Atch 3 Drawings 614-23-103 Replace Old Roofing Buildings 1 1A 5 and 7.pdf
PDF 15 MB Posted
- Solicitation number
- 36C24926R0044
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attachment 12 Pre-bid Site Visit Attendance Sheet.pdf | ||
| 36C24926R0044 0001.pdf | ||
| Atch 4 Calculation of Contractor Self Performed Work.xlsx | XLSX spreadsheet | |
| Atch 7 Price Breakout Schedule.xlsx | XLSX spreadsheet | |
| Atch 1 WD Shelby County Building TN20260200 dated 01022026.pdf | ||
| Atch 9 Past Performance Questionnaire.docx | DOCX document | |
| 36C24926R0044_2.docx | DOCX document | |
| Atch 2 Specifications 614-23-103 Replace Old Roofing Buildings 1 1A 5 and 7.pdf | ||
| Atch 5 Contractor EMR Certification Form.docx | DOCX document | |
| Atch 6 General Conditions Breakout.xlsx | XLSX spreadsheet | |
| Atch 11 SF 1442 36C24926R0044.pdf | ||
| Atch 8 TAX ID UEI Information.docx | DOCX document | |
| Atch 10 RFI Form.docx | DOCX document |
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
N
VICINITY MAP
SCALE: N.T.S.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
WWW.RAYMOND.GLOBAL
FULL-SERVICE ARCHITECTURE & ENGINEERING
CONYERS, GA | SAVANNAH, GA | GREER, SC | RALEIGH, NC
ORLANDO, FL | MIAMI, FL | RICHMOND, VA
1035 GREEN ST., STE A
CONYERS, GA 30012
404-345-8201
REPLACE ROOF BLDG 1, 1A, 5 & 7
VA MEDICAL CENTER - MEMPHIS, TN
614-23-103
N
LOCATION MAP
SCALE: N.T.S.
PROJECT LOCATION:
MEMPHIS VA MEDICAL CENTER
MEMPHIS, TN.
PROJECT LOCATION:
MEMPHIS VA MEDICAL CENTER
MEMPHIS, TN.
REPLACE ROOF BLDG 1, 1A, 5 & 7
Department of Veterans Affairs
REVISED BID SET SUBMISSION
DECEMBER 30, 2024
PROJECT # 614-23-103
MEMPHIS VA MEDICAL CENTER,
1030 JEFFERSON AVENUE MEMPHIS, TN, 38104
COVER SHEET
GI-001
AR
C
H F
U
LL
B
LE
ED
E
(3
0.
X
2.
IN
C
H
ES
/3 0/
:1
PM
PA
PE
R S
IZ
E
LA
ST
S
AV
ED
AB, DRJ, CFAB
35% SUBMISSION 05 JUNE, 2023
30 DEC 2024
DWG NO DRAWING TITLE
GI-002 GENERAL INFORMATION
AD-101 BUILDING 1 - DEMOLITION ROOF PLAN
GI-001 COVER SHEET
GI-003 GENERAL NOTES
A SEPARATE PROJECT MANUAL (SPECIFICATIONS) IS:
INCLUDED
NOT INCLUDED
AS PART OF THIS PROJECT.
INDEX
AD-102
AD-103
AD-104 BUILDING 1 CONNECTING CORRIDORS & DOCK CANOPY, AND BLDG 1A PENTHOUSE - DEMOLITION ROOF PLAN
BUILDING 1A SECOND FLOOR PATIO ROOF - DEMOLITION ROOF PLAN
BUILDING 1A GENERATOR - DEMOLITION ROOF PLAN
REV. BID SET SUBMISSION
AD-105
AD-106 BUILDING 7 - DEMOLITION ROOF PLAN
AS-101 BUILDING 1 - NEW ROOF PLAN
AS-102
AS-103
AS-104
BUILDING 1A SECOND FLOOR PATIO ROOF - NEW ROOF PLAN
BUILDING 1A GENERATOR - NEW ROOF PLAN
AS-105 BUILDING 5 & COOLING TOWER EQUIPMENT ROOM - NEW ROOF PLAN
AS-106 BUILDING 7 - NEW ROOF PLAN
65% SUBMISSION 15 AUGUST, 2023
AS-501 ROOF DETAILS
AS-502 ROOF DETAILS
AS-503 ROOF DETAILS
AS-504 ROOF DETAILS
AS-505 ROOF DETAILS
95% SUBMISSION 12 DECEMBER, 2023
S-101 BUILDING 1 - WIND ZONE ROOF PLAN
S-102
S-103
S-104
BUILDING 1A SECOND FLOOR PATIO ROOF - WIND ZONE ROOF PLAN
BUILDING 1A GENERATOR - WIND ZONE ROOF PLAN
S-105 BUILDING 5 & COOLING TOWER EQUIPMENT ROOM - WIND ZONE ROOF PLAN
S-106 BUILDING 7 - WIND ZONE ROOF PLAN
PAUL S. BROWN II
PROJECT ENGINEER, FAC-COR II, FE-C
LT. COL. LUKE J. WEATHERS, JR. VA MEDICAL CENTER
ADMIN BLDG 1, AEG28
1030 JEFFERSON AVE
MEMPHIS, TN 38104
OFFICE: 901 523 8990 EXT 4172
BUILDING 1 CONNECTING CORRIDORS & DOCK CANOPY, AND BLDG 1A PENTHOUSE - NEW ROOF PLAN
BUILDING 1 CONNECTING CORRIDORS & DOCK CANOPY, AND BLDG 1A PENTHOUSE - WIND ZONE ROOF PLAN
BUILDING 5 & COOLING TOWER EQUIPMENT ROOM - DEMOLITION ROOF PLAN
100% SUBMISSION 8 APRIL, 2024
BID SET 4 OCTOBER, 2024
REVISED BID SET 30 DECEMBER, 2024
EARTH
CONCRETE MASONRY
CONCRETE
COMPRESSIBLE FILLER
PORTLAND CEMENT
PLASTER OVER METAL LATH
UNIT
PORTLAND
BATT INSULATION
ROOF GYPSUM COVER BOARD
LWIC-LIGHT WEIGHT INSULATED CONCRETE
MEMBERFINISH SYSTEM
PLYWOOD
WOOD BLOCKING
CONTINUOUS WOOD
FINISHED WOOD MEMBER
EXTERIOR INSULATION &
GLASS
GYPSUM BOARD
POLYISOCYANURATE
METAL
A-611
4 2
A-611
MATERIALS LEGEND
SYMBOLS
CEMENT PLASTER
CODE INFORMATION
SECTIONS
TONGUE & GROOVE
HOLLOW METAL
MAX MAXIMUM
INSUL
HM
INSULATION
WOOD
VENT THRU ROOF
TOP OF STEEL
WD
W/ W/O
WITH
WITHOUT
VTR
TYP
TOS
TYPICAL
CONDENSING UNITCU
EXPANSIONEXP
FIELD JOINT
FLASHING
GALVANIZED
GA
GALV
GAUGE
FLASH'G
FIN
FL
FP
FJ
EXST'G
FINISH
FLOOR
EXISTING
FIREPROOF
DIAMETER
DOWN SPOUT
EXPANSION JOINT
DS
EJ
EWC ELECTRIC WATER COOLER
DN
DIA
DOWN
AT
CONCRETE MASONRY UNIT
ABOVE FINISHED FLOOR
ACOUSTICAL CEILING TILE or ACOUSTICAL TREATMENT
AIR CONDITIONING
CONTROL JOINT
CONCRETE
CONTINUOUS
CLG
COL
CONC
CONT
CMU
CJ
BLDG
CEILING
COLUMN
BUILDING
AFF
ACT
A/C
SUSPENDED CEILING
TOP OF MASONRY
STAINLESS STEEL
SQUARE
THICK
TREATED
TOM
TREAT'D
THK
SQ
SUSP. CLG.
REQD REQUIRED
PLASTIC LAMINATE
ROOF DRAIN
RAD
RD
RADIUS
PLYWD
PLAS. LAM.
PL
PLYWOOD
PLATE
OPENING
MECHANICAL
NOT IN CONTRACT
ON CENTER
OPEN'G(OPN'G)
OC
NIC
MIN
MECH
MINIMUM
ABBREVIATIONS
METALMTL
ELEVATIONEL
MASONRY OPENINGMO
BOARDBD
BLK BLOCK
BLK'G BLOCKING
BUR BUILD UP ROOFING
CENTER LINECL
DRAWINGDWG
GLASSGL
JT JOINT
LAVATORYLAV
NOT APPLICABLENA
STEELSTL
VIF VERIFY IN FIELD
PRESSURE TREATEDPT
SUSPENDED ACOUSTICAL TILESAT
LAMINATELAM
LOW POINTLP
SS
SCALE:
TITLE
############ A-501
MODIFIED BITUMEN SYSTEM
COMPONENT AND CLADDING WIND
UPLIFT PRESSURES
ROOF DRAINAGE CALCULATION
REFER TO SHEETS S-101 - S-106 FOR WIND ZONE ROOF PLANS:
S-101 - BUILDING 1 - WIND ZONE ROOF PLAN
S-102 - BUILDING 1 GENERATOR BLDG AND LOW ROOF - WIND ZONE ROOF PLAN
S-103 - BUILDING 1A PATIO ROOF - WIND ZONE ROOF PLAN
S-104 - BUILDING 1A PENTOUSE, CORRIDORS & DOCK CANOPY - WIND ZONE ROOF PLAN
S-105 - BULDING 5.1-5.4 & COOLING TOWER - WIND ZONE ROOF PLAN
S-106 - BUILDING 7 - WIND ZONE ROOF PLAN
CODE: ASCE 7-10; IBC 2012
ROOF AREA DIMENSIONS (FEET): REFER ROOF PLAN
MEAN ROOF HEIGHT: 115' (BUILDING 1A PENTHOUSE), 90' (ALL ROOF AREAS EXCEPT COOLING TOWER AND BUILDING 1A
MECHANICAL PENTHOUSE), 15' (COOLING TOWER)
RISK CATEGORY: IV
EXPOSURE CATEGORY: C
BASIC WIND SPEED (THREE-SECOND PEAK GUST, MPH): 120 MPH
TABLE HEIGHT
ZONE H= 90'-0"
LRFD
ASD*
* ROOFING CONTRACTOR SHALL INSTALL A TESTED ROOF ASSEMBLY TO MEET OR EXCEED ASD
PRESSURES WITH A SAFTEY FACTOR OF 2.
LOAD TYPE
-44.95 PSF
-65.69 PSF
-86.44 PSF
-33.42 PSF
-54.17 PSF
-74.91 PSF
-109.48 PSF
-144.06 PSF
-55.70 PSF
-90.28 PSF
H= 115'-0"
-47.33 PSF
-69.17 PSF
-91.01 PSF
-35.19 PSF
-57.03 PSF
-78.88 PSF
-115.28 PSF
-151.68 PSF
-58.65 PSF
-95.05 PSF
H= 15'-0"
-24.02 PSF
-33.81 PSF
-44.86 PSF
-23.59 PSF
-27.10 PSF
-40.03 PSF
-56.35 PSF
-74.76 PSF
-39.31 PSF
-45.16 PSF
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
WWW.RAYMOND.GLOBAL
FULL-SERVICE ARCHITECTURE & ENGINEERING
CONYERS, GA | SAVANNAH, GA | GREER, SC | RALEIGH, NC
ORLANDO, FL | MIAMI, FL | RICHMOND, VA
1035 GREEN ST., STE A
CONYERS, GA 30012
404-345-8201
35% SUBMISSION 05 JUNE, 2023
65% SUBMISSION 15 AUGUST, 2023
95% SUBMISSION 12 DECEMBER, 2023
BID SET 4 OCTOBER, 2024
REVISED BID SET 30 DECEMBER, 2024
GI-002
AR
C
H F
U
LL
B
LE
ED
E
(3
0.
X
2.
IN
C
H
ES
/3 0/
:1
PM
PA
PE
R S
IZ
E
LA
ST
S
AV
ED
GENERAL INFORMATION
AB AB, DRJ, CF
REPLACE ROOF BLDG 1, 1A, 5 & 7
VA MEDICAL CENTER - MEMPHIS, TN
614-23-103
PAUL S. BROWN II
PROJECT ENGINEER, FAC-COR II, FE-C
LT. COL. LUKE J. WEATHERS, JR. VA MEDICAL CENTER
ADMIN BLDG 1, AEG28
1030 JEFFERSON AVE
MEMPHIS, TN 38104
OFFICE: 901 523 8990 EXT 4172
30 DEC 2024
REV. BID SET SUBMISSION
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
WWW.RAYMOND.GLOBAL
FULL-SERVICE ARCHITECTURE & ENGINEERING
CONYERS, GA | SAVANNAH, GA | GREER, SC | RALEIGH, NC
ORLANDO, FL | MIAMI, FL | RICHMOND, VA
1035 GREEN ST., STE A
CONYERS, GA 30012
404-345-8201
35% SUBMISSION 05 JUNE, 2023
65% SUBMISSION 15 AUGUST, 2023
95% SUBMISSION 12 DECEMBER, 2023
BID SET 4 OCTOBER, 2024
REVISED BID SET 30 DECEMBER, 2024
GI-003
AR
C
H F
U
LL
B
LE
ED
E
(3
0.
X
2.
IN
C
H
ES
/3 0/
:1
PM
PA
PE
R S
IZ
E
LA
ST
S
AV
ED
GENERAL NOTES
CF, AB, DRJ
ROOF DEMOLITION NOTES
GENERAL CONSTRUCTION NOTES
GENERAL SCOPE OF WORK
PROTECTION NOTES
GENERAL NOTES
SCALE: N.T.S.1 SITE PLAN - SCOPE OF WORK
AB
REPLACE ROOF BLDG 1, 1A, 5 & 7
VA MEDICAL CENTER - MEMPHIS, TN
614-23-103
PAUL S. BROWN II
PROJECT ENGINEER, FAC-COR II, FE-C
LT. COL. LUKE J. WEATHERS, JR. VA MEDICAL CENTER
ADMIN BLDG 1, AEG28
1030 JEFFERSON AVE
MEMPHIS, TN 38104
OFFICE: 901 523 8990 EXT 4172
DEDUCT ALTERNATES
PRD
PRD PRD
PRD
PRD
NOT IN SCOPE
NOT IN SCOPE
NOT IN SCOPE
NOT IN SCOPE
NOT IN SCOPE
NOT IN SCOPE
NOT IN SCOPE
NOT IN SCOPE
NOT IN SCOPE
SVP
SVP
SVP
SVP
ENTRANCE VESTIBULE 1
DS
G
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
WWW.RAYMOND.GLOBAL
FULL-SERVICE ARCHITECTURE & ENGINEERING
CONYERS, GA | SAVANNAH, GA | GREER, SC | RALEIGH, NC
ORLANDO, FL | MIAMI, FL | RICHMOND, VA
1035 GREEN ST., STE A
CONYERS, GA 30012
404-345-8201
35% SUBMISSION 05 JUNE, 2023
65% SUBMISSION 15 AUGUST, 2023
95% SUBMISSION 12 DECEMBER, 2023
BID SET 4 OCTOBER, 2024
REVISED BID SET 30 DECEMBER, 2024
AD-101
AR
C
H F
U
LL
B
LE
ED
E
(3
0.
X
2.
IN
C
H
ES
/3 0/
:1
PM
PA
PE
R S
IZ
E
LA
ST
S
AV
ED
BUILDING 1 - DEMOLITION ROOF PLAN
BUILDING 1 - DEMOLITION ROOF PLAN 1 SCALE: 1/16" : 1'-0"
KEYPLAN
LEGEND
ROOFTOP UNIT
ROOF OUTLINE/PARAPET GUTTER (GU)
SOIL VENT PIPE (SVP)
DOWNSPOUT (DS)
TEST CUT1
WATER FLOWPRIMAY ROOF DRAIN (PRD)
ROOF-TO-WALL
EXPANSION JOINT
ROOF OUTLINE/
GRAVE-STOP FASCIA
ROOF AREA NOT-IN-
CONTRACT (N.I.C.)
ROOF-TO-ROOF
EXPANSION JOINTSKYLIGHT (S)S
ELEVATION CHANGE
LIGHTINING ROD
REPLACE ROOF BLDG 1, 1A, 5 & 7
VA MEDICAL CENTER - MEMPHIS, TN
614-23-103
EXISTING ROOF ASSEMBLY CHART
RO
OF
D
ES
IG
NA
TI
ON
STRUCTURAL
DECK
VAPOR
RETARDER INSULATION COVER
BOARD
ROOF
MEMBRANE SURFACING COMMENTS
FL
AT
S
TR
UC
TU
RA
L C
ON
CR
ET
E
CO
AL
T
AR
P
IT
CH
TA
PE
RE
D
PO
LY
IS
OC
YA
NU
RA
TE
PE
RL
IT
E
BU
ILT
-U P
RO
OF
AG
GR
EG
AT
E
SU
RF
AC
IN
G
ENTRANCE
VESTIBULE 1 ● - - ● ● ● X3/AS-501
ENTRANCE
VESTIBULE 2 ● - - - - - X6/AS-501
ROOF OVER THEATER ● ● ● ● ● ● X2/AS-501
AMBULATORY CARE
MECHANICAL
PENTHOUSE ● - ● ● ● ● X1/AS-501
SPECIFIC ROOF DEMOLITION NOTES
25'-5"±
45'-3"±
9'-3"±
10'-7"± 23'-2"±
6'±
27'-2"±
44'±
67'-4"±
42'-2"±
27'-1"±
23'-7"±
24'-6"±
23'-3"±
5'-4"±
CF, AB, DRJAB
PAUL S. BROWN II
PROJECT ENGINEER, FAC-COR II, FE-C
LT. COL. LUKE J. WEATHERS, JR. VA MEDICAL CENTER
ADMIN BLDG 1, AEG28
1030 JEFFERSON AVE
MEMPHIS, TN 38104
OFFICE: 901 523 8990 EXT 4172
EXISTING FALL
PROTECTION
NOT IN SCOPE
NOT IN SCOPE
PRD PRD
PRD
PRD
PRD PRD
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
WWW.RAYMOND.GLOBAL
FULL-SERVICE ARCHITECTURE & ENGINEERING
CONYERS, GA | SAVANNAH, GA | GREER, SC | RALEIGH, NC
ORLANDO, FL | MIAMI, FL | RICHMOND, VA
1035 GREEN ST., STE A
CONYERS, GA 30012
404-345-8201
35% SUBMISSION 05 JUNE, 2023
65% SUBMISSION 15 AUGUST, 2023
95% SUBMISSION 12 DECEMBER, 2023
BID SET 4 OCTOBER, 2024
REVISED BID SET 30 DECEMBER, 2024
AD-102
AR
C
H F
U
LL
B
LE
ED
E
(3
0.
X
2.
IN
C
H
ES
/3 0/
:1
PM
PA
PE
R S
IZ
E
LA
ST
S
AV
ED
BUILDING 1A GENERATOR - DEMOLITION ROOF PLAN1 SCALE: 3/32" : 1'-0"
LEGEND
ROOFTOP UNIT
ROOF OUTLINE/PARAPET
PRIMARY SCUPPER (PS)
GUTTER (GU)
TAPERED INSULATION
STRUCTURAL RIDGE/HIP
SOIL VENT PIPE (SVP)
OVERFLOW ROOF DRAIN
(ORD)
DOWNSPOUT (DS)
VALLEY
TEST CUT1
WATER FLOW
FALL PROTECTION DAVIT
(FPD)
PRIMAY ROOF DRAIN (PRD)
LIGHTNING PROTECTION
PITCH POCKET (LPS)
PITCH POCKET (PP)
FALL PROTECTION
ANCHOR (FPA)
ROOF-TO-WALL
EXPANSION JOINT
FALL PROTECTION
CABLE (FPC)
ROOF OUTLINE/
GRAVE-STOP FASCIA
ROOF AREA NOT-IN-
CONTRACT (N.I.C.) WIND ZONE NO. 1
WIND ZONE NO. 3 WIND ZONE NO. 2
ROOF-TO-ROOF
EXPANSION JOINT
OVERFLOW SCUPPER
(OS)
EXHAUST FAN (EF) HEATED VENT STACK
(HVS)
SKYLIGHT (S)S ROOF ACCESS - LADDER
ROOF HATCH ROOF WALKWAY PAD
CONTROL JOINT
ELEVATION CHANGE
KEYPLAN
LIGHTINING ROD
EXISTING ROOF ASSEMBLY CHART
RO
OF
D
ES
IG
NA
TI
ON
STRUCTURAL
DECK INSULATION COVERB
OARD
ROOF
MEMBR
ANE
RECOVER
BOARD
RECOVER
MEMBRANE SURFACING COMMENTS
FL
AT
M
ET
AL
D
EC
K
TA
PE
RE
D
PO
LY
IS
OC
YA
NU
RA
TE
PE
RL
IT
E
MU
LT
I-P
LY
B
UI
LT
U
P
RO
OF
PE
RL
IT
E
MU
LT
I-P
LY
B
UR
GR
AN
UL
ES
GENERATOR
BUILDING ● ● ● ● ● ● ● X7/AS-501
BUILDING 1A GENERATOR - DEMOLITION
ROOF PLAN
REPLACE ROOF BLDG 1, 1A, 5 & 7
VA MEDICAL CENTER - MEMPHIS, TN
614-23-103
8'-11"±
44'-5"±
38'-4"±
12'-11"±
29'-7"±
37'-9"±
15'-6"±
66'-7"±
34'-10"±
1'-11"±
35'-2"±
13'-6"± 1'-9"± 67'-5"±
61'-7"±
12'-1"±
21'-9"±
8'-9"±
9'±
11'-3"±
7'-8"±
106'-4"±
SPECIFIC ROOF DEMOLITION NOTES
CF, AB, DRJAB
PAUL S. BROWN II
PROJECT ENGINEER, FAC-COR II, FE-C
LT. COL. LUKE J. WEATHERS, JR. VA MEDICAL CENTER
ADMIN BLDG 1, AEG28
1030 JEFFERSON AVE
MEMPHIS, TN 38104
OFFICE: 901 523 8990 EXT 4172
EXISTING FALL
PROTECTION
NOT IN SCOPE
TPO ROOF TO REMAIN
PATIO ROOF 2
PATIO ROOF 1
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
WWW.RAYMOND.GLOBAL
FULL-SERVICE ARCHITECTURE & ENGINEERING
CONYERS, GA | SAVANNAH, GA | GREER, SC | RALEIGH, NC
ORLANDO, FL | MIAMI, FL | RICHMOND, VA
1035 GREEN ST., STE A
CONYERS, GA 30012
404-345-8201
35% SUBMISSION 05 JUNE, 2023
65% SUBMISSION 15 AUGUST, 2023
95% SUBMISSION 12 DECEMBER, 2023
BID SET 4 OCTOBER, 2024
REVISED BID SET 30 DECEMBER, 2024
AD-103
AR
C
H F
U
LL
B
LE
ED
E
(3
0.
X
2.
IN
C
H
ES
/3 0/
:1
PM
PA
PE
R S
IZ
E
LA
ST
S
AV
ED
BUILDING 1A, SECOND FLOOR PATIO ROOFS - DEMOLITION ROOF PLAN1 SCALE: 3/32" : 1'-0"
LEGEND
ROOFTOP UNIT
ROOF OUTLINE/PARAPET GUTTER (GU)
SOIL VENT PIPE (SVP)
DOWNSPOUT (DS)
TEST CUT1
WATER FLOWPRIMAY ROOF DRAIN (PRD)
ROOF-TO-WALL
EXPANSION JOINT
ROOF OUTLINE/
GRAVE-STOP FASCIA
ROOF AREA NOT-IN-
CONTRACT (N.I.C.)
ROOF-TO-ROOF
EXPANSION JOINTSKYLIGHT (S)S
ELEVATION CHANGE
KEYPLAN
LIGHTINING ROD
BUILDING 1A, SECOND FLOOR PATIO
ROOF - DEMOLITION ROOF PLAN
REPLACE ROOF BLDG 1, 1A, 5 & 7
VA MEDICAL CENTER - MEMPHIS, TN
614-23-103
26'-2"±
61'±
72'-6"±
14'-5"±
33'-10"±
39'-2"±
32'-11"±
46'-9"±
11'-5"±
EXISTING ROOF ASSEMBLY CHART
RO
OF
D
ES
IG
NA
TI
ON
STRUCTURAL
DECK
ROOF
MEMBRANE PAVERS COMMENTS
FL
AT
S
TR
UC
TU
RA
L C
ON
CR
ET
E
BU
ILT
-U P
RO
OF
PE
DE
ST
AL
S
PA
VE
RS
BLDG 1A PATIO
ROOFS ● ● ● X5/AS-501
SPECIFIC ROOF DEMOLITION NOTES
CF, AB, DRJAB
PAUL S. BROWN II
PROJECT ENGINEER, FAC-COR II, FE-C
LT. COL. LUKE J. WEATHERS, JR. VA MEDICAL CENTER
ADMIN BLDG 1, AEG28
1030 JEFFERSON AVE
MEMPHIS, TN 38104
OFFICE: 901 523 8990 EXT 4172
PRD
PRD
PRD PRD
DS
DS
AN
PRD
PRD
PRD
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
WWW.RAYMOND.GLOBAL
FULL-SERVICE ARCHITECTURE & ENGINEERING
CONYERS, GA | SAVANNAH, GA | GREER, SC | RALEIGH, NC
ORLANDO, FL | MIAMI, FL | RICHMOND, VA
1035 GREEN ST., STE A
CONYERS, GA 30012
404-345-8201
35% SUBMISSION 05 JUNE, 2023
65% SUBMISSION 15 AUGUST, 2023
95% SUBMISSION 12 DECEMBER, 2023
BID SET 4 OCTOBER, 2024
REVISED BID SET 30 DECEMBER, 2024
AD-104
AR
C
H F
U
LL
B
LE
ED
E
(3
0.
X
2.
IN
C
H
ES
/3 0/
:1
PM
PA
PE
R S
IZ
E
LA
ST
S
AV
ED
BUILDING 1, CONNECTING CORRIDORS - DEMOLITION ROOF PLAN1 SCALE: 1/8" : 1'-0"
LEGEND
ROOFTOP UNIT
ROOF OUTLINE/PARAPET
PRIMARY SCUPPER (PS)
GUTTER (GU)
TAPERED INSULATION
STRUCTURAL RIDGE/HIP
SOIL VENT PIPE (SVP)
OVERFLOW ROOF DRAIN
(ORD)
DOWNSPOUT (DS)
VALLEY
TEST CUT1
WATER FLOW
FALL PROTECTION DAVIT
(FPD)
PRIMAY ROOF DRAIN (PRD)
LIGHTNING PROTECTION
PITCH POCKET (LPS)
PITCH POCKET (PP)
FALL PROTECTION
ANCHOR (FPA)
ROOF-TO-WALL
EXPANSION JOINT
FALL PROTECTION
CABLE (FPC)
ROOF OUTLINE/
GRAVE-STOP FASCIA
ROOF AREA NOT-IN-
CONTRACT (N.I.C.) WIND ZONE NO. 1
WIND ZONE NO. 3 WIND ZONE NO. 2
ROOF-TO-ROOF
EXPANSION JOINT
OVERFLOW SCUPPER
(OS)
EXHAUST FAN (EF) HEATED VENT STACK
(HVS)
SKYLIGHT (S)S ROOF ACCESS - LADDER
ROOF HATCH ROOF WALKWAY PAD
CONTROL JOINT
ELEVATION CHANGE
KEYPLAN
LIGHTINING ROD
EXISTING ROOF ASSEMBLY CHART
RO
OF
D
ES
IG
NA
TI
ON
DECK INSULATION COVER BOARD ROOF
MEMBRANE SURFACING COMMENTS
FL
AT
M
ET
AL
D
EC
K
TA
PE
RE
D
LIG
HT
W
EI
GH
T
CO
NC
RE
TE
O
VE
R
FL
AT
M
ET
AL
DE
CK
FL
AT
S
TR
UC
TU
RA
L C
ON
CR
ET
E
DE
CK
FL
AT
P
OL
YI
SO
CY
AN
UR
AT
E
TA
PE
RE
D
PE
RL
IT
E
FL
AT
P
ER
LIT
E
BU
ILT
-U P
RO
OF
GR
AN
UL
E
SU
RF
AC
IN
G
CONNECTING
CORRIDOR 1 ● - - ● ● - ● ● X8/AS-501
CONNECTING
CORRIDOR 2 - ● - - - ● ● ● X9/AS-501
DOCK CANOPY - - ● - - - - - X6/AS-501
BUILDING 1A
PENTHOUSE ● - - ● ● - ● ● X8/AS-501
SPECIFIC ROOF DEMOLITION NOTES
BUILDING 1 CONNECTING CORRIDORS,
DOCK CANOPY, & BLDG 1A PENTHOUSE -
DEMOLITION ROOF PLAN
REPLACE ROOF BLDG 1, 1A, 5 & 7
VA MEDICAL CENTER - MEMPHIS, TN
614-23-103
BUILDING 1A, PENTHOUSE3 SCALE: 1/8" : 1'-0"
ANTENNAAN
BUILDING 1, DOCK CANOPY - DEMOLITION ROOF PLAN2 SCALE: 1/8" : 1'-0"
17'-6"±
132'-11"±
2'-10"±
11'-5"±
14'-5"± 55'-2"± 8'-9"± 17'-6"±
13'-10"±
40'-4"±
55'-5"±25'-11"±
10'-4"±
4'-3"±
2'-11"± 14'-6"±
22'-1"±
15'-6"±
33'-9"±
13'-2"±
42'-4"±
31'-3"±
27'-6"±
1'-8"±
29'-7"±
47°±
41'-9"±
CONNECTING
CORRIDOR 1
CONNECTING
CORRIDOR 2
CF, AB, DRJAB
PAUL S. BROWN II
PROJECT ENGINEER, FAC-COR II, FE-C
LT. COL. LUKE J. WEATHERS, JR. VA MEDICAL CENTER
ADMIN BLDG 1, AEG28
1030 JEFFERSON AVE
MEMPHIS, TN 38104
OFFICE: 901 523 8990 EXT 4172 30 DEC 2024
PRD PRD
PRD
PRD
PRD
BUILDING 5
MECHANICAL
PENTHOUSE
(5.2)
BUILDING 5
ROOF EAST
OF WOMEN'S
CLINIC
RENOVATION
(5.1)
NOT IN SCOPE
NOT IN SCOPE
PRD
PRD
PRD
PRD
PRD
LOADING
DOCK
CANOPY (5.4)
BUILDING 5
LOW ROOF
(5.3)
COOLING
TOWER
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
WWW.RAYMOND.GLOBAL
FULL-SERVICE ARCHITECTURE & ENGINEERING
CONYERS, GA | SAVANNAH, GA | GREER, SC | RALEIGH, NC
ORLANDO, FL | MIAMI, FL | RICHMOND, VA
1035 GREEN ST., STE A
CONYERS, GA 30012
404-345-8201
35% SUBMISSION 05 JUNE, 2023
65% SUBMISSION 15 AUGUST, 2023
95% SUBMISSION 12 DECEMBER, 2023
BID SET 4 OCTOBER, 2024
REVISED BID SET 30 DECEMBER, 2024
AD-105
AR
C
H F
U
LL
B
LE
ED
E
(3
0.
X
2.
IN
C
H
ES
/3 0/
:1
PM
PA
PE
R S
IZ
E
LA
ST
S
AV
ED
2 SCALE: 1/16" : 1'-0"
KEYPLAN
LEGEND
ROOFTOP UNIT
GUTTER (GU)
SOIL VENT PIPE (SVP)
DOWNSPOUT (DS)
WATER FLOW
PRIMAY ROOF DRAIN (PRD)
ROOF-TO-WALL
EXPANSION JOINT
ROOF OUTLINE/
GRAVE-STOP FASCIA
ROOF AREA NOT-IN-
CONTRACT (N.I.C.)
CONTROL JOINT
ELEVATION CHANGE
STRUCTURAL RIDGE/HIP
VALLEY
EXISTING ROOF ASSEMBLY CHART
RO
OF
D
ES
IG
NA
TI
ON
DECK INSULATION COVER
BOARD
ROOF
MEMBRANE SURFACING COMMENTS
TA
PE
RE
D
LIG
HT
W
EI
GH
T
CO
NC
RE
TE
O
VE
R
ME
TA
L D
EC
K
FL
AT
S
TR
UC
TU
RA
L C
ON
CR
ET
E
DE
CK
SL
OP
ED
M
ET
AL
D
EC
K
PO
LY
IS
O
IN
SU
LA
TI
ON
, F
LA
T
PE
RL
IT
E
BU
ILT
-U P
RO
OF
GR
AN
UL
AT
ED
C
AP
S
HE
ET
BUILDING 5 ROOF
EAST OF WOMEN'S
CLINIC
RENOVATION (5.1)
● - - - - ● ● X1/AS-502
BUILDING 5
MECHANICAL
PENTHOUSE (5.2) ● - - - - ● ● X1/AS-502
BUILDING 5 LOW
ROOF (5.3) ● - - - - ● ● X1/AS-502
BUILDING 5
LOADING DOCK
CANOPY (5.4)
- ● - - ● ● ● X4/AS-501
COOLING TOWER - - ● ● ● ● ● X2/AS-502
SPECIFIC ROOF DEMOLITION NOTES
BUILDING 5 - DEMOLITION ROOF PLAN
1 SCALE: 1/8" : 1'-0"
BUILDING 5 - DEMOLITION ROOF PLAN
3 SCALE: 1/4" : 1'-0"
COOLING TOWER EQUIPMENT ROOM - DEMOLITION ROOF PLAN
BUILDING 5 & COOLING TOWER EQUIPMENT
ROOM - DEMOLITION ROOF PLAN
REPLACE ROOF BLDG 1, 1A, 5 & 7
VA MEDICAL CENTER - MEMPHIS, TN
614-23-103
75'-7"±
7'-2"± 8'±
59'-6"±
18'-11"±
7'-2"±
9'-10"±
113°±
133°±
5'-1"±
42'-1"±
15'-10"± 18'± 29'-2"±
42'-5"±
27'-9"± 17'-2"±
5'-8"±
17'-11"±
21'-5"±
9'-2"± 17'-11"± 10'±
22'-7"± 17'-3"± 17'-5"± 12'-6"± 10'-1"±
59'±
10'-1"±
15'±
43'-4"±10'-8"±
6'-11"±
21'-1"±9'-7"±
8'-1"±
45'-8"±31'-11"±19'-6"±
64'-10"±
47'-5"±
13'-11"±
CF, AB, DRJAB
PAUL S. BROWN II
PROJECT ENGINEER, FAC-COR II, FE-C
LT. COL. LUKE J. WEATHERS, JR. VA MEDICAL CENTER
ADMIN BLDG 1, AEG28
1030 JEFFERSON AVE
MEMPHIS, TN 38104
OFFICE: 901 523 8990 EXT 4172
EXISTING FALL
PROTECTION
PRD PRD
PRD
PRD
PRD
PRD
PRD
PRD PRD
PRD
ORD
PRD PRD
PRD PRD PRD
PRD
PRD
PRD
PRD
PRD
PRD
PRD
PRD PRD
PRD
PRD
PRD PRD
PRD PRD PRD
PRD PRD
PRD
PRD
PRD
PRD
PRD
PRD
NOT IN SCOPE
NOT IN SCOPE
CONC. PATIO
NOT IN SCOPE
CONC. PATIO
NOT IN SCOPE
NOT IN SCOPE
NOT IN SCOPE
BUILDING 7.6
SL
SL SL
SL
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
WWW.RAYMOND.GLOBAL
FULL-SERVICE ARCHITECTURE & ENGINEERING
CONYERS, GA | SAVANNAH, GA | GREER, SC | RALEIGH, NC
ORLANDO, FL | MIAMI, FL | RICHMOND, VA
1035 GREEN ST., STE A
CONYERS, GA 30012
404-345-8201
35% SUBMISSION 05 JUNE, 2023
65% SUBMISSION 15 AUGUST, 2023
95% SUBMISSION 12 DECEMBER, 2023
BID SET 4 OCTOBER, 2024
REVISED BID SET 30 DECEMBER, 2024
AD-106
AR
C
H F
U
LL
B
LE
ED
E
(3
0.
X
2.
IN
C
H
ES
/3 0/
:1
PM
PA
PE
R S
IZ
E
LA
ST
S
AV
ED
BUILDING 7 - DEMOLITION ROOF PLAN
BUILDING 7 - DEMOLITION ROOF PLAN1 SCALE: 1/32" : 1'-0"
LEGEND
ROOFTOP UNIT
ROOF OUTLINE/PARAPET
PRIMARY SCUPPER (PS)
GUTTER (GU)
TAPERED INSULATION
SOIL VENT PIPE (SVP)
OVERFLOW ROOF DRAIN
(ORD)
DOWNSPOUT (DS)
TEST CUT1
WATER FLOW
FALL PROTECTION DAVIT
(FPD)
PRIMAY ROOF DRAIN (PRD)
LIGHTNING PROTECTION
PITCH POCKET (LPS)
PITCH POCKET (PP)
FALL PROTECTION
ANCHOR (FPA)
ROOF-TO-WALL
EXPANSION JOINT
ROOF OUTLINE/
GRAVE-STOP FASCIA
ROOF AREA NOT-IN-
CONTRACT (N.I.C.)
WIND ZONE NO. 1
WIND ZONE NO. 3
WIND ZONE NO. 2
ROOF-TO-ROOF
EXPANSION JOINT
OVERFLOW SCUPPER
(OS)
EXHAUST FAN (EF)
HEATED VENT STACK
(HVS)
SKYLIGHT (S)S
ROOF ACCESS - LADDER
ROOF HATCH
ROOF WALKWAY PAD
CONTROL JOINT
ELEVATION CHANGE
KEYPLAN
LIGHTINING ROD
EXISTING ROOF ASSEMBLY CHART
RO
OF
D
ES
IG
NA
TI
ON
DECK INSULATION COVER
BOARD
ROOF
MEMBRANE SURFACING COMMENTS
FL
AT
S
TR
UC
TU
RA
L C
ON
CR
ET
E
TA
PE
RE
D
PO
LY
IS
OC
YA
NU
RA
TE
PE
RL
IT
E
BU
ILT
-U P
RO
OF
AG
GR
EG
AT
E
BUILDINGS
7.1 - 7.9 ● ● ● ● ● X1/AS-501
SPECIFIC ROOF DEMOLITION NOTES
STRUCTURAL RIDGE/HIP
VALLEY
REPLACE ROOF BLDG 1, 1A, 5 & 7
VA MEDICAL CENTER - MEMPHIS, TN
614-23-103
22'±
19'±17'-5"±
49'-1"±
21'-7"± 20'-8"±
136°±
93'-10"±
80'-1"± 15'-7"±
105'-11"±
2'-7"± 23'-5"±
17'-9"±
140°±
21'-9"± 6'-8"±
118'-1"± 116'-10"±
6'-8"±
21'-4"±
17'-9"±
131°± 23'-5"±
2'-8"±
92'-10"±
17'-10"±
5'-9"±
18'-11"±
36'-2"±
134°±
30'-6"±
66'-8"±
13'-7"±
100'-7"±
61'-10"±
71'-4"±
97'-3"±
48'-10"±
45°±
12'-8"±
125'-9"±
91'-11"±
4'-10"± 24'-10"±
17'-11"±
136°±
20'-3"±
2'-8"±
119'-3"±
31'±
30'-9"±
55'±
28'-7"±
39'-3"±
59'-4"±
33'-7"±
9'-2"± 24'-9"±
133°±
16'-10"±
26'-1"±
9'±
13'-1"±
24'-10"±
BUILDING 7.4
BUILDING 7.1
BUILDING 7.2
BUILDING 7.3
BUILDING 7.5
BUILDING 7.6
BUILDING
7.9
BUILDING 7.7
BUILDING 7.8
5'-0"±
5'-0"±
22'-0"±
22'-0"±
CF, AB, DRJAB
PAUL S. BROWN II
PROJECT ENGINEER, FAC-COR II, FE-C
LT. COL. LUKE J. WEATHERS, JR. VA MEDICAL CENTER
ADMIN BLDG 1, AEG28
1030 JEFFERSON AVE
MEMPHIS, TN 38104
OFFICE: 901 523 8990 EXT 4172
EXTENT OF COURTYARD
EXISTING FALL
PROTECTION
BUILDING 7.10
PRD PRD
PRD
PRD
NOT IN SCOPE
NOT IN SCOPE
NOT IN SCOPE
NOT IN SCOPE
NOT IN SCOPE
NOT IN SCOPE
NOT IN SCOPE
ENTRANCE
VESTIBULE 2
ENTRANCE
VESTIBULE 1
ROOF OVER
THEATER
AMBULATORY CARE
MECHANICAL
PENTHOUSE
NOT IN SCOPE
NOT IN SCOPE
0.25:12
TAPER
0.25:12
TAPER
0.25:12
TAPER
0.25:12
TAPER
0.25:12
TAPER
0.25:12
TAPER
0.25:12
TAPER
0.25:12
TAPER
0.25:12
TAPER
0.25:12
TAPER
SVP
SVP
SVP
SVP
ENTRANCE VESTIBULE 1
DS
G 0.25:12
TAPER
KEYPLAN
LEGEND
ROOFTOP UNIT
ROOF OUTLINE/PARAPET GUTTER (GU)
SOIL VENT PIPE (SVP)
DOWNSPOUT (DS)
TEST CUT1
WATER FLOWPRIMAY ROOF DRAIN (PRD)
ROOF-TO-WALL
EXPANSION JOINT
ROOF OUTLINE/
GRAVE-STOP FASCIA
ROOF AREA NOT-IN-
CONTRACT (N.I.C.)
ROOF-TO-ROOF
EXPANSION JOINTSKYLIGHT (S)S
ELEVATION CHANGE
LIGHTINING ROD
REPLACE ROOF BLDG 1, 1A, 5 & 7
VA MEDICAL CENTER - MEMPHIS, TN
614-23-103
NEW ROOF ASSEMBLY CHART
RO
OF
D
ES
IG
NA
TI
ON
STRUCTURAL
DECK UNDERLAYMENT INSULATION COVER
BOARD
ROOF
MEMBRANE SURFACING COMMENTS
FL
AT
S
TR
UC
TU
RA
L C
ON
CR
ET
E
MO
DI
FI
ED
B
IT
UM
EN
B
AS
E
SH
EE
T, TO
RC
H
AP
PL
IE
D
TA
PE
RE
D
PO
LY
IS
OC
YA
NU
RA
TE
AD
HE
RE
D
AP
PR
OV
ED
C
OV
ER
B
OA
RD
AD
HE
RE
D
2 P
LY
M
OD
IF
IE
D
BI
TU
ME
N W
IT
H
GR
AN
UL
AT
ED
C
AP
S
HE
ET
, T
OR
CH
AP
PL
IE
D
GR
AN
UL
ES
M
EE
TI
NG
C
OO
L R
OO
F
RA
TI
NG
C
OU
NC
IL
RE
QU
IR
EM
EN
TS
FO
R
LO
W
-S
LO
PE
R
OO
FS
ENTRANCE
VESTIBULE 1 ● ● ● ● ● ● 1/AS-502
ENTRANCE
VESTIBULE 2 ● ● ● ● ● ● 1/AS-502
ROOF OVER THEATER ● ● ● ● ● ● 1/AS-502
AMBULATORY CARE
MECHANICAL
PENTHOUSE ● ● ● ● ● ● 1/AS-502
SPECIFIC ROOF CONSTRUCTION NOTES
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
WWW.RAYMOND.GLOBAL
FULL-SERVICE ARCHITECTURE & ENGINEERING
CONYERS, GA | SAVANNAH, GA | GREER, SC | RALEIGH, NC
ORLANDO, FL | MIAMI, FL | RICHMOND, VA
1035 GREEN ST., STE A
CONYERS, GA 30012
404-345-8201
35% SUBMISSION 05 JUNE, 2023
65% SUBMISSION 15 AUGUST, 2023
95% SUBMISSION 12 DECEMBER, 2023
BID SET 4 OCTOBER, 2024
REVISED BID SET 30 DECEMBER, 2024
AS-101
AR
C
H F
U
LL
B
LE
ED
E
(3
0.
X
2.
IN
C
H
ES
/3 0/
:1
PM
PA
PE
R S
IZ
E
LA
ST
S
AV
ED
BUILDING 1 - NEW ROOF PLAN
BUILDING 1 - NEW ROOF PLAN 1 SCALE: 1/16" : 1'-0"
CF, AB, DRJAB
SIM.
SIM.
PAUL S. BROWN II
PROJECT ENGINEER, FAC-COR II, FE-C
LT. COL. LUKE J. WEATHERS, JR. VA MEDICAL CENTER
ADMIN BLDG 1, AEG28
1030 JEFFERSON AVE
MEMPHIS, TN 38104
OFFICE: 901 523 8990 EXT 4172
EXISTING FALL
PROTECTION
NOT IN SCOPE
PRD PRD
PRD
0.
:1
TA
PE
R 0.
:1
TA
PE
R
PRD
PRD PRD
0.25:12
TAPER
0.
:1
TA
PE
R
0.
:1
TA
PE
R
0.
:1
TA
PE
R
0.
:1
TA
PE
R
0.
:1
TA
PE
R
0.
:1
TA
PE
R
0.
:1
TA
PE
R
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
WWW.RAYMOND.GLOBAL
FULL-SERVICE ARCHITECTURE & ENGINEERING
CONYERS, GA | SAVANNAH, GA | GREER, SC | RALEIGH, NC
ORLANDO, FL | MIAMI, FL | RICHMOND, VA
1035 GREEN ST., STE A
CONYERS, GA 30012
404-345-8201
35% SUBMISSION 05 JUNE, 2023
65% SUBMISSION 15 AUGUST, 2023
95% SUBMISSION 12 DECEMBER, 2023
BID SET 4 OCTOBER, 2024
REVISED BID SET 30 DECEMBER, 2024
AS-102
AR
C
H F
U
LL
B
LE
ED
E
(3
0.
X
2.
IN
C
H
ES
/3 0/
:1
PM
PA
PE
R S
IZ
E
LA
ST
S
AV
ED
BUILDING 1A GENERATOR - NEW ROOF PLAN1 SCALE: 3/32" : 1'-0"
LEGEND
ROOFTOP UNIT
ROOF OUTLINE/PARAPET
PRIMARY SCUPPER (PS)
GUTTER (GU)
TAPERED INSULATION
STRUCTURAL RIDGE/HIP
SOIL VENT PIPE (SVP)
OVERFLOW ROOF DRAIN
(ORD)
DOWNSPOUT (DS)
VALLEY
TEST CUT1
WATER FLOW
FALL PROTECTION DAVIT
(FPD)
PRIMAY ROOF DRAIN (PRD)
LIGHTNING PROTECTION
PITCH POCKET (LPS)
PITCH POCKET (PP)
FALL PROTECTION
ANCHOR (FPA)
ROOF-TO-WALL
EXPANSION JOINT
FALL PROTECTION
CABLE (FPC)
ROOF OUTLINE/
GRAVE-STOP FASCIA
ROOF AREA NOT-IN-
CONTRACT (N.I.C.) WIND ZONE NO. 1
WIND ZONE NO. 3 WIND ZONE NO. 2
ROOF-TO-ROOF
EXPANSION JOINT
OVERFLOW SCUPPER
(OS)
EXHAUST FAN (EF) HEATED VENT STACK
(HVS)
SKYLIGHT (S)S ROOF ACCESS - LADDER
ROOF HATCH ROOF WALKWAY PAD
CONTROL JOINT
ELEVATION CHANGE
KEYPLAN
LIGHTINING ROD
NEW ROOF ASSEMBLY CHART
RO
OF
D
ES
IG
NA
TI
ON
STRUCTURAL
DECK INSULATION COVER
BOARD
ROOF
MEMBRANE SURFACING COMMENTS
FL
AT
M
ET
AL
D
EC
K
TA
PE
RE
D
PO
LY
IS
OC
YA
NU
RA
TE
AP
PR
OV
ED
C
OV
ER
B
OA
RD
2 P
LY
M
OD
IF
IE
D
BI
TU
ME
N W
IT
H
GR
AN
UL
AT
ED
C
AP
S
HE
ET
, T
OR
CH
AP
PL
IE
D
GR
AN
UL
ES
M
EE
TI
NG
C
OO
L R
OO
F
RA
TI
NG
C
OU
NC
IL
RE
QU
IR
EM
EN
TS
FO
R
LO
W
-S
LO
PE
R
OO
FS
GENERATOR
BUILDING ● ● ● ● ● 3/AS-502
BUILDING 1A GENERATOR - NEW
ROOF PLAN
REPLACE ROOF BLDG 1, 1A, 5 & 7
VA MEDICAL CENTER - MEMPHIS, TN
614-23-103
CF, AB, DRJAB
SPECIFIC ROOF CONSTRUCTION NOTES
PAUL S. BROWN II
PROJECT ENGINEER, FAC-COR II, FE-C
LT. COL. LUKE J. WEATHERS, JR. VA MEDICAL CENTER
ADMIN BLDG 1, AEG28
1030 JEFFERSON AVE
MEMPHIS, TN 38104
OFFICE: 901 523 8990 EXT 4172
EXISTING FALL
PROTECTION
NOT IN SCOPE
TPO ROOF TO REMAIN
PATIO ROOF 2
PATIO ROOF 1
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
WWW.RAYMOND.GLOBAL
FULL-SERVICE ARCHITECTURE & ENGINEERING
CONYERS, GA | SAVANNAH, GA | GREER, SC | RALEIGH, NC
ORLANDO, FL | MIAMI, FL | RICHMOND, VA
1035 GREEN ST., STE A
CONYERS, GA 30012
404-345-8201
35% SUBMISSION 05 JUNE, 2023
65% SUBMISSION 15 AUGUST, 2023
95% SUBMISSION 12 DECEMBER, 2023
BID SET 4 OCTOBER, 2024
REVISED BID SET 30 DECEMBER, 2024
AS-103
AR
C
H F
U
LL
B
LE
ED
E
(3
0.
X
2.
IN
C
H
ES
/3 0/
:1
PM
PA
PE
R S
IZ
E
LA
ST
S
AV
ED
BUILDING 1A, SECOND FLOOR PATIO ROOF - NEW ROOF PLAN1 SCALE: 3/32" : 1'-0"
LEGEND
ROOFTOP UNIT
ROOF OUTLINE/PARAPET GUTTER (GU)
SOIL VENT PIPE (SVP)
DOWNSPOUT (DS)
TEST CUT1
WATER FLOWPRIMAY ROOF DRAIN (PRD)
ROOF-TO-WALL
EXPANSION JOINT
ROOF OUTLINE/
GRAVE-STOP FASCIA
ROOF AREA NOT-IN-
CONTRACT (N.I.C.)
ROOF-TO-ROOF
EXPANSION JOINTSKYLIGHT (S)S
ELEVATION CHANGE
KEYPLAN
LIGHTINING ROD
BUILDING 1A, SECOND FLOOR PATIO
ROOF - NEW ROOF PLAN
REPLACE ROOF BLDG 1, 1A, 5 & 7
VA MEDICAL CENTER - MEMPHIS, TN
614-23-103
26'-2"±
61'±
72'-6"±
14'-5"±
33'-10"±
39'-2"±
32'-11"±
46'-9"±
11'-5"±
NEW ROOF ASSEMBLY CHART
RO
OF
D
ES
IG
NA
TI
ON
STRUCTURAL
DECK UNDERLAYMENT INSULATION COVER
BOARD ROOF MEMBRANE SURFACING COMMENTS
FL
AT
S
TR
UC
TU
RA
L C
ON
CR
ET
E
MO
DI
FI
ED
B
IT
UM
EN
B
AS
E
SH
EE
T, TO
RC
H
AP
PL
IE
D
TA
PE
RE
D
PO
LY
IS
OC
YA
NU
RA
TE
AD
HE
RE
D (V
.I.F
AP
PR
OV
ED
C
OV
ER
B
OA
RD
AD
HE
RE
D
2 P
LY
M
OD
IF
IE
D
BI
TU
ME
N W
IT
H
GR
AN
UL
AT
ED
C
AP
S
HE
ET
, T
OR
CH
AP
PL
IE
D
M
IL
FU
LL
Y
AD
HE
RE
D
TP
O
ME
MB
RA
NE
PE
DE
ST
AL
S
AN
D
PA
VE
RS
PATIO ROOF 1 ● ● ● ● ● ● 4/AS-502
PATIO ROOF 2 ● ● ● ● ● 4A/AS-502
CF, AB, DRJAB
SPECIFIC ROOF CONSTRUCTION NOTES
PAUL S. BROWN II
PROJECT ENGINEER, FAC-COR II, FE-C
LT. COL. LUKE J. WEATHERS, JR. VA MEDICAL CENTER
ADMIN BLDG 1, AEG28
1030 JEFFERSON AVE
MEMPHIS, TN 38104
OFFICE: 901 523 8990 EXT 4172
PRD
PRD
PRD PRD
0.25:12
STR
U C
TU
R
AL
0.25:12
STR
U C
TU
R
AL
0.25:12
STR
U C
TU
R
AL
0.25:12
STR
U C
TU
R
AL
0.2 5:1
TAPER
0.2 5:1
TAPER
0.2 5:1
TAPER
0.2 5:1
TAPER
AN
DS DS
DS DS
DS
DSDS
DSDS
DS
DS DS
0.25:12
TAPER
0.
:1
TA
PE
R
0.25:12
TAPER
0.25:12
TAPER
0.25:12
TAPER
0.
:1
TA
PE
R
PRD
PRD
PRD
0.25:12
TAPER
0.25:12
TAPER
0.25:12
TAPER
0.25:12
TAPER
0.25:12
TAPER
0.25:12
TAPER
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
WWW.RAYMOND.GLOBAL
FULL-SERVICE ARCHITECTURE & ENGINEERING
CONYERS, GA | SAVANNAH, GA | GREER, SC | RALEIGH, NC
ORLANDO, FL | MIAMI, FL | RICHMOND, VA
1035 GREEN ST., STE A
CONYERS, GA 30012
404-345-8201
35% SUBMISSION 05 JUNE, 2023
65% SUBMISSION 15 AUGUST, 2023
95% SUBMISSION 12 DECEMBER, 2023
BID SET 4 OCTOBER, 2024
REVISED BID SET 30 DECEMBER, 2024
AS-104
AR
C
H F
U
LL
B
LE
ED
E
(3
0.
X
2.
IN
C
H
ES
/3 0/
:1
PM
PA
PE
R S
IZ
E
LA
ST
S
AV
ED
BUILDING 1, CONNECTING CORRIDORS - NEW ROOF PLAN1 SCALE: 1/8" : 1'-0"
LEGEND
ROOFTOP UNIT
ROOF OUTLINE/PARAPET
PRIMARY SCUPPER (PS)
GUTTER (GU)
TAPERED INSULATION
STRUCTURAL RIDGE/HIP
SOIL VENT PIPE (SVP)
OVERFLOW ROOF DRAIN
(ORD)
DOWNSPOUT (DS)
VALLEY
TEST CUT1
WATER FLOW
FALL PROTECTION DAVIT
(FPD)
PRIMAY ROOF DRAIN (PRD)
LIGHTNING PROTECTION
PITCH POCKET (LPS)
PITCH POCKET (PP)
FALL PROTECTION
ANCHOR (FPA)
ROOF-TO-WALL
EXPANSION JOINT
FALL PROTECTION
CABLE (FPC)
ROOF OUTLINE/
GRAVE-STOP FASCIA
ROOF AREA NOT-IN-
CONTRACT (N.I.C.) WIND ZONE NO. 1
WIND ZONE NO. 3 WIND ZONE NO. 2
ROOF-TO-ROOF
EXPANSION JOINT
OVERFLOW SCUPPER
(OS)
EXHAUST FAN (EF) HEATED VENT STACK
(HVS)
SKYLIGHT (S)S ROOF ACCESS - LADDER
ROOF HATCH ROOF WALKWAY PAD
CONTROL JOINT
ELEVATION CHANGE
KEYPLAN
LIGHTINING ROD
NEW ROOF ASSEMBLY CHART
RO
OF
D
ES
IG
NA
TI
ON
DECK UNDERLAYMENT INSULATION COVER
BOARD
ROOF
MEMBRANE SURFACING COMMENTS
FL
AT
M
ET
AL
D
EC
K
TA
PE
RE
D
LIG
HT
W
EI
GH
T
CO
NC
RE
TE
O
VE
R
FL
AT
M
ET
AL
DE
CK
FL
AT
S
TR
UC
TU
RA
L C
ON
CR
ET
E
DE
CK
AP
PR
OV
ED
U
ND
ER
LA
YM
EN
T
BO
AR
D, A
DH
ER
ED
MO
DI
FI
ED
B
IT
UM
EN
B
AS
E
SH
EE
T, TO
RC
H
AP
PL
IE
D
FL
AT
P
OL
YI
SO
CY
AN
UR
AT
E
TA
PE
RE
D
PO
LY
IS
OC
YA
NU
RA
TE
AP
PR
OV
ED
C
OV
ER
B
OA
RD
2 P
LY
M
OD
IF
IE
D
BI
TU
ME
N W
IT
H
GR
AN
UL
AT
ED
C
AP
S
HE
ET
, T
OR
CH
AP
PL
IE
D
GR
AN
UL
ES
M
EE
TI
NG
C
OO
L R
OO
F
RA
TI
NG
C
OU
NC
IL
RE
QU
IR
EM
EN
TS
FO
R
LO
W
-S
LO
PE
R
OO
FS
CONNECTING
CORRIDOR 1 ● - - - - - ● ● ● ● 3/AS-502
CONNECTING
CORRIDOR 2 - ● - ● ● ● - ● ● ● 2/AS-502
DOCK CANOPY - - ● - ● - ● ● ● ● 1/AS-502
BUILDING 1A
PENTHOUSE ● - - - - - ● ● ● ● 3/AS-502
BUILDING 1 CONNECTING CORRIDORS, DOCK
CANOPY & BLDG 1A PENTHOUSE -
NEW ROOF PLAN
REPLACE ROOF BLDG 1, 1A, 5 & 7
VA MEDICAL CENTER - MEMPHIS, TN
614-23-103
BUILDING 1A, PENTHOUSE - NEW ROOF PLAN3 SCALE: 1/8" : 1'-0"
CONNECTING
CORRIDOR 2
ANTENNAAN
BUILDING 1, DOCK CANOPY - NEW ROOF PLAN2 SCALE: 1/8" : 1'-0"
CONNECTING
CORRIDOR 1
CF, AB, DRJAB
SPECIFIC ROOF CONSTRUCTION NOTES
PAUL S. BROWN II
PROJECT ENGINEER, FAC-COR II, FE-C
LT. COL. LUKE J. WEATHERS, JR. VA MEDICAL CENTER
ADMIN BLDG 1, AEG28
1030 JEFFERSON AVE
MEMPHIS, TN 38104
PRD PRD
PRD
PRD
PRD
BUILDING 5
MECHANICAL
PENTHOUSE
(5.2)
BUILDING 5
ROOF EAST
OF WOMEN'S
CLINIC
RENOVATION
(5.1)
0.25:12
STR
U C
TU
R
AL
0.25:12
STR
U C
TU
R
AL
0.25:12
STR
U C
TU
R
AL
0.25:12
STR
U C
TU
R
AL
0.25:12
STR
U C
TU
R
AL
0.25:12
STR
U
C
TU
R
AL
0.25:12
STR
U C
TU
R
AL
0.25:12
STR
U
C
TU
R
AL
0.25:12
STR
U C
TU
R
AL
0.25:12
STR
U
C
TU
R
AL
NOT IN SCOPE
NOT IN SCOPE
PRD
PRD
PRD
PRD
PRD
LOADING
DOCK
CANOPY (5.4)
BUILDING 5
LOW ROOF
(5.3)
0.25:12
TAPER
0.25:12
TAPER
0.25:12
STR
U C
TU
R
AL
0.25:12
STR
U C
TU
R
AL 0.25:12
STR
U C
TU
R
AL
0.25:12
STR
U C
TU
R
AL
COOLING
TOWER
0.25:12
STRUCTURAL
DS
DS
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
WWW.RAYMOND.GLOBAL
FULL-SERVICE ARCHITECTURE & ENGINEERING
CONYERS, GA | SAVANNAH, GA | GREER, SC | RALEIGH, NC
ORLANDO, FL | MIAMI, FL | RICHMOND, VA
1035 GREEN ST., STE A
CONYERS, GA 30012
404-345-8201
35% SUBMISSION 05 JUNE, 2023
65% SUBMISSION 15 AUGUST, 2023
95% SUBMISSION 12 DECEMBER, 2023
BID SET 4 OCTOBER, 2024
REVISED BID SET 30 DECEMBER, 2024
AS-105
AR
C
H F
U
LL
B
LE
ED
E
(3
0.
X
2.
IN
C
H
ES
/3 0/
:1
PM
PA
PE
R S
IZ
E
LA
ST
S
AV
ED
2 SCALE: 1/16" : 1'-0"
KEYPLAN
LEGEND
ROOFTOP UNIT
GUTTER (GU)
SOIL VENT PIPE (SVP)
DOWNSPOUT (DS)
WATER FLOW
PRIMAY ROOF DRAIN (PRD)
ROOF-TO-WALL
EXPANSION JOINT
ROOF OUTLINE/
GRAVE-STOP FASCIA
ROOF AREA NOT-IN-
CONTRACT (N.I.C.)
CONTROL JOINT
ELEVATION CHANGE
STRUCTURAL RIDGE/HIP
VALLEY
NEW ROOF ASSEMBLY CHART
RO
OF
D
ES
IG
NA
TI
ON
DECK UNDERLAYMENT INSULATION COVER
BOARD
ROOF
MEMBRANE SURFACING COMMENTS
TA
PE
RE
D
LIG
HT
W
EI
GH
T
CO
NC
RE
TE
O
VE
R
ME
TA
L D
EC
K
FL
AT
S
TR
UC
TU
RA
L C
ON
CR
ET
E
DE
CK
SL
OP
ED
M
ET
AL
D
EC
K
AP
PR
OV
ED
U
ND
ER
LA
YM
EN
T
BO
AR
D, A
DH
ER
ED
MO
DI
FI
ED
B
IT
UM
EN
B
AS
E
SH
EE
T, TO
RC
H
AP
PL
IE
D
FL
AT
P
OL
YI
SO
CY
AN
UR
AT
E
TA
PE
RE
D
PO
LY
IS
OC
YA
NU
RA
TE
AP
PR
OV
ED
C
OV
ER
B
OA
RD
2 P
LY
M
OD
IF
IE
D
BI
TU
ME
N W
IT
H
GR
AN
UL
AT
ED
C
AP
S
HE
ET
, T
OR
CH
AP
PL
IE
D
GR
AN
UL
ES
M
EE
TI
NG
C
OO
L R
OO
F
RA
TI
NG
C
OU
NC
IL
RE
QU
IR
EM
EN
TS
FO
R
LO
W
-S
LO
PE
R
OO
FS
BUILDING 5 ROOF
EAST OF WOMEN'S
CLINIC
RENOVATION (5.1)
● - - ● ● ● - ● ● ● 2/AS-502
BUILDING 5
MECHANICAL
PENTHOUSE (5.2) ● - - ● ● ● - ● ● ● 2/AS-502
BUILDING 5 LOW
ROOF (5.3) ● - - ● ● ● - ● ● ● 2/AS-502
BUILDING 5
LOADING DOCK
CANOPY (5.4)
- ● - - ● - ● ● ● ● 1/AS-502
COOLING TOWER - - ● - - ● - ● ● ● 3/AS-502
BUILDING 5 - NEW ROOF PLAN
1 SCALE: 1/8" : 1'-0"
BUILDING 5 - NEW ROOF PLAN
3 SCALE: 1/4" : 1'-0"
COOLING TOWER EQUIPMENT ROOM - NEW ROOF PLAN
BUILDING 5 & COOLING TOWER EQUIPMENT
ROOM - NEW ROOF PLAN
REPLACE ROOF BLDG 1, 1A, 5 & 7
VA MEDICAL CENTER - MEMPHIS, TN
614-23-103
CF, AB, DRJAB
SPECIFIC ROOF CONSTRUCTION NOTES
PAUL S. BROWN II
PROJECT ENGINEER, FAC-COR II, FE-C
LT. COL. LUKE J. WEATHERS, JR. VA MEDICAL CENTER
ADMIN BLDG 1, AEG28
1030 JEFFERSON AVE
MEMPHIS, TN 38104
OFFICE: 901 523 8990 EXT 4172
EXISTING FALL
PROTECTION
PRD PRD
PRD
PRD
PRD
PRD
PRD
PRD PRD
PRD
ORD
PRD PRD
PRD PRD PRD
PRD
PRD
PRD
PRD
PRD
PRD
PRD
PRD PRD
PRD
PRD
PRD PRD
PRD PRD PRD
PRD PRD
PRD
PRD
PRD
PRD
PRD
PRD
NOT IN SCOPE
NOT IN SCOPE
CONC. PATIO
NOT IN SCOPE
CONC. PATIO
NOT IN SCOPE
NOT IN SCOPE
NOT IN SCOPE
BUILDING 7.6
0.25:12
TAPER
0.25:12
TAPER
0.25:12
TAPER
0.25:12
TAPER
0.25:12
TAPER
0.25:12
TAPER
0.25:12
TAPER
0.25:12
TAPER
0.25:12
TAPER
0.25:12
TAPER
0.25:12
TAPER
0.25:12
TAPER
0.25:12
TAPER
0.25:12
TAPER
0.25:12
TAPER
0.25:12
TAPER
0.25:12
TAPER
0.25:12
TAPER
0.25:12
TAPER
0.25:12
TAPER
0.25:12
TAPER
0.25:12
TAPER
0.
:1
TA
PE
R
0.
:1
TA
PE
R
0.
:1
TA
PE
R
0.
:1
TA
PE
R
0.
:1
TA
PE
R
0.
:1
TA
PE
R
0.
:1
TA
PE
R
0.
:1
TA
PE
R
0.
:1
TA
PE
R
0.
:1
TA
PE
R
0.
:1
TA
PE
R
0.
:1
TA
PE
R
0.
:1
TA
PE
R
0.
:1
TA
PE
R
0.
:1
TA
PE
R
0.
:1
TA
PE
R
0.
:1
TA
PE
R
0.
:1
TA
PE
R 0.
:1
TA
PE
R
0.
:1
TA
PE
R
0.
:1
TA
PE
R
0.
:1
TA
PE
R
0.
:1
TA
PE
R
0.
:1
TA
PE
R 0.
:1
TA
PE
R
0.
:1
TA
PE
R
0.
:1
TA
PE
R
0.
:1
TA
PE
R
0.
:1
TA
PE
R
0.
:1
TA
PE
R
0.
:1
TA
PE
R
0.
:1
TA
PE
R
0.
:1
TA
PE
R
0.
:1
TA
PE
R
0.
:1
TA
PE
R
0.
:1
TA
PE
R
0.
:1
TA
PE
R
0.
:1
TA
PE
R
0.
:1
TA
PE
R
0.
:1
TA
PE
R
0.
:1
TA
PE
R
0.
:1
TA
PE
R
0.
:1
TA
PE
R 0.
:1
TA
PE
R
0.
:1
TA
PE
R
0.
:1
TA
PE
R
0.
:1
TA
PE
R
0.
:1
TA
PE
R
0.
:1
TA
PE
R
0.
:1
TA
PE
R
0.25:12
TAPER
SL
SL SL
SL
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
WWW.RAYMOND.GLOBAL
FULL-SERVICE ARCHITECTURE & ENGINEERING
CONYERS, GA | SAVANNAH, GA | GREER, SC | RALEIGH, NC
ORLANDO, FL | MIAMI, FL | RICHMOND, VA
1035 GREEN ST., STE A
CONYERS, GA 30012
404-345-8201
35% SUBMISSION 05 JUNE, 2023
65% SUBMISSION 15 AUGUST, 2023
95% SUBMISSION 12 DECEMBER, 2023
BID SET 4 OCTOBER, 2024
REVISED BID SET 30 DECEMBER, 2024
AS-106
AR
C
H F
U
LL
B
LE
ED
E
(3
0.
X
2.
IN
C
H
ES
/3 0/
:1
PM
PA
PE
R S
IZ
E
LA
ST
S
AV
ED
BUILDING 7 - NEW ROOF PLAN
BUILDING 7 - NEW ROOF PLAN1 SCALE: 1/32" : 1'-0"
LEGEND
ROOFTOP UNIT
ROOF OUTLINE/PARAPET
PRIMARY SCUPPER (PS)
GUTTER (GU)
TAPERED INSULATION
SOIL VENT PIPE (SVP)
OVERFLOW ROOF DRAIN
(ORD)
DOWNSPOUT (DS)
TEST CUT1
WATER FLOW
FALL PROTECTION DAVIT
(FPD)
PRIMAY ROOF DRAIN (PRD)
LIGHTNING PROTECTION
PITCH POCKET (LPS)
PITCH POCKET (PP)
FALL PROTECTION
ANCHOR (FPA)
ROOF-TO-WALL
EXPANSION JOINT
ROOF OUTLINE/
GRAVE-STOP FASCIA
ROOF AREA NOT-IN-
CONTRACT (N.I.C.)
WIND ZONE NO. 1
WIND ZONE NO. 3
WIND ZONE NO. 2
ROOF-TO-ROOF
EXPANSION JOINT
OVERFLOW SCUPPER
(OS)
EXHAUST FAN (EF)
HEATED VENT STACK
(HVS)
SKYLIGHT - MIN 8" BASE
FLASHING HEIGHTSL
ROOF ACCESS - LADDER
ROOF HATCH
ROOF WALKWAY PAD
CONTROL JOINT
ELEVATION CHANGE
KEYPLAN
LIGHTINING ROD
STRUCTURAL RIDGE/HIP
VALLEY
REPLACE ROOF BLDG 1, 1A, 5 & 7
VA MEDICAL CENTER - MEMPHIS, TN
614-23-103
BUILDING 7.4
BUILDING 7.1
BUILDING 7.2
BUILDING 7.3
BUILDING 7.5
BUILDING 7.6
BUILDING
7.9
BUILDING 7.7
BUILDING 7.8
NEW ROOF ASSEMBLY CHART
RO
OF
D
ES
IG
NA
TI
ON
STRUCTURAL
DECK UNDERLAYMENT INSULATION COVER
BOARD
ROOF
MEMBRANE SURFACING COMMENTS
FL
AT
S
TR
UC
TU
RA
L C
ON
CR
ET
E
MO
DI
FI
ED
B
IT
UM
EN
B
AS
E
SH
EE
T, TO
RC
H
AP
PL
IE
D
TA
PE
RE
D
PO
LY
IS
OC
YA
NU
RA
TE
AD
HE
RE
D
AP
PR
OV
ED
C
OV
ER
B
OA
RD
AD
HE
RE
D
2 P
LY
M
OD
IF
IE
D
BI
TU
ME
N W
IT
H
GR
AN
UL
AT
ED
C
AP
S
HE
ET
, T
OR
CH
AP
PL
IE
D
GR
AN
UL
ES
M
EE
TI
NG
C
OO
L R
OO
F
RA
TI
NG
C
OU
NC
IL
RE
QU
IR
EM
EN
TS
FO
R
LO
W
-S
LO
PE
R
OO
FS
BUILDINGS 7.1-7.10 ● ● ● ● ● ● 1/AS-502
CF, AB, DRJAB
SPECIFIC ROOF CONSTRUCTION NOTES
PAUL S. BROWN II
PROJECT ENGINEER, FAC-COR II, FE-C
LT. COL. LUKE J. WEATHERS, JR. VA MEDICAL CENTER
ADMIN BLDG 1, AEG28
1030 JEFFERSON AVE
MEMPHIS, TN 38104
OFFICE: 901 523 8990 EXT 4172
EXTENT OF COURTYARD
EXISTING FALL
PROTECTION
BUILDING 7.10
NOT IN
SCOPE
NOT IN
SCOPE
NOT IN
SCOPE
NOT IN
SCOPE
NOT IN
SCOPE
NOT IN
SCOPE
NOT IN
SCOPE
ENTRANCE
VESTIBULE
15'±
ENTRANCE
VESTIBULE 1
15'±
ROOF
OVER
THEATER
40'±
AMBULATORY
CARE
MECHANICAL
PENTHOUSE
28'±
NOT IN
SCOPE
NOT IN SCOPE
3 3
KEYPLAN
35% SUBMISSION 05 JUNE, 2023
TAB12 DEC 2024
BID SET SUBMISSION REPLACE ROOF BLDG 1, 1A, 5 & 7
VA MEDICAL CENTER - MEMPHIS, TN
614-23-103 Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
WWW.RAYMOND.GLOBAL
FULL-SERVICE ARCHITECTURE & ENGINEERING
CONYERS, GA | SAVANNAH, GA | GREER, SC | RALEIGH, NC
ORLANDO, FL | MIAMI, FL | RICHMOND, VA
1035 GREEN ST., STE A
CONYERS, GA 30012
404-345-8201 S-101
AR
C
H F
U
LL
B
LE
ED
E
(3
0.
X
2.
IN
C
H
ES
/1 3/
:1
PM
PA
PE
R S
IZ
E
LA
ST
S
AV
ED
BUILDING 1 - WIND ZONE ROOF PLAN
CF, ABTAB
BUILDING 1 - WIND ZONE ROOF PLAN 1 SCALE: 1/16" : 1'-0"
65% SUBMISSION 15 AUGUST, 2023
95% SUBMISSION 12 DECEMBER, 2023
LEGEND
ZONE 1 - FIELD
ZONE 2 - PERIMETER
ZONE 3 - CORNER
22'-0"
TYP
22'-0"
TYP
11'-3"
TYP
11'-3"
TYP
11'-3"
TYP
WIND UPLIFT PRESSURES
ASCE 7-10; IBC 2012
ROOF AREA DIMENSIONS (FEET): REFER ROOF PLAN
RISK CATEGORY: IV
EXPOSURE CATEGORY: C
BASIC WIND SPEED (THREE-SECOND PEAK GUST, MPH): 120 MPH
ASD*
ZONE 1 -44.95 PSF
ZONE 2 -65.69 PSF
ZONE 3 -86.44 PSF
ROOFING CONTRACTOR SHALL INSTALL TESTED ROOF ASSEMBLY w/ 2.0
SAFETY FACTOR TO MEET OR EXCEED THESE PRESSURES.
100 SUBMISSION 08 APRIL, 2024
BID SET 12/12/2024
NOT IN
SCOPE
NOT IN
SCOPE
3 3
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
WWW.RAYMOND.GLOBAL
FULL-SERVICE ARCHITECTURE & ENGINEERING
CONYERS, GA | SAVANNAH, GA | GREER, SC | RALEIGH, NC
ORLANDO, FL | MIAMI, FL | RICHMOND, VA
1035 GREEN ST., STE A
CONYERS, GA 30012
404-345-8201 S-102
AR
C
H F
U
LL
B
LE
ED
E
(3
0.
X
2.
IN
C
H
ES
/1 3/
:1
PM
PA
PE
R S
IZ
E
LA
ST
S
AV
ED
TAB
BUILDING 1A GENERATOR - WIND ZONE ROOF PLAN1 SCALE: 3/32" : 1'-0"
KEYPLAN
CF, AB, DRJ
35% SUBMISSION 05 JUNE, 2023
TAB
BUILDING 1A GENERATOR - WIND ZONE ROOF
PLAN
REPLACE ROOF BLDG 1, 1A, 5 & 7
VA MEDICAL CENTER - MEMPHIS, TN
614-23-103
65% SUBMISSION 15 AUGUST, 2023
95% SUBMISSION 12 DECEMBER, 2023
LEGEND
ZONE 1 - FIELD
6'-0"
6'-0"
WIND UPLIFT PRESSURES
ASCE 7-10; IBC 2012
ROOF AREA DIMENSIONS (FEET): REFER ROOF PLAN
RISK CATEGORY: IV
EXPOSURE CATEGORY: C
BASIC WIND SPEED (THREE-SECOND PEAK GUST, MPH): 120 MPH
ASD*
ZONE 1 -44.95 PSF
ZONE 2 -65.69 PSF
ZONE 3 -86.44 PSF
ROOFING CONTRACTOR SHALL INSTALL TESTED ROOF ASSEMBLY w/ 2.0
SAFETY FACTOR TO MEET OR EXCEED THESE PRESSURES.
6'-0"
TYP
100% SUBMISSION 08 APRIL, 2024
BID SET 12 DECEMBER, 2024
BID SET
12 DEC 2024
NOT IN
SCOPE
NOT IN
SCOPE
TPO ROOF TO REMAIN
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
WWW.RAYMOND.GLOBAL
FULL-SERVICE ARCHITECTURE & ENGINEERING
CONYERS, GA | SAVANNAH, GA | GREER, SC | RALEIGH, NC
ORLANDO, FL | MIAMI, FL | RICHMOND, VA
1035 GREEN ST., STE A
CONYERS, GA 30012
404-345-8201 S-103
AR
C
H F
U
LL
B
LE
ED
E
(3
0.
X
2.
IN
C
H
ES
/1 3/
:1
PM
PA
PE
R S
IZ
E
LA
ST
S
AV
ED
CF, ABTAB
BUILDING 1A, SECOND FLOOR PATIO ROOF - WIND ZONE ROOF PLAN1 SCALE: 3/32" : 1'-0"
KEYPLAN
35% SUBMISSION 05 JUNE, 2023
TAB
BUILDING 1A, SECOND FLOOR PATIO
ROOF - WIND ZONE ROOF PLAN
REPLACE ROOF BLDG 1, 1A, 5 & 7
VA MEDICAL CENTER - MEMPHIS, TN
614-23-103
65% SUBMISSION 15 AUGUST, 2023
95% SUBMISSION 12 DECEMBER, 2023
LEGEND
ZONE 1 - FIELD
WIND UPLIFT PRESSURES
ASCE 7-10; IBC 2012
ROOF AREA DIMENSIONS (FEET): REFER ROOF PLAN
RISK CATEGORY: IV
EXPOSURE CATEGORY: C
BASIC WIND SPEED (THREE-SECOND PEAK GUST, MPH): 120 MPH
ASD*
ZONE 1 -44.95 PSF
ZONE 2 -65.69 PSF
ZONE 3 -86.44 PSF
ROOFING CONTRACTOR SHALL INSTALL TESTED ROOF ASSEMBLY w/ 2.0
SAFETY FACTOR TO MEET OR EXCEED THESE PRESSURES.
100% SUBMISSION 08 APRIL, 2024
BID SET 12 DECEMBER, 2024
3 3
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
WWW.RAYMOND.GLOBAL
FULL-SERVICE ARCHITECTURE & ENGINEERING
CONYERS, GA | SAVANNAH, GA | GREER, SC | RALEIGH, NC
ORLANDO, FL | MIAMI, FL | RICHMOND, VA
1035 GREEN ST., STE A
CONYERS, GA 30012
404-345-8201 S-104
AR
C
H F
U
LL
B
LE
ED
E
(3
0.
X
2.
IN
C
H
ES
/1 3/
:1
PM
PA
PE
R S
IZ
E
LA
ST
S
AV
ED
TAB
BUILDING 1, CONNECTING CORRIDORS - WIND ZONE ROOF PLAN1 SCALE: 1/8" : 1'-0"
KEYPLAN
CF, AB, DRJ
35% SUBMISSION 05 JUNE, 2023
TAB
BUILDING 1 CONNECTING CORRIDORS,
DOCK CANOPY, & BUILDING 1A PENTHOUSE
- WIND ZONE ROOF PLANS
REPLACE ROOF BLDG 1, 1A, 5 & 7
VA MEDICAL CENTER - MEMPHIS, TN
614-23-103
BUILDING 1A, PENTHOUSE - WIND ZONE NEW ROOF PLAN3 SCALE: 1/8" : 1'-0"
CONNECTING
CORRIDOR 2
BUILDING 1, DOCK CANOPY - WIND ZONE ROOF PLAN2 SCALE: 1/8" : 1'-0"
CONNECTING
CORRIDOR 1
65% SUBMISSION 15 AUGUST, 2023
95% SUBMISSION 12 DECEMBER, 2023
LEGEND
ZONE 1 - FIELD
3'-0"
3'-0"
TYP 3'-0"
TYP
3'-0"
TYP
5'-3"
TYP
WIND UPLIFT PRESSURES
ASCE 7-10; IBC 2012
ROOF AREA DIMENSIONS (FEET): REFER ROOF PLAN
RISK CATEGORY: IV
EXPOSURE CATEGORY: C
BASIC WIND SPEED (THREE-SECOND PEAK GUST, MPH): 120 MPH
BUILDING 1A PENTHOUSE
ASD*
ZONE 1 -47.33 PSF
ZONE 2 -69.17 PSF
ZONE 3 -91.01 PSF
BUILDING 1 CORRIDORS
ASD*
ZONE 1 -44.95 PSF
ZONE 2 -65.69 PSF
ZONE 3 -86.44 PSF
BUILDING 1 DOCK CANOPY
ASD*
ZONE 1 -40.03 PSF
ZONE 2 -56.35 PSF
ZONE 3 -74.76 PSF
ROOFING CONTRACTOR SHALL INSTALL TESTED ROOF ASSEMBLY w/ 2.0
SAFETY FACTOR TO MEET OR EXCEED THESE PRESSURES.
10'-6"
TYP
10'-6"
TYP
100% SUBMISSION 08 APRIL, 2024
BID SET 12 DECEMBER, 2024
NOT IN
SCOPE
BUILDING 5
MECHANICAL
PENTHOUSE (5.2)
BUILDING 5
ROOF EAST OF
WOMEN'S CLINIC
RENOVATION (5.1)
2 2
33 2
2 2
2 2
3 3 3 3 3
NOT IN SCOPE
NOT IN SCOPE
LOADING
DOCK
CANOPY (5.4)
BUILDING 5
LOW ROOF (5.3)
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
WWW.RAYMOND.GLOBAL
FULL-SERVICE ARCHITECTURE & ENGINEERING
CONYERS, GA | SAVANNAH, GA | GREER, SC | RALEIGH, NC
ORLANDO, FL | MIAMI, FL | RICHMOND, VA
1035 GREEN ST., STE A
CONYERS, GA 30012
404-345-8201 S-105
AR
C
H F
U
LL
B
LE
ED
E
(3
0.
X
2.
IN
C
H
ES
/1 3/
:1
PM
PA
PE
R S
IZ
E
LA
ST
S
AV
ED
TAB
2 SCALE: 1/16" : 1'-0"
KEYPLAN
CF, AB, DRJ
BUILDING 5 - WIND ZONE ROOF PLAN
1 SCALE: 1/8" : 1'-0"
BUILDING 5 - WIND ZONE ROOF PLAN
3 SCALE: 1/4" : 1'-0"
COOLING TOWER EQUIPMENT ROOM - WIND ZONE ROOF PLAN
35% SUBMISSION 05 JUNE, 2023 BUILDING 5 & COOLING TOWER EQUIPMENT
ROOM - WIND ZONE ROOF PLANS
REPLACE ROOF BLDG 1, 1A, 5 & 7
VA MEDICAL CENTER - MEMPHIS, TN
614-23-103
65% SUBMISSION 15 AUGUST, 2023
95% SUBMISSION 12 DECEMBER, 2023
LEGEND
ZONE 1 - FIELD
3'-0"
3'-0"
TYP
3'-0"
TYP
3'-0"
TYP
16'-0"
TYP 16'-0"
TYP
WIND UPLIFT PRESSURES
ASCE 7-10; IBC 2012
ROOF AREA DIMENSIONS (FEET): REFER ROOF PLAN
RISK CATEGORY: IV
EXPOSURE CATEGORY: C
BASIC WIND SPEED (THREE-SECOND PEAK GUST, MPH): 120 MPH
COOLING TOWER EQUIPMENT ROOM
ASD*
ZONE 1 -24.50 PSF
ZONE 2 -37.15 PSF
ZONE 3 -52.95 PSF
BUILDING 5
ASD*
ZONE 1 -44.95 PSF
ZONE 2 -65.69 PSF
ZONE 3 -86.44 PSF
BUILDING 5 LOADING DOCK CANOPY
ASD*
ZONE 1 -40.03 PSF
ZONE 2 -56.35 PSF
ZONE 3 -74.76 PSF
ROOFING CONTRACTOR SHALL INSTALL TESTED ROOF ASSEMBLY w/ 2.0
SAFETY FACTOR TO MEET OR EXCEED THESE PRESSURES.
100% SUBMISSION 08 APRIL, 2024
BID SET 12 DECEMBER, 2024
NOT
IN
SCOPE
NOT
IN
SCOPE
CONC.
PATIO
NOT
IN
SCOPE
CONC.
PATIO
NOT
IN
SCOPE
NOT
IN
SCOPE
NOT
IN
SCOPE
BUILDING
7.6
3 3 3
3 32
NOT
IN
SCOPE
NOT
IN
SCOPE
CONC.
PATIO
NOT
IN
SCOPE
CONC.
PATIO
NOT
IN
SCOPE
NOT
IN
SCOPE
NOT
IN
SCOPE
BUILDING
7.6
3 3 3
3 32
NOT
IN
SCOPE
NOT
IN
SCOPE
CONC.
PATIO
NOT
IN
SCOPE
CONC.
PATIO
NOT
IN
SCOPE
NOT
IN
SCOPE
NOT
IN
SCOPE
BUILDING
7.6
3 3 3
3 32
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
WWW.RAYMOND.GLOBAL
FULL-SERVICE ARCHITECTURE & ENGINEERING
CONYERS, GA | SAVANNAH, GA | GREER, SC | RALEIGH, NC
ORLANDO, FL | MIAMI, FL | RICHMOND, VA
1035 GREEN ST., STE A
CONYERS, GA 30012
404-345-8201 S-106
AR
C
H F
U
LL
B
LE
ED
E
(3
0.
X
2.
IN
C
H
ES
/1 3/
:1
PM
PA
PE
R S
IZ
E
LA
ST
S
AV
ED
BUILDING 7 - WIND ZONE ROOF PLAN
TAB
BUILDING 7 - WIND ZONE ROOF PLAN1 SCALE: 1/32" : 1'-0"
KEYPLAN
CF, AB, DRJ
35% SUBMISSION 05 JUNE, 2023
TAB
REPLACE ROOF BLDG 1, 1A, 5 & 7
VA MEDICAL CENTER - MEMPHIS, TN
614-23-103
BUILDING 7.4
BUILDING 7.1
BUILDING 7.2
BUILDING 7.5
BUILDING 7.6
BUILDING
7.9
BUILDING 7.7
BUILDING 7.8
65% SUBMISSION 15 AUGUST, 2023
95% SUBMISSION 12 DECEMBER, 2023
LEGEND
ZONE 1 - FIELD
125'-9"±125'-9"±
16'-0"
TYP
16'-0"
TYP
WIND UPLIFT PRESSURES
ASCE 7-10; IBC 2012
ROOF AREA DIMENSIONS (FEET): REFER ROOF PLAN
RISK CATEGORY: IV
EXPOSURE CATEGORY: C
BASIC WIND SPEED (THREE-SECOND PEAK GUST, MPH): 120 MPH
SPINAL CHORD INJURY BUILDING
ASD*
ZONE 1 -44.95 PSF
ZONE 2 -65.69 PSF
ZONE 3 -86.44 PSF
ROOFING CONTRACTOR SHALL INSTALL TESTED ROOF ASSEMBLY w/ 2.0
SAFETY FACTOR TO MEET OR EXCEED THESE PRESSURES.
100% SUBMISSION 07 MARCH, 2024
BUILDING 7.10
BID SET 12 DECEMBER, 2024
STRUCTURAL CONCRETE DECK, FLAT
POLYISOCYANURATE FOAM BOARD
INSULATION, TAPERED
PERLITE
COAL TAR PITCH
STRUCTURAL CONCRETE DECK, FLAT
EX. METAL DECK
EX. ISOCYANURATE
INSULATION
EX. PERLITE
EX. B.U.R. FELTS
EX. AGGREGATE
STRUCTURAL CONCRETE DECK, FLAT
PERLITE
STRUCTURAL CONCRETE DECK, FLAT
STRUCTURAL CONCRETE DECK, FLAT
STRUCTURAL CONCRETE DECK
PERLITE
METAL DECK, FLAT
PERLITE (RE-COVER BOARD)
METAL DECK, FLAT
TAPRED PERLITE
LWC OVER METAL DECK,
TAPERED
PERLITE
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
WWW.RAYMOND.GLOBAL
FULL-SERVICE ARCHITECTURE & ENGINEERING
CONYERS, GA | SAVANNAH, GA | GREER, SC | RALEIGH, NC
ORLANDO, FL | MIAMI, FL | RICHMOND, VA
1035 GREEN ST., STE A
CONYERS, GA 30012
404-345-8201
35% SUBMISSION 05 JUNE, 2023
65% SUBMISSION 15 AUGUST, 2023
95% SUBMISSION 12 DECEMBER, 2023
BID SET 4 OCTOBER, 2024
REVISED BID SET 30 DECEMBER, 2024
AS-501
AR
C
H F
U
LL
B
LE
ED
E
(3
0.
X
2.
IN
C
H
ES
/3 0/
:1
PM
PA
PE
R S
IZ
E
LA
ST
S
AV
ED
ROOF DETAILS REPLACE ROOF BLDG 1, 1A, 5 & 7
VA MEDICAL CENTER - MEMPHIS, TN
614-23-103
CF, AB, DRJAB
PAUL S. BROWN II
PROJECT ENGINEER, FAC-COR II, FE-C
LT. COL. LUKE J. WEATHERS, JR. VA MEDICAL CENTER
ADMIN BLDG 1, AEG28
1030 JEFFERSON AVE
MEMPHIS, TN 38104
APPROVED FIRE RETARDANT CANT
ROOFING FASTENERS AT 8" O.C
ROOF MEMBRANE (2-PLY) FLASHING SYSTEM PER
MANUFACTURER.
NOTE:
1. ALTERNATE DETAIL SHOULD ONLY BE USED UPON WRITTEN APPROVAL FROM THE DESIGNER OF RECORD AND ROOF SYSTEM MANUFACTURER AT LOCATIONS WHERE 8"
BASE FLASHING HEIGHT IS NOT POSSIBLE.
2. COUNTERFLASHING NOT SHOWN FOR CLARITY. REFER TO INDIVIDUAL DETAIL DRAWINGS FOR COUNTERFLASHING INFORMATION. INSTALL BASE WALL FLASHING SYSTEM
PER MANUFACTURER REQUIREMENTS. ALL FLASHINGS SHALL BE WARRANTED BY ROOF SYSTEM MANUFACTURER.
APPROVED FIRE RETARDANT CANT
REINFORCED LIQUID APPLIED FLASHING
SYSTEM
ROOF MEMBRANE (2-PLY) FLASHING SYSTEM PER
MANUFACTURER.
ROOFING FASTENERS
AT 8" O.C
ALTERNATE DETAIL: 4-6" MINIMUM BASE FLASHING HEIGHTSTANDARD DETAIL: 8" MINIMUM BASE FLASHING HEIGHT
DECK TO STRUCTURE ATTACHMENT PER
APPROVAL.
ROOF MEMBRANE BASE FLASHING (2-PLY MIN.)
AT VERTICAL MASONRY WALL
EXISTING MASONRY SURFACE SHALL BE SCRAPED,
CLEANED AND PRIMED
AT WOOD WALLS
MECHANICALLY FASTEN APPROVED
MANUFACTURER BASE FLASHING PLY TO
MASONRY/WOOD SURFACE @ 12" O.C ALL
DIRECTION PRIOR TO INSTALLATION OF TWO PLY
BASE FLASHING.
MASONRY/ STRUCTURAL CONCRETE: INSTALL 14" DIAMETER ANCHOR 300 SS
BY AGGRE-GATOR, 2 ROWS STAGGERED CONNECTING WOOD BLOCKING TO
MASONRY/ STRUCTURAL CONCRETE. ANCHORS TO BE STAGGERED AND
COUNTER SUNK. (FOR OTHER SUBSTRATE, NOTIFY ENGINEER OF RECORD TO
OBTAIN FASTENER TYPE AND PATTERN SECUREMENT)
MINIMUM DISTANCE FROM THE EDGE 2 INCHES
MINIMUM EMBEDMENT 1.25 INCHES
3 INCHES
9 INCHES
8 INCHES
MINIMUM SPACING
SPACING AT PERIMETER
SPACING AT CORNER
WOOD BLOCKING (PRESSURE TREATED) SECUREMENT OF WOOD
MEMBER TO WOOD NAILER: INSTALL MINIMUM NO. 8 SCREWS IN
TWO STAGGERED ROWS SPACING AT 6" O.C.
WOOD BLOCKING MIN. 2X6 (PRESSURE TREATED)
STEEL DECK
STEEL ANGLE/ BEAM
POLYISOCYANURATE FOAM BOARD
INSULATION, R-30, SLOPED OR FLAT
- REFER NEW ROOF ASSEMBLY
CHART ON NEW ROOF PLAN.
ADHERED (STAGGER JOINTS), 4'X4'
BOARD, MIN. 2 LAYERS
APPROVED COVER BOARD, ADHERED
MEMBRANE ROOFING SYSTEM
MEMBRANE…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .