This is a Road Design plan for the Hidden Springs Administrative Site located within the Shawnee National Forest, Hidden Springs Ranger District. The document is a site plan drawing (Sheet C.105) prepared by the U.S. Department of Agriculture Forest Service, Region 9, dated March 20, 2007.
The site plan illustrates the layout of a 4.69-acre administrative facility with detailed road design and infrastructure. Key features include construction limits, visitor parking (8 spaces with ADA accessibility), employee parking (26 spaces), government parking (20 spaces), temporary parking (8 spaces), a new gas station, fire station, and various support structures. The design incorporates roads with specific contours, a water system infrastructure including water meter and hydrant locations, utility poles, light poles, guy wires, and fire hydrants. The plan includes a legend identifying wood lines, utility poles, light poles, guy wires, fire hydrants, water lines, water meters, and water hydrants. The total disturbed area is noted as 4.69 acres. The drawing contains standard civil engineering notation, graphic scale, design contours, and references to a general notes section addressing construction practices, material specifications, environmental considerations, and site-specific requirements for the administrative facility development.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Q_and_A-12445526Q0054.xlsx | XLSX spreadsheet | |
| Amd_0002_12445526Q0054.pdf | ||
| Att 02_SOW and FSSS to FP14 (260428).pdf | ||
| Q_and_A-12445526Q0054.xlsx | XLSX spreadsheet | |
| Amd_0001_Sol_12445526Q0054.pdf | ||
| Q_and_A-12445526Q0054.xlsx | XLSX spreadsheet | |
| Att 07_Striping Details (260422).docx | DOCX document | |
| Q_and_A-12445526Q0054.xlsx | XLSX spreadsheet | |
| Sol_12445526Q0054.pdf | ||
| Att 01_Schedule of Items (260408).docx | DOCX document | |
| Att 02_FSSS to FP14 (260319).pdf | ||
| Att 05_Highlighted Area to Receive Seal Coat (260319).pdf | ||
| Att 06_Wage Rates (260102).pdf | ||
| HOW TO FOLLOW PROJECTS ON SAM FOR EMAIL ALERTS.pdf | ||
| Att 04_Location Map (260319).pdf |
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AustinHenk Line
AustinHenk Line
File details come from the government source that posted it. Updated .