This document is Attachment 7 to RFP No. FA520524R0004, which contains a historical list of task orders issued under the current Indefinite Delivery/Indefinite Quantity (IDIQ) Multiple Award Construction Contract (MACC) for Misawa Air Base, Japan over the past 8 years. The attachment provides details on 94 task orders, including the project title, project type, contractor design percentage, task order amounts in Japanese Yen and US Dollars, and a summary of the task order amounts by price range. The total value of the task orders over the 8-year period is $103,926,855.56, with an annual average of $12,990,856.95. The task orders cover a wide range of construction disciplines and facility types at Misawa Air Base and associated sites in Japan.
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attachment 7 of RFP No. FA520524R0004
HISTRICAL DATA
List of Task Orders (TOs) issued under Current IDIQ MACCs for 8 Years
Project Title Project Type (Ktr Design %) TO Yen Amount TO Dollar Amount
CNST ADDN JTAGS Facility B1751 Design-Build (65% Design) ¥95,736,340 $785,819.09
Repair Overhead Electrical Power Line, B300 Area Design-Build (40% Design) ¥94,000,000 $771,566.94
Repair Elevators, Main Base MFH Tower B116 (68 units) Design-Build (35% Design) ¥128,820,000 $1,057,375.03
Install Covered Patios Main MFH Area #5 Design-Build (35% Design) ¥18,450,000 $151,440.53
Install Covered Patios Main MFH Area #6 Design-Build (35% Design) ¥15,400,000 $126,405.65
Install Covered Patios Main MFH Area #9 Design-Build (35% Design) ¥17,910,000 $147,008.13
Install Covered Patios Main MFH Area #4 Design-Build (35% Design) ¥20,790,000 $170,647.62
Install Covered Patios Main MFH Area #7 Design-Build (35% Design) ¥21,900,000 $179,758.68
Install Covered Patios Main MFH Area #10 Design-Build (35% Design) ¥16,450,000 $135,024.21
Install Covered Patios Main MFH Area #11 Design-Build (35% Design) ¥19,430,000 $159,484.53
Install Covered Patios Main MFH Area #12 Design-Build (35% Design) ¥24,490,000 $201,017.81
Install Covered Patios Main MFH Area #13 Design-Build (35% Design) ¥23,680,000 $194,369.20
Install Covered Patios Main MFH Area #8 Design-Build (35% Design) ¥13,760,000 $112,944.27
Active Vehicle Barriers Friendship/Falcon/Levitow Gates Design-Build (35% Design) ¥225,431,000 $1,850,373.47
Repair Health Deficiency, Industrial Wastewater HAS Design-Build (35% Design) ¥198,980,000 $1,633,259.46
Repair Domestic Hot Water, Main Base Area 4 (B172) Design-Build (35% Design) ¥78,000,000 $640,236.39
Repair Domestic Hot Water, Main Base Area 2 (B119) Design-Build (35% Design) ¥93,167,280 $764,731.84
Repair Domestic Hot Water, Main Base Area 3 (B141) Design-Build (35% Design) ¥86,182,740 $707,401.63
Repair Domestic Hot Water, Main Base Area 5 (B185) Design-Build (35% Design) ¥102,398,400 $840,502.34
Repair Domestic Hot Water, Main Base Area 6 (B216) Design-Build (35% Design) ¥79,966,040 $656,373.96
Repair Domestic Hot Water, North Area 4 (B1917) Design-Build (35% Design) ¥91,828,240 $753,740.79
Repair Domestic Hot Water, North Area 5 (B1934) Design-Build (35% Design) ¥93,883,580 $770,611.34
Repair Domestic Hot Water, North Area 6 (B1822) Design-Build (35% Design) ¥96,739,540 $794,053.52
Repair Domestic Hot Water, Main Base Area 1 (B61) Design-Build (35% Design) ¥76,104,500 $624,677.83
Repair Domestic Hot Water, Main Base Area 7 (B227) Design-Build (35% Design) ¥76,814,400 $630,504.80
Repair Security Hill WWTP, B1542 Design-Build (35% Design) ¥128,300,000 $1,053,106.79
Repair/Add AMC Passenger Terminal, B943 Design-Build (20% Design) ¥380,707,997 $3,854,598.07
Repair Roads, Main Base Area 1 Design-Build (65% Design) ¥53,826,180 $441,813.84
Repair Roads, Main Base Area 2 Design-Build (65% Design) ¥47,718,580 $391,681.69
Repair Roads, Main Base Area 3 Design-Build (65% Design) ¥44,538,000 $365,574.98
Repair Roads, North Base Area 1 Design-Build (65% Design) ¥43,299,000 $355,405.07
Repair Roads, North Base Area 2 Design-Build (65% Design) ¥42,499,000 $348,838.55
Repair Roads, Main Base Area 4 Design-Build (65% Design) ¥37,300,000 $306,164.33
ADD Golf Cart Paths, B1464 Design-Build (5% Design) ¥18,450,000 $167,727.27
Repair Electrical, Substation 81239 Design-Build (35% Design) ¥395,000,000 $3,225,756.40
Demolish MSOC B1500 Construction Only ¥502,818,881 $4,106,256.26
Repair Exterior HAS, B3253, B3254 Design-Build (20% Design) ¥43,576,361 $355,865.13
Repair Exterior HAS, B3242, B3243, B3247 Design-Build (20% Design) ¥60,957,306 $497,806.13
Repair SNCO Homes 3 Bldgs, 12 Units 804, 806, 810 Construction Only ¥490,058,000 $4,002,044.88
Repair Domestic Hot Water North Base Area 8 (B2111) Design-Build (35% Design) ¥54,800,000 $447,522.66
Repair Wastwater Line, B325 Area/B320 thru B322 Design-Build (35% Design) ¥82,908,700 $677,071.57
Repair Wastewater Line, B1542 thru Lake Anenuma Design-Build (5% Design) ¥34,700,000 $283,376.57
Repair Water Line, Gym Area Design-Build (5% Design) ¥73,981,258 $604,165.86
Repair Water Line, B973 Area Design-Build (5% Design) ¥52,680,230 $430,211.62
Repair Water Line, B471 thru B495 Design-Build (5% Design) ¥20,010,000 $163,411.10
Demo and Consolidate Jet Engine Maintenance Storage
Facility Construction Only ¥226,312,788 $1,857,611.33
Repair Sidewalks and Curbs, Main Base MFH Design-Build (35% Design) ¥23,400,000 $210,173.66
Repair Roads, Drainage and Sidewalks, North Area MFH Design-Build (35% Design) ¥123,075,000 $1,105,432.63
Maintain Exterior, MFH (15 Bldgs) Construction Only ¥45,075,196 $404,855.51
Repair Roads, Drainage and Sidewalks, North Area MFH Design-Build (35% Design) ¥128,412,770 $1,153,375.31
Maintain Exterior, MFH (13 Bldgs) Construction Only ¥54,951,947 $493,566.32
Repair Industrial WWTP, B1385, B1386 Construction Only ¥190,700,000 $1,712,825.53
Repair Overhead Electrical Power, B740 Area Design-Build (35% Design) ¥82,000,000 $736,506.00
Repair Water Well, Droughon Range Design-Build (35% Design) ¥30,680,000 $275,561.02
Repair Boiler, Boiler Plant B1337 Construction Only ¥1,122,149,080 $9,277,237.19
Repair Electrical Infrx Secondary Line, MB MFH Design-Build (35% Design) ¥36,265,669 $324,979.25
Repair Domestic Hot Water, B1937 – Tower (68 Units) Design-Build (35% Design) ¥148,817,080 $1,333,560.47
Repair Domestic Hot Water, B1938 – Tower (68 Units) Design-Build (35% Design) ¥150,025,080 $1,344,385.44
Repair Domestic Hot Water, B1939 – Tower (68 Units) Design-Build (35% Design) ¥145,900,610 $1,307,425.77
Repair Sanitary Sewer Line, Apple Gate Area Design-Build (35% Design) ¥41,609,000 $374,335.83
Repair Airfield Lighting A1 Design-Build (35% Design) ¥99,900,000 $898,751.46
Repair Apron Light Area 1 Design-Build (35% Design) ¥77,000,000 $692,731.36
Demolish ADC/CAP/TAX Cenetr/AAFES, B514 Construction Only ¥58,036,000 $522,121.52
Demolish DV Quarters, B17 Construction Only ¥43,035,600 $398,804.95
Reapir Airfield lighting BEACON Design-Build (35% Design) ¥76,500,000 $708,914.91
Shariki Short-Term Solution Construction Only ¥8,750,427 $81,089.00
Repair Apron Light Area 2 Design-Build (5% Design) ¥39,700,000 $367,894.40
Repair Overhead Electrical Power, B760 Area Design-Build (35% Design) ¥79,980,000 $741,163.58
Repair Munitions Facility, B1494 Design-Build (35% Design) ¥48,077,472 $445,527.28
Repair Wastewater Drain, B627 Bowling Center Design-Build (35% Design) ¥51,852,999 $480,514.56
Repair Overhead Electrical Power, B650 Area Design-Build (5% Design) ¥43,300,000 $401,255.10
Construct Clean/Dirty Room, B1495 Construction Only ¥581,189,977 $5,385,807.03
Repair Apron Light & XFMR Area 3 Design-Build (5% Design) ¥68,250,000 $641,127.41
Repair Boiler Plant, B465 & Repair Oil Tank Pipe and
Pump Design-Build (35% Design) ¥164,382,000 $1,544,172.97
Repair Transformer, B323 Design-Build (35% Design) ¥100,234,000 $941,578.97
Repair Electrical INFRX Secondary Line, MFH, Area 2 Design-Build (35% Design) ¥53,700,000 $504,447.50
Repair Weasel's Den, B973 Design-Build (35% Design) ¥273,672,420 $2,570,826.21
Repair Wastewater Treatment System, North MFH Construction Only ¥908,502,000 $8,534,293.51
Repair 13th Fighter Squadron Ops B3267 Construction Only ¥23,300,000 $218,875.73
Maintain Base Beach Design-Build (35% Design) ¥78,500,000 $715,578.18
Repair Electric Feeder, B1501 & B1543 Design-Build (5% Design) ¥47,000,000 $428,435.35
Repair Roads NAVY Munition B1430/B1431 Design-Build (15% Design) ¥84,000,000 $657,443.16
Repair Lift Station B680 Design-Build (35% Design) ¥163,236,000 $1,277,599.89
Repair Airfield Lighting, B1115 Design-Build (5% Design) ¥62,500,000 $489,169.02
Repair Steam Line, B428 thru B325 & Commissary B323 Construction Only ¥493,400,000 $3,861,695.87
Repair Roads Main Base MFH, Cape Hateras Design-Build (35% Design) ¥88,000,000 $688,749.97
Repair Command Post, B928 Construction Only ¥288,000,000 $2,254,090.82
Repair Electrical INFRX Secondary Line, MFH, Area 3 Design-Build (35% Design) ¥97,700,000 $764,669.00
Repair Street and Parking Lot Lights, Multi Design-Build (5% Design) ¥141,000,000 $1,103,565.30
Repair Front Parking Lot, B793 Design-Build (15% Design) ¥210,450,000 $1,647,129.91
Repair Road, Munitions Area2 Design-Build (15% Design) ¥109,500,000 $857,024.11
Repair Voltage Drop, Security Hill Design-Build (5% Design) ¥180,000,000 $1,408,806.76
Repair Roads Navy Munitions Command Design-Build (15% Design) ¥174,000,000 $1,361,846.54
Repair DHW, Main Base Area 9, B265 Design-Build (35% Design) ¥189,300,000 $1,481,595.11
Summary of TOs
Nr of TOs Yen Amount Dollar Amount
Total Amount of TOs for Eight (8) Years 94 ¥12,173,764,668 $103,926,855.56
Annual Average Amount 12 ¥1,521,720,584 $12,990,856.95
Average Amount of Individual TOs - ¥129,508,135 $1,105,604.85
Per Price Range of Individual TO Amounts Nr of TOs Total Amount
Up to ¥9,999,999 1 ¥8,750,427
¥10,000,000 thru ¥49,999,999 30 ¥945,793,878
¥50,000,000 thru ¥99,999,999 32 ¥2,454,447,280
¥100,000,000 thru ¥199,999,999 18 ¥2,667,080,940
¥200,000,000 thru ¥299,999,999 5 ¥1,223,866,208
¥300,000,000 thru ¥399,999,999 2 ¥775,707,997
¥400,000,000 thru ¥499,999,999 2 ¥983,458,000
¥500,000,000 thru ¥599,999,999 2 ¥1,084,008,858
¥600,000,000 thru ¥699,999,999 0 ¥0
¥700,000,000 thru ¥799,999,999 0 ¥0
¥800,000,000 thru ¥899,999,999 0 ¥0
¥900,000,000 thru ¥999,999,999 1 ¥908,502,000
¥1,000,000,000 thru ¥1,141,140,000 1 ¥1,122,149,080