Att 02_SOW (250225).pdf

PDF 109 KB Posted

Attached to
GAOA Monday Creek Trailhead Bridge Rehabilitation
Solicitation number
12445525B0002
Issued by

About this file

This document is a Statement of Work (SOW) for a bridge rehabilitation project located in the Wayne National Forest at the Monday Creek OHV Trailhead. The project scope includes removal of the existing deck, bridge rail, and superstructure, followed by installation of new deck, bridge rail, transition rail, and superstructure on existing abutments. Additional work encompasses riprap protection, road surfacing, site stabilization, and ancillary improvements.

The contractor will have full use of Forest roads during construction, with limitations on operations to minimize public inconvenience. Safety measures include providing adequate signage, barricades, and protecting undisturbed areas. The work is to be conducted under the oversight of the Contracting Officer, with road closures permitted upon written approval. The project is part of the Department of Agriculture Forest Service's solicitation (No. 12445525B0002) for the Monday Creek Trailhead Bridge Rehabilitation, which requires the contractor to provide all necessary materials and labor to complete the project in accordance with contract terms, specifications, and attachments.

View the file

Other files

File Type Posted
Abstract_12445525B0002.pdf PDF
Q and A_12445525B0002.pdf PDF
Att 07_Sheet C-05 Amendment (250422).pdf PDF
Amd 01_12445525B0002.pdf PDF
Site Visit Notes_12445525B0002 (250422).pdf PDF
Sol_12445525B0002.pdf PDF
Att 01_Schedule of Items (250320).docx DOCX document
Att 03_Plans (240502).pdf PDF
Att 04_FSSS (250225).pdf PDF
Att 05_Location Map (250225).pdf PDF
Att 06_Wage Rates (250314).pdf PDF
Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK

STATEMENT OF WORK

PART 1 - GENERAL

1.1 SUMMARY

A. Work for this project consists of, but is not limited to: Removal of existing deck, bridge rail, and superstructure; installation of new deck bridge rail, transition rail, and superstructure on the existing abutments. Additional riprap protection, road surfacing, site stabilization and ancillary work as shown on engineering plans or required by specifications. Any road grading or improvements to the access, are incidental to the work. Contractor is responsible for any damage to the access site.

1.2 LOCATION

A. This project is located in the Wayne National Forest on the Athens Ranger District, at the Monday Creek OHV Trailhead.

1.3 USE OF PREMISES

A. General: Contractor shall have full use of Forest roads for construction operations, during construction period. Contractor's use of Forest roads is limited only by the Government's right to perform work or to retain other contractors on portions of Project.

B. Contractor shall at all times conduct his operations to ensure the least inconvenience to the public and employees. Road closures will be permitted, when required, upon written approval of the Contracting Officer (CO).

C. Confine storage of materials to areas as approved by the CO.

D. Contractor shall provide adequate signing and barricades and take necessary safety measures to protect the public during all brushing operations. Contractor shall minimize disturbance of all undisturbed areas.

PART 2 - PRODUCTS (NOT USED)

PART 3 - EXECUTION (NOT USED)

1.
1.1 summary
A. Work for this project consists of, but is not limited to: Removal of existing deck, bridge rail, and superstructure; installation of new deck bridge rail, transition rail, and superstructure on the existing abutments. Additional riprap protection, ...
1.2 location
A. This project is located in the Wayne National Forest on the Athens Ranger District, at the Monday Creek OHV Trailhead.
1.3 USE OF PREMISES
A. General: Contractor shall have full use of Forest roads for construction operations, during construction period. Contractor's use of Forest roads is limited only by the Government's right to perform work or to retain other contractors on portions ...
B. Contractor shall at all times conduct his operations to ensure the least inconvenience to the public and employees. Road closures will be permitted, when required, upon written approval of the Contracting Officer (CO).
C. Confine storage of materials to areas as approved by the CO.
D. Contractor shall provide adequate signing and barricades and take necessary safety measures to protect the public during all brushing operations. Contractor shall minimize disturbance of all undisturbed areas.