Atch 2_SOR Philadelphia.xlsx

XLSX spreadsheet 59 KB Posted

Attached to
Philadelphia, PA S&RTS Federal contract opportunity
Solicitation number
HTC711-21-R-R003
Issued by
Department of Defense United States Transportation Command

About this file

This document provides a template for a solicitation response related to stevedoring and related terminal services at the Port of Philadelphia. The solicitation number is HTC711-21-R-R003 and is being issued by the Department of Defense United States Transportation Command for a base period of five years plus a six-month extension option.

The template includes rate schedules for various services including loading and discharging vessels, railcars, and trucks. It also provides rates for extra labor, overtime differentials, detention costs, equipment rentals, storage, facilities use, and miscellaneous out-of-pocket expenses. Commodity categories cover items such as aircraft, general cargo, containers, vehicles in light, medium and heavy categories. Services are defined for various handling methods including lift-on/lift-off, roll-on/roll-off, and towing on/towing off. The total proposed price is $231,000 for the initial five-year period plus six-month extension.

View the file

Other files for this federal contract opportunity

Other files attached to Philadelphia, PA S&RTS, newest first.
File Type Posted
HTC711-21-R-R003_0004.pdf PDF
Atch 2_SOR_ Philadelphia_12-21-20.xlsx XLSX spreadsheet
RFP_HTC711-21-R-R003_0003.pdf PDF
RFP_HTC711-21-R-R003_0002.pdf PDF
Atch 3_SRTS General Compliance Tool_Rev 01_2020.12-10.xlsx XLSX spreadsheet
Attch 7_CUI Requirements Table 1.docx DOCX document
Atch 1_Performance Work Statement_Rev 01_2020.12.10.pdf PDF
RFP_HTC711-21-R-R003_0001.pdf PDF
Atch 2_SOR Philadelphia_Rev 01_2020.12.09.xlsx XLSX spreadsheet
Attch 8_Cyber Security_NIST.SP.800-171_Template.xlsx XLSX spreadsheet
Atch 3_SRTS General Compliance Tool.xlsx XLSX spreadsheet
Atch 4_ Tech Worksheet Philadelphia (v.2020.11.04).docx DOCX document
Atch 5_WDOL_SF98_21-R-R003_2020.09.22.pdf PDF
Atch 6_Contractor Plan for Continuation of Essential Contractor Services.docx DOCX document
HTC711-21-R-R003_Philadelphia.pdf PDF
Atch 1_Performance Work Statement.pdf PDF
Show all 16

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Definitions

UNCLASSIFIED // FOR OFFICIAL USE ONLY

WORKING HOURSSHIFT HOURS (as applicable)
Hours may be estimatedWorking Shift / Hoursoperating hours
Straight TimeBase wages before differentials are appliedDay Shift
Night shift
RegularRange from 7am-12pm & 1pm-5pm1st Shift
duty hours2nd Shift
3rd Shift
Regular Overbefore 7 or 8am, after 4 or 5pm, excluding meal hrs4th Shift
Time (OT)begins after working 8 hours not including noon meal
Swing / Hoot Owl
Meal HoursPremium OT rate includes Noon to 1pm ,
6pm to 7-pm Overtime, Midnight to 1am OvertimeNormal work day hours
6am to 7am Overtime until labor is released;
premium paid only to the 1/2 hr** Note: Hours stated may be changed as operations or mission scope dictates.

UNITS OF MEASURE

MTONMeasurement Tons (measure of volume)1 MTON = 40 cubic feet (1.13 cubic meters)
HRHour = 1 HR = 60 minutes
DYDay = 1 DY = 24 hours
MTHMonth = 1 MTH = 30 days
EAEach
SQFTSquare Feet (measure of area)1' SQFT = 144'' inchs dimensions 12''x12''
SQMTSquare Meter (measure of area)1 SQFT = 0.0929 square meters
1 CFT = 1728 cubic inches 12"x12"x12"
BNDBundle
PCPiece (one each)
ROLLRoll ( roll of wire)
MIMile (measure of distance) = 1 Mile = 5280 feet ( 1,609.34 meters )
TRIPSTrip = 1 Trip, as described in the PWS (if applicable)
LTLong Ton = 1 LT = 2,240 pounds ( 1,016.05 kilograms )
LBSUS. Pounds = 1 LBS = 0.45 kilograms
KGkg = 1 kg = 2.204 pounds
MTONMTON recorded and billed to the sponsor will be applied to the gross cube (40 cubic feet = 1 MTON) of the container.

COMMODITY HANDLING METHODS (includes all standard lashing & Unlashing, blocking and bracing cargo)

LO/LOLift On / Lift Off - includes all standard lashing,( a ) Shore Crane Type (Fixed Port Gantry or Port Mobile Container Crane (i.e. Gottwald))
& Unlashing, blocking and bracing cargo( b ) Ships Gear, Ships crane
RO/RORoll On / Roll Off - includes all standard lashing,( c ) Vehicle rolling under Own Power - Containers loaded by ramp
& Unlashing, blocking and bracing cargo
TO/TOTow On / Tow Off - includes all standard lashing,( d ) Trailers towed by Contractor Equipment or Gov't vehicles
& Unlashing, blocking and bracing cargo( e ) Inoperable Vehicles being towed

RO/RO Containers, loaded by contractor trailer Containers loaded onto trailers, bomb carts, MIFI's, or other equipment, otherwise trailered into RORO vessels and unloaded, stowed and lashed

CONTAINER - BREAK BULK DEFINITIONS
20Explosives, in crates, boxes, tubs, tubes
25Milvan - Containers packed with explosives. Explosives placed in containers are classified as containers.
40Break-Bulk cargo, Non-explosive, Non-ISO cornered , includes M7 FRS, shelters, shop sets, ISU-90/60, mind rollers, blade boxes, skid mounted generators,
crates, 463L pallets,
44Cargo transporters (CONEX) ISO Fitted, loaded/empty - INCLUDE QUADCONS, BICONS, TRICONS, stackable tank modules, SINGLE OR LESS THAN TEU
45Milvan - Containers (non-explosives). All containers ISO Fitted 20'-40' empty or full, includes ISO 20' FRC-Fuel tank moduals, ISO hippo,
ISO 20' stackable flat racks, ISO FPU/BOH
VEHICLE CATEGORY DEFINITIONS
60 - MEDIUM VEHICLE25,001 US. pounds to 60,000 pounds 11,340.26 kg to 27,215.54 kg 11.161 LT to 26.786 LT
60 - GOVERNMENT VEHICLES, UNBOXED, weighing 25,001lbs. to 60,000lbs. per unit
Includes but not limited to: trucks, tractors, track vehicles, semi-trailer vans, mobile cranes, construction equipment (track or wheel), road graders,
rock crushers, busses, boats (trailered/cradled).

61 - LIGHT VEHICLE 25,000 pounds or less 11,339.81 kilograms or less 11.16 long tons

61 - GOVERNMENT VEHICLES, UNBOXED, weighing 25,000lbs. or less per unit includes but limited to: trucks, ambulances, tractors, POV, engineer construction equipment,
personnel carriers, boats or boats on cradles) engineer construction equipment, tracked vehicles and boats (trailered/cradled).

67 - HEAVY VEHICLE 60,001 pounds or more 27,216 kg. or more 26.786 LT or more

67 - GOVERNMENT VEHICLES, UNBOXED, weighing 60,000lbs. per unit or more includes but not limited to: trucks, tractors, vans, track vehicles, HETS, MRAPs, Heavy mobile cranes,
tracked or wheeled engineer construction equipment, and boats (trailered/cradled).

Summary SUMMARY for all Port Locations

FOR OFFICIAL USE ONLY

PHILLADELPHIA, PA HTC711-21-R-R003
5 Year PoP6-Month Ext.TOTAL
Schedule1A1LOADING VESSEL$ - 0$ - 0$ - 0
Schedule1A1aLASHING ONLY$ - 0$ - 0$ - 0
Schedule1A2DISCHARGE VESSEL$ - 0$ - 0$ - 0
Schedule1A2aUNLASHING ONLY$ - 0$ - 0$ - 0
Schedule1B1LOAD RAILCARS$ - 0$ - 0$ - 0
Schedule1B2DISCHARGE RAILCARS$ - 0$ - 0$ - 0
Schedule1B3LOADING TRUCKS$ - 0$ - 0$ - 0
Schedule1B4DISCHARGE TRAUCKS$ - 0$ - 0$ - 0
Schedule1CRECEPTION ONLY$ - 0$ - 0$ - 0
Schedule1DDISPOSITION ONLY$ - 0$ - 0$ - 0
Schedule1ESTUFFING/UNSTUFFING$ - 0$ - 0$ - 0
Schedule1FINTRA PORT TRANSFER$ - 0$ - 0$ - 0
Schedule1FaCROSS DOCKING$ - 0$ - 0$ - 0
Schedule2EXTRA LABOR$ - 0$ - 0$ - 0
Schedule3ADETENTION$ - 0$ - 0$ - 0
Schedule3BOVERTIME DIFFERENTIALS$ - 0$ - 0$ - 0
Schedule3CGUARANTEED TIME$ - 0$ - 0$ - 0
Schedule4EQUIPMENT RENTAL$ - 0$ - 0$ - 0
Schedule5STORAGE$ - 0$ - 0$ - 0
Schedule6FACILITIES$ - 0$ - 0$ - 0
Schedule7LUMBER / DUNNAGE$ - 0$ - 0$ - 0
Schedule8MISCELLANEOUS OOP$ 210,000.00$ 21,000.00$ 231,000.00
Schedule9INLAND TRANSPORTATION$ - 0$ - 0$ - 0
Schedule103PL SERVICES$ - 0$ - 0$ - 0

5-YEAR TOTAL: $ 210,000.00

6-MO EXT. TOTAL: $ 21,000.00

TOTAL PROPOSED PRICE (TPP): (5-YR + 6-MO EXT.) $ 231,000.00

CEILING: (25% of Total Proposed Price) $ 57,750.00

TOTAL LIFECYCLE: (5-YR + 6-MO EXT. + CEILING) $ 288,750.00

Port of Philadephia

UNCLASSIFIED // FOR OFFICIAL USE ONLY - FOUO
STEVEDORING & RELATED TERMINAL SERVICESPERIOD OF PERFORMANCE:15 Mar 2021through15 Sep 2026(including 6 mo extension, if applicable)
RFP:HTC711-21-R-R003input start dateinput final end date
LOCATION:Philadelphia PA
PORT:5-YEAR TOTAL:$ 210,000.00
6-MONTH EXTENTION TOTAL:$ 21,000.00
5-YEAR + 6-MONTH EXT. WITH CEILING (25%):$ 288,750.00
Line ItemCategoryScheduleCommodityDescriptionUnit of DurationEstimated DurationUnit of MeasureUnit PriceUnit QuantityUnit QuantityExtended Price
5Commodity1A1LOAD VESSEL35aAIRCRAFT, WHOLE OR UNBOXED | LO/LO - Shore Crane (Fixed Port Gantry or Port Mobile Container Crane (i.e. Gottwald))EA$ - 01050$ - 0
6Commodity1A1LOAD VESSEL35bAIRCRAFT, WHOLE OR UNBOXED | LO/LO - Ships Gear, Ships craneEA$ - 01050$ - 0
7Commodity1A1LOAD VESSEL35cAIRCRAFT, WHOLE OR UNBOXED | RO/RO, by rampEA$ - 0210$ - 0
8Commodity1A1LOAD VESSEL40aGENERAL CARGO (Breakbulk) NOT OTHERWISE SPECIFIED (NOS) | LO/LO - Shore Crane (Fixed Port Gantry or Mobile Container Crane (i.e. Gottwald))MTON$ - 0100.00500$ - 0
9Commodity1A1LOAD VESSEL40bGENERAL CARGO (Breakbulk) NOT OTHERWISE SPECIFIED (NOS) | LO/LO - by lift with equipment other than described in 40aMTON$ - 022.00110$ - 0
10Commodity1A1LOAD VESSEL44aCONTAINERS LESS THAN TEU - SINGLE - Conex, Quadcons, Tricons, Bicons, W/ISO | LO/LO - Shore Crane (Fixed Port Gantry or Mobile Container Crane (i.e. Gottwald))EA$ - 0630$ - 0
11Commodity1A1LOAD VESSEL44bCONTAINERS LESS THAN TEU - SINGLE - Conex, Quadcons, Tricons, Bicons, W/ISO | LO/LO - Ships Gear, Ships craneEA$ - 0145725$ - 0
13Commodity1A1LOAD VESSEL45aMILVAN-CONTAINER 20' - 40' (TEU configured) PACKED W/ NON-EXPLOSIVES | LO/LO - Shore Crane (Fixed Port Gantry or Mobile Container Crane (i.e. Gottwald))EA$ - 030150$ - 0
14Commodity1A1LOAD VESSEL45bMILVAN-CONTAINER 20' - 40' (TEU configured) PACKED W/ NON-EXPLOSIVES | LO/LO - Ships Gear, Ships crane, or Mobile shore craneEA$ - 03561780$ - 0
17Commodity1A1LOAD VESSEL60aMEDIUM VEHICLES OR TRAILERS | LO/LO - Shore Crane (Fixed Port Gantry or Port Mobile Container Crane (i.e. Gottwald))EA$ - 01050$ - 0
18Commodity1A1LOAD VESSEL60bMEDIUM VEHICLES OR TRAILERS | LO/LO - Ships Gear, Ships craneEA$ - 098490$ - 0
19Commodity1A1LOAD VESSEL60cMEDIUM VEHICLES | RO/RO - Vehicle rolling under Own Power , by rampEA$ - 036180$ - 0
20Commodity1A1LOAD VESSEL60dMEDIUM TRAILERS | TO/TO - Towed by Contractor Equipment or (connect/disconnected) trailer and prime moverEA$ - 02701350$ - 0
21Commodity1A1LOAD VESSEL60eMEDIUM VEHICLES| TO/TO - Inoperable Vehicle TowedEA$ - 035175$ - 0
22Commodity1A1LOAD VESSEL61aLIGHT VEHICLES OR TRAILERS | LO/LO - Shore Crane (Fixed Port Gantry or Port Mobile Container Crane (i.e. Gottwald))EA$ - 01680$ - 0
23Commodity1A1LOAD VESSEL61bLIGHT VEHICLES OR TRAILERS | LO/LO - Ships Gear, Ships craneEA$ - 050250$ - 0
24Commodity1A1LOAD VESSEL61cLIGHT VEHICLES | RO/RO - Vehicle rolling under Own Power , by rampEA$ - 0188940$ - 0
25Commodity1A1LOAD VESSEL61dLIGHT TRAILERS | TO/TO - Towed by Contractor Equipment or (connect/disconnected) trailer and prime mover- 0EA$ - 064320$ - 0
26Commodity1A1LOAD VESSEL61eLIGHT VEHICLES | TO/TO - Inoperable Vehicle TowedEA$ - 025125$ - 0
27Commodity1A1LOAD VESSEL67aHEAVY VEHICLES OR TRAILERS | LO/LO - Shore Crane (Fixed Port Gantry or Port Mobile Container Crane (i.e. Gottwald))EA$ - 030150$ - 0
28Commodity1A1LOAD VESSEL67bHEAVY VEHICLES OR TRAILERS | LO/LO - Ships Gear, Ships craneEA$ - 039195$ - 0
29Commodity1A1LOAD VESSEL67cHEAVY VEHICLES | RO/RO - Vehicle rolling under Own Power by rampEA$ - 0115575$ - 0
30Commodity1A1LOAD VESSEL67dHEAVY TRAILERS | TO/TO - Towed by Contractor Equipment or (connect/disconnected) trailer and prime moverEA$ - 0125625$ - 0
31Commodity1A1LOAD VESSEL67eHEAVY VEHICLES | TO/TO - Inoperable Vehicle TowedEA$ - 01575$ - 0
TOTAL 1A1 - Loading Vessel$ - 0
34Commodity1A1aLASHING ONLY (PSA Loaded)35AIRCRAFT, WHOLE OR UNBOXEDEA$ - 065325$ - 0
39Commodity1A1aLASHING ONLY (PSA Loaded)60MEDIUM VEHICLES OR TRAILERSEA$ - 01050$ - 0
41Commodity1A1aLASHING ONLY (PSA Loaded)67HEAVY VEHICLES OR TRAILERSEA$ - 085425$ - 0
TOTAL 1A1a - Lashing Only$ - 0
46Commodity1A2DISCHARGE VESSEL35aAIRCRAFT, WHOLE OR UNBOXED | LO/LO - Shore Crane (Fixed Port Gantry or Port Mobile Container Crane (i.e. Gottwald))EA$ - 01050$ - 0
47Commodity1A2DISCHARGE VESSEL35bAIRCRAFT, WHOLE OR UNBOXED | LO/LO - Ships Gear, Ships craneEA$ - 01050$ - 0
49Commodity1A2DISCHARGE VESSEL40aGENERAL CARGO NOT OTHERWISE SPECIFIED (NOS) | LO/LO - Shore Crane (Fixed Port Gantry or Mobile Container Crane (i.e. Gottwald))MTON$ - 0100.00500$ - 0
50Commodity1A2DISCHARGE VESSEL40bGENERAL CARGO NOT OTHERWISE SPECIFIED (NOS) | LO/LO - by lift with equipment other than described in 40aMTON$ - 0100.00500$ - 0
51Commodity1A2DISCHARGE VESSEL44aCONTAINERS LESS THAN TEU - SINGLE - Conex, Quadcons, Tricons, Bicons, W/ISO | LO/LO - Shore Crane (Fixed Port Gantry or Mobile Container Crane (i.e. Gottwald))EA$ - 0525$ - 0
52Commodity1A2DISCHARGE VESSEL44bCONTAINERS LESS THAN TEU - SINGLE - Conex, Quadcons, Tricons, Bicons, W/ISO | LO/LO - Ships Gear, Ships craneEA$ - 01575$ - 0
54Commodity1A2DISCHARGE VESSEL45aMILVAN-CONTAINER 20' - 40' (TEU configured) PACKED W/ NON-EXPLOSIVES | LO/LO - Shore Crane (Fixed Port Gantry or Mobile Container Crane (i.e. Gottwald))EA$ - 030150$ - 0
55Commodity1A2DISCHARGE VESSEL45bMILVAN-CONTAINER 20' - 40' (TEU configured) PACKED W/ NON-EXPLOSIVES | LO/LO - Ships Gear, Ships crane, or Mobile shore craneEA$ - 03561780$ - 0
58Commodity1A2DISCHARGE VESSEL60aMEDIUM VEHICLES OR TRAILERS | LO/LO - Shore Crane (Fixed Port Gantry or Port Mobile Container Crane (i.e. Gottwald))EA$ - 01155$ - 0
59Commodity1A2DISCHARGE VESSEL60bMEDIUM VEHICLES OR TRAILERS | LO/LO - Ships Gear, Ships craneEA$ - 0166830$ - 0
60Commodity1A2DISCHARGE VESSEL60cMEDIUM VEHICLES | RO/RO - Vehicle rolling under Own Power , by rampEA$ - 03811905$ - 0
61Commodity1A2DISCHARGE VESSEL60dMEDIUM TRAILERS | TO/TO - Towed by Contractor Equipment or (connect/disconnected) trailer and prime moverEA$ - 02821410$ - 0
62Commodity1A2DISCHARGE VESSEL60eMEDIUM VEHICLES| TO/TO - Inoperable Vehicle TowedEA$ - 01050$ - 0
63Commodity1A2DISCHARGE VESSEL61aLIGHT VEHICLES OR TRAILERS | LO/LO - Shore Crane (Fixed Port Gantry or Port Mobile Container Crane (i.e. Gottwald))EA$ - 01365$ - 0
64Commodity1A2DISCHARGE VESSEL61bLIGHT VEHICLES OR TRAILERS | LO/LO - Ships Gear, Ships craneEA$ - 02461230$ - 0
65Commodity1A2DISCHARGE VESSEL61cLIGHT VEHICLES | RO/RO - Vehicle rolling under Own Power , by rampEA$ - 02471235$ - 0
66Commodity1A2DISCHARGE VESSEL61dLIGHT TRAILERS | TO/TO - Towed by Contractor Equipment or (connect/disconnected) trailer and prime moverEA$ - 069345$ - 0
67Commodity1A2DISCHARGE VESSEL61eLIGHT VEHICLES | TO/TO - Inoperable Vehicle TowedEA$ - 080400$ - 0
68Commodity1A2DISCHARGE VESSEL67aHEAVY VEHICLES OR TRAILERS | LO/LO - Shore Crane (Fixed Port Gantry or Port Mobile Container Crane (i.e. Gottwald))EA$ - 01575$ - 0
69Commodity1A2DISCHARGE VESSEL67bHEAVY VEHICLES OR TRAILERS | LO/LO - Ships Gear, Ships craneEA$ - 0840$ - 0
70Commodity1A2DISCHARGE VESSEL67cHEAVY VEHICLES | RO/RO - Vehicle rolling under Own Power by rampEA$ - 088440$ - 0
71Commodity1A2DISCHARGE VESSEL67dHEAVY TRAILERS | TO/TO - Towed by Contractor Equipment or (connect/disconnected) trailer and prime moverEA$ - 0630$ - 0
72Commodity1A2DISCHARGE VESSEL67eHEAVY VEHICLES | TO/TO - Inoperable Vehicle TowedEA$ - 0630$ - 0
TOTAL - 1A2- Discharge Vessel$ - 0
75Commodity1A2aUNLASHING ONLY (PSA unloaded)35AIRCRAFT, WHOLE OR UNBOXEDEA$ - 0110550$ - 0
81Commodity1A2aUNLASHING ONLY (PSA unloaded)61LIGHT VEHICLES OR TRAILERSEA$ - 025125$ - 0
82Commodity1A2aUNLASHING ONLY (PSA unloaded)67HEAVY VEHICLES OR TRAILERSEA$ - 060300$ - 0
TOTAL 1A2a Unlashing only$ - 0
96Commodity1B1LOAD RAIL45bMILVAN-CONTAINER 20' - 40' (TEU configured) PACKED W/ NON-EXPLOSIVES | LO/LO - Ships Gear, Ships crane, or Mobile shore craneEA$ - 060300$ - 0
99Commodity1B1LOAD RAIL60aMEDIUM VEHICLES OR TRAILERS | LO/LO - Shore Crane (Fixed Port Gantry or Port Mobile Container Crane (i.e. Gottwald))EA$ - 0210$ - 0
100Commodity1B1LOAD RAIL60bMEDIUM VEHICLES OR TRAILERS | LO/LO - Ships Gear, Ships craneEA$ - 029145$ - 0
101Commodity1B1LOAD RAIL60cMEDIUM VEHICLES | RO/RO - Vehicle rolling under Own Power , by rampEA$ - 0162810$ - 0
102Commodity1B1LOAD RAIL60dMEDIUM TRAILERS | TO/TO - Towed by Contractor Equipment or (connect/disconnected) trailer and prime moverEA$ - 0188940$ - 0
103Commodity1B1LOAD RAIL60eMEDIUM VEHICLES| TO/TO - Inoperable Vehicle TowedEA$ - 049245$ - 0
105Commodity1B1LOAD RAIL61bLIGHT VEHICLES OR TRAILERS | LO/LO - Ships Gear, Ships craneEA$ - 020100$ - 0
106Commodity1B1LOAD RAIL61cLIGHT VEHICLES | RO/RO - Vehicle rolling under Own Power , by rampEA$ - 0134670$ - 0
107Commodity1B1LOAD RAIL61dLIGHT TRAILERS | TO/TO - Towed by Contractor Equipment or (connect/disconnected) trailer and prime moverEA$ - 0112560$ - 0
108Commodity1B1LOAD RAIL61eLIGHT VEHICLES | TO/TO - Inoperable Vehicle TowedEA$ - 01995$ - 0
109Commodity1B1LOAD RAIL67aHEAVY VEHICLES OR TRAILERS | LO/LO - Shore Crane (Fixed Port Gantry or Port Mobile Container Crane (i.e. Gottwald))EA$ - 030150$ - 0
110Commodity1B1LOAD RAIL67bHEAVY VEHICLES OR TRAILERS | LO/LO - Ships Gear, Ships craneEA$ - 01575$ - 0
111Commodity1B1LOAD RAIL67cHEAVY VEHICLES | RO/RO - Vehicle rolling under Own Power by rampEA$ - 0118590$ - 0
112Commodity1B1LOAD RAIL67dHEAVY TRAILERS | TO/TO - Towed by Contractor Equipment or (connect/disconnected) trailer and prime moverEA$ - 025125$ - 0
113Commodity1B1LOAD RAIL67eHEAVY VEHICLES | TO/TO - Inoperable Vehicle TowedEA$ - 01470$ - 0
TOTAL 1B1 Load Railcars$ - 0
124Commodity1B2DISCHARGE RAIL44bCONTAINERS LESS THAN TEU - SINGLE - Conex, Quadcons, Tricons, Bicons, W/ISO | LO/LO - Ships Gear, Ships craneEA$ - 060300$ - 0
130Commodity1B2DISCHARGE RAIL60aMEDIUM VEHICLES OR TRAILERS | LO/LO - Shore Crane (Fixed Port Gantry or Port Mobile Container Crane (i.e. Gottwald))EA$ - 0210$ - 0
131Commodity1B2DISCHARGE RAIL60bMEDIUM VEHICLES OR TRAILERS | LO/LO - Ships Gear, Ships craneEA$ - 01050$ - 0
132Commodity1B2DISCHARGE RAIL60cMEDIUM VEHICLES | RO/RO - Vehicle rolling under Own Power , by rampEA$ - 0126630$ - 0
133Commodity1B2DISCHARGE RAIL60dMEDIUM TRAILERS | TO/TO - Towed by Contractor Equipment or (connect/disconnected) trailer and prime moverEA$ - 080400$ - 0
134Commodity1B2DISCHARGE RAIL60eMEDIUM VEHICLES| TO/TO - Inoperable Vehicle TowedEA$ - 01995$ - 0
136Commodity1B2DISCHARGE RAIL61bLIGHT VEHICLES OR TRAILERS | LO/LO - Ships Gear, Ships craneEA$ - 020100$ - 0
137Commodity1B2DISCHARGE RAIL61cLIGHT VEHICLES | RO/RO - Vehicle rolling under Own Power , by rampEA$ - 054270$ - 0
138Commodity1B2DISCHARGE RAIL61dLIGHT TRAILERS | TO/TO - Towed by Contractor Equipment or (connect/disconnected) trailer and prime moverEA$ - 0127635$ - 0
139Commodity1B2DISCHARGE RAIL61eLIGHT VEHICLES | TO/TO - Inoperable Vehicle TowedEA$ - 01470$ - 0
140Commodity1B2DISCHARGE RAIL67aHEAVY VEHICLES OR TRAILERS | LO/LO - Shore Crane (Fixed Port Gantry or Port Mobile Container Crane (i.e. Gottwald))EA$ - 0210$ - 0
141Commodity1B2DISCHARGE RAIL67bHEAVY VEHICLES OR TRAILERS | LO/LO - Ships Gear, Ships craneEA$ - 01575$ - 0
142Commodity1B2DISCHARGE RAIL67cHEAVY VEHICLES | RO/RO - Vehicle rolling under Own Power by rampEA$ - 0115575$ - 0
143Commodity1B2DISCHARGE RAIL67dHEAVY TRAILERS | TO/TO - Towed by Contractor Equipment or (connect/disconnected) trailer and prime moverEA$ - 025125$ - 0
144Commodity1B2DISCHARGE RAIL67eHEAVY VEHICLES | TO/TO - Inoperable Vehicle TowedEA$ - 030150$ - 0
TOTAL 1B2 Discharge Railcars$ - 0
153Commodity1B3LOAD TRUCKS40bGENERAL CARGO NOT OTHERWISE SPECIFIED (NOS) | LO/LO - by lift with equipment other than described in 40aMTON$ - 0100.00500.00$ - 0
158Commodity1B3LOAD TRUCKS45bMILVAN-CONTAINER 20' - 40' (TEU configured) PACKED W/ NON-EXPLOSIVES | LO/LO - Ships Gear, Ships crane, or Mobile shore craneEA$ - 03561,780$ - 0
162Commodity1B3LOAD TRUCKS60bMEDIUM VEHICLES OR TRAILERS | LO/LO - Ships Gear, Ships craneEA$ - 0165825$ - 0
163Commodity1B3LOAD TRUCKS60cMEDIUM VEHICLES | RO/RO - Vehicle rolling under Own Power , by rampEA$ - 05342,670$ - 0
164Commodity1B3LOAD TRUCKS60dMEDIUM TRAILERS | TO/TO - Towed by Contractor Equipment or (connect/disconnected) trailer and prime moverEA$ - 054270$ - 0
165Commodity1B3LOAD TRUCKS60eMEDIUM VEHICLES| TO/TO - Inoperable Vehicle TowedEA$ - 0525$ - 0
166Commodity1B3LOAD TRUCKS61aLIGHT VEHICLES OR TRAILERS | LO/LO - Shore Crane (Fixed Port Gantry or Port Mobile Container Crane (i.e. Gottwald))EA$ - 020100$ - 0
167Commodity1B3LOAD TRUCKS61bLIGHT VEHICLES OR TRAILERS | LO/LO - Ships Gear, Ships craneEA$ - 02031,015$ - 0
168Commodity1B3LOAD TRUCKS61cLIGHT VEHICLES | RO/RO - Vehicle rolling under Own Power , by rampEA$ - 02101,050$ - 0
169Commodity1B3LOAD TRUCKS61dLIGHT TRAILERS | TO/TO - Towed by Contractor Equipment or (connect/disconnected) trailer and prime moverEA$ - 036180$ - 0
170Commodity1B3LOAD TRUCKS61eLIGHT VEHICLES | TO/TO - Inoperable Vehicle TowedEA$ - 0420$ - 0
171Commodity1B3LOAD TRUCKS67aHEAVY VEHICLES OR TRAILERS | LO/LO - Shore Crane (Fixed Port Gantry or Port Mobile Container Crane (i.e. Gottwald))EA$ - 0630$ - 0
172Commodity1B3LOAD TRUCKS67bHEAVY VEHICLES OR TRAILERS | LO/LO - Ships Gear, Ships craneEA$ - 01575$ - 0
173Commodity1B3LOAD TRUCKS67cHEAVY VEHICLES | RO/RO - Vehicle rolling under Own Power by rampEA$ - 02801,400$ - 0
174Commodity1B3LOAD TRUCKS67dHEAVY TRAILERS | TO/TO - Towed by Contractor Equipment or (connect/disconnected) trailer and prime moverEA$ - 025125$ - 0
175Commodity1B3LOAD TRUCKS67eHEAVY VEHICLES | TO/TO - Inoperable Vehicle TowedEA$ - 030150$ - 0
TOTAL 1B3 Loading Trucks$ - 0
184Commodity1B4DISCHARGE TRUCKS40bGENERAL CARGO NOT OTHERWISE SPECIFIED (NOS) | LO/LO - by lift with equipment other than described in 40aMTON$ - 038.00190.00$ - 0
189Commodity1B4DISCHARGE TRUCKS45bMILVAN-CONTAINER 20' - 40' (TEU configured) PACKED W/ NON-EXPLOSIVES | LO/LO - Ships Gear, Ships crane, or Mobile shore craneEA$ - 03561,780$ - 0
193Commodity1B4DISCHARGE TRUCKS60bMEDIUM VEHICLES OR TRAILERS | LO/LO - Ships Gear, Ships craneEA$ - 081405$ - 0
194Commodity1B4DISCHARGE TRUCKS60cMEDIUM VEHICLES | RO/RO - Vehicle rolling under Own Power , by rampEA$ - 04502,250$ - 0
195Commodity1B4DISCHARGE TRUCKS60dMEDIUM TRAILERS | TO/TO - Towed by Contractor Equipment or (connect/disconnected) trailer and prime moverEA$ - 064320$ - 0
196Commodity1B4DISCHARGE TRUCKS60eMEDIUM VEHICLES| TO/TO - Inoperable Vehicle TowedEA$ - 0315$ - 0
197Commodity1B4DISCHARGE TRUCKS61aLIGHT VEHICLES OR TRAILERS | LO/LO - Shore Crane (Fixed Port Gantry or Port Mobile Container Crane (i.e. Gottwald))EA$ - 01365$ - 0
198Commodity1B4DISCHARGE TRUCKS61bLIGHT VEHICLES OR TRAILERS | LO/LO - Ships Gear, Ships craneEA$ - 0126630$ - 0
199Commodity1B4DISCHARGE TRUCKS61cLIGHT VEHICLES | RO/RO - Vehicle rolling under Own Power , by rampEA$ - 034170$ - 0
200Commodity1B4DISCHARGE TRUCKS61dLIGHT TRAILERS | TO/TO - Towed by Contractor Equipment or (connect/disconnected) trailer and prime moverEA$ - 063315$ - 0
201Commodity1B4DISCHARGE TRUCKS61eLIGHT VEHICLES | TO/TO - Inoperable Vehicle TowedEA$ - 0630$ - 0
202Commodity1B4DISCHARGE TRUCKS67aHEAVY VEHICLES OR TRAILERS | LO/LO - Shore Crane (Fixed Port Gantry or Port Mobile Container Crane (i.e. Gottwald))EA$ - 030150$ - 0
203Commodity1B4DISCHARGE TRUCKS67bHEAVY VEHICLES OR TRAILERS | LO/LO - Ships Gear, Ships craneEA$ - 060300$ - 0
204Commodity1B4DISCHARGE TRUCKS67cHEAVY VEHICLES | RO/RO - Vehicle rolling under Own Power by rampEA$ - 078390$ - 0
205Commodity1B4DISCHARGE TRUCKS67dHEAVY TRAILERS | TO/TO - Towed by Contractor Equipment or (connect/disconnected) trailer and prime moverEA$ - 087435$ - 0
206Commodity1B4DISCHARGE TRUCKS67eHEAVY VEHICLES | TO/TO - Inoperable Vehicle TowedEA$ - 01575$ - 0
TOTAL 1B4 Discharge Trucks$ - 0
257Manhours2EXTRA LABOR (XL)[ Straight Time ] - GENERAL LABOR: LONGSHOREMAN | LASHER | LINE HANDLERSHR$ - 05402,700$ - 0
258Manhours2EXTRA LABOR (XL)[ Straight Time ] - SKILLED LABOR (OPERATORS): DRIVERSHR$ - 04082,040$ - 0
259Manhours2EXTRA LABOR (XL)[ Straight Time ] - SKILLED LABOR (OPERATORS): CRANEMAN | FORKLIFT OPERATOR | FLAGMANHR$ - 0192960$ - 0
260Manhours2EXTRA LABOR (XL)[ Straight Time ] - FOREMAN: SHIP FOREMAN| DOCK FOREMAN| CARPENTER FOREMANHR$ - 072360$ - 0
262Manhours2EXTRA LABOR (XL)[ Straight Time ] - WALKING BOSSHR$ - 036180$ - 0
263Manhours2EXTRA LABOR (XL)[ Straight Time ] - CLERK | CHECKERHR$ - 02521,260$ - 0
264Manhours2EXTRA LABOR (XL)[ Straight Time ] - HEAD CHECKER | CHIEF CLERK | TIMEKEEPERHR$ - 036180$ - 0
265Manhours2EXTRA LABOR (XL)[ Straight Time ] - CARPENTERHR$ - 0840$ - 0
266Manhours2EXTRA LABOR (XL)[ Straight Time ] - MECHANIC | DRIVER | GEARMANHR$ - 096480$ - 0
TOTAL 2 Extra Labor (XL)$ - 0
267Manhours3ADETENTION[ Straight Time ] - GENERAL LABOR: LONGSHOREMAN | LASHER | LINE HANDLERSHR$ - 045225$ - 0
268Manhours3ADETENTION[ Straight Time ] - SKILLED LABOR (OPERATORS): DRIVERSHR$ - 030150$ - 0
269Manhours3ADETENTION[ Straight Time ] - SKILLED LABOR (OPERATORS): CRANEMAN | FORKLIFT OPERATOR | FLAGMANHR$ - 01260$ - 0
270Manhours3ADETENTION[ Straight Time ] - FOREMAN: SHIP FOREMAN| DOCK FOREMAN| CARPENTER FOREMANHR$ - 0630$ - 0
272Manhours3ADETENTION[ Straight Time ] - WALKING BOSSHR$ - 0315$ - 0
273Manhours3ADETENTION[ Straight Time ] - CLERK | CHECKERHR$ - 0315$ - 0
274Manhours3ADETENTION[ Straight Time ] - HEAD CHECKER | CHIEF CLERK | TIMEKEEPERHR$ - 01260$ - 0
275Manhours3ADETENTION[ Straight Time ] - CARPENTERHR$ - 0210$ - 0
276Manhours3ADETENTION[ Straight Time ] - MECHANIC | DRIVER | GEARMANHR$ - 0210$ - 0
TOTAL 3A Detention$ - 0
277Manhours3BOVERTIME DIFFERENTIALS[ Regular OT ] - GENERAL LABOR: LONGSHOREMAN | LASHER | LINE HANDLERSHR$ - 05402700$ - 0
278Manhours3BOVERTIME DIFFERENTIALS[ Regular OT ] - SKILLED LABOR (OPERATORS): DRIVERSHR$ - 03761880$ - 0
279Manhours3BOVERTIME DIFFERENTIALS[ Regular OT ] - SKILLED LABOR (OPERATORS): CRANEMAN | FORKLIFT OPERATOR | FLAGMANHR$ - 0160800$ - 0
280Manhours3BOVERTIME DIFFERENTIALS[ Regular OT ] - FOREMAN: SHIP FOREMAN| DOCK FOREMAN| CARPENTER FOREMANHR$ - 072360$ - 0
282Manhours3BOVERTIME DIFFERENTIALS[ Regular OT ] - WALKING BOSSHR$ - 036180$ - 0
283Manhours3BOVERTIME DIFFERENTIALS[ Regular OT ] - CLERK | CHECKERHR$ - 0172860$ - 0
284Manhours3BOVERTIME DIFFERENTIALS[ Regular OT ] - HEAD CHECKER | CHIEF CLERK | TIMEKEEPERHR$ - 036180$ - 0
285Manhours3BOVERTIME DIFFERENTIALS[ Regular OT ] - CARPENTERHR$ - 0210$ - 0
286Manhours3BOVERTIME DIFFERENTIALS[ Regular OT ] - MECHANIC | DRIVER | GEARMANHR$ - 01680$ - 0
287Manhours3BOVERTIME DIFFERENTIALS[ OT Diff during meal hours ] or [ Regular OT & AMMO Diff ] - GENERAL LABOR: LONGSHOREMAN | LASHER | LINE HANDLERSHR$ - 030150$ - 0
288Manhours3BOVERTIME DIFFERENTIALS[ OT Diff during meal hours ] or [ Regular OT & AMMO Diff ] - SKILLED LABOR (OPERATORS): DRIVERSHR$ - 020100$ - 0
289Manhours3BOVERTIME DIFFERENTIALS[ OT Diff during meal hours ] or [ Regular OT & AMMO Diff ] SKILLED LABOR (OPERATORS): CRANEMAN | FORKLIFT OPERATOR | FLAGMANHR$ - 0840$ - 0
290Manhours3BOVERTIME DIFFERENTIALS[ OT Diff during meal hours ] or [ Regular OT & AMMO Diff ] - HEADER FOREMAN: SHIP FOREMAN| DOCK FOREMAN| CARPENTER FOREMANHR$ - 0420$ - 0
292Manhours3BOVERTIME DIFFERENTIALS[ OT Diff during meal hours ] or [ Regular OT & AMMO Diff ] - WALKING BOSSHR$ - 0210$ - 0
293Manhours3BOVERTIME DIFFERENTIALS[ OT Diff during meal hours ] or [ Regular OT & AMMO Diff ] - CLERK | CHECKERHR$ - 0840$ - 0
294Manhours3BOVERTIME DIFFERENTIALS[ OT Diff during meal hours ] or [ Regular OT & AMMO Diff ] - HEAD CHECKER | CHIEF CLERK | TIMEKEEPER | PLANS CLERK | SHIPSIDE CLERKHR$ - 0210$ - 0
295Manhours3BOVERTIME DIFFERENTIALS[ OT Diff during meal hours ] or [ Regular OT & AMMO Diff ] - CARPENTERHR$ - 015$ - 0
296Manhours3BOVERTIME DIFFERENTIALS[ OT Diff during meal hours ] or [ Regular OT & AMMO Diff ] - MECHANIC | GEARMANHR$ - 015$ - 0
TOTAL 3B Overtime Differentials$ - 0
297Manhours3CGUARANTEED TIME[ Straight Time ] - GENERAL LABOR: LONGSHOREMAN | LASHER | LINE HANDLERSHR$ - 0180900$ - 0
298Manhours3CGUARANTEED TIME[ Straight Time ] - SKILLED LABOR (OPERATORS): DRIVERSHR$ - 0120600$ - 0
299Manhours3CGUARANTEED TIME[ Straight Time ] - SKILLED LABOR (OPERATORS): CRANEMAN | FORKLIFT OPERATOR | FLAGMANHR$ - 048240$ - 0
300Manhours3CGUARANTEED TIME[ Straight Time ] - FOREMAN: SHIP FOREMAN| DOCK FOREMAN| CARPENTER FOREMANHR$ - 024120$ - 0
302Manhours3CGUARANTEED TIME[ Straight Time ] - WALKING BOSSHR$ - 01260$ - 0
303Manhours3CGUARANTEED TIME[ Straight Time ] - CLERK | CHECKERHR$ - 048240$ - 0
304Manhours3CGUARANTEED TIME[ Straight Time ] - HEAD CHECKER | CHIEF CLERK | TIMEKEEPERHR$ - 01260$ - 0
305Manhours3CGUARANTEED TIME[ Straight Time ] - CARPENTERHR$ - 0210$ - 0
306Manhours3CGUARANTEED TIME[ Straight Time ] - MECHANIC | DRIVER | GEARMANHR$ - 0210$ - 0
TOTAL 3C Guaranteed Time$ - 0
Line ItemCategoryScheduleCommodityDescriptionUnit of DurationEstimated DurationUnit of MeasureUnit PriceUnit QuantityUnit QuantityExtended Price
307Manhours4EQUIPMENT RENTAL (EQR)FORKLIFT, 3K - 10K capacityHR4EA$ - 015$ - 0
308Manhours4EQUIPMENT RENTAL (EQR)FORKLIFT, 11K - 15K capacityHR4EA$ - 015$ - 0
309Manhours4EQUIPMENT RENTAL (EQR)FORKLIFT, 16K - 34K capacityHR80EA$ - 015$ - 0
310Manhours4EQUIPMENT RENTAL (EQR)FORKLIFT, 35K - 49K capacityHR80EA$ - 015$ - 0
311Manhours4EQUIPMENT RENTAL (EQR)FORKLIFT, 50K and greater capacityHR20EA$ - 015$ - 0
312Manhours4EQUIPMENT RENTAL (EQR)CONTAINER HANDLER / top lift, 80,000 LB lifting capacityHR16EA$ - 015$ - 0
313Manhours4EQUIPMENT RENTAL (EQR)YARD TRACTOR (HUSTLER, YARD DOG)HR8EA$ - 015$ - 0
314Manhours4EQUIPMENT RENTAL (EQR)20 FOOT CONTAINER CHASSISHR4EA$ - 015$ - 0
315Manhours4EQUIPMENT RENTAL (EQR)40 FOOT CONTAINER CHASSISHR4EA$ - 015$ - 0
316Manhours4EQUIPMENT RENTAL (EQR)20 or 40 FOOT FLAT BED TRAILERS | MAFIs or MAFIs WITH PROBEHR4EA$ - 015$ - 0
317Manhours4EQUIPMENT RENTAL (EQR)HEAVY DUTY MEDIUM TUG or TRACTORHR5EA$ - 015$ - 0
318Manhours4EQUIPMENT RENTAL (EQR)HEAVY DUTY LARGE TUG or TRACTORHR10EA$ - 015$ - 0
319Manhours4EQUIPMENT RENTAL (EQR)CONTRACTOR'S MOBILE CRANE, UP TO AND EQUAL TO 70 TON capacityHR2EA$ - 015$ - 0
320Manhours4EQUIPMENT RENTAL (EQR)CONTRACTOR'S MOBILE CRANE, 71 TON TO 175 TON capacityHR4EA$ - 015$ - 0
321Manhours4EQUIPMENT RENTAL (EQR)CONTRACTOR'S MOBILE CRANE, GREATER THAN 175 UP TO 275 TON capacityHR1EA$ - 015$ - 0
324Manhours4EQUIPMENT RENTAL (EQR)GENERATOR, 3 kilowattDY1EA$ - 015$ - 0
325Manhours4EQUIPMENT RENTAL (EQR)GENERATOR, 10 kilowattDY1EA$ - 015$ - 0
326Manhours4EQUIPMENT RENTAL (EQR)GENERATOR, 60 kilowattDY1EA$ - 015$ - 0
327Manhours4EQUIPMENT RENTAL (EQR)GENERATOR, 100 kilowattDY1EA$ - 015$ - 0
328Manhours4EQUIPMENT RENTAL (EQR)GENERATOR, 500 kilowattDY1EA$ - 015$ - 0
329Manhours4EQUIPMENT RENTAL (EQR)Presure washer (heated water temp to 180 degrees) 2500psi with attachmentsDY1EA$ - 015$ - 0
330Manhours4EQUIPMENT RENTAL (EQR)LIGHT SETS, 1000 wattDY2EA$ - 015$ - 0
TOTAL 4 Equipment Rental$ - 0
340Miscellaneous6PORT FACILITIESOFFICE SPACE, PERMANENT | see PWS for specific detailsMISSION1EA$ - 015$ - 0
341Miscellaneous6PORT FACILITIESOFFICE SPACE, PORTABLE | see PWS for specific detailsMISSION1EA$ - 015$ - 0
348Miscellaneous6PORT FACILITIESFacsimile Machine (FAX)MISSION1EA$ - 015$ - 0
349Miscellaneous6PORT FACILITIESCopy Machine - with 1000 sheet per day capacity - with maintenanceMISSION1EA$ - 015$ - 0
350Miscellaneous6PORT FACILITIESLatrines and Handwashing stations | see PWS for specific detailsDY10EA$ - 01050$ - 0
351Miscellaneous6PORT FACILITIESRefuse container | see PWS for specific detailsDY10EA$ - 0210$ - 0
351Miscellaneous6PORT FACILITIESTraffic Cones (25 ea)MISSION1EA$ - 0210$ - 0
352Miscellaneous6PORT FACILITIESOPEN STAGING AREA, hard stand, Lots, storage areas | see PWS for specific detailsMISSION1CARGO SQFT$ - 0176,250881,250$ - 0
353Miscellaneous6PORT FACILITIESWAREHOUSE - CLOSED STAGING AREA | see PWS for specific detailsMISSION1WHSE SQFT USED$ - 024,000120,000$ - 0
355Miscellaneous6PORT FACILITIESCONTAINER WALL 20FT- 40FT CONTAINERS (combination of both)DY1EA$ - 015$ - 0
356Miscellaneous6PORT FACILITIESCONTAINER WALL 20'-40' Delivered, setup, and removal,EA$ - 0210$ - 0
TOTAL 6 Facilities$ - 0
370Miscellaneous8MISCELLANEOUSOUT-OF-POCKET POOLMTH12USD$ 1.003,50017,500$ 210,000.00
TOTAL 8 Miscellanious OOP$ 210,000.00

File details come from the government source that posted it. Updated .