Atch 7 Price Breakout Schedule.xlsx

XLSX spreadsheet 25 KB Posted

Attached to
Y1DA--621-22-129 - Bldg 160 Kitchen AHU-4 Replacement Federal contract opportunity
Solicitation number
36C24925B0005
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 9

About this file

The file is a Price Breakout Schedule for a VA Medical Center project at the James H. Quillen VA Medical Center in Mountain Home, Tennessee. The solicitation (Number 36C24925B0005) is for Building 160 Kitchen Air Handling Unit (AHU-4) Replacement, with a project performance period of 180 calendar days after Notice to Proceed. The scope involves completely preparing the site, demolishing existing structures, and installing a new HVAC system in the fourth-floor mechanical room to condition the kitchen hood supply, with work to be performed during normal hours (Monday-Friday, 7:30 am to 4:00 pm ET) and potentially during nights and weekends to maintain kitchen operations.

The price breakout template provides a detailed cost breakdown structure across multiple divisions including General Conditions, General Requirements, Existing Conditions, HVAC, Electrical, and Electronic Safety and Security. The document specifies tax rates, overhead (10%), profit (10%), and bonding/permit fees (3%), though the actual cost fields are blank. The VA Network Contracting Office requires contractors to provide granular pricing details for each division, with specific instructions that lump-sum pricing will not be accepted and that contractors should break down costs to the greatest possible degree.

View the file

Other files for this federal contract opportunity

Other files attached to Y1DA--621-22-129 - Bldg 160 Kitchen AHU-4 Replacement, newest first.
File Type Posted
Atch 9 Sign In Sheet 06162025.pdf PDF
Atch 1 WD Washington County Building TN20250191 dated 06062025.pdf PDF
36C24925B0005 0001.docx DOCX document
Atch 5 Contractor EMR Certification Form.docx DOCX document
Atch 1 WD Washington County Building TN20250191 dated 05022025.pdf PDF
36C24925B0005_1.docx DOCX document
Atch 8 RFI Form.docx DOCX document
Atch 2 Specifications 05282025.pdf PDF
Atch 6 General Conditions Breakout.xlsx XLSX spreadsheet
Atch 3 Drawings 06032025.pdf PDF
Atch 4 Calculation of Contractor Self Performed Work.xlsx XLSX spreadsheet
Show all 11

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Breakdown

LOCATION:Solicitation Number:Project NumberProject TitleBid Date
Mountain Home, TN36 C24925B0005621-22-129Bldg 160 Kitchen AHU 4 Replacement
PRICE BREAKOUT SCHEDULE
When entering a line item for General Conditions costs on Schedule of Values, a breakout of the General Conditions costs must be provided. Per VAAR 852.243-70 Contract Changes-Supplement, paragraph (c)(1), the following contractual restrictions apply: Overhead and Contractor's fee percentages shall be considered to include insurance other than mentioned herein, field and office supervisors and assistants, security police, use of small tools, incidental job burdens, and general home office expenses and no separate allowance will be made. Assistants to office supervisors include all clerical, stenographic and general office help. Incidental job burdens include, but are not necessarily limited to, office equipment and supplies, temporary toilets, telephone and conformance to OSHA requirements. Items such as, but not necessarily limited to, review and coordination, estimating and expediting relative to contract changes are associated with field and office supervision and are considered to be included in the Contractor's overhead and/or fee percentage.
SPEC/COST CODEDESCRIPTIONLABORMATERIALEQUIPMENTDIVISION TOTALS
General Conditions$0.00
Superintendent
Project Manager
Field Office Engineer
Builder's Risk Insurance
Other Project Specific Liability Insurance
Site Maintenance and Protection
Progress Photos (per contract specifications)
Dumpsters
Office Trailer
Storage Trailer/POD/CONEX
Telephone (Cell and/or Landline)
Signage (per contract specifications and/or drawings)
Travel (must comply with Federal Travel Regulations)
Lodging (must comply with Federal Travel Regulations)
Record Document Preparation
As-builts (per contract specifications)
Weather Protection (per contract specifications)
Infection Control (per contract specifications)
Information Technology (Internet, etc.)
DIVISION 1GENERAL REQUIREMENTS$0.00
01 00 00General Requirements
01 32 16.15Project Schedules
01 33 23Shop Drawings, Product Data, & Samples
01 35 26Safety Requirements
01 45 00Quality Control
01 57 19Temporary Environmental Controls
DIVISION 2Existing Conditions$0.00
02 41 00Demolition
DIVISION 23Heating, Ventilating and Air Conditioning HVAC$0.00
23 05 11Common Work Results for HVAC
23 05 12General Motor Requriments for HVAC and Steam Generation Equipment
23 05 41Noise and Vibration Control for HVAC Piping and Equipment
23 05 93Testing, Adjusting and Balancing for HVAC
23 09 23Direct Digital Control System for HVAC
23 21 13Hydronic Piping
23 22 13Steam Condensate Pumps
23 73 00Indoor Central Station Air Handling units
DIVISION 26ELECTRICAL$0.00
26 05 11Requirements for Electrical Installations
26 05 19Low-Voltage Electrical Power Conductors and Cables
26 29 11Motor Controllers
DIVISION 28ELECTRONIC SAFETY AND SECURITY$0.00
28 31 00Fire Detection & Alarm
TOTALS
TOTAL LABOR$0.00

TOTAL MATERIALS $0.00

TAX FOR MATERIALS 6% $0.00

TOTAL EQUIPMENT $0.00

DIVISION GRAND TOTALS $0.00

DIVISION GRAND TOTALS$0INSTRUCTIONS
TAX FOR MATERIALS$0
1. Contract breakdowns must include the applicable VA Medical Center, the date the proposal was provided to the VA, the job title, project number, and the solicitation number;
SUBTOTAL$0
OVERHEAD10%$02. Lump sum price breakdowns will not be accepted. Lump sum price breakdowns are defined as a single price provided by the contractor for one division or subdivision when each division or subdivision can be broken down by price to a greater degree;
PROFIT10%$0
SUBTOTAL$0
3. Divisions must still be listed even if not applicable to the construction requirement;
BOND/FEE4. The template above does not include all possible divisions or subdivisions needed for the fictitious requirement referenced above. It is only provided as an example of what would be acceptable to the VA Network Contracting Office 9 -Construction Team as of 6-30-2016. Contractors shall provide all prices for each categorical column above and break down each specific division to the greatest degree possible, similar to what is referenced above. Utilizing this template in the contractor's proposal does not in any way require the Government to accept any subsequent price breakdown that is provided by the contractor or prevent the Government from requesting a further price breakdown. Therefore, it is in the Governments and contractor’s best interest to provide a thorough price breakdown initially; and
PERMITS/LICENSES3%$0

GRAND TOTAL $0

5. This template, or another template that would be provide the same kind of information referenced above, is required for all proposals provided to the VA Network Contracting Office 9 - Construction as of 6-30-2016.