Atch_4_Rainwater_Basin_Wells_Bid_Schedule.xlsx

XLSX spreadsheet 13 KB Posted

Attached to
RAINWATER Basin Wells and PUMPS Federal contract opportunity
Solicitation number
140F0121R0062
Issued by
Department of the Interior Fish and Wildlife Service

About this file

This document includes an attachment with a bid schedule for replacing wells at two wetland areas, as well as information about a related federal contract opportunity. The bid schedule lists various line items and services required to decommission existing wells and install new wells and related infrastructure at the Harvard and Atlanta wetland project areas. Services include mobilization, permitting, well installation, discharge piping, electrical work, and connecting the new wells to the existing system. The federal contract opportunity is solicited by the U.S. Fish and Wildlife Service and seeks a contractor to provide all material, equipment, and labor to install two new wells, abandon existing wells, and connect the new wells to the existing system in accordance with the attached statement of work and drawings. The point of contact is provided for any questions.

View the file

Other files for this federal contract opportunity

Other files attached to RAINWATER Basin Wells and PUMPS, newest first.
File Type Posted
Amend_0002_Atch_1_Rainwater_Basin_Wells_Bid_Schedule_Rev_1_0002.xlsx XLSX spreadsheet
Sol_140F0121R0062_Amd_0002.pdf PDF
Sol_140F0121R0062_Amd_0001.pdf PDF
Atch_2_Rainwater_Basin_Wells_Submittals.pdf PDF
Sol_140F0121R0062.pdf PDF
Atch_3_Rainwater_Basin_Wells_DBA_Wage_Det_Nebraska_Heavy.pdf PDF
Atch_5_Rainwater_Basin_Wells_Past_Perf_Quest.doc DOC document
Atch_1_Rainwater_Basin_Wells_SOW.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1 Project Description: Replace wells for two WPAs.

Furnish all labor, materials, and equipment to complete the following work in accordance with the attached specifications.

UnitTotal
QTYUnitCostCost
WELL DECOMMISSION
1Harvard well and paperwork1LS
2Atlanta well and paperwork1LS
Section Total
HARVARD WPA
1Mobilization/Demobilization, Bonding, Overhead, & Profit1LS
2Well Permit to NRD1EA
3Harvard well and appurtenances1LS
4Harvard well discharge connection1LS
5Harvard electrical as defined in the SOW1LS
Section Total
ATLANTA WPA
1Mobilization/Demobilization, Bonding, Overhead, & Profit1LS
2Well Permit to NRD1EA
3Atlanta well and appurtenances1LS
4Atlanta well discharge piping, valve, and appurtenances1LS
5Atlanta electrical as defined in the SOW1LS
6Atlanta power company cost1LS

Section Total

Total All Sections

BID SCHEDULE

21-003

RAINWATER BASIN WETLAND MANAGEMENT DISTRICT

FUNK, NEBRASKA