Site Visit Notes_12445525B0002 (250422).pdf

PDF 77 KB Posted

Attached to
GAOA Monday Creek Trailhead Bridge Rehabilitation
Solicitation number
12445525B0002
Issued by

About this file

These are pre-bid meeting notes for the Monday Creek Trailhead Bridge Rehabilitation project, held on 4/22/2025 at 10:00 am, involving representatives from the US Forest Service and several construction/bridge companies. Key discussion points included site access (only from the Trailhead), tree removal guidelines (trees over 6" D.B.H. require Forest Service approval), and two disposal methods: Method "A" involves removing deck and rail components, while Method "J" requires hauling specific bridge components to the Ironton Ranger District Storage Yard. Additional technical details were addressed, such as bridge girder height, deck transition, anchor bolt treatment, and construction staking requirements. Attendees included Chad Meenach (USFS Engineering Technician), representatives from John Cecil Construction, US Bridge, DJ Group Inc., and Scrimgeour's Farm All, with the meeting concluding at 10:36 am.

View the file

Other files

File Type Posted
Abstract_12445525B0002.pdf PDF
Q and A_12445525B0002.pdf PDF
Att 07_Sheet C-05 Amendment (250422).pdf PDF
Amd 01_12445525B0002.pdf PDF
Sol_12445525B0002.pdf PDF
Att 01_Schedule of Items (250320).docx DOCX document
Att 03_Plans (240502).pdf PDF
Att 04_FSSS (250225).pdf PDF
Att 05_Location Map (250225).pdf PDF
Att 02_SOW (250225).pdf PDF
Att 06_Wage Rates (250314).pdf PDF
Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Monday Creek Trailhead Bridge Rehabilitation

Pre-bid meeting 4/22/2025 10:00 am.

A pre-bid meeting was conducted, on-site. Those in attendance were:

Chad Meenach USFS Engineering Technician/ proposed COR

John Cecil Construction 740-607-8309 amorgan@johncecilcon.com

Dennis Gonano, US Bridge 740-630-8459 dgonano@usbridge.com

Thad Haines, DJ Group Inc. 744-568-8295 thaines@djgroupinc.com

Scrimgeour’s Farm All 410-726-5007 gwreddon@gmail.com

Questions asked:

• Is there access to the bridge site from the other side of the bridge? No. The only access is from the Trailhead.

• No trees shall be removed from the project area (Drawing sheet C-01). Is there a tree size classification? Any trees over 6” D.B.H. shall be cut with prior approval from FS and left on site.

• Disposal methods “A” and” J”. What is the difference in the specifications? Method “A” is removal from project (Section 203.05) and pertains to “Dispose of Deck, Approach Rail and Bridge Rail. Submit receipt to C.O.” (Drawing sheet C-02 “NOTES”) Disposal Method “J” is listed in FSSS (Section 203.05 (j) Removal to designated locations) and “Dispose of the Bridge rail, Bridge rail posts, Offset blocking and Five girders by hauling to the Ironton Ranger District Storage Yard. (38.604157,0-82.63134.)”

• Bridge Girders are the same height, making the bridge deck 2” higher than the abutment.

How is the transition to be completed? See attached.

• Who is the contact in Ironton for receiving the salvaged girders. Coordination will be through the COR.

• Are there any details of the existing anchor bolts? If not, can the old bolts be cut and ground down to abutment? No details of bolts exist. Bolts may be cut or ground to concrete level.

• What is the Construction Survey and Staking Line Item for? All construction staking requirements are listed in Specification 152.

• No trees shall be removed from the project area (Drawing sheet C-01). Is there a tree size classification? Any trees over 6” D.B.H. shall be cut with prior approval from FS and left on site.

The meeting ended at 10:36 am.