| PROJECT DESCRIPTION: |
| Removal of a combined service spillway and outlet works; excavating a trapezoidal channel through the dam at EL. 1635.15’ comprised of a 50-long bottom dimension with side slopes of 5(H):1(V); installation of rip-rap (D50=12”) along the crest, bottom and side-slopes of the new excavation as indicated on the construction drawings; and install a new, concrete, low-water crossing where indicated on the construction drawings. |
| A. GENERAL CONDITIONS: | |||
| Item 1: General Requirements | |||
| Mobilization and demobilization + Bond | $ | ||
| Bond | $ |
General Requirements (other) $
Division 1 Total $ 0
B. SUMMARY OF COST BREAKDOWN FOR MATERIALS, LABOR AND EQUIPMENT
Item 2 - Survey Control and Monument Replacement $
Item 3 - Access Road and Site Improvements $
Item 4 - Excavation $
Item 5 - Demolition $
Item 6 - Furnish and install Low Water Crossing $
Item 7 - Furnish and install Road Base $
Item 8 - Furnish and install Riprap $
Item 9 - Furnish and Install Riprap Bedding $
Item 10 - Placing Random Fill $
Item 11 - Placing Embankment Fill $
Item 12 - Furnish and iIstall Filter Fabric and Gabion Rock $
Item 13 NOT USED
Item 14 - Reclamation and Cleanup $
BASE TOTAL $ 0
OVERHEAD AND PROFIT (percentage) % 0% $ 0
BASE TOTAL PLUS OVERHEAD AND PROFIT $ 0
&"Times New Roman,Regular"&12BIDDING SCHEDULE
Bone Hill Dam Breach Const - 21-046
Kulm Wetland Management District
Lamoure County, North Dakota