Atch_5_Bone_Hill_Dam_Breach_Bid_Schedule_Bone.xlsx

XLSX spreadsheet 14 KB Posted

Attached to
BONE HILL NWR-DAM BREACH CONSTRUCTION Federal contract opportunity
Solicitation number
140F0121R0055
Issued by
Department of the Interior Fish and Wildlife Service

View the file

Other files for this federal contract opportunity

Show all 11

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

PROJECT DESCRIPTION:
Removal of a combined service spillway and outlet works; excavating a trapezoidal channel through the dam at EL. 1635.15’ comprised of a 50-long bottom dimension with side slopes of 5(H):1(V); installation of rip-rap (D50=12”) along the crest, bottom and side-slopes of the new excavation as indicated on the construction drawings; and install a new, concrete, low-water crossing where indicated on the construction drawings.
A. GENERAL CONDITIONS:
Item 1: General Requirements
Mobilization and demobilization + Bond$
Bond$

General Requirements (other) $

Division 1 Total $ 0

B. SUMMARY OF COST BREAKDOWN FOR MATERIALS, LABOR AND EQUIPMENT

Item 2 - Survey Control and Monument Replacement $

Item 3 - Access Road and Site Improvements $

Item 4 - Excavation $

Item 5 - Demolition $

Item 6 - Furnish and install Low Water Crossing $

Item 7 - Furnish and install Road Base $

Item 8 - Furnish and install Riprap $

Item 9 - Furnish and Install Riprap Bedding $

Item 10 - Placing Random Fill $

Item 11 - Placing Embankment Fill $

Item 12 - Furnish and iIstall Filter Fabric and Gabion Rock $

Item 13 - Furnishing Topsoil $

Item 14 - Reclamation and Cleanup $

BASE TOTAL $ 0

OVERHEAD AND PROFIT (percentage) % 0% $ 0

BASE TOTAL PLUS OVERHEAD AND PROFIT $ 0

&"Times New Roman,Regular"&12BIDDING SCHEDULE

Bone Hill Dam Breach Const - 21-046

Kulm Wetland Management District

Lamoure County, North Dakota