This is a Questions and Answers (Q&A) document for RFQ 12445526Q0054, issued by the Department of Agriculture Forest Service for pavement preservation work at the Hidden Springs Ranger District office Vienna parking lot. The RFQ is a Total Small Business Set-Aside with a size standard of $45,000,000, classified under NAICS code 237310 (Highway, Street, and Bridge Construction).

The project requires three primary services: pavement crack sealing using hot-applied methods (typical crack size 1/4" wide x 1/2" deep), sealcoating on approximately 53,000 square feet, and pavement markings totaling 1,600 linear feet. Work scope includes surface preparation with prime oil spot treatment to prevent bleed-through; no milling, power washing, or minor asphalt repairs are expected. Pricing must be submitted as unit prices and totals for each line item on the provided Schedule of Items attachment, with final quantities subject to field verification per AGAR clause 452.211-73. The contractor must provide acceptable sealcoat material meeting specification 406.02 with no preferred system mandated. Work completion is preferred over a weekend to minimize disruptions, though weekday work is acceptable with advance notification to the Contracting Officer Representative. Site visits are optional but recommended; the Forest Service requests that visiting contractors check in at the visitor center front desk. The parking lot may be fully closed during construction. For specific dates, pricing structure details, drawings, and striping specifications, contractors should reference Attachments 1 and 2, the Striping Details attachment, the Parking Lot Layout attachment, and pages referenced in the SF-1442 form and main solicitation document.

View the file

Other files

File Type Posted
Amd_0002_12445526Q0054.pdf PDF
Att 02_SOW and FSSS to FP14 (260428).pdf PDF
Q_and_A-12445526Q0054.xlsx XLSX spreadsheet
Q_and_A-12445526Q0054.xlsx XLSX spreadsheet
Att 07_Striping Details (260422).docx DOCX document
Amd_0001_Sol_12445526Q0054.pdf PDF
Q_and_A-12445526Q0054.xlsx XLSX spreadsheet
Att 02_FSSS to FP14 (260319).pdf PDF
Att 01_Schedule of Items (260408).docx DOCX document
Att 04_Location Map (260319).pdf PDF
Att 03_Parking Lot Layout_C.105 (260319).pdf PDF
Sol_12445526Q0054.pdf PDF
HOW TO FOLLOW PROJECTS ON SAM FOR EMAIL ALERTS.pdf PDF
Att 06_Wage Rates (260102).pdf PDF
Att 05_Highlighted Area to Receive Seal Coat (260319).pdf PDF
Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

RFQ12445526Q0054Vienna Parking Lot Pavement Preservation
Last Updated4/22/26
Question #ReceivedReceived QuestionForest Service Response
14/16/26Scope of Work Clarification:

A: Can you confirm the exact extent of pavement preservation required (e.g., milling depth, seal coat type, striping requirements, and total square footage)?

B: Are there any phasing requirements for the work?A: Refer to Attachments 1 &2, and FP-14. No milling involved. B: No specific phasing requirements. However, it would be preferred for the work to be completed over a weekend while the office is empty as this would minimize disruptions for all parties. But that is not required. Work can be completed during the week but office staff will need to be notified in advance of performance start date to clear the lot and for staff to park at a nearby lot for the duration of the project.
24/16/26Site Visit:

A: Is a site visit mandatory or optional?

B: If required, what is the RSVP process and deadline? A: The decision to visit the site is left to the contractor. Please refer to clause 52.236-3 Site Investigations and Conditions Affecting the Work.

B: The Forest Service requests that contractors visiting the site during this solicitation period stop by the front desk in the visitor's center to inform the staff that you will be inspecting the parking lot as part of your quote.

34/16/26Schedule & Deadlines: Can you confirm all key dates, including questions due date, proposal due date, and anticipated award timeline?Refer to Block 13 of the SF-1442, and Pages 15-16 of the solicitation document.
44/16/26Place of Performance:
Can you provide the exact location and any site access restrictions?The address is provided on page 4 of the solicitation document, under the title "Project Location."
54/16/26Subcontracting Requirements:
Are there any limitations on subcontracting or required self-performance percentages?No
64/16/26Traffic Control & Safety:
Are there specific traffic control plans or safety requirements that must be followed?No specific traffic control plan or safety requirements other than the typical taping/barricading of the lot entrances to keep people from driving on the fresh seal coat or pavement markings.
74/16/26Materials & Specifications: Are there approved material specifications or brand requirements for pavement treatments?Refer to 406.02 on Pg 10 of attachment 02.
84/16/26Pricing Structure:
Should pricing be submitted as a lump sum, unit pricing, or both?Pricing must be filled out on attachment 01 Schedule of Items. Contractors must provide unit prices and totals for each individual line item, and the total for all items combined.
94/21/26Crack Sealing (Item 0002): Could you please confirm the required crack sealing method (hot-applied vs. cold), as well as typical crack width/depth and whether routing is expected?Hot. Crack size varies but typical size is 1/4" wide x 1/2" deep.
104/21/26Pavement Markings (Item 0003 – Type K):

A: Please confirm the striping scope, including layout, line widths, colors, and whether ADA markings or symbols are required.

B: Additionally, is the 1,600 LF intended for full restriping or only specific areas?A: Refer to the Striping Details attachment. B: Refer to the Striping Details attachment and the Parking Lot Layout attachment.
114/21/26Sealcoat Material System (Item 0001): The specification references multiple acceptable material standards. Could you please confirm if there is a preferred or required sealcoat system for this project?No preferrred or required sealcoat system.
124/21/26Surface Preparation Requirements: Beyond general cleaning, are additional preparation steps expected (such as oil spot treatment, power washing, or minor asphalt repairs), or should these only be addressed if encountered in the field?Prime oil spots to help prevent bleed through. Power washing or minor asphalt repairs are not expected.
134/21/26Traffic Control / Site Access: Will full closure of the parking lot be permitted during construction, or should contractors anticipate phased work to maintain access to the facility?Full closure may be permitted. The COR will need to be notified in advance of start date to clear the lot and for staff to park at a nearby lot for the duration of the project.
144/21/26Quantity Confirmation: Should the listed quantities (e.g., 53,000 SF of fog seal) be considered final for payment, or are they approximate and subject to field verification?This contract will contain AGAR clause 452.211-73 Variation in Estimated Quantity. See full text of clause on page 10 of solicitation.
154/21/26Drawings and Site Information:

A: The drawings provided appear to be conceptual. Do you have any additional drawings with dimensions, striping layouts, or more detailed plans?

B: If available, could you also provide any recent site photos to better understand existing conditions? A: No additional drawings. Refer to the Striping Details attachment for further detail on striping info. B: No. Suggest making a site visit.