 1
1'-0" KEYED
RIPRAP, CLASS 3
PROPOSED TRAIL EDGE
PROPOSED CONCRETE
HEADWALL
START TRAIL
RECONSTRUCTION
END TRAIL
RECONSTRUCTION
MOVE EXISTING BOULDER BARRICADE AT
BEGINNING OF TRAIL AND REPLACE WITH
REMOVABLE BOLLARDS. SEE SHEET 2 FOR
BOLLARD DETAILS. BOULDERS SHALL BE PLACE
AT LOCATION APPROVED BY COR.
M
I
N
M
I
N
FLOATING DOCK SECTIONS
(10' MAX LENGTH FOR EACH
SECTIONS)
M
I
N
NEW TRAIL
SURFACE
AGGREGATE
DRAWN
DESIGNER
STAMPS, LOGOS, AND SEALS
PROJECT NAME
DRAWING TITLE
CHECKED
ARCHIVE NO.
DATE
PROJECT NO.
DRAWING SHEET NO.
DATENO.
REVISION / ISSUE
OFSHEET
United States Department of Agriculture Forest Service
4/2 1/2
6 1 1:
D
AV
ID
PD
ON
AH
UE
C :\U
SE
RS
\D
AV
ID
PD
ON
AH
UE
\B
OX
\77
TR
AV
EL
MG
MT
\77
DE
VE
LO
PM
EN
T\
_R
OA
DS
\77
_P
RO
JE
CT
S\
FR
2_
LE
FF
ER
TS
\D
RA
FT
IN
FO
\D W
G\
BO
AT
L
AU
NC
H\ 2.D
W G;
R-09
EASTERN REGION
LEFFERTS POND
ACCESSIBILITY
IMPROVEMENTS
GREEN MOUNTAIN
NATIONAL FOREST
MIDDLEBURY RANGER DISTRICT
ACCESSIBLE DOCK &
TRAIL PLAN VIEW
4/21/2026
D. DONAHUE
D. DONAHUE
B. AUSTIN
C-03 04 05
ACCESSIBLE DOCK PLAN
CHITTENDEN RESERVOIR
FLOATING DOCK SPECIFICATIONS
1. DOCK/PLATFORM OVERALL DIMENSIONS SHALL BE A MINIMUM OF 15' X 15' .
2. DOCK LAYOUT AND CONFIGURATION SHALL BE ACCESSIBLE PER ADA GUIDELINES.
3. FLOATING DOCKING SHALL BE DESIGN FOR PEDESTRIAN LOADING AND MAINTAIN SUFFICIENT FREEBOARD WHEN
FULLY LOADED.
4. DOCK SHALL HAVE AN ANCHORING SYSTEM TO SECURE THE DOCK IN THE SAME LOCATION AND BE SUITABLE FOR
THIS BODY OF WATER. ANCHORING SYSTEM SHALL CONSIST OF GALVANIZED CHAINS AND BALLAST THAT CAN BE
DISCONNECTED FROM THE DOCK EACH YEAR.
5. DOCK SHALL HAVE A NON-WOOD, NON-SKID / SLIP RESISTANT SURFACE.
6. DOCK SHALL BE COMPRISED OF SMALLER SECTIONS THAT ARE REMOVABLE FROM EACH OTHER. EACH DOCK
SECTIONS SHALL WEIGH 1500 LBS OR LESS.
7. DOCK SHALL HAVE A SAFETY CURB AROUND THE ENTIRE OUTSIDE PERMITER OF THE DOCK (2" MINIMUM HEIGHT).
8. DOCK SHALL HAVE AN ACCESSIBLE KAYAK LAUNCH. KAYAK LAUNCH MAY BE ON THE SIDE OR IN THE MIDDLE OF
THE PLATFORM.
9. KAYAK LAUNCH SHALL HAVE AN ACCESSIBLE TRANSFER PLATFORM/STEPS WITH A SLIDEOUT SEAT TO ASSIST
WITH LOADING/UNLOADING. TRANSFORM PLATFORM HEIGHT SHALL BE BETWEEN 11 AND 18 INCHES.
10. KAYAK LAUNCH SHALL HAVE ROLLERS OR GLIDES TO ASSIST WITH LAUNCHING.
11. KAYAK LAUNCH SHALL HAVE OVERHEAD BAR, HANDLES, RAILS AND A GRAB BAR FOR ASSISTING WITH LOADING, UNLOADING, AND LAUNCHING.
12. DOCK SHALL COME WITH A 5' WIDE X 30' GANGWAY.
13. GANGWAY SHALL HAVE A NON-WOOD, NON-SKID / SLIP RESISTANT SURFACE.
14. GANGWAY SHALL HAVE RAILINGS ON BOTH SIDES.
15. GANGWAY SHALL BY CONNECTED TO A CONCRETE HEADWALL BY A PIN, ROLLER, OR HINGE CONNECTION.
16. GANGWAY SHALL LAND ON THE DOCK OR ITS OWN FLOATING SECTION THAT IS CONNECTED TO THE DOCK.
17. THE DOCK, ACCESSIBLE KAYAK CHUTE, GANGWAY, AND ANCHORING SYSTEMS SHALL ALL BE COMPATIBLE WITH
EACH OTHER. THIS INCLUDES ALL INCIDENTAL MATERIALS AND HARDWARE TO COMPLETELY INSTALL AND
OPERATE.
18. THE INSTALLATION SHALL BE IN ACCORDANCE WITH THE MANUFACTURERS SPECIFICATIONS.
19. THE INTENT IS TO SEASONALLY INSTALL THE DOCK IN THE SPRING AND REMOVE IT IN THE FALL.
20. CONTRACTOR SHALL FURNISH TO THE GOVERNMENT ALL SPECIALIZED TOOLS OR EQUIPMENT REQUIRED TO
ASSEMBLE AND DISASSEMBLE THE DOCK.
21. ALL COSTS ASSOCIATED WITH THE WORK IDENTIFIED TO FURNISH, DELIVER, UNLOADED, AND INSTALL THE
GANGWAY, FLOATING DOCK/PLATFORM, AND KAYAK LAUNCH SHALL BE PAID FOR UNDER PAY ITEM 64605. THIS
INCLUDES ALL MISCELLANEOUS PARTS AND MATERIALS. PAYMENT SHALL BE FOR FULLY A FUNCTIONAL AND
COMPLETE DOCK SYSTEM AS IDENTIFIED IN THESE PLANS.
Feet
0 10 20
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text V
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text T
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text T
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text G
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text U
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text U
AutoCAD SHX Text R
L E
V A
T I O
N
F
E E
T
E L E
V A
T I O
N
F
E E
T
STATION (FEET)
0+00 0+25 0+50 0+75 1+00
W W W W W W W W W W W W W W W W W W
ELEV 86.63
APPROX. HIGH WATER
ELEV 81.63
APPROX. LOW WATER
30'-0" 20'-0" 15'-0"
W W W W W W W W W W W W W W W W W W W W W W W W W
EXISTING TRAIL EDGE
STA 0+07.17
ELEV 86.82
STA 0+20.50
FINAL ELEVATION TO BE SET
BY FOREST SERVICE
RAMP/GANGWAY
EXISTING GROUND
PRE-CAST
CONCRETE
HEADWALL
SEE SHEET 3
1'-0" FOUNDATION FILL
KEYED RIPRAP,
CLASS 3
1'-0"
(TYP.)
1.5H
1V
PROPOSED
GRADE
SEPARATION GEOTEXTILE,
NON-WOVEN
CONNECTION BY
MANUFACTURER
TRAIL SURFACE
AGGREGATE
FOUNDATION FILL
TRANSITION PLATE
GANGWAY SUPPORT
AND CONNECTION
TO BE SPECIFIED BY
MANUFACTURER.
START TRAIL
RECONSTRUCTION
STA 0+00
ELEV 86.82
STA 0+40.51
ELEV 82.00
STA 0+50.00
ELEV 81.00
STA 0+64.69
ELEV 80.00
STA 0+73.06
ELEV 79.00
STA 0+81.44
ELEV 78.00
E L E
V A
T I O
N
F
E E
T
OFFSET (FEET)
0+20.50
0 5 100-5-10
5'-0"
E L E
V A
T I O
N
F
E E
T
OFFSET (FEET)
0+04.60
0 5 100-5-10
E L E
V A
T I O
N
F
E E
T
OFFSET (FEET)
0+09.74
0 5 10 150-5-10
E L E
V A
T I O
N
F
E E
T
OFFSET (FEET)
0+15.12
0 5 10 150-5-10
OFF: -2.50
ELEV: 86.82
OFF: 4.48
ELEV: 86.82
OFF: 8.45
ELEV: 85.08
OFF: 0.00
ELEV: 86.87
OFF: 2.50
ELEV: 86.81
OFF: 9.48
ELEV: 86.16
OFF: 13.70
ELEV: 84.39
OFF: 7.74
ELEV: 85.73
OFF: 14.67
ELEV: 84.99
OFF: 0.00
ELEV: 86.93
PROPOSED CONCRETE
HEADWALL
ELEV: 87.00
TRAIL SURFACE
AGGREGATE
TRAIL SURFACE
AGGREGATE
CLASS 1
RIPRAP
CLASS 3
RIPRAP
CLASS 1
RIPRAP
OFF: 0.00
ELEV: 85.82
E L
E V
A T
I O
N
F
E E
T
E L
E V
A T
I O
N
F
E E
T
STATION (FEET)
1+00 1+25 1+50 1+60
EXISTING
TRAIL
PROPOSED
GRADE
REMOVE AND DISPOSE OF EXISTING
CONCRETE MAT. RESURFACE WITH
TRAIL SURFACE AGGREGATE TO BLEND
IN WITH ADJACENT GROUND.
STA. 1+27.26
ELEV 86.62
END PROPOSED
LANDING
STA. 1+20.24
ELEV 86.62
START PROPOSED
LANDING
TRAIL SURFACE
AGGREGATE
DRAWN
DESIGNER
STAMPS, LOGOS, AND SEALS
PROJECT NAME
DRAWING TITLE
CHECKED
ARCHIVE NO.
DATE
PROJECT NO.
DRAWING SHEET NO.
DATENO.
REVISION / ISSUE
OFSHEET
United States Department of Agriculture Forest Service
4/2 1/2
6 1 1:
D
AV
ID
PD
ON
AH
UE
C :\U
SE
RS
\D
AV
ID
PD
ON
AH
UE
\B
OX
\77
TR
AV
EL
MG
MT
\77
DE
VE
LO
PM
EN
T\
_R
OA
DS
\77
_P
RO
JE
CT
S\
FR
2_
LE
FF
ER
TS
\D
RA
FT
IN
FO
\D W
G\
BO
AT
L
AU
NC
H\ 2.D
W G;
R-09
EASTERN REGION
LEFFERTS POND
ACCESSIBILITY
IMPROVEMENTS
GREEN MOUNTAIN
NATIONAL FOREST
MIDDLEBURY RANGER DISTRICT
ACCESSIBLE DOCK &
TRAIL PROFILE &
SECTION VIEW
4/21/2026
D. DONAHUE
D. DONAHUE
B. AUSTIN
C-04 05 05
ACCESSIBLE DOCK TRAIL PROFILE
BOAT LAUNCH ACCESS TRAIL PROFILE
ACCESSIBLE DOCK TRAIL SECTIONS
Feet
0 10 20
Feet
0 10 20
Feet
0 10 20
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text V
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text T
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text T
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text G
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text U
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text U
AutoCAD SHX Text R
| 1 |
| Sheets and Views |
| COVERSHEET |
| OLE1 |
| 2 |
| Sheets and Views |
| NOTES |
| OLE1 |
| 3 |
| Sheets and Views |
| SHEET 3 |
| OLE1 |
| 4 |
| Sheets and Views |
| PLAN |
| OLE1 |
| 5 |
| Sheets and Views |
| PROFILE (2) |
| OLE1 |
| 2026-04-21T13:19:29-0400 | |
| BRIAN AUSTIN |
| 2026-04-22T09:54:29-0400 | |
| CHRISTOPHER MATTRICK |
| 2026-04-24T09:56:17-0400 | |
| JOHN SINCLAIR |
File details come from the government source that posted it. Updated .