Amend_0002_Atch_1_Rainwater_Basin_Wells_Bid_Schedule_Rev_1_0002.xlsx
XLSX spreadsheet 13 KB Posted
- Attached to
- RAINWATER Basin Wells and PUMPS
- Solicitation number
- 140F0121R0062
About this file
This bid schedule outlines the requirements for replacing two wells and abandoning existing wells for two Wetland Protection Areas in Funk, Nebraska. The contractor will be responsible for furnishing all labor, materials, and equipment to complete the following work at each WPA site in accordance with specifications: mobilization, bonding, overhead and profit; well permits; new wells and appurtenances; well discharge connections and piping; and electrical work as defined in the scope of work. The related federal contract opportunity posted by the Department of the Interior Fish and Wildlife Service solicits bids to provide all material, equipment, and labor to install two new wells, abandon the existing wells, and connect the new wells to the existing system in the Rainwater Basin Wetland Management District in Funk, Nebraska. The point of contact is listed as the contracting officer.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1 Project Description: Replace wells for two WPAs.
Furnish all labor, materials, and equipment to complete the following work in accordance with the attached specifications.
| Unit | Total | ||||
| QTY | Unit | Cost | Cost | ||
| WELL DECOMMISSION | |||||
| 1 | Harvard well and paperwork | 1 | LS | ||
| 2 | Atlanta well and paperwork | 1 | LS |
| Section Total | ||||
| HARVARD WPA | ||||
| 1 | Mobilization/Demobilization, Bonding, Overhead, & Profit | 1 | LS | |
| 2 | Well Permit to NRD | 1 | EA | |
| 3 | Harvard well and appurtenances | 1 | LS | |
| 4 | Harvard well discharge connection | 1 | LS | |
| 5 | Harvard electrical as defined in the SOW | 1 | LS |
| Section Total | ||||
| ATLANTA WPA | ||||
| 1 | Mobilization/Demobilization, Bonding, Overhead, & Profit | 1 | LS | |
| 2 | Well Permit to NRD | 1 | EA | |
| 3 | Atlanta well and appurtenances | 1 | LS | |
| 4 | Atlanta well discharge piping, valve, and appurtenances | 1 | LS | |
| 5 | Atlanta electrical as defined in the SOW | 1 | LS | |
| 6 | NOT USED | 1 | LS |
Section Total
Total All Sections
BID SCHEDULE
21-003
RAINWATER BASIN WETLAND MANAGEMENT DISTRICT
FUNK, NEBRASKA
File details come from the government source that posted it. Updated .