Atch 6 General Conditions Breakout.xlsx

XLSX spreadsheet 13 KB Posted

Attached to
Y1DA--621-22-129 - Bldg 160 Kitchen AHU-4 Replacement Federal contract opportunity
Solicitation number
36C24925B0005
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 9

About this file

The file is an Excel spreadsheet detailing General Conditions Breakout for a VA construction contract (Solicitation 36C24925B0005) at the James H. Quillen VA Medical Center in Mountain Home, Tennessee. The contract involves replacing the AHU-4 HVAC system in Building 160's fourth-floor mechanical room, with a 180-calendar day performance period and a one-year warranty. The spreadsheet provides a comprehensive breakdown of potential project costs across categories including project management (superintendent, safety manager, schedulers), bonds and insurance, and site conditions, with all line items currently showing zero dollar values. The project requires work that maintains kitchen operational status, with work permitted during nights and weekends in addition to normal working hours of Monday through Friday, 7:30 am to 4:00 pm ET.

View the file

Other files for this federal contract opportunity

Other files attached to Y1DA--621-22-129 - Bldg 160 Kitchen AHU-4 Replacement, newest first.
File Type Posted
Atch 9 Sign In Sheet 06162025.pdf PDF
Atch 1 WD Washington County Building TN20250191 dated 06062025.pdf PDF
36C24925B0005 0001.docx DOCX document
Atch 5 Contractor EMR Certification Form.docx DOCX document
Atch 1 WD Washington County Building TN20250191 dated 05022025.pdf PDF
36C24925B0005_1.docx DOCX document
Atch 8 RFI Form.docx DOCX document
Atch 7 Price Breakout Schedule.xlsx XLSX spreadsheet
Atch 2 Specifications 05282025.pdf PDF
Atch 3 Drawings 06032025.pdf PDF
Atch 4 Calculation of Contractor Self Performed Work.xlsx XLSX spreadsheet
Show all 11

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

GC Breakout

GENERAL CONDITIONS BREAKOUT
When entering a line item for General Conditions costs on Schedule of Values, a breakout of the General Conditions costs must be provided. Per VAAR 852.243-70 Construction Contract Changes-Supplement, paragraph (c)(1), the following contractual restrictions apply: Overhead and Contractor's fee percentages shall be considered to include insurance other than mentioned herein, field and office supervisors and assistants, security police, use of small tools, incidental job burdens, and general home office expenses and no separate allowance will be made. Assistants to office supervisors include all clerical, stenographic and general office help. Incidental job burdens include, but are not necessarily limited to, office equipment and supplies, temporary toilets, telephone and conformance to OSHA requirements. Items such as, but not necessarily limited to, review and coordination, estimating and expediting relative to contract changes are associated with field and office supervision and are considered to be included in the Contractor's overhead and/or fee percentage.
General Condition DescriptionValue
Project Management:$ - 0
Superintendent(s)$ - 0
Safety Manager$ - 0
CPM Scheduler$ - 0
Quality Assurance/Quality Control$ - 0
Project Manager (s)$ - 0
Project Executive$ - 0
Field Office Engineer$ - 0
Field Office Support Staff$ - 0
Project Expeditor$ - 0
Assistant Superintendent (s)$ - 0
Project Manager Subtotal:$ - 0
Bonds and Insurance (excluding any for Subcontractors):$ - 0
Builder’s Risk Insurance$ - 0
General Liability Insurance$ - 0
Security, Payment & Performance Bonds$ - 0
Bonds and Insurance Subtotal:$ - 0
Site Conditions:$ - 0
Temporary Power Consumption (Offices)$ - 0
Temporary Power Consumption (General Site Use)$ - 0
Temporary Water and Sewer Consumption$ - 0
Temporary Water Hookup, Distribution & Meters$ - 0
Temporary Electrical Hookup, Distribution & Meters$ - 0
Temporary Telephone & Network System Installation$ - 0
Temporary Telephone & Internet Consumption Fees$ - 0
Temporary Fire Protection$ - 0
Temporary Heating & Cooling$ - 0
Temporary Fencing$ - 0
Temporary Covered Walkways$ - 0
SWPPP Measures$ - 0
Temporary Entries and Truck Washes$ - 0
Street Cleaning (by G.C.)$ - 0
Traffic Control Measures$ - 0
Temporary Barricades & Signage$ - 0
Temporary Roads & Walkways (install & maintenance)$ - 0
Temporary Lighting$ - 0
Temporary Partitions & Covered Floor Openings$ - 0
Temporary Toilets/Sanitary Measures$ - 0
Temporary Laydown (prep and restoration)$ - 0
Security System/Watchman$ - 0
Pre-construction Photo Documentation$ - 0
Progress Photos$ - 0
Temporary Protection (in place work/adjacent structures)$ - 0
$ - 0
$ - 0
$ - 0
General Conditions Total$ - 0