This document is a Schedule of Items for the GAOA Monday Creek Trailhead Bridge Rehabilitation project, solicitation number 12445525B0002, issued by the Department of Agriculture Forest Service. The project involves comprehensive bridge rehabilitation work in Hocking County, Ohio, with 14 distinct line items covering mobilization, construction survey, structure removal, riprap placement, aggregate surfacing, steel and timber structural work, railing installation, seeding, and traffic control.
Key contract details include a firm fixed price (FFP) procurement with a performance period from award through February 27, 2026. Contractors must have an active SAM.gov registration and attend a mandatory site visit scheduled for 10:00 AM on April 22, 2025, with government representative Chad Meenach. The total contract price includes performance and payment bonds, and payment will only be made for items listed in the schedule. Contractors are required to provide pricing for all line items, with incidental work considered part of the listed items.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Solicitation No.: 12445525B0002 GAOA Monday Creek Trailhead Bridge Rehabilitation Wayn National Forest, Athens Ranger District Hocking County, OH
Schedule of Items Item Number
| Description |
| Qty |
| Units |
| Unit |
Price Amount
| 0001 |
| (15101) MOBILIZATION |
| 1 |
| LS |
| $ |
| $ |
| 0002 |
| (15201) CONSTRUCTION SURVEY AND STAKING, TOL. A |
| 1 |
| LS |
| $ |
| $ |
| 0003 |
| (20301‐1) REMOVAL OF STRUCTURE, DISPOSAL METHOD A |
| 1 |
| LS |
| $ |
| $ |
| 0004 |
| (20301‐2) REMOVAL OF STRUCTURE, DISPOSAL METHOD J |
| 1 |
| LS |
| $ |
| $ |
| 0005 |
| (25101) PLACED RIPRAP, CLASS 3 |
| 20 |
| CY |
| $ |
| $ |
| 0006 |
| (30112) AGGREGATE SURFACE COURSE, ODOT 304, |
COMPACTION A
| 30 |
| CY |
| $ |
| $ |
| 0007 |
| (55204) ADHESIVE ANCHORING OF VERTICAL BARS |
| 20 |
| EA |
| $ |
| $ |
| 0008 |
| (55501) STRUCTURAL STEEL |
| 1 |
| LS |
| $ |
| $ |
| 0009 |
| (55704) TREATED STRUCTURAL TIMBER |
| 1 |
| LS |
| $ |
| $ |
| 0010 |
| (56401) BEARING DEVICE |
| 10 |
| EA |
| $ |
| $ |
| 0011 |
| (61706) STRUCTURE TRANSITION RAILING |
| 88 |
| LF |
| $ |
| $ |
| 0012 |
| (62504) SEEDING, HYDRAULIC OR DRY METHOD |
| 0.1 |
| AC |
| $ |
| $ |
| 0013 |
| (63301) SIGN SYSTEM, OBJECT MARKER, TYPE 3 |
| 4 |
| EA |
| $ |
| $ |
| 0014 |
| (63501) TEMPORARY TRAFFIC CONTROL |
| 1 |
| LS |
| $ |
| $ |
Total
| Signature:___________________________________________________ | Date:_____________ |
| Company Name:______________________________________________ | UEI:______________ |
Schedule Notes
1) AC = Acre, EA = Each, CY = Cubic yard, LF = Linear Foot, LS = Lump Sum
2) Period of performance will be from award through 02/27/2026.
3) One Firm Fixed Price (FFP) contract is anticipated from this solicitation. Contractors must enter pricing for all items.
4) Contractors must have an active registration at https://sam.gov to be eligible for award. Note that a status of "ID Assigned" is not considered an active registration.
5) Payment will only be made for the items shown in the schedule. Any work necessary to complete this project that is not listed in the schedule is considered incidental to the items shown.
6) The total contract price is inclusive of any required performance and payment bonds. The price of any contract awarded from this solicitation will not be modified to accommodate failure of the contractor to account for bonding premiums in their offer.
7) A site visit is scheduled for 10:00 A.M. on 04/22/2025. Chad Meenach <chad.b.meenach@usda.gov> will be the government representative in charge of the site visit.