Sol_140F0121R0062_Amd_0002.pdf

PDF 161 KB Posted

Attached to
RAINWATER Basin Wells and PUMPS Federal contract opportunity
Solicitation number
140F0121R0062
Issued by
Department of the Interior Fish and Wildlife Service

About this file

This amendment to a solicitation provides responses to contractor questions about a federal contract opportunity for replacing wells and pumps in the Rainwater Basin Wetland Priority Area in Nebraska. Line item six for electrical costs under the Atlanta WPA section is no longer required and should be left blank, as power has already been installed and paid for. The response due date remains August 24, 2021 at 1900 hours local time. Bidders must acknowledge receipt of this amendment. The opportunity is to provide materials, equipment, and labor to install two new wells, abandon existing wells, and connect the new systems according to the statement of work and drawings. The contracting agency is the U.S. Fish and Wildlife Service.

View the file

Other files for this federal contract opportunity

Other files attached to RAINWATER Basin Wells and PUMPS, newest first.
File Type Posted
Amend_0002_Atch_1_Rainwater_Basin_Wells_Bid_Schedule_Rev_1_0002.xlsx XLSX spreadsheet
Sol_140F0121R0062_Amd_0001.pdf PDF
Atch_2_Rainwater_Basin_Wells_Submittals.pdf PDF
Sol_140F0121R0062.pdf PDF
Atch_4_Rainwater_Basin_Wells_Bid_Schedule.xlsx XLSX spreadsheet
Atch_5_Rainwater_Basin_Wells_Past_Perf_Quest.doc DOC document
Atch_1_Rainwater_Basin_Wells_SOW.pdf PDF
Atch_3_Rainwater_Basin_Wells_DBA_Wage_Det_Nebraska_Heavy.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(x)

140F0121R0062 x x copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR

OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

x

F06

Lakewood CO 80228-1807

134 UNION BOULEVARD

LAKE PLAZA NORTH

FWS, DIVISION OF CONTRACTING AND GE

F01

PORTLAND OR 97232-4181

911 NE 11TH AVENUE

EASTSIDE FEDERAL COMPLEX

FWS, DIVISION OF CONTRACTING AND GE

21-00308/23/20210002

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

FACILITY CODE CODE

10B. DATED (SEE ITEM 13)

10A. MODIFICATION OF CONTRACT/ORDER NO.

9B. DATED (SEE ITEM 11)

9A. AMENDMENT OF SOLICITATION NO.

CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY

PAGE OF PAGES

4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)

1. CONTRACT ID CODE

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

07/19/2021

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.

ORDER NO. IN ITEM 10A.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

see page 2

Legacy Doc #: FWS

Period of Performance: 08/31/2021 to 11/01/2021

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

Timothy Officer

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

Previous edition unusable

Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .

Solicitation Amendment

Document 140F0121R0062-0002

Document Title Replace Wells and Pumps, Rainwater Basin, WPA, Nebraska Page 2 of 2

A. The purpose of this amendment is to respond to contractor questions.

B. The following contractor question and Government response are provided for consideration:

1. Contractor Question: I’m looking at the line items on the bid schedule for 21-003, under the Atlanta WPA, #6 is Atlanta power company costs, the service for the Atlanta wetland is already completed, I talked with the power company and they said it has been paid for already, do we have to reimburse someone, or what potential cost could there be to power company?

Government Response: The Bid Schedule under section Atlanta WPA line item 6 “Atlanta power company cost” is no longer needed and should have a $0 entered or left blank. The electrical power has been paid for after the bid package was submitted. The attached revised bid/proposal schedule is provided for contractor use.

C. The response due date and time is Not Extended and remains Tuesday, 24 Aug 2021, 1900 hours local time. Please provide acknowledgement of this amendment.

D. All other terms and conditions remain unchanged.

File details come from the government source that posted it. Updated .