Abstract_12445525B0002.pdf
PDF 179 KB Posted
- Solicitation number
- 12445525B0002
- Issued by
-
Department of Agriculture Forest Service
About this file
This Bid Abstract document details the solicitation for the GAOA Monday Creek Trailhead Bridge Rehabilitation project (Solicitation No. 12445525B0002) issued by CSA East 13. The abstract captures bid proposals from six small businesses, including RB Construction, Axis Civil Construction, John Cecil Construction LLC, Reagent World, Green World Contracting, and East Wind Enterprises Inc. The project involves bridge rehabilitation with 14 line items ranging from mobilization to seeding, with estimated quantities and unit prices for each component.
The government estimate for the project totals $405,270.00, while the received bids varied significantly, with the lowest total bid at $348,000.00 from Axis Civil Construction and the highest at $656,528.35 from RB Construction. Key bid items include structural steel, treated structural timber, removal of existing structures, construction survey and staking, and temporary traffic control. All bidders are classified as small businesses, and the solicitation requires a 30-day acceptance period. The bid was opened and recorded on 5/9/2025 by Paul Boucher, with the project likely to be awarded to the most competitive bidder meeting all requirements.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BID ABSTRACT
ISSUING OFFICE:
CSA East 13 (124455) I certify that I have opened, read, and recorded on this abstract all offers received in response to this solicitation.
Address
Signature: Date: 5/9/2025
SOLICITATION NO.: 12445525B0002
PROJECT: GAOA Monday Creek Trailhead Bridge Rehabilitation
Vendor Name:
Vendor City/State:
Amendments Acknowledged:
Acceptance Time 30
SAM UEI KS2AWWVA7DK3
Business Size Small
Bid Guarantee:
Government Estimate
ITEM EST. UNIT EST. UNIT UNIT UNIT UNIT UNIT UNIT
NO. DESCRIPTION QTY. UNIT PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT 0001 MOBILIZATION 1 LS $42,000.00 $42,000.00 $145,588.39 $145,588.39 $25,000.00 $25,000.00 $19,000.00 $19,000.00 $66,022.82 $66,022.82 $39,000.00 $39,000.00 $35,000.00 $35,000.00
0002 CONSTRUCTION SURVEY AND STAKING 1 LS
$2,000.00
$2,000.00 $3,507.64 $3,507.64 $5,000.00 $5,000.00 $6,500.00 $6,500.00 $19,806.85 $19,806.85 $1,170.00 $1,170.00 $3,000.00 $3,000.00
REMOVAL OF STRUCTURE,
DISPOSAL METHOD A 1 LS $13,000.00 $13,000.00 $34,793.53 $34,793.53 $24,000.00 $24,000.00 $28,000.00 $28,000.00 $52,818.25 $52,818.25 $19,500.00 $19,500.00 $53,500.00 $53,500.00
REMOVAL OF STRUCTURE,
DISPOSAL METHOD J 1 LS $18,000.00 $18,000.00 $29,146.97 $29,146.97 $29,000.00 $29,000.00 $52,000.00 $52,000.00 $39,613.69 $39,613.69 $26,000.00 $26,000.00 $55,000.00 $55,000.00
0005 PLACED RIPRAP 20 CY
$150.00
$3,000.00 $356.07 $7,121.34 $290.00 $5,800.00 $470.00 $9,400.00 $1,320.46 $26,409.20 $435.50 $8,710.00 $600.00 $12,000.00
0006 AGGREGATE SURFACE COURSE 30 CY
$90.00
$2,700.00 $204.55 $6,136.47 $220.00 $6,600.00 $270.00 $8,100.00 $660.23 $19,806.90 $195.00 $5,850.00 $200.00 $6,000.00
0007 ADHESIVE ANCHORING OF VERTICAL BARS 20 EA $75.00 $1,500.00 $265.16 $5,303.12 $200.00 $4,000.00 $400.00 $8,000.00 $660.23 $13,204.60 $71.90 $1,430.00 $100.00 $2,000.00
0008 STRUCTURAL STEEL 1 LS
$187,000.00
$187,000.00 $195,527.39 $195,527.39 $108,000.00 $108,000.00 $143,000.00 $143,000.00 $39,613.69 $39,613.69 $206,700.00 $206,700.00 $100,000.00 $100,000.00
0009 TREATED STRUCTURAL TIMBER 1 LS
$106,000.00
$106,000.00 $185,865.61 $185,865.61 $120,000.00 $120,000.00 $155,000.00 $155,000.00 $46,215.97 $46,215.97 $148,200.00 $148,200.00 $92,500.00 $92,500.00
0010 BEARING DEVICE 10 EA
$775.00
$7,750.00 $662.89 $6,628.90 $300.00 $3,000.00 $200.00 $2,000.00 $2,640.91 $26,409.10 $292.50 $2,925.00 $500.00 $5,000.00
0011 STRUCTURE TRANSITION RAILING 88 LF
$190.00
$16,720.00 $284.09 $25,000.43 $100.00 $8,800.00 $260.00 $22,800.00 $750.26 $66,022.88 $195.00 $17,160.00 $75.00 $15,000.00
0012 SEEDING 0.1 AC
$20,000.00
$2,000.00 $40.51 $4,051.08 $30,000.00 $3,000.00 $28,000.00 $2,800.00 $1,320.46 $1,320.46 $42,900.00 $4,290.00 $2,000.00
0013 SIGN SYSTEM 4 EA
$400.00
$1,600.00 $649.00 $2,596.00 $325.00 $1,300.00 $200.00 $800.00 $4,951.71 $19,806.84 $174.20 $696.80 $300.00 $1,200.00
0014 TEMPORARY TRAFFIC CONTROL 1 LS $2,000.00 $2,000.00 $5,261.47 $5,261.47 $4,500.00 $4,500.00 $5,700.00 $5,700.00 $19,806.85 $19,806.85 $3,250.00 $3,250.00 $2,800.00 $2,800.00
Total $405,270.00 $656,528.35 $348,000.00 $463,100.00 $456,878.10 $484,881.80 $385,000.00
NoYes
RB Construction Axis Civil Construction Powhatan Point, OH yes yes Yes
Small yes
Paul Boucher
John Cecil Construction LLC
Yes No
Mount Clemens, MI Reagent World
Gahanna, OH
RZEKQX274N73
Small
LRGBFJFA6M89
yes
Yes Yes 30 60 30
Small
DQNLKMRXG8N5
Irvine, CA
WMD6CT8YXG49
Small
K8APXEU6M6V7
Small
Green World Contracting Natrona Heights, PA
OFFEROR NO. 1 OFFEROR NO. 2 OFFEROR NO. 3 OFFEROR NO. 4 OFFEROR NO. 5 OFFEROR NO. 6 East Wind Enterprises Inc
Yorktown, VA No
File details come from the government source that posted it. Updated .