Atch 2_Draft Drawing 07 Plumbing - Repair Dorm B542.pdf

PDF 11 MB Posted

Attached to
Project No. QKKA 171042, Repair Dorm Bldg. 542, Misawa Air Base, Japan
Solicitation number
FA520522R0001
Issued by

About this file

This pre-solicitation notice is for a firm-fixed price construction contract to renovate Dormitory Building 542 at Misawa Air Base in Japan. The contractor shall provide supervision, management, labor, equipment and materials to complete interior and exterior demolition, hazardous material abatement, structural and architectural improvements, new building systems and finishes. Renovations include electrical, plumbing and telecommunications systems; fire alarm, mass notification and suppression; and HVAC. Site improvements involve utilities, sidewalks and a new fire access lane. The performance period is 531 calendar days including 30 days for mobilization. The contract value is estimated between $10-25 million USD. The solicitation will issue on January 31, 2022 with proposals due around 40 days later. A pre-proposal conference is scheduled for February 25, 2022 at Misawa Air Base to review requirements. The award will be a single contract determined by subjective tradeoff of past performance and price factors. The Department of the Air Force Pacific Air Forces is the contracting agency.

View the file

Other files

Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CO

OR

HOSE BIBB

FLOOR DRAINS WITH CAST IRON DEEP SEALING TRAP & PRIMER TAP (NUMBER INDICATES TYPE)FD

DRAINAGE WYE, PLAN VIEW

DRAINAGE COMBINATION WYE AND ONE-EIGHTH BEND, PLAN VIEW

VENT THRU ROOF, STONEMAN VANDAL PROOF VENT FLASHING ASSEMBLY WITH SKIRT

CAST IRON SINGLE FLOOR OR YARD CLEANOUT, BRONZE PLUG, STAINLESS STEEL TOP

CAST IRON WALL CLEANOUT TEE, BRONZE PLUG, CHROME PLATED BRONZE FRAME & ACCESS COVER

HB

VTR

WCO OR CO

PLUMBING NEW WORK KEYED NOTE

DESCRIPTION

PLUMBING LEGEND

SANITARY OR WASTE DRAINAGE PIPING

ABBREVIATION

SAN

DOMESTIC HOT WATER PIPING

DOMESTIC COLD WATER PIPING

GATE VALVE; UNION BONNET, NON-RISING STEM, WITH SS SEAT RING AND THREADED ENDS

BALL VALVE; THREE PIECE, FULL PORT, SS BALL AND STEM; THREADED WITH UNION

ELBOW, PLAN VIEW (45°)

ELBOW, TURNING DOWNWARD

ELBOW, PLAN VIEW

BRANCH TEE OUT OF BOTTOM OF PIPING

BRANCH TEE OUT OF SIDE OF PIPING

BRANCH TEE OUT OF TOP OF PIPING

DIELECTRIC UNIONUN

BV

HW

CW

VALVE (BV, UON) LOCATED IN VERTICAL RISER

SANITARY OR WASTE DRAINAGE VENT PIPINGV

ABOVE FLOOR / AIR FORCE

ASME APPROVED COMBINATION TEMPERATURE AND PRESSURE RELIEF VALVE

TYPICAL AND / OR TYPICAL AS SHOWN

UNLESS OTHERWISE NOTED

ABOVE CEILING (GENERALLY INDICATES NOTED PIPING INSTALLED

ABOVE SUSPENDED CEILING)

REDUCED PRESSURE BACKFLOW PREVENTER ASSEMBLY WITH GATE VALVES

SANITARY

TPRV

UON

TYP

RPBFP

SAN

AF

AC

VTR

SP STATIC PRESSURE (kPA)

VENT-THRU-ROOF/WALL; VANDAL-PROOF WITH SKIRT, BOOT, FLASHING AND HOOD

CAST IRON PIPING, FITTINGS AND COUPLINGSCI

DUCTILE IRON PIPING, FITTINGS AND COUPLINGSDI

DRAINAGE, WASTE AND VENTDWV

COMBINATION WASTE AND VENTCWV

GALLONS PER MINUTEGPM

INVERT ELEVATION-REFERENCE TO TOP OF FINISHED

GROUND LEVEL FLOOR SLAB ELEVATION

IE

POLYVINYL CHLORIDE PIPING, FITTINGS AND COUPLINGSPVC

WC WATER CLOSET

PLUMBING ABBREVIATIONS:

ABOVE FINISHED FLOOR - REFERENCE TO TOP OF FINISHED FLOOR ELEVATIONAFF

GREASE LADEN WASTEGW

PRESSURE GAUGE AND SNUBBER; LARGE DIAL; METRIC (kPa) AND ENGLISH (PSIG) UNITSPG

ABOVE GRADEAG

DOMESTIC HOT WATER RETURN PIPINGHWR

DN (GENERALLY INDICATES PIPING TRANSITION DOWN THRU ROOF/CEILING/FLOOR)DN

BALANCING VALVE, THREADED ENDS

GV

FCO OR YCO

THERMOSTATIC MIXING VALVETMV

ENTERING WATER TEMPERATUREEWT

ENTERING SOURCE TEMPERATUREEST

LEAVING WATER TEMPERATURELWT

LAV LAVATORY

MINIMUM CIRCUIT AMPACITYMCA

RATED LOAD AMPSRLA

KW KILOWATT

GALLONSGAL

MAXIMUMMAX

MINIMUMMIN

CONNECT TO EXISTING

EXISTING SANITARY OR WASTE DRAINAGE PIPING(E)SAN

EXISTING DOMESTIC COLD WATER PIPING(E)CW

POINT OF DISCONNECTION

AUTOMATIC CLOTHES WASHERACW

AUTOMATIC DISHWASHERADW

EXISTING TO REMAINETR

PLUMBING DEMOLITION KEYED NOTE

VTR

LAUNDRY TUBLT

HOT WATER RE-CIRC PUMPHWP

FLOOR DRAINFD

SK KITCHEN SINK

SHOWERSH

BATHTUBBT

FLOOR CLEANOUTFCO

HOSE BIBBHB

DOMESTIC WATER HEATERDWH BRONZE BODY (LEAD FREE) CHECK VALVE

HOT WATER RE-CIRCT PUMP WITH AQUASTAT AND TIMER

WCO

CO

EXISTING PIPING TO BE REMOVED

EXISTING WORK TO BE REMOVED

GENERAL ISOLATION VALVE AND PIT

PRESSURE RELIEF VALVEPRV

WCO

ELBOW, TURNING UPWARD

RISER NOTATIONX

EXPANSION JOINT

EXPANSION JOINTEJ

EJ

AV - AIR VENT, AND AV-DRAINAV

WHA - WATER HAMMER ARRESTORWHA

R .K

O

EN

IG

C

TS

TT

W

P-001

PL

U

M

BI

N G

S

YM

BO

LS

A N

D A

BB

R

EV

IA

TI

O

N S

R E

P A

I R

D

O R

M

B

M I S

A W

A

A

B

A S

E

J

A P

A N

(Q

KK

A1

2)

FA

-1

8- F-

JU

N

E

, 2

SHEET

IDENTIFICATION

D

ES

IG

N

ED

B

Y:

D W

N B

Y:

C

KD

B

Y:

SO

LI

C

IT

AT

IO

N

N O

D

AT

E:

C O

N

TR

AC

T

N O

SU

BM

IT

TE

D

B Y:

U .S

. A

IR

F O

R C

E C

IV

IL

E N

G

IN

EE

R

C

EN

TE

R

O

TI

E R

S& H

J O

IN

T

VE

N

TU

R

E

N

. M

AY

FA

IR

R O

AD

S

U

IT

E

M

IL

W

AU

KE

E, W

I 5

A

B

C

D

1 2 3 4 5

M A

R K

D E

S C

R I P

T I O

N D

A T

E

FINAL DESIGN

SIGNED

THIS WORK WAS PREPARED

BY ME OR UNDER MY

SUPERVISION

SHEET OF 232

PA

U

L

VA

N D

EN

BE

R G

DRAFT

STAIR 2

STAIR 1

UNIT 124STORAGE 1

UNIT 119 UNIT 121 UNIT 123

LAUNDRY 1

JANITOR 1

CORRIDOR 1W

DAY ROOM 1

MECHANICAL RM

LINEN 1

UNIT 114

UNIT 112UNIT 110UNIT 108

UNIT 113UNIT 111UNIT 109UNIT 107UNIT 105UNIT 103UNIT 101

UNIT 102 UNIT 104 UNIT 106

RRM 1

LOBBY

CORRIDOR 1

OFFICE

14 14'

M

ATC

H

LIN

E

01 02 03 04 05 06 07 08 09 11 12 13 14 14'10

OFFICE

M

ATC

H

LIN

E

PD401

PD401

PD402

PD401

PD401

(ETR)20

CW

(E)40 HWR

(E)80 CW

(E)32 HWR

(E)80 CW

(E)40 HWR

(E)32 HWR

(E)100 CW

(E)40 HWR

(E)25 HWR

(E)40 HWR

(E)100 CW

(E)40 HWR

(E)100 CW

(E)25 HWR

(E)40 HWR

(E)100 CW

(E)32 HWR

(E)40 HWR

(E)100 CW

(E)HB

(E)HB

(E)HB

(E)20 CW

3 3

2 2 2 2 2 2 2 2

A

B

C

D

E

F

G

H J

K

L

M

N

I

1 1 1 1 11 1

A

14 15 16 17 18 19 20

B

C

D

E

F

14'

STAIR 3

UNIT 130UNIT 128UNIT 126 UNIT 136

UNIT 135

UNIT 134

UNIT 133UNIT 125 UNIT 127 UNIT 129

UNIT 132

UNIT 131

CORRIDOR 1E

M

ATC

H

LIN

E

A

B

C

D

E

F

14'

M

ATC

H

LIN

E

PD401

PD401

PD401

(ETR)20

CW

(E)32 HWR

(E)40 HWR

(E)80 CW

(E)40 HWR

(E)40 HWR

(E)80 CW

(E)32 HWR

(E)40 HWR

(E)100 CW

(E)HB

3 3 3

2 2 2 2 2 2

O

P

Q

R

S

T

1 1 1

SCALE:

PLUMBING UNDERFLOOR DEMOLITION PLAN - FIRST FLOOR

1:1001 0 700030001000

PLAN

NORTH

R E

P A

R

M

B

M I S

A W

A

A

S

E

J

A P

A N

(Q

KK

A1

2)

FA

-1

8- F-

JU

N

E

, 2

SHEET

IDENTIFICATION

D

ES

IG

N

ED

B

Y:

D W

N B

Y:

C

KD

B

Y:

SO

LI

C

IT

AT

IO

N

N O

D

AT

E:

C O

N

TR

AC

T

N O

SU

BM

IT

TE

D

B Y:

U .S

. A

IR

F O

R C

E C

IV

IL

E N

G

IN

EE

R

C

EN

TE

R

O

TI

E R

S& H

J O

IN

T

VE

N

TU

R

E

N

. M

AY

FA

IR

R O

AD

S

U

IT

E

M

IL

W

AU

KE

E, W

I 5

A

B

C

D

1 2 3 4 5

M A

R K

D E

S C

R I P

T I O

N D

A T

E

FINAL DESIGN

SIGNED

THIS WORK WAS PREPARED

BY ME OR UNDER MY

SUPERVISION

SHEET OF 232

PA

U

L

VA

N D

EN

BE

R G

R .K

O

EN

IG

N C

D

TT

W

PD101

PL

U

M

BI

N G

U N

D

ER

FL

O

O R

D

EM

O

LI

TI

O

N P

LA

N

FI

R

ST

F

LO

O R

1. CONTRACTOR SHALL PROVIDE ALL NECESSARY SAW-CUTTING

OF EXISTING FLOOR IN ORDER TO FACILITATE REPLACEMENT

OF EXISTING UNDERFLOOR SANITARY PIPING. THERE IS NOT A

CRAWL SPACE UNDER THIS UNIT.

2. COORDINATE SHUT DOWN OF DOMESTIC HOT AND COLD

WATER SYSTEM TO DWELLING UNITS WITH AF BASE PRIOR TO

DEMOLITION.

3. ALL EXISTING PLUMBING FIXTURES (INCLUDING, BUT NOT

LIMITED TO LAVATORIES, WATER CLOSETS, BATHTUBS,

SHOWERS, KITCHEN SINKS, DISHWASHER) SHALL BE REMOVED

IN THEIR ENTIRETY FOR REPLACEMENT.

4. ALL EXISTING APPURTENANCES CONNECTED TO AND

ASSOCIATED WITH FIXTURES SHOWN AS DEMO SHALL BE

REMOVED IN THEIR ENTIRETY, UNLESS OTHERWISE NOTED.

THIS INCLUDES (BUT IS NOT LIMITED TO) ASSOCIATED

FAUCETS, STOP VALVES, P-TRAPS, CONNECTORS PIPING,

SUPPORTS AND ACCESSORIES.

5. LOCATION OF PIPING TO BE REMOVED SHOWN ON DRAWINGS

IS APPROXIMATE - FIELD VERIFY ALL PIPING PRIOR TO

REMOVAL.

6. COORDINATE REMOVAL AND RETENTION OF ALL EQUIPMENT

WITH BASE HOUSING.

7. COORDINATE REMOVAL AND ABATEMENT OF ASBESTOS

CONTAINING MATERIALS FOR ALL UNITS. REFER TO HAZMAT

PLAN SHEETS FOR ADDITIONAL DEMOLITION NOTES.

8. CONTRACTOR IS RESPONSIBLE FOR PATCHING ALL OPENINGS

IN CEILINGS, WALLS AND FLOORS THAT RESULT FROM

DEMOLITION WORK OR REMOVED EQUIPMENT, UNLESS

OPENING IS TO BE REUSED. PATCHING OF OPENINGS OR

OTHER DAMAGE IS TO MATCH ADJACENT SURFACES,

MATERIALS AND CONDITIONS.

9. ANY DAMAGE TO EXISTING STRUCTURES, FLOORS, AND WALLS

DURING CONSTRUCTION SHALL BE RESTORED TO ORIGINAL

CONDITION AT NO ADDITIONAL COST TO THE PROJECT.

10. DEMOLITION OF EXISTING DOMESTIC WATER SERVICE SHALL

EXTEND TO EXISTING GATE VALVE LOCATED APPROXIMATELY

1.5M OUTSIDE BUILDING.

11. DEMOLITION OF EXISTING SANITARY SEWER LATERAL SHALL

EXTEND UP TO EXISTING YARD CLEANOUT LOCATED

APPROXIMATELY 1.5M OUTSIDE BUILDING.

12. CONTRACTOR SHALL FIELD VERIFY EXISTING CONDITIONS

WITH RESPECT TO PLANS PRIOR TO DEMOLITION WORK.

13. EXISTING PIPE DEMOLITION SIZES SHOWN ON PLANS ARE

APPROXIMATE - SIZES SHOWN FOR PURPOSES OF ESTIMATING

EFFORT OF DEMOLITION WORK.

GENERAL NOTES:KEYNOTES

1 DISCONNECT AND REMOVE PIPING TO 1.5M FROM BUILDING.

2 REMOVE PIPING TO UNITS IN CRAWL SPACE (TYPICAL).

3 REMOVE CONCRETE SLAB FOR NEW HOSE BIB BELOW SLAB

PIPING. REMOVAL BY GC. SEE AD105 FOR LIMITS OF

DEMOLITION.

4 DISCONNECT AND REMOVE HOT WATER STORAGE TANK

AND ASSOCIATED PIPING.

14. SEE ENLARGED PLANS FOR ADDITIONAL DETAILS.

5 ABANDON-IN-PLACE EXISTING COLD WATER PIPING

OUTSIDE THE CRAWL SPACE.

01 02 03 04 05 06 07 08 09 11 12 13 14 14'10

STAIR 2

STAIR 1

UNIT 223UNIT 221

UNIT 224UNIT 222

UNIT 219

UNIT 218

STORAGE 2

CORRIDOR 2W

LOUNGE 2

LAUNDRY 2

UNIT 216UNIT 214UNIT 212UNIT 210UNIT 208UNIT 206UNIT 204UNIT 202

UNIT 201 UNIT 203 UNIT 205 UNIT 207 UNIT 209 UNIT 211 UNIT 213

JANITOR 2

CORRIDOR 2

M

ATC

H

LIN

E

14 14'

CORRIDOR 2E

M

ATC

H

LIN

E

PD403

PD403

PD403

PD404

PD403

1 1 1 1

1 1

A

B

C

D

E

F

G

H J

K

L

M

N

I

A

B

C

D

E

F

14'

M

ATC

H

LIN

E

A

14 15 16 17 18 19 20

B

C

D

E

F

14'

STAIR 3

UNIT 233UNIT 231UNIT 229UNIT 227UNIT 225

UNIT 232UNIT 230UNIT 228UNIT 226 UNIT 236UNIT 234

UNIT 235

CORRIDOR 2E

M

ATC

H

LIN

E

PD403

PD403

PD403

PD403

1 1 1

1 1 1

O

P

Q

R

S

T

SCALE:

PLUMBING UNDERFLOOR DEMOLITION PLAN - SECOND, THIRD & FOURTH FLOORS

1:1001 0 700030001000

PLAN

NORTH

R E

P A

R

M

B

M I S

A W

A

A

S

E

J

A P

A N

(Q

KK

A1

2)

FA

-1

8- F-

JU

N

E

, 2

SHEET

IDENTIFICATION

D

ES

IG

N

ED

B

Y:

D W

N B

Y:

C

KD

B

Y:

SO

LI

C

IT

AT

IO

N

N O

D

AT

E:

C O

N

TR

AC

T

N O

SU

BM

IT

TE

D

B Y:

U .S

. A

IR

F O

R C

E C

IV

IL

E N

G

IN

EE

R

C

EN

TE

R

O

TI

E R

S& H

J O

IN

T

VE

N

TU

R

E

N

. M

AY

FA

IR

R O

AD

S

U

IT

E

M

IL

W

AU

KE

E, W

I 5

A

B

C

D

1 2 3 4 5

M A

R K

D E

S C

R I P

T I O

N D

A T

E

FINAL DESIGN

SIGNED

THIS WORK WAS PREPARED

BY ME OR UNDER MY

SUPERVISION

SHEET OF 232

PA

U

L

VA

N D

EN

BE

R G

R .K

O

EN

IG

N C

D

TT

W

PD102

PL

U

M

BI

N G

U N

D

ER

FL

O

O R

D

EM

O

LI

TI

O

N

PL

AN

SE

C

O N

D , T

H

IR

D

F O

U R

TH

F

LO

O

R S

1. CONTRACTOR SHALL PROVIDE ALL NECESSARY SAW-CUTTING

OF EXISTING FLOOR IN ORDER TO FACILITATE REPLACEMENT

OF EXISTING UNDERFLOOR SANITARY PIPING. THERE IS NOT A

CRAWL SPACE UNDER THIS UNIT.

2. COORDINATE SHUT DOWN OF DOMESTIC HOT AND COLD

WATER SYSTEM TO DWELLING UNITS WITH AF BASE PRIOR TO

DEMOLITION.

3. ALL EXISTING PLUMBING FIXTURES (INCLUDING, BUT NOT

LIMITED TO LAVATORIES, WATER CLOSETS, BATHTUBS,

SHOWERS, KITCHEN SINKS, DISHWASHER) SHALL BE REMOVED

IN THEIR ENTIRETY FOR REPLACEMENT.

4. ALL EXISTING APPURTENANCES CONNECTED TO AND

ASSOCIATED WITH FIXTURES SHOWN AS DEMO SHALL BE

REMOVED IN THEIR ENTIRETY, UNLESS OTHERWISE NOTED.

THIS INCLUDES (BUT IS NOT LIMITED TO) ASSOCIATED

FAUCETS, STOP VALVES, P-TRAPS, CONNECTORS PIPING,

SUPPORTS AND ACCESSORIES.

5. LOCATION OF PIPING TO BE REMOVED SHOWN ON DRAWINGS

IS APPROXIMATE - FIELD VERIFY ALL PIPING PRIOR TO

REMOVAL.

6. COORDINATE REMOVAL AND RETENTION OF ALL EQUIPMENT

WITH BASE HOUSING.

7. COORDINATE REMOVAL AND ABATEMENT OF ASBESTOS

CONTAINING MATERIALS FOR ALL UNITS. REFER TO HAZMAT

PLAN SHEETS FOR ADDITIONAL DEMOLITION NOTES.

8. CONTRACTOR IS RESPONSIBLE FOR PATCHING ALL OPENINGS

IN CEILINGS, WALLS AND FLOORS THAT RESULT FROM

DEMOLITION WORK OR REMOVED EQUIPMENT, UNLESS

OPENING IS TO BE REUSED. PATCHING OF OPENINGS OR

OTHER DAMAGE IS TO MATCH ADJACENT SURFACES,

MATERIALS AND CONDITIONS.

9. ANY DAMAGE TO EXISTING STRUCTURES, FLOORS, AND WALLS

DURING CONSTRUCTION SHALL BE RESTORED TO ORIGINAL

CONDITION AT NO ADDITIONAL COST TO THE PROJECT.

10. DEMOLITION OF EXISTING DOMESTIC WATER SERVICE SHALL

EXTEND TO EXISTING GATE VALVE LOCATED APPROXIMATELY

1.5M OUTSIDE BUILDING.

11. DEMOLITION OF EXISTING SANITARY SEWER LATERAL SHALL

EXTEND UP TO EXISTING YARD CLEANOUT LOCATED

APPROXIMATELY 1.5M OUTSIDE BUILDING.

12. CONTRACTOR SHALL FIELD VERIFY EXISTING CONDITIONS

WITH RESPECT TO PLANS PRIOR TO DEMOLITION WORK.

13. EXISTING PIPE DEMOLITION SIZES SHOWN ON PLANS ARE

APPROXIMATE - SIZES SHOWN FOR PURPOSES OF ESTIMATING

EFFORT OF DEMOLITION WORK.

GENERAL NOTES:KEYNOTES

1 DISCONNECT AND REMOVE PIPING TO POINT INDICATED.

14. SEE ENLARGED PLANS FOR ADDITIONAL DETAILS.

14 14'

CORRIDOR 4E

M

ATC

H

LIN

E

01 02 03 04 05 06 07 08 09 11 12 13 14 110

STAIR 2

STAIR 1

DAY ROOM 4

UNIT 418

UNIT 419 UNIT 423

STORAGE 4

UNIT 422 UNIT 424UNIT 416UNIT 414UNIT 412UNIT 410UNIT 408UNIT 406UNIT 404UNIT 402

UNIT 401 UNIT 403 UNIT 405 UNIT 407 UNIT 409 UNIT 411 UNIT 413

LAUNDRY 4

JANITOR 4

UNIT 421

CORRIDOR 4CORRIDOR 4W

RRM 4

M

ATC

H

LIN

E

D

(E)100 V

(E)V TO

EXTERIOR

(E)V TO

EXTERIOR

(E)V TO

EXTERIOR

(E)V TO

EXTERIOR

(E)V TO

EXTERIOR

(E)V TO

EXTERIOR

(E)100 V (E)100 V (E)100 V

(E)V TO

EXTERIOR

(E)V TO

EXTERIOR (E)V TO

EXTERIOR

(E)100 V (E)80 V (E)100 V(E)100 V

(E)50 HW (E)50 HW (E)65 HW

(E)V TO

EXTERIOR

(E)100 V (E)100 V

(E)V TO

EXTERIOR

(E)100 V

(E)100 (E)50

(E)50(E)50 (E)50 (E)50 (E)50(E)50

(E)80

(E)100

(E)50 (E)50 (E)50 (E)50

B F H

J

L N

(E)50 (E)50

A C

(E)50 (E)50

E

(E)50 (E)50

G

(E)50

I (E)40

(E)80

K

M

(E)100 V

(E)50 (E)50

(E)100 V

(E)50 (E)50

(E)EJ

(E)40

(E)40

(E)40

(E)40

(E)40

(E)40

(E)40

(E)32 (E)32

(E)40

(E)32

(E)65 HW

(E)EJ (E)EJ

(E)32

(E)40

(E)50 HW

(E)V TO

EXTERIOR

(E)V TO

EXTERIOR

A

14 15 16 17 18 19 20

B

C

D

E

F

14'

STAIR 3

UNIT 425

UNIT 434UNIT 426 UNIT 428 UNIT 430 UNIT 432

UNIT 427 UNIT 429 UNIT 431 UNIT 433 UNIT 435

CORRIDOR 4E

UNIT 436

M

ATC

H

LIN

E

14 1

M

ATC

H

LIN

E

(E)V TO

EXTERIOR

(E)V TO

EXTERIOR

(E)V TO

EXTERIOR

(E)V TO

EXTERIOR

(E)V TO

EXTERIOR

(E)V TO

EXTERIOR

(E)100 V (E)100 V (E)100 V

(E)50 HW

(E)100 V (E)100 V (E)100 V

(E)50 (E)50 (E)50 (E)50 (E)50 (E)50

P R T

(E)50 (E)50 (E)50 (E)50 (E)50 (E)50

O Q S

(E)EJ

(E)EJ(E)40 (E)40 (E)40

(E)40 (E)40(E)40

SCALE:

PLUMBING ABOVE FLOOR DEMOLITION PLAN - FOURTH FLOOR

1:1001 0 700030001000

PLAN

NORTH

R E

P A

R

M

B

M I S

A W

A

A

S

E

J

A P

A N

(Q

KK

A1

2)

FA

-1

8- F-

JU

N

E

, 2

SHEET

IDENTIFICATION

D

ES

IG

N

ED

B

Y:

D W

N B

Y:

C

KD

B

Y:

SO

LI

C

IT

AT

IO

N

N O

D

AT

E:

C O

N

TR

AC

T

N O

SU

BM

IT

TE

D

B Y:

U .S

. A

IR

F O

R C

E C

IV

IL

E N

G

IN

EE

R

C

EN

TE

R

O

TI

E R

S& H

J O

IN

T

VE

N

TU

R

E

N

. M

AY

FA

IR

R O

AD

S

U

IT

E

M

IL

W

AU

KE

E, W

I 5

A

B

C

D

1 2 3 4 5

M A

R K

D E

S C

R I P

T I O

N D

A T

E

FINAL DESIGN

SIGNED

THIS WORK WAS PREPARED

BY ME OR UNDER MY

SUPERVISION

SHEET OF 232

PA

U

L

VA

N D

EN

BE

R G

R .K

O

EN

IG

N C

D

TT

W

PD103

PL

U

M

BI

N G

A

BO

VE

F

LO

O

R D

EM

O

LI

TI

O N

P

LA

N

FO

U

R

TH

F

LO

O R

1. CONTRACTOR SHALL PROVIDE ALL NECESSARY SAW-CUTTING

OF EXISTING FLOOR IN ORDER TO FACILITATE REPLACEMENT

OF EXISTING UNDERFLOOR SANITARY PIPING. THERE IS NOT A

CRAWL SPACE UNDER THIS UNIT.

2. COORDINATE SHUT DOWN OF DOMESTIC HOT AND COLD

WATER SYSTEM TO DWELLING UNITS WITH AF BASE PRIOR TO

DEMOLITION.

3. ALL EXISTING PLUMBING FIXTURES (INCLUDING, BUT NOT

LIMITED TO LAVATORIES, WATER CLOSETS, BATHTUBS,

SHOWERS, KITCHEN SINKS, DISHWASHER) SHALL BE REMOVED

IN THEIR ENTIRETY FOR REPLACEMENT.

4. ALL EXISTING APPURTENANCES CONNECTED TO AND

ASSOCIATED WITH FIXTURES SHOWN AS DEMO SHALL BE

REMOVED IN THEIR ENTIRETY, UNLESS OTHERWISE NOTED.

THIS INCLUDES (BUT IS NOT LIMITED TO) ASSOCIATED

FAUCETS, STOP VALVES, P-TRAPS, CONNECTORS PIPING,

SUPPORTS AND ACCESSORIES.

5. LOCATION OF PIPING TO BE REMOVED SHOWN ON DRAWINGS

IS APPROXIMATE - FIELD VERIFY ALL PIPING PRIOR TO

REMOVAL.

6. COORDINATE REMOVAL AND RETENTION OF ALL EQUIPMENT

WITH BASE HOUSING.

7. COORDINATE REMOVAL AND ABATEMENT OF ASBESTOS

CONTAINING MATERIALS FOR ALL UNITS. REFER TO HAZMAT

PLAN SHEETS FOR ADDITIONAL DEMOLITION NOTES.

8. CONTRACTOR IS RESPONSIBLE FOR PATCHING ALL OPENINGS

IN CEILINGS, WALLS AND FLOORS THAT RESULT FROM

DEMOLITION WORK OR REMOVED EQUIPMENT, UNLESS

OPENING IS TO BE REUSED. PATCHING OF OPENINGS OR

OTHER DAMAGE IS TO MATCH ADJACENT SURFACES,

MATERIALS AND CONDITIONS.

9. ANY DAMAGE TO EXISTING STRUCTURES, FLOORS, AND WALLS

DURING CONSTRUCTION SHALL BE RESTORED TO ORIGINAL

CONDITION AT NO ADDITIONAL COST TO THE PROJECT.

10. DEMOLITION OF EXISTING DOMESTIC WATER SERVICE SHALL

EXTEND TO EXISTING GATE VALVE LOCATED APPROXIMATELY

1.5M OUTSIDE BUILDING.

11. DEMOLITION OF EXISTING SANITARY SEWER LATERAL SHALL

EXTEND UP TO EXISTING YARD CLEANOUT LOCATED

APPROXIMATELY 1.5M OUTSIDE BUILDING.

12. CONTRACTOR SHALL FIELD VERIFY EXISTING CONDITIONS

WITH RESPECT TO PLANS PRIOR TO DEMOLITION WORK.

13. EXISTING PIPE DEMOLITION SIZES SHOWN ON PLANS ARE

APPROXIMATE - SIZES SHOWN FOR PURPOSES OF ESTIMATING

EFFORT OF DEMOLITION WORK.

GENERAL NOTES:

01 02 03

UNIT 103UNIT 101

UNIT 102 UNIT 104

(E)LAV

(E)SH

(E)WC

(E)WC

(E)FCO

(E)LAV

(E)WC (E)WC

(E)FCO

(E)LAV

(E)SH(E)SH

(E)FCO

(E)SK

(E)SK

(E)65 CW

(E)20 HWR

(E)20 HWR

(E)65 CW(E)100 SAN

(E)20 CW

(E)20 HW

(E)20

HW

(E)125 SAN

(E)100 SAN

(E)FCO (E)SH

(E)LAV

(E)100 SAN

(E)20 HWR

(E)SK(E)SK

(E)HWR

(E)HWR

(E)CW

A

B

(ETR)SAN

A

B

C

D

E

F

D

E

F

A

B

C

07 08

STORAGE 1

CORRIDOR 1W

DAY ROOM 1

UNIT 114

UNIT 113

(E)DRINKING

FOUNTAIN

(E)WC

(E)WC

(E)SH

(E)LAV

(E)SK

(E)125 SAN

(E)65 CW

(E)50 CW

(E)20 HW

(E)20

CW

(E)50 CW

(E)20 HW

(E)100 SAN

(E)FCO

(E)SK

(E)SH

(E)HWR

(E)HWR

(E)CW (E)CW

G

H

(ETR)SAN

R E

P A

R

M

B

M I S

A W

A

A

S

E

J

A P

A N

(Q

KK

A1

2)

FA

-1

8- F-

JU

N

E

, 2

SHEET

IDENTIFICATION

D

ES

IG

N

ED

B

Y:

D W

N B

Y:

C

KD

B

Y:

SO

LI

C

IT

AT

IO

N

N O

D

AT

E:

C O

N

TR

AC

T

N O

SU

BM

IT

TE

D

B Y:

U .S

. A

IR

F O

R C

E C

IV

IL

E N

G

IN

EE

R

C

EN

TE

R

O

TI

E R

S& H

J O

IN

T

VE

N

TU

R

E

N

. M

AY

FA

IR

R O

AD

S

U

IT

E

M

IL

W

AU

KE

E, W

I 5

A

B

C

D

1 2 3 4 5

M A

R K

D E

S C

R I P

T I O

N D

A T

E

FINAL DESIGN

SIGNED

THIS WORK WAS PREPARED

BY ME OR UNDER MY

SUPERVISION

SHEET OF 232

PA

U

L

VA

N D

EN

BE

R G

R .K

O

EN

IG

N C

D

TT

W

PD401

PL

U

M

BI

N G

U N

D

ER

FL

O

O R

D

EM

O

LI

TI

O

N P

LA

N

FI

R

ST

F

LO

O R

SCALE:

DEMOLITION PLAN - FIRST FLOOR TYPICAL UNT

1:501

1. CONTRACTOR SHALL PROVIDE ALL NECESSARY SAW-CUTTING

OF EXISTING FLOOR IN ORDER TO FACILITATE REPLACEMENT

OF EXISTING UNDERFLOOR SANITARY PIPING. THERE IS NOT A

CRAWL SPACE UNDER THIS UNIT.

2. COORDINATE SHUT DOWN OF DOMESTIC HOT AND COLD

WATER SYSTEM TO DWELLING UNITS WITH AF BASE PRIOR TO

DEMOLITION.

3. ALL EXISTING PLUMBING FIXTURES (INCLUDING, BUT NOT

LIMITED TO LAVATORIES, WATER CLOSETS, BATHTUBS,

SHOWERS, KITCHEN SINKS, DISHWASHER) SHALL BE REMOVED

IN THEIR ENTIRETY FOR REPLACEMENT.

4. ALL EXISTING APPURTENANCES CONNECTED TO AND

ASSOCIATED WITH FIXTURES SHOWN AS DEMO SHALL BE

REMOVED IN THEIR ENTIRETY, UNLESS OTHERWISE NOTED.

THIS INCLUDES (BUT IS NOT LIMITED TO) ASSOCIATED

FAUCETS, STOP VALVES, P-TRAPS, CONNECTORS PIPING,

SUPPORTS AND ACCESSORIES.

5. LOCATION OF PIPING TO BE REMOVED SHOWN ON DRAWINGS

IS APPROXIMATE - FIELD VERIFY ALL PIPING PRIOR TO

REMOVAL.

6. COORDINATE REMOVAL AND RETENTION OF ALL EQUIPMENT

WITH BASE HOUSING.

7. COORDINATE REMOVAL AND ABATEMENT OF ASBESTOS

CONTAINING MATERIALS FOR ALL UNITS. REFER TO HAZMAT

PLAN SHEETS FOR ADDITIONAL DEMOLITION NOTES.

8. CONTRACTOR IS RESPONSIBLE FOR PATCHING ALL OPENINGS

IN CEILINGS, WALLS AND FLOORS THAT RESULT FROM

DEMOLITION WORK OR REMOVED EQUIPMENT, UNLESS

OPENING IS TO BE REUSED. PATCHING OF OPENINGS OR

OTHER DAMAGE IS TO MATCH ADJACENT SURFACES,

MATERIALS AND CONDITIONS.

9. ANY DAMAGE TO EXISTING STRUCTURES, FLOORS, AND WALLS

DURING CONSTRUCTION SHALL BE RESTORED TO ORIGINAL

CONDITION AT NO ADDITIONAL COST TO THE PROJECT.

10. DEMOLITION OF EXISTING DOMESTIC WATER SERVICE SHALL

EXTEND TO EXISTING GATE VALVE LOCATED APPROXIMATELY

1.5M OUTSIDE BUILDING.

11. DEMOLITION OF EXISTING SANITARY SEWER LATERAL SHALL

EXTEND UP TO EXISTING YARD CLEANOUT LOCATED

APPROXIMATELY 1.5M OUTSIDE BUILDING.

12. CONTRACTOR SHALL FIELD VERIFY EXISTING CONDITIONS

WITH RESPECT TO PLANS PRIOR TO DEMOLITION WORK.

13. EXISTING PIPE DEMOLITION SIZES SHOWN ON PLANS ARE

APPROXIMATE - SIZES SHOWN FOR PURPOSES OF ESTIMATING

EFFORT OF DEMOLITION WORK.

GENERAL NOTES:

KEYNOTES

1 DISCONNECT AND REMOVE PIPING TO 1.5M FROM BUILDING.

2 REMOVE PIPING TO UNITS IN CRAWL SPACE (TYPICAL).

3 REMOVE CONCRETE SLAB FOR DEMOLITION OF BELOW

SLAB PIPING.

PLUMBING UNDERFLOOR

SCALE:

DEMOLITION PLAN - FIRST FLOOR

1:502

PLUMBING UNDERFLOOR

0 350015005000 35001500500

09 11 12 13 14 14'10

UNIT 124STORAGE 1

UNIT 119 UNIT 121 UNIT 123

LAUNDRY 1

JANITOR 1

DAY ROOM 1

MECHANICAL RM

LINEN 1

RRM 1

LOBBY

CORRIDOR 1

OFFICE

(E)80 V UP

(E)50 V

(E)H W

(E)C W

(E)SAN

(E)50 V

(E)WC

(E)FCO

(E)SK

(E)FD

(E)WC

(E)FCO

(E)SK

(E)WC

(E)WC

(E)LAV(E)LAV

(E)SH

(E)SH

(E)SH (E)FCO

(E)100 SAN

(E)65 SAN

(E)20 CW

(E)20 CW

(E)20 HW

(E)50 SAN

(E)20 CW

(E)20 HW

(E)60 V

(E)50 V

(E)100 SAN

(E)20 HW

(E)50 CW

(E)80 SAN

(E)100

SAN

(E)100

CW

(E)50 CW

(E)25 CW

P

P

(E)40 HWR

(E)100 CW

(E)100 CW

(E)80 HW

(E)50

SAN

(E)20 HW

(E)HB

(E)20 CW

(E)20 CW

(E)50 CW

(E)20 CW

(E)20 HW

(E)100 SAN

(E)WC

(E)50 CW

(E)SK

(E)SH

(E)20 HWR

(E)100 SAN

(E)LAV

(E)20 CW

(E)75 SAN

(E)100 SAN

(E)80 V

(E)40 CW

(E)20 HW

(E)20 CW

(E)50 SAN

(E)50 V

(E)FCO

(E)100 SAN

(E)100 SAN

(E)50 SAN

(E)50

SAN

(E)100 SAN

(E)65

SAN

(E)50 CW

(E)100 SAN

(E)50 SAN

(E)100

SAN UP

(E)HB

(E)125 SAN

(E)40

HWR

(E)SK (E)SK

(E)20 HWR

(E)65 CW

(E)100

SAN

(E)125 SAN

(E)20 HW

(E)65 CW

(E)20 HWR

(E)65 CW

(E)20 CW

(E)20 HW

(E)HWR

(E)HWR

(E)CW

(E)HWR

(E)HWR

(E)CW

(E)HWR

(E)HWR

(E)CW

J

K

L

M

N

I

11 1

(E)EJ

(ETR)125 SAN

(ETR)SAN

(ETR)SAN(ETR)SAN

A

B

C

D

E

F

R .K

O

EN

IG

N C

D

TT

W

PD402

PL

U

M

BI

N G

U N

D

ER

FL

O

O R

D

EM

O

LI

TI

O

N P

LA

N

FI

R

ST

F

LO

O R

1. CONTRACTOR SHALL PROVIDE ALL NECESSARY SAW-CUTTING

OF EXISTING FLOOR IN ORDER TO FACILITATE REPLACEMENT

OF EXISTING UNDERFLOOR SANITARY PIPING. THERE IS NOT A

CRAWL SPACE UNDER THIS UNIT.

2. COORDINATE SHUT DOWN OF DOMESTIC HOT AND COLD

WATER SYSTEM TO DWELLING UNITS WITH AF BASE PRIOR TO

DEMOLITION.

3. ALL EXISTING PLUMBING FIXTURES (INCLUDING, BUT NOT

LIMITED TO LAVATORIES, WATER CLOSETS, BATHTUBS,

SHOWERS, KITCHEN SINKS, DISHWASHER) SHALL BE REMOVED

IN THEIR ENTIRETY FOR REPLACEMENT.

4. ALL EXISTING APPURTENANCES CONNECTED TO AND

ASSOCIATED WITH FIXTURES SHOWN AS DEMO SHALL BE

REMOVED IN THEIR ENTIRETY, UNLESS OTHERWISE NOTED.

THIS INCLUDES (BUT IS NOT LIMITED TO) ASSOCIATED

FAUCETS, STOP VALVES, P-TRAPS, CONNECTORS PIPING,

SUPPORTS AND ACCESSORIES.

5. LOCATION OF PIPING TO BE REMOVED SHOWN ON DRAWINGS

IS APPROXIMATE - FIELD VERIFY ALL PIPING PRIOR TO

REMOVAL.

6. COORDINATE REMOVAL AND RETENTION OF ALL EQUIPMENT

WITH BASE HOUSING.

7. COORDINATE REMOVAL AND ABATEMENT OF ASBESTOS

CONTAINING MATERIALS FOR ALL UNITS. REFER TO HAZMAT

PLAN SHEETS FOR ADDITIONAL DEMOLITION NOTES.

8. CONTRACTOR IS RESPONSIBLE FOR PATCHING ALL OPENINGS

IN CEILINGS, WALLS AND FLOORS THAT RESULT FROM

DEMOLITION WORK OR REMOVED EQUIPMENT, UNLESS

OPENING IS TO BE REUSED. PATCHING OF OPENINGS OR

OTHER DAMAGE IS TO MATCH ADJACENT SURFACES,

MATERIALS AND CONDITIONS.

9. ANY DAMAGE TO EXISTING STRUCTURES, FLOORS, AND WALLS

DURING CONSTRUCTION SHALL BE RESTORED TO ORIGINAL

CONDITION AT NO ADDITIONAL COST TO THE PROJECT.

10. DEMOLITION OF EXISTING DOMESTIC WATER SERVICE SHALL

EXTEND TO EXISTING GATE VALVE LOCATED APPROXIMATELY

1.5M OUTSIDE BUILDING.

11. DEMOLITION OF EXISTING SANITARY SEWER LATERAL SHALL

EXTEND UP TO EXISTING YARD CLEANOUT LOCATED

APPROXIMATELY 1.5M OUTSIDE BUILDING.

12. CONTRACTOR SHALL FIELD VERIFY EXISTING CONDITIONS

WITH RESPECT TO PLANS PRIOR TO DEMOLITION WORK.

13. EXISTING PIPE DEMOLITION SIZES SHOWN ON PLANS ARE

APPROXIMATE - SIZES SHOWN FOR PURPOSES OF ESTIMATING

EFFORT OF DEMOLITION WORK.

GENERAL NOTES:

R E

P A

R

M

B

M I S

A W

A

A

S

E

J

A P

A N

(Q

KK

A1

2)

FA

-1

8- F-

JU

N

E

, 2

SHEET

IDENTIFICATION

D

ES

IG

N

ED

B

Y:

D W

N B

Y:

C

KD

B

Y:

SO

LI

C

IT

AT

IO

N

N O

D

AT

E:

C O

N

TR

AC

T

N O

SU

BM

IT

TE

D

B Y:

U .S

. A

IR

F O

R C

E C

IV

IL

E N

G

IN

EE

R

C

EN

TE

R

O

TI

E R

S& H

J O

IN

T

VE

N

TU

R

E

N

. M

AY

FA

IR

R O

AD

S

U

IT

E

M

IL

W

AU

KE

E, W

I 5

A

B

C

D

1 2 3 4 5

M A

R K

D E

S C

R I P

T I O

N D

A T

E

FINAL DESIGN

SIGNED

THIS WORK WAS PREPARED

BY ME OR UNDER MY

SUPERVISION

SHEET OF 232

PA

U

L

VA

N D

EN

BE

R G

SCALE:

PLUMBING UNDERFLOOR DEMOLITION PLAN - FIRST FLOOR

1:501

KEYNOTES

1 DISCONNECT AND REMOVE PIPING TO 1.5M FROM BUILDING.

2 REMOVE PIPING TO UNITS IN CRAWL SPACE (TYPICAL).

3 REMOVE CONCRETE SLAB FOR DEMOLITION OF BELOW

FLOOR PIPING.

4 DISCONNECT AND REMOVE HOT WATER STORAGE TANK

AND ASSOCIATED PIPING.

0 35001500500

UNIT 204UNIT 202

UNIT 201 UNIT 203

(E)SK

(E)WC (E)WC

(E)FCO

(E)SK

(E)SH(E)SH

(E)SK(E)SK

(E)20 CW

(E)20 HW

(E)SK

(E)WC (E)WC

(E)FCO

(E)SK

(E)SH(E)SH

(E)SK(E)SK

(E)20 CW

(E)20 HW

(E)50 SAN

(E)50 SAN

A

B

A

B

C

D

E

F

R E

P A

R

M

B

M I S

A W

A

A

S

E

J

A P

A N

(Q

KK

A1

2)

FA

-1

8- F-

JU

N

E

, 2

SHEET

IDENTIFICATION

D

ES

IG

N

ED

B

Y:

D W

N B

Y:

C

KD

B

Y:

SO

LI

C

IT

AT

IO

N

N O

D

AT

E:

C O

N

TR

AC

T

N O

SU

BM

IT

TE

D

B Y:

U .S

. A

IR

F O

R C

E C

IV

IL

E N

G

IN

EE

R

C

EN

TE

R

O

TI

E R

S& H

J O

IN

T

VE

N

TU

R

E

N

. M

AY

FA

IR

R O

AD

S

U

IT

E

M

IL

W

AU

KE

E, W

I 5

A

B

C

D

1 2 3 4 5

M A

R K

D E

S C

R I P

T I O

N D

A T

E

FINAL DESIGN

SIGNED

THIS WORK WAS PREPARED

BY ME OR UNDER MY

SUPERVISION

SHEET OF 232

PA

U

L

VA

N D

EN

BE

R G

R .K

O

EN

IG

N C

D

TT

W

PD403

PL

U

M

BI

N G

U N

D

ER

FL

O

O R

D

EM

O

LI

TI

O

N P

LA

N

SE

C O

N D

TH

IR

D

F

O U

R

TH

F

LO

O R

S

TY

PI

C

AL

U

N

IT

S

SCALE:

SECOND, THIRD & FOURTH FLOORS TYPICAL UNITS

1:501

1. CONTRACTOR SHALL PROVIDE ALL NECESSARY SAW-CUTTING

OF EXISTING FLOOR IN ORDER TO FACILITATE REPLACEMENT

OF EXISTING UNDERFLOOR SANITARY PIPING. THERE IS NOT A

CRAWL SPACE UNDER THIS UNIT.

2. COORDINATE SHUT DOWN OF DOMESTIC HOT AND COLD

WATER SYSTEM TO DWELLING UNITS WITH AF BASE PRIOR TO

DEMOLITION.

3. ALL EXISTING PLUMBING FIXTURES (INCLUDING, BUT NOT

LIMITED TO LAVATORIES, WATER CLOSETS, BATHTUBS,

SHOWERS, KITCHEN SINKS, DISHWASHER) SHALL BE REMOVED

IN THEIR ENTIRETY FOR REPLACEMENT.

4. ALL EXISTING APPURTENANCES CONNECTED TO AND

ASSOCIATED WITH FIXTURES SHOWN AS DEMO SHALL BE

REMOVED IN THEIR ENTIRETY, UNLESS OTHERWISE NOTED.

THIS INCLUDES (BUT IS NOT LIMITED TO) ASSOCIATED

FAUCETS, STOP VALVES, P-TRAPS, CONNECTORS PIPING,

SUPPORTS AND ACCESSORIES.

5. LOCATION OF PIPING TO BE REMOVED SHOWN ON DRAWINGS

IS APPROXIMATE - FIELD VERIFY ALL PIPING PRIOR TO

REMOVAL.

6. COORDINATE REMOVAL AND RETENTION OF ALL EQUIPMENT

WITH BASE HOUSING.

7. COORDINATE REMOVAL AND ABATEMENT OF ASBESTOS

CONTAINING MATERIALS FOR ALL UNITS. REFER TO HAZMAT

PLAN SHEETS FOR ADDITIONAL DEMOLITION NOTES.

8. CONTRACTOR IS RESPONSIBLE FOR PATCHING ALL OPENINGS

IN CEILINGS, WALLS AND FLOORS THAT RESULT FROM

DEMOLITION WORK OR REMOVED EQUIPMENT, UNLESS

OPENING IS TO BE REUSED. PATCHING OF OPENINGS OR

OTHER DAMAGE IS TO MATCH ADJACENT SURFACES,

MATERIALS AND CONDITIONS.

9. ANY DAMAGE TO EXISTING STRUCTURES, FLOORS, AND WALLS

DURING CONSTRUCTION SHALL BE RESTORED TO ORIGINAL

CONDITION AT NO ADDITIONAL COST TO THE PROJECT.

10. DEMOLITION OF EXISTING DOMESTIC WATER SERVICE SHALL

EXTEND TO EXISTING GATE VALVE LOCATED APPROXIMATELY

1.5M OUTSIDE BUILDING.

11. DEMOLITION OF EXISTING SANITARY SEWER LATERAL SHALL

EXTEND UP TO EXISTING YARD CLEANOUT LOCATED

APPROXIMATELY 1.5M OUTSIDE BUILDING.

12. CONTRACTOR SHALL FIELD VERIFY EXISTING CONDITIONS

WITH RESPECT TO PLANS PRIOR TO DEMOLITION WORK.

13. EXISTING PIPE DEMOLITION SIZES SHOWN ON PLANS ARE

APPROXIMATE - SIZES SHOWN FOR PURPOSES OF ESTIMATING

EFFORT OF DEMOLITION WORK.

GENERAL NOTES:

KEYNOTES

1 DISCONNECT AND REMOVE PIPING TO INCLUDE PLUMBING

STACKS, LEADERS, RISERS, AIR VENTS AND AIR VENT

DRAINS.

PLUMBING UNDERFLOOR DEMOLITION PLAN -

07 08 09 11 1210

UNIT 219

UNIT 218

STORAGE 2

LOUNGE 2

LAUNDRY 2

UNIT 216UNIT 214

UNIT 213

JANITOR 2

CORRIDOR 2

(E)SK

(E)FCO

(E)SK

(E)SK

(E)FCO

(E)FCO

(E)FCO

(E)C W

(E)C W

(E)H W

(E)H W

(E)H W

(E)WC

(E)SH

(E)80 SAN (E)50 SAN

(E)50 CW

(E)20 CW

(E)32 HW

(E)20 CW

(E)20 HWR

(E)50 SAN

(E)SK

(E)WC (E)WC

(E)FCO

(E)SK

(E)SH(E)SH

(E)SK(E)SK

(E)20 CW

(E)20 HW

(E)SK

(E)WC

(E)SH

(E)SK

(E)20 CW

(E)20 HW

(E)SK

(E)WC

(E)SH

(E)SK

(E)20 HW

(E)SK

(E)50 SAN

(E)50 SAN

(E)20 CW

(E)50 SAN

(E)SK

(E)20 HW

(E)20 CW

G

H J

K

L

I

A

B

C

D

E

F

R E

P A

R

M

B

M I S

A W

A

A

S

E

J

A P

A N

(Q

KK

A1

2)

FA

-1

8- F-

JU

N

E

, 2

SHEET

IDENTIFICATION

D

ES

IG

N

ED

B

Y:

D W

N B

Y:

C

KD

B

Y:

SO

LI

C

IT

AT

IO

N

N O

D

AT

E:

C O

N

TR

AC

T

N O

SU

BM

IT

TE

D

B Y:

U .S

. A

IR

F O

R C

E C

IV

IL

E N

G

IN

EE

R

C

EN

TE

R

O

TI

E R

S& H

J O

IN

T

VE

N

TU

R

E

N

. M

AY

FA

IR

R O

AD

S

U

IT

E

M

IL

W

AU

KE

E, W

I 5

A

B

C

D

1 2 3 4 5

M A

R K

D E

S C

R I P

T I O

N D

A T

E

FINAL DESIGN

SIGNED

THIS WORK WAS PREPARED

BY ME OR UNDER MY

SUPERVISION

SHEET OF 232

PA

U

L

VA

N D

EN

BE

R G

R .K

O

EN

IG

N C

D

TT

W

PD404

PL

U

M

BI

N G

U N

D

ER

FL

O

O R

D

EM

O

LI

TI

O

N P

LA

N

SE

C O

N D

, T H

IR

D

F

O U

R

TH

F

LO

O R

S

SCALE:

PLUMBING UNDERFLOOR DEMOLITION PLAN - SECOND, THIRD & FOURTH FLOORS

1:501

1. CONTRACTOR SHALL PROVIDE ALL NECESSARY SAW-CUTTING

OF EXISTING FLOOR IN ORDER TO FACILITATE REPLACEMENT

OF EXISTING UNDERFLOOR SANITARY PIPING. THERE IS NOT A

CRAWL SPACE UNDER THIS UNIT.

2. COORDINATE SHUT DOWN OF DOMESTIC HOT AND COLD

WATER SYSTEM TO DWELLING UNITS WITH AF BASE PRIOR TO

DEMOLITION.

3. ALL EXISTING PLUMBING FIXTURES (INCLUDING, BUT NOT

LIMITED TO LAVATORIES, WATER CLOSETS, BATHTUBS,

SHOWERS, KITCHEN SINKS, DISHWASHER) SHALL BE REMOVED

IN THEIR ENTIRETY FOR REPLACEMENT.

4. ALL EXISTING APPURTENANCES CONNECTED TO AND

ASSOCIATED WITH FIXTURES SHOWN AS DEMO SHALL BE

REMOVED IN THEIR ENTIRETY, UNLESS OTHERWISE NOTED.

THIS INCLUDES (BUT IS NOT LIMITED TO) ASSOCIATED

FAUCETS, STOP VALVES, P-TRAPS, CONNECTORS PIPING,

SUPPORTS AND ACCESSORIES.

5. LOCATION OF PIPING TO BE REMOVED SHOWN ON DRAWINGS

IS APPROXIMATE - FIELD VERIFY ALL PIPING PRIOR TO

REMOVAL.

6. COORDINATE REMOVAL AND RETENTION OF ALL EQUIPMENT

WITH BASE HOUSING.

7. COORDINATE REMOVAL AND ABATEMENT OF ASBESTOS

CONTAINING MATERIALS FOR ALL UNITS. REFER TO HAZMAT

PLAN SHEETS FOR ADDITIONAL DEMOLITION NOTES.

8. CONTRACTOR IS RESPONSIBLE FOR PATCHING ALL OPENINGS

IN CEILINGS, WALLS AND FLOORS THAT RESULT FROM

DEMOLITION WORK OR REMOVED EQUIPMENT, UNLESS

OPENING IS TO BE REUSED. PATCHING OF OPENINGS OR

OTHER DAMAGE IS TO MATCH ADJACENT SURFACES,

MATERIALS AND CONDITIONS.

9. ANY DAMAGE TO EXISTING STRUCTURES, FLOORS, AND WALLS

DURING CONSTRUCTION SHALL BE RESTORED TO ORIGINAL

CONDITION AT NO ADDITIONAL COST TO THE PROJECT.

10. DEMOLITION OF EXISTING DOMESTIC WATER SERVICE SHALL

EXTEND TO EXISTING GATE VALVE LOCATED APPROXIMATELY

1.5M OUTSIDE BUILDING.

11. DEMOLITION OF EXISTING SANITARY SEWER LATERAL SHALL

EXTEND UP TO EXISTING YARD CLEANOUT LOCATED

APPROXIMATELY 1.5M OUTSIDE BUILDING.

12. CONTRACTOR SHALL FIELD VERIFY EXISTING CONDITIONS

WITH RESPECT TO PLANS PRIOR TO DEMOLITION WORK.

13. EXISTING PIPE DEMOLITION SIZES SHOWN ON PLANS ARE

APPROXIMATE - SIZES SHOWN FOR PURPOSES OF ESTIMATING

EFFORT OF DEMOLITION WORK.

GENERAL NOTES:

KEYNOTES

1 DISCONNECT AND REMOVE PIPING TO INCLUDE PLUMBING

STACKS, LEADERS, RISERS, AIR VENTS AND AIR VENT

DRAINS.

01 02 03 04 05 06 07 08 09 11 12 13 110

S2

STAIR 2

S1

STAIR 1

UNIT 124

ST1

STORAGE 1

UNIT 119

UNIT 121

UNIT 123

LD1

LAUNDRY 1

J1

JANITOR 1

C1W

CORRIDOR 1W

LG1

DAY ROOM 1

MECHANICAL RM

LINEN 1

UNIT 114

UNIT 112

UNIT 110

UNIT 108

UNIT 113

UNIT 111

UNIT 109

UNIT 107

UNIT 105

UNIT 103

UNIT 101

UNIT 102

UNIT 104

UNIT 106

RR1

RRM 1

LOBBY

FACP ROOM

C1

CORRIDOR 1

14 14'

M

ATC

H

LIN

E

1,2 P-401

1,2 P-401

1,2 P-401

1,2 P-402

1,2 P-403

1,2 P-404

HB 1

20 CW

HB 1

HB 1

20 CW

A

B

C

D

E

F

G

H J

K

L

M

N

33333

2 2

2 2 2

I

EXPANSION JOINT

P-510

P-510 2

P-510

EXPANSION

JOINT

EXPANSION

JOINT

1 1 1 1 1

A

14 15 16 17 18 19 20

B

C

D

E

F

14'

S3

STAIR 3

UNIT 130

UNIT 128

UNIT 126

UNIT 136

UNIT 135

UNIT 134

UNIT 133

UNIT 125

UNIT 127

UNIT 129

UNIT 132

UNIT 131

C1E

CORRIDOR 1E

M

ATC

H

LIN

E

1,2 P-401

1,2 P-401

1,2 P-401

HB 1

20 CW

O

P

Q

R

S

T

P-510

P-510

EXPANSION

EXPANSION JOINT

1 1 1

SCALE:

PLUMBING UNDERFLOOR PLAN - FIRST FLOOR

1:1001 0 700030001000

PLAN

NORTH

R E

P A

R

M

B

M I S

A W

A

A

S

E

J

A P

A N

(Q

KK

A1

2)

FA

-1

8- F-

JU

N

E

, 2

SHEET

IDENTIFICATION

D

ES

IG

N

ED

B

Y:

D W

N B

Y:

C

KD

B

Y:

SO

LI

C

IT

AT

IO

N

N O

D

AT

E:

C O

N

TR

AC

T

N O

SU

BM

IT

TE

D

B Y:

U .S

. A

IR

F O

R C

E C

IV

IL

E N

G

IN

EE

R

C

EN

TE

R

O

TI

E R

S& H

J O

IN

T

VE

N

TU

R

E

N

. M

AY

FA

IR

R O

AD

S

U

IT

E

M

IL

W

AU

KE

E, W

I 5

A

B

C

D

1 2 3 4 5

M A

R K

D E

S C

R I P

T I O

N D

A T

E

FINAL DESIGN

SIGNED

THIS WORK WAS PREPARED

BY ME OR UNDER MY

SUPERVISION

SHEET OF 232

PA

U

L

VA

N D

EN

BE

R G

R . K

O

EN

IG

AM

D

TT

W

P-101

PL

U

M

BI

N G

U N

D

ER

FL

O

O R

P

LA

N

FI

R

ST

F

LO

O

R

KEYNOTES

1 CONNECT NEW PIPING TO EXISTING SERVICE LATERAL AND

USE EXISTING HOLE IN WALL.

2 INSTALL NEW PIPING TO UNITS IN CRAWL SPACE (TYPICAL).

3 RESTORE/REPLACE CONCRETE FLOORING. SEE AD105 FOR

EXTENT OF REPAIR WORK.

GENERAL NOTES:

1. ALL DWELLING UNITS ARE FED FROM FLOOR BELOW.

DWV AND WATER SUPPLY RUNS ON FLOOR BELOW

UNIT IT SERVES.

2. COORDINATE SHUT DOWN OF DOMESTIC HOT AND

COLD WATER SYSTEM TO DWELLING UNITS WITH

CONTRACTING OFFICER PRIOR TO DEMOLITION.

3. ALL EXISTING PLUMBING FIXTURES AND ASSOCIATED

COMPONENTS SHALL BE REMOVED AND REPLACED.

4. ALL EXISTING APPURTENANCES CONNECTED TO AND

ASSOCIATED WITH FIXTURES SHOWN AS DEMO SHALL

BE REMOVED OTHERWISE NOTED. THIS INCLUDES (BUT

IS NOT LIMITED TO) ASSOCIATED FAUCETS, STOP

VALVES, P-TRAPS, CONNECTORS PIPING, SUPPORTS

AND ACCESSORIES.

5. REPLACEMENT OF EXISTING PLUMBING DISTRIBUTION

SYSTEM SHALL INCLUDE EXISTING DWV AND WATER

SUPPLY RISERS, LOCATED IN EXISTING CHASE WALL

BETWEEN BATHROOMS, AND EXISTING LOBBY CHASES.

REFER TO PLUMBING ISOMETRIC DRAWINGS FOR

EXTENT OF PLUMBING RISER REPLACEMENT WORK.

6. LOCATION OF PIPING TO BE REMOVED SHOWN ON

DRAWINGS IS APPROXIMATE - FIELD VERIFY ALL PIPING

PRIOR TO REMOVAL.

7. COORDINATE REMOVAL AND RETENTION OF ALL

EQUIPMENT WITH BASE HOUSING.

8. COORDINATE REMOVAL AND ABATEMENT OF

ASBESTOS CONTAINING MATERIALS FOR ALL UNITS.

REFER TO HAZMAT PLAN SHEETS FOR ADDITIONAL

DEMOLITION NOTES.

9. CONTRACTOR IS RESPONSIBLE FOR PATCHING ALL

OPENINGS IN CEILINGS, WALLS AND FLOORS THAT

RESULT FROM DEMOLITION WORK OR REMOVED

EQUIPMENT, UNLESS OPENING IS TO BE REUSED.

PATCHING OF OPENINGS OR OTHER DAMAGE IS TO

MATCH ADJACENT SURFACES, MATERIALS AND

CONDITIONS.

10. WORK IN LOWEST LEVEL DWELLING UNITS TAKES

PLACE IN CRAWLSPACE. CONTRACTOR SHALL MAKE

ALL NECESSARY PROVISIONS TO WORK IN CONFINED

SPACE.

11. SLAB DEMOLITION AND INSTALLATION WORK SHOWN

ON PLANS FOR REFERENCE ONLY. SEE

ARCHITECTURAL DRAWINGS FOR SCOPE AND

DEFINITION OF SLAB WORK.

CORRIDOR 2E

M

ATC

H

LIN

E

01 02 03 04 05 06 07 08 09 11 12 13 110

S2

STAIR 2

S1

STAIR 1

UNIT 223

UNIT 221

UNIT 224

UNIT 222

UNIT 219

UNIT 218

ST2

STORAGE 2

C2W

CORRIDOR 2W

LG2

LOUNGE 2

LD2

LAUNDRY 2

UNIT 216

UNIT 214

UNIT 212

UNIT 210

UNIT 208

UNIT 206

UNIT 204

UNIT 202

UNIT 201

UNIT 203

UNIT 205

UNIT 207

UNIT 209

UNIT 211

UNIT 213

J2

JANITOR 2

C2

CORRIDOR 2

P-405

P-405

P-405

P-406

P-407

P-405

P-407

P-408

A

B

C

D

E

F

G

H

I

J

K

L

M

N

1 1 1 1 1 1

111111 1

A

14 15 16 17 18 19 20

B

C

D

E

F

14'

S3

STAIR 3

UNIT 233

UNIT 231

UNIT 229

UNIT 227

UNIT 225

UNIT 232

UNIT 230

UNIT 228

UNIT 226

UNIT 236

UNIT 234

UNIT 235

C2E

CORRIDOR 2E

M

ATC

H

LIN

E

P-405

P-405

P-405

P-405

O

P

Q

R

S

T

1 1 1

SCALE:

PLUMBING UNDERFLOOR PLAN - SECOND, THIRD & FOURTH FLOORS

1:1001 0 700030001000

PLAN

NORTH

R E

P A

R

M

B

M I S

A W

A

A

S

E

J

A P

A N

(Q

KK

A1

2)

FA

-1

8- F-

JU

N

E

, 2

SHEET

IDENTIFICATION

D

ES

IG

N

ED

B

Y:

D W

N B

Y:

C

KD

B

Y:

SO

LI

C

IT

AT

IO

N

N O

D

AT

E:

C O

N

TR

AC

T

N O

SU

BM

IT

TE

D

B Y:

U .S

. A

IR

F O

R C

E C

IV

IL

E N

G

IN

EE

R

C

EN

TE

R

O

TI

E R

S& H

J O

IN

T

VE

N

TU

R

E

N

. M

AY

FA

IR

R O

AD

S

U

IT

E

M

IL

W

AU

KE

E, W

I 5

A

B

C

D

1 2 3 4 5

M A

R K

D E

S C

R I P

T I O

N D

A T

E

FINAL DESIGN

SIGNED

THIS WORK WAS PREPARED

BY ME OR UNDER MY

SUPERVISION

SHEET OF 232

PA

U

L

VA

N D

EN

BE

R G

R . K

O

EN

IG

AM

D

TT

W

P-102

PL

U

M

BI

N G

U N

D

ER

FL

O

O R

P

LA

N

SE

C

O N

D

TH

IR

D

F O

U R

TH

F

LO

O

R S

GENERAL NOTES:

1. ALL DWELLING UNITS ARE FED FROM FLOOR BELOW.

DWV AND WATER SUPPLY RUNS ON FLOOR BELOW

UNIT IT SERVES.

2. COORDINATE SHUT DOWN OF DOMESTIC HOT AND

COLD WATER SYSTEM TO DWELLING UNITS WITH

CONTRACTING OFFICER PRIOR TO DEMOLITION.

3. ALL EXISTING PLUMBING FIXTURES AND ASSOCIATED

COMPONENTS SHALL BE REMOVED AND REPLACED.

4. ALL EXISTING APPURTENANCES CONNECTED TO AND

ASSOCIATED WITH FIXTURES SHOWN AS DEMO SHALL

BE REMOVED OTHERWISE NOTED. THIS INCLUDES (BUT

IS NOT LIMITED TO) ASSOCIATED FAUCETS, STOP

VALVES, P-TRAPS, CONNECTORS PIPING, SUPPORTS

AND ACCESSORIES.

5. REPLACEMENT OF EXISTING PLUMBING DISTRIBUTION

SYSTEM SHALL INCLUDE EXISTING DWV AND WATER

SUPPLY RISERS, LOCATED IN EXISTING CHASE WALL

BETWEEN BATHROOMS, AND EXISTING LOBBY CHASES.

REFER TO PLUMBING ISOMETRIC DRAWINGS FOR

EXTENT OF PLUMBING RISER REPLACEMENT WORK.

6. LOCATION OF PIPING TO BE REMOVED SHOWN ON

DRAWINGS IS APPROXIMATE - FIELD VERIFY ALL PIPING

PRIOR TO REMOVAL.

7. COORDINATE REMOVAL AND RETENTION OF ALL

EQUIPMENT WITH BASE HOUSING.

8. COORDINATE REMOVAL AND ABATEMENT OF

ASBESTOS CONTAINING MATERIALS FOR ALL UNITS.

REFER TO HAZMAT PLAN SHEETS FOR ADDITIONAL

DEMOLITION NOTES.

9. CONTRACTOR IS RESPONSIBLE FOR PATCHING ALL

OPENINGS IN CEILINGS, WALLS AND FLOORS THAT

RESULT FROM DEMOLITION WORK OR REMOVED

EQUIPMENT, UNLESS OPENING IS TO BE REUSED.

PATCHING OF OPENINGS OR OTHER DAMAGE IS TO

MATCH ADJACENT SURFACES, MATERIALS AND

CONDITIONS.

10. WORK IN LOWEST LEVEL DWELLING UNITS TAKES

PLACE IN CRAWLSPACE. CONTRACTOR SHALL MAKE

ALL NECESSARY PROVISIONS TO WORK IN CONFINED

SPACE.

11. SLAB DEMOLITION AND INSTALLATION WORK SHOWN

ON PLANS FOR REFERENCE ONLY. SEE

ARCHITECTURAL DRAWINGS FOR SCOPE AND

DEFINITION OF SLAB WORK.

KEYNOTES

1 INSTALL NEW PIPING FOR SANITARY, VENT & DOMESTIC

WATER. SEE RISER DIAGRAMS FOR SIZES.

CORRIDOR 4E

M

ATC

H

LIN

E

01 02 03 04 05 06 07 08 09 11 12 13 14 110

S2

STAIR 2

S1

STAIR 1

LG4

DAY ROOM 4

UNIT 418

UNIT 419

UNIT 423

ST4

STORAGE 4

UNIT 422

UNIT 424

UNIT 416

UNIT 414

UNIT 412

UNIT 410

UNIT 408

UNIT 406

UNIT 404

UNIT 402

UNIT 401

UNIT 403

UNIT 405

UNIT 407

UNIT 409

UNIT 411

UNIT 413

LD4

LAUNDRY 4

J4

JANITOR 4

UNIT 421

C4

CORRIDOR 4

C4W

CORRIDOR 4W

RR4

RRM 4

M

ATC

H

LIN

E

A

B

C

D

E

F

G

H

I

J

K

L

M

N

100 100 100 100 100

404040404040

40 40 40 40 40 40 4050 HW 50 HW 50 HW 50 HW 50 HW

50 HW

100 100 100 100 100 100

VTRVTRVTRVTRVTRVTR

VTR VTR VTR VTR VTR VTR VTR

50 50 50 50 50 50 50 50

50 50 50 50 50 50

50 50 50

50 50

EXPANSION

JOINT

EXPANSION

JOINT

P-510

P-510

A

14 15 16 17 18 19 20

B

C

D

E

F

14'

S3

STAIR 3

UNIT 425

UNIT 434

UNIT 426

UNIT 428

UNIT 430

UNIT 432

UNIT 427

UNIT 429

UNIT 431

UNIT 433

UNIT 435

C4E

CORRIDOR 4E

UNIT 436

M

ATC

H

LIN

E

14 1

M

ATC

H

LIN

E

O

P

Q

R

S

T

100 100 100

40 40 40

40 40 4050 HW 50 HW

100 100 100

VTR VTRVTR

VTR VTR VTR

50 50 50 50 50 50

50 50 50 50 50 50

EXPANSION

EXPANSION

JOINT

EXPANSION

JOINT

P-510

P-510

P-510

SCALE:

PLUMBING ABOVE FLOOR PLAN - FOURTH FLOOR

1:1001 0 700030001000

PLAN

NORTH

R E

P A

R

M

B

M I S

A W

A

A

S

E

J

A P

A N

(Q

KK

A1

2)

FA

-1

8- F-

JU

N

E

, 2

SHEET

IDENTIFICATION

D

ES

IG

N

ED

B

Y:

D W

N B

Y:

C

KD

B

Y:

SO

LI

C

IT

AT

IO

N

N O

D

AT

E:

C O

N

TR

AC

T

N O

SU

BM

IT

TE

D

B Y:

U .S

. A

IR

F O

R C

E C

IV

IL

E N

G

IN

EE

R

C

EN

TE

R

O

TI

E R

S& H

J O

IN

T

VE

N

TU

R

E

N

. M

AY

FA

IR

R O

AD

S

U

IT

E

M

IL

W

AU

KE

E, W

I 5

A

B

C

D

1 2 3 4 5

M A

R K

D E

S C

R I P

T I O

N D

A T

E

FINAL DESIGN

SIGNED

THIS WORK WAS PREPARED

BY ME OR UNDER MY

SUPERVISION

SHEET OF 232

PA

U

L

VA

N D

EN

BE

R G

R . K

O

EN

IG

AM

D

TT

W

P-103

PL

U

M

BI

N G

A

BO

VE

F

LO

O

R P

LA

N

FO

U R

TH

FL

O O

R

GENERAL NOTES:

1. ALL DWELLING UNITS ARE FED FROM FLOOR BELOW.

DWV AND WATER SUPPLY RUNS ON FLOOR BELOW

UNIT IT SERVES.

2. COORDINATE SHUT DOWN OF DOMESTIC HOT AND

COLD WATER SYSTEM TO DWELLING UNITS WITH

CONTRACTING OFFICER PRIOR TO DEMOLITION.

3. ALL EXISTING PLUMBING FIXTURES AND ASSOCIATED

COMPONENTS SHALL BE REMOVED AND REPLACED.

4. ALL EXISTING APPURTENANCES CONNECTED TO AND

ASSOCIATED WITH FIXTURES SHOWN AS DEMO SHALL

BE REMOVED OTHERWISE NOTED. THIS INCLUDES (BUT

IS NOT LIMITED TO) ASSOCIATED FAUCETS, STOP

VALVES, P-TRAPS, CONNECTORS PIPING, SUPPORTS

AND ACCESSORIES.

5. REPLACEMENT OF EXISTING PLUMBING DISTRIBUTION

SYSTEM SHALL INCLUDE EXISTING DWV AND WATER

SUPPLY RISERS, LOCATED IN EXISTING CHASE WALL

BETWEEN BATHROOMS, AND EXISTING LOBBY CHASES.

REFER TO PLUMBING ISOMETRIC DRAWINGS FOR

EXTENT OF PLUMBING RISER REPLACEMENT WORK.

6. LOCATION OF PIPING TO BE REMOVED SHOWN ON

DRAWINGS IS APPROXIMATE - FIELD VERIFY ALL PIPING

PRIOR TO REMOVAL.

7. COORDINATE REMOVAL AND RETENTION OF ALL

EQUIPMENT WITH BASE HOUSING.

8. COORDINATE REMOVAL AND ABATEMENT OF

ASBESTOS CONTAINING MATERIALS FOR ALL UNITS.

REFER TO HAZMAT PLAN SHEETS FOR ADDITIONAL

DEMOLITION NOTES.

9. CONTRACTOR IS RESPONSIBLE FOR PATCHING ALL

OPENINGS IN CEILINGS, WALLS AND FLOORS THAT

RESULT FROM DEMOLITION WORK OR REMOVED

EQUIPMENT, UNLESS OPENING IS TO BE REUSED.

PATCHING OF OPENINGS OR OTHER DAMAGE IS TO

MATCH ADJACENT SURFACES, MATERIALS AND

CONDITIONS.

10. WORK IN LOWEST LEVEL DWELLING UNITS TAKES

PLACE IN CRAWLSPACE. CONTRACTOR SHALL MAKE

ALL NECESSARY PROVISIONS TO WORK IN CONFINED

SPACE.

11. SLAB DEMOLITION AND INSTALLATION WORK SHOWN

ON PLANS FOR REFERENCE ONLY. SEE

ARCHITECTURAL DRAWINGS FOR SCOPE AND

DEFINITION OF SLAB WORK.

UNIT 103

UNIT 101

UNIT 102

UNIT 104

A

B

(145)

50 50

80100

WC 1WC 1

WC 1 WC 1

FCO 1

SH 1

SH 1FCO 1

SK 1 SK 1

FCO 1

LAV 1LAV 1

SH 1SH 1

LAV 1LAV 1

FCO 1

SK 1SK 1

A

B

C

D

E

F

A

B

C

D

E

F

01 02 03

UNIT 103

UNIT 101

UNIT 102

UNIT 104

A

B

HW

HWR

CW

25 20

20 20

32 25

SK 1 SK 1

SH 1 SH 1

LAV 1 LAV 1

WC 1

WC 1

SK 1SK 1

LAV 1 LAV 1

SH 1 SH 1

WC 1 WC 1

R E

P A

R

M

B

M I S

A W

A

A

S

E

J

A P

A N

(Q

KK

A1

2)

FA

-1

8- F-

JU

N

E

, 2

SHEET

IDENTIFICATION

D

ES

IG

N

ED

B

Y:

D W

N B

Y:

C

KD

B

Y:

SO

LI

C

IT

AT

IO

N

N O

D

AT

E:

C O

N

TR

AC

T

N O

SU

BM

IT

TE

D

B Y:

U .S

. A

IR

F O

R C

E C

IV

IL

E N

G

IN

EE

R

C

EN

TE

R

O

TI

E R

S& H

J O

IN

T

VE

N

TU

R

E

N

. M

AY

FA

IR

R O

AD

S

U

IT

E

M

IL

W

AU

KE

E, W

I 5

A

B

C

D

1 2 3 4 5

M A

R K

D E

S C

R I P

T I O

N D

A T

E

FINAL DESIGN

SIGNED

THIS WORK WAS PREPARED

BY ME OR UNDER MY

SUPERVISION

SHEET OF 232

PA

U

L

VA

N D

EN

BE

R G

R . K

O

EN

IG

AM

D

TT

W

P-401

PL

U

M

BI

N G

U N

D

ER

FL

O

O R

P

LA

N

FI

R

ST

F

LO

O

R T

YP

IC

AL

U

N

IT

SCALE:

SANITARY PLAN - FIRST FLOOR TYPICAL UNIT

1:502

1. ALL DWELLING UNITS ARE FED FROM FLOOR BELOW.

DWV AND WATER SUPPLY RUNS ON FLOOR BELOW

UNIT IT SERVES.

2. COORDINATE SHUT DOWN OF DOMESTIC HOT AND

COLD WATER SYSTEM TO DWELLING UNITS WITH

CONTRACTING OFFICER PRIOR TO DEMOLITION.

3. ALL EXISTING PLUMBING FIXTURES AND ASSOCIATED

COMPONENTS SHALL BE REMOVED AND REPLACED.

4. ALL EXISTING APPURTENANCES CONNECTED TO AND

ASSOCIATED WITH FIXTURES SHOWN AS DEMO SHALL

BE REMOVED OTHERWISE NOTED. THIS INCLUDES (BUT

IS NOT LIMITED TO) ASSOCIATED FAUCETS, STOP

VALVES, P-TRAPS, CONNECTORS PIPING, SUPPORTS

AND ACCESSORIES.

5. REPLACEMENT OF EXISTING PLUMBING DISTRIBUTION

SYSTEM SHALL INCLUDE EXISTING DWV AND WATER

SUPPLY RISERS, LOCATED IN EXISTING CHASE WALL

BETWEEN BATHROOMS, AND EXISTING LOBBY CHASES.

REFER TO PLUMBING ISOMETRIC DRAWINGS FOR

EXTENT OF PLUMBING RISER REPLACEMENT WORK.

6. LOCATION OF PIPING TO BE REMOVED SHOWN ON

DRAWINGS IS APPROXIMATE - FIELD VERIFY ALL PIPING

PRIOR TO REMOVAL.

7. COORDINATE REMOVAL AND RETENTION OF ALL

EQUIPMENT WITH BASE HOUSING.

8. COORDINATE REMOVAL AND ABATEMENT OF

ASBESTOS CONTAINING MATERIALS FOR ALL UNITS.

REFER TO HAZMAT PLAN SHEETS FOR ADDITIONAL

DEMOLITION NOTES.

9. CONTRACTOR IS RESPONSIBLE FOR PATCHING ALL

OPENINGS IN CEILINGS, WALLS AND FLOORS THAT

RESULT FROM DEMOLITION WORK OR REMOVED

EQUIPMENT, UNLESS OPENING IS TO BE REUSED.

PATCHING OF OPENINGS OR OTHER DAMAGE IS TO

MATCH ADJACENT SURFACES, MATERIALS AND

CONDITIONS.

10. WORK IN LOWEST LEVEL DWELLING UNITS TAKES

PLACE IN CRAWLSPACE. CONTRACTOR SHALL MAKE

ALL NECESSARY PROVISIONS TO WORK IN CONFINED

SPACE.

11. SLAB DEMOLITION AND INSTALLATION WORK SHOWN

ON PLANS FOR REFERENCE ONLY. SEE

ARCHITECTURAL DRAWINGS FOR SCOPE AND

DEFINITION OF SLAB WORK.

GENERAL NOTES:

KEYNOTES

1 REUSE EXISTING PENETRATIONS IN FOUNDATION WALLS.

SLEEVE AND SEAL HOLE.

2 SEE RISER DIAGRAM 2-P-601.

3 SEE DOMESTIC WATER RISERS ON P-611 FOR PIPE SIZES.

SCALE:

WATER SUPPLY PLAN - FIRST FLOOR TYPICAL UNIT

1:501

4 INSTALL NEW PIPING IN CRAWL SPACE.

5 INSTALL NEW PIPING BELOW SLAB. REPAIR AND REPLACE

CONCRETE (1ST FLOOR ONLY).

PLUMBING UNDERFLOOR PLUMBING UNDERFLOOR

0 350015005000 35001500500

07 08

ST1

STORAGE 1

CORRIDOR 1W

LG1

DAY ROOM 1

UNIT 114

UNIT 112

UNIT 113UNIT 111

G

H

(113)

(50)

WC 1

WC 1

SH 1

SK 1

LAV 1

EWC 1

EWC 2

FS 1

SH 1

FCO 1

LAV 1

SK 1

A

B

C

D

E

F

A

B

C

D

E

F

07 08

ST1

STORAGE 1

CORRIDOR 1W

LG1

DAY ROOM 1

UNIT 114

UNIT 112

UNIT 113UNIT 111

CW

HW

HWR

G 3

H 3

SH 1 EWC 1

EWC 2

SK 1

LAV 1

WC 1

WC 1

SH 1

LAV 1

SK 1

R E

P A

R

M

B

M I S

A W

A

A

S

E

J

A P

A N

(Q

KK

A1

2)

FA

-1

8- F-

JU

N

E

, 2

SHEET

IDENTIFICATION

D

ES

IG

N

ED

B

Y:

D W

N B

Y:

C

KD

B

Y:

SO

LI

C

IT

AT

IO

N

N O

D

AT

E:

C O

N

TR

AC

T

N O

SU

BM

IT

TE

D

B Y:

U .S

. A

IR

F O

R C

E C

IV

IL

E N

G

IN

EE

R

C

EN

TE

R

O

TI

E R

S& H

J O

IN

T

VE

N

TU

R

E

N

. M

AY

FA

IR

R O

AD

S

U

IT

E

M

IL

W

AU

KE

E, W

I 5

A

B

C

D

1 2 3 4 5

M A

R K

D E

S C

R I P

T I O

N D

A T

E

FINAL DESIGN

SIGNED

THIS WORK WAS PREPARED

BY ME OR UNDER MY

SUPERVISION

SHEET OF 232

PA

U

L

VA

N D

EN

BE

R G

R . K

O

EN

IG

AM

D

TT

W

P-402

PL

U

M

BI

N G

U N

D

ER

FL

O

O R

P

LA

N

FI

R

ST

F

LO

O

R

SCALE:

UNDERFLOOR SANITARY PLAN - FIRST FLOOR

1:502 SCALE:

UNDERFLOOR WATER SUPPLY PLAN - FIRST FLOOR

1:501

KEYNOTES

1 REUSE EXISTING PENETRATIONS IN FOUNDATION WALLS.

SLEEVE AND SEAL HOLE.

2 SEE RISER DIAGRAM 2/P-601.

3 SEE DOMESTIC WATER RISERS ON P-611 FOR PIPE SIZES.

4 INSTALL NEW PIPING IN CRAWL SPACE.

5 INSTALL NEW PIPING BELOW SLAB. REPAIR AND REPLACE

CONCRETE (1ST FLOOR ONLY).

0 350015005000 35001500500

GENERAL NOTES:

1. ALL DWELLING UNITS ARE FED FROM FLOOR BELOW. DWV AND

WATER SUPPLY RUNS ON FLOOR BELOW UNIT IT SERVES.

2. COORDINATE SHUT DOWN OF DOMESTIC HOT AND COLD WATER

SYSTEM TO DWELLING UNITS WITH CONTRACTING OFFICER

PRIOR TO DEMOLITION.

3. ALL EXISTING PLUMBING FIXTURES AND ASSOCIATED

COMPONENTS SHALL BE REMOVED AND REPLACED.

4. ALL EXISTING APPURTENANCES CONNECTED TO AND

ASSOCIATED WITH FIXTURES SHOWN AS DEMO SHALL BE

REMOVED OTHERWISE NOTED. THIS INCLUDES (BUT IS NOT

LIMITED TO) ASSOCIATED FAUCETS, STOP VALVES, P-TRAPS,

CONNECTORS PIPING, SUPPORTS AND ACCESSORIES.

5. REPLACEMENT OF EXISTING PLUMBING DISTRIBUTION SYSTEM

SHALL INCLUDE EXISTING DWV AND WATER SUPPLY RISERS,

LOCATED IN EXISTING CHASE WALL BETWEEN BATHROOMS,

AND EXISTING LOBBY CHASES. REFER TO PLUMBING ISOMETRIC

DRAWINGS FOR EXTENT OF PLUMBING RISER REPLACEMENT

WORK.

6. LOCATION OF PIPING TO BE REMOVED SHOWN ON DRAWINGS IS

APPROXIMATE - FIELD VERIFY ALL PIPING PRIOR TO REMOVAL.

7. COORDINATE REMOVAL AND RETENTION OF ALL EQUIPMENT

WITH BASE HOUSING.

8. COORDINATE REMOVAL AND ABATEMENT OF ASBESTOS

CONTAINING MATERIALS FOR ALL UNITS. REFER TO HAZMAT

PLAN SHEETS FOR ADDITIONAL DEMOLITION NOTES.

9. CONTRACTOR IS RESPONSIBLE FOR PATCHING ALL OPENINGS IN

CEILINGS, WALLS AND FLOORS THAT RESULT FROM DEMOLITION

WORK OR REMOVED EQUIPMENT, UNLESS OPENING IS TO BE

REUSED. PATCHING OF OPENINGS OR OTHER DAMAGE IS TO

MATCH ADJACENT SURFACES, MATERIALS AND CONDITIONS.

10. WORK IN LOWEST LEVEL DWELLING UNITS TAKES PLACE IN

CRAWLSPACE. CONTRACTOR SHALL MAKE ALL NECESSARY

PROVISIONS TO WORK IN CONFINED SPACE.

11. SLAB DEMOLITION AND INSTALLATION WORK SHOWN ON PLANS

FOR REFERENCE ONLY. SEE ARCHITECTURAL DRAWINGS FOR

SCOPE AND DEFINITION OF SLAB WORK

09 10

S1

STAIR 1

STORAGE 1

LD1

LAUNDRY 1

J1

JANITOR 1

LG1

DAY ROOM 1

RR1

RRM 1

LOBBY

FACP ROOM

C1

CORRIDOR 1

J

I

(85)

(85)

(18)

50 50

AWC 1

FD 2

AWC 1

SS 1

SS 1 FD 1

LAV 2

FD 1

FCO 1 WC 2

AWC 1

AWC 1

AWC 1

AWC 1

AWC 1

A

B

C

D

E

F

A

B

C

D

E

F

09 10

S1

STAIR 1

STORAGE 1

LD1

LAUNDRY 1

J1

JANITOR 1

LG1

DAY ROOM 1

RR1

RRM 1

LOBBY

FACP ROOM

C1

CORRIDOR 1

HB 1

CW

HWR

J

I 3

HB 1

ACW 1

SS 1

SS 1

LAV 2

WC 2

ACW 1

ACW 1

ACW 1

ACW 1

ACW 1

R E

P A

R

M

B

M I S

A W

A

A

S

E

J

A P

A N

(Q

KK

A1

2)

FA

-1

8- F-

JU

N

E

, 2

SHEET

IDENTIFICATION

D

ES

IG

N

ED

B

Y:

D W

N B

Y:

C

KD

B

Y:

SO

LI

C

IT

AT

IO

N

N O

D

AT

E:

C O

N

TR

AC

T

N O

SU

BM

IT

TE

D

B Y:

U .S

. A

IR

F O

R C

E C

IV

IL

E N

G

IN

EE

R

C

EN

TE

R

O

TI

E R

S& H

J O

IN

T

VE

N

TU

R

E

N

. M

AY

FA

IR

R O

AD

S

U

IT

E

M

IL

W

AU

KE

E, W

I 5

A

B

C

D

1 2 3 4 5

M A

R K

D E

S C

R I P

T I O

N D

A T

E

FINAL DESIGN

SIGNED

THIS WORK WAS PREPARED

BY ME OR UNDER MY

SUPERVISION

SHEET OF 232

PA

U

L

VA

N D

EN

BE

R G

R . K

O

EN

IG

AM

D

TT

W

P-403

PL

U

M

BI

N G

U N

D

ER

FL

O

O R

P

LA

N

FI

R

ST

F

LO

O

R

SCALE:

UNDERFLOOR SANITARY PLAN - FIRST FLOOR

1:502 SCALE:

UNDERFLOOR WATER SUPPLY PLAN - FIRST FLOOR

1:501

KEYNOTES

1 REUSE EXISTING PENETRATIONS IN FOUNDATION WALLS.

SLEEVE AND SEAL HOLE.

2 SEE RISER DIAGRAM 2/P-601.

3 SEE DOMESTIC WATER RISERS ON P-611 FOR PIPE SIZES.

4 INSTALL NEW PIPING IN CRAWL SPACE.

5 INSTALL NEW PIPING BELOW SLAB. REPAIR AND REPLACE

CONCRETE (1ST FLOOR ONLY).

0 350015005000 35001500500

GENERAL NOTES:

1. ALL DWELLING UNITS ARE FED FROM FLOOR BELOW. DWV AND

WATER SUPPLY RUNS ON FLOOR BELOW UNIT IT SERVES.

2. COORDINATE SHUT DOWN OF DOMESTIC HOT AND COLD WATER

SYSTEM TO DWELLING UNITS WITH CONTRACTING OFFICER

PRIOR TO DEMOLITION.

3. ALL EXISTING PLUMBING FIXTURES AND ASSOCIATED

COMPONENTS SHALL BE REMOVED AND REPLACED.

4. ALL EXISTING APPURTENANCES CONNECTED TO AND

ASSOCIATED WITH FIXTURES SHOWN AS DEMO SHALL BE

REMOVED OTHERWISE NOTED. THIS INCLUDES (BUT IS NOT

LIMITED TO) ASSOCIATED FAUCETS, STOP VALVES, P-TRAPS,

CONNECTORS PIPING, SUPPORTS AND ACCESSORIES.

5. REPLACEMENT OF EXISTING PLUMBING DISTRIBUTION SYSTEM

SHALL INCLUDE EXISTING DWV AND WATER SUPPLY RISERS,

LOCATED IN EXISTING CHASE WALL BETWEEN BATHROOMS,

AND EXISTING LOBBY CHASES. REFER TO PLUMBING ISOMETRIC

DRAWINGS FOR EXTENT OF PLUMBING RISER REPLACEMENT

WORK.

6. LOCATION OF PIPING TO BE REMOVED SHOWN ON DRAWINGS IS

APPROXIMATE - FIELD VERIFY ALL PIPING PRIOR TO REMOVAL.

7. COORDINATE REMOVAL AND RETENTION OF ALL EQUIPMENT

WITH BASE HOUSING.

8. COORDINATE REMOVAL AND ABATEMENT OF ASBESTOS

CONTAINING MATERIALS FOR ALL UNITS. REFER TO HAZMAT

PLAN SHEETS FOR ADDITIONAL DEMOLITION NOTES.

9. CONTRACTOR IS RESPONSIBLE FOR PATCHING ALL OPENINGS IN

CEILINGS, WALLS AND FLOORS THAT RESULT FROM DEMOLITION

WORK OR REMOVED EQUIPMENT, UNLESS OPENING IS TO BE

REUSED. PATCHING OF OPENINGS OR OTHER DAMAGE IS TO

MATCH ADJACENT SURFACES, MATERIALS AND CONDITIONS.

10. WORK IN LOWEST LEVEL DWELLING UNITS TAKES PLACE IN

CRAWLSPACE. CONTRACTOR SHALL MAKE ALL NECESSARY

PROVISIONS TO WORK IN CONFINED SPACE.

11. SLAB DEMOLITION AND INSTALLATION WORK SHOWN ON PLANS

FOR REFERENCE ONLY. SEE ARCHITECTURAL DRAWINGS FOR

11 12 13

UNIT 124

UNIT 119

UNIT 121

UNIT 123

MECHANICAL RM

LINEN 1

CORRIDOR 1

M

N

K

1 1

(102)

(36)

(102)

(32)

(66)

(135)

(72)

(59)

80 50

50 100

2 2

SP 1 FCO 1

FD 2

CB 1

FCO 1

FD 3

FD 3

SH 1

SK 1

LAV 1

WC 1

FCO 1

WC 1

LAV 1

WC 1

SH 1 SH 1 FCO 1FCO 1

LAV 1LAV 1

SK 1

SH 1

WC 1

SK 1 SK 1

ACW 1

ACW 1

A

B

C

D

E

F

A

B

C

D

E

F

11 12 13

STAIR 1

UNIT 124

UNIT 119

UNIT 121

UNIT 123

MECHANICAL RM

LINEN 1

LOBBY

CORRIDOR 1

M

N

CW

HW

HWR

L

K

100 80

M

444444

ST 1

WM 1

HWP 1

HWP 2

TMV 1

LAV 1LAV 1

SH 1SH 1

SK 1SK 1

WC 1 WC 1

WC 1

LAV 1

SH 1

SK 1

WC 1

SH 1

LAV 1

SK 1

BACKFLOW

PREVENTER

R E

P A

R

M

B

M I S

A W

A

A

S

E

J

A P

A N

(Q

KK

A1

2)

FA

-1

8- F-

JU

N

E

, 2

SHEET

IDENTIFICATION

D

ES

IG

N

ED

B

Y:

D W

N B

Y:

C

KD

B

Y:

SO

LI

C

IT

AT

IO

N

N O

D

AT

E:

C O

N

TR

AC

T

N O

SU

BM

IT

TE

D

B Y:

U .S

. A

IR

F O

R C

E C

IV

IL

E N

G

IN

EE

R

C

EN

TE

R

O

TI

E R

S& H

J O

IN

T

VE

N

TU

R

E

N

. M

AY

FA

IR

R O

AD

S

U

IT

E

M

IL

W

AU

KE

E, W

I 5

A

B

C

D

1 2 3 4 5

M A

R K

D E

S C

R I P

T I O

N D

A T

E

FINAL DESIGN

SIGNED

THIS WORK WAS PREPARED

BY ME OR UNDER MY

SUPERVISION

SHEET OF 232

PA

U

L

VA

N D

EN

BE

R G

R . K

O

EN

IG

AM

D

TT

W

P-404

PL

U

M

BI

N G

U N

D

ER

FL

O

O R

P

LA

N

FI

R

ST

F

LO

O

R

SCALE:

UNDERFLOOR SANITARY PLAN - FIRST FLOOR

1:502 SCALE:

UNDERFLOOR WATER SUPPLY PLAN - FIRST FLOOR

1:501

KEYNOTES

1 REUSE EXISTING PENETRATIONS IN FOUNDATION WALLS.

SLEEVE AND SEAL HOLE.

2 SEE RISER DIAGRAM 2/P-601.

3 SEE DOMESTIC WATER RISERS ON P-611 FOR PIPE SIZES.

4 INSTALL NEW PIPING IN CRAWL SPACES.

5 INSTALL NEW PIPING BELOW SLAB. REPAIR AND REPLACE

CONCRETE (1ST FLOOR ONLY). SEE ARCHITECTURE

DRAWINGS FOR CONCRETE REPLACEMENT.

0 350015005000 35001500500

GENERAL NOTES:

1. ALL DWELLING UNITS ARE FED FROM FLOOR BELOW. DWV AND

WATER SUPPLY RUNS ON FLOOR BELOW UNIT IT SERVES.

2. COORDINATE SHUT DOWN OF DOMESTIC HOT AND COLD WATER

SYSTEM TO DWELLING UNITS WITH CONTRACTING OFFICER

PRIOR TO DEMOLITION.

3. ALL EXISTING PLUMBING FIXTURES AND ASSOCIATED

COMPONENTS SHALL BE REMOVED AND REPLACED.

4. ALL EXISTING APPURTENANCES CONNECTED TO AND

ASSOCIATED WITH FIXTURES SHOWN AS DEMO SHALL BE

REMOVED OTHERWISE NOTED. THIS INCLUDES (BUT IS NOT

LIMITED TO) ASSOCIATED FAUCETS, STOP VALVES, P-TRAPS,

CONNECTORS PIPING, SUPPORTS AND ACCESSORIES.

5. REPLACEMENT OF EXISTING PLUMBING DISTRIBUTION SYSTEM

SHALL INCLUDE EXISTING DWV AND WATER SUPPLY RISERS,

LOCATED IN EXISTING CHASE WALL BETWEEN BATHROOMS,

AND EXISTING LOBBY CHASES. REFER TO PLUMBING ISOMETRIC

DRAWINGS FOR EXTENT OF PLUMBING RISER REPLACEMENT

WORK.

6. LOCATION OF PIPING TO BE REMOVED SHOWN ON DRAWINGS IS

APPROXIMATE - FIELD VERIFY ALL PIPING PRIOR TO REMOVAL.

7. COORDINATE REMOVAL AND RETENTION OF ALL EQUIPMENT

WITH BASE HOUSING.

8. COORDINATE REMOVAL AND ABATEMENT OF ASBESTOS

CONTAINING MATERIALS FOR ALL UNITS. REFER TO HAZMAT

PLAN SHEETS FOR ADDITIONAL DEMOLITION NOTES.

9. CONTRACTOR IS RESPONSIBLE FOR PATCHING ALL OPENINGS IN

CEILINGS, WALLS AND FLOORS THAT RESULT FROM DEMOLITION

WORK OR REMOVED EQUIPMENT, UNLESS OPENING IS TO BE

REUSED. PATCHING OF OPENINGS OR OTHER DAMAGE IS TO

MATCH ADJACENT SURFACES, MATERIALS AND CONDITIONS.

10. WORK IN LOWEST LEVEL DWELLING UNITS TAKES PLACE IN

CRAWLSPACE. CONTRACTOR SHALL MAKE ALL NECESSARY

PROVISIONS TO WORK IN CONFINED SPACE.

11. SLAB DEMOLITION AND INSTALLATION WORK SHOWN ON PLANS

FOR REFERENCE ONLY. SEE ARCHITECTURAL DRAWINGS FOR

UNIT 204

UNIT 202

UNIT 201

UNIT 203

A

B

80 80

80 80

WC 1WC 1

FCO 1FCO 1

LAV 1 LAV 1

SH 1SH 1

SK 1SK 1

WC 1WC 1

FCO 1

LAV 1

SH 1 SH 1

FCO 1

LAV 1

SK 1SK 1

A

B

C

D

E

F

A

B

C

D

E

F

01 02 03

UNIT 204

UNIT 202

UNIT 201

UNIT 203

25 20

20 20

32 25

20 20

A

B

WC 1WC 1

WC 1WC 1

LAV 1LAV 1

LAV 1 LAV 1

SK 1SK 1

SK 1 SK 1

SH 1SH 1

SH 1 SH 1

R E

P A

R

M

B

M I S

A W

A

A

S

E

J

A P

A N

(Q

KK

A1

2)

FA

-1

8- F-

JU

N

E

, 2

SHEET

IDENTIFICATION

D

ES

IG

N

ED

B

Y:

D W

N B

Y:

C

KD

B

Y:

SO

LI

C

IT

AT

IO

N

N O

D

AT

E:

C O

N

TR

AC

T

N O

SU

BM

IT

TE

D

B Y:

U .S

. A

IR

F O

R C

E C

IV

IL

E N

G

IN

EE

R

C

EN

TE

R

O

TI

E R

S& H

J O

IN

T

VE

N

TU

R

E

N

. M

AY

FA

IR

R O

AD

S

U

IT

E

M

IL

W

AU

KE

E, W

I 5

A

B

C

D

1 2 3 4 5

M A

R K

D E

S C

R I P

T I O

N D

A T

E

FINAL DESIGN

SIGNED

THIS WORK WAS PREPARED

BY ME OR UNDER MY

SUPERVISION

SHEET OF 232

PA

U

L

VA

N D

EN

BE

R G

R . K

O

EN

IG

AM

D

TT

W

P-405

PL

U

M

BI

N G

U N

D

ER

FL

O

O R

P

LA

N

SE

C

O N

D -F

O U

R

TH

F

LO

O R

S

TY

PI

C

AL

U

N

IT

SCALE:

SANITARY PLAN - SECOND-FOURTH FLOORS TYPICAL UNIT

1:502 SCALE:

SUPPLY PLAN - SECOND-FOURTH FLOORS TYPICAL UNIT

1:501

KEYNOTES

1 INSTALL PIPING FROM FLOOR BELOW UP TO FIXTURES.

2 SANITARY AND VENT STACKS - SEE RISER DIAGRAMS

2/P-601.

3 DOMESTIC WATER RISERS - SEE RISER DIAGRAMS.

PLUMBING UNDERFLOOR PLUMBING UNDERFLOOR WATER

0 350015005000 35001500500

GENERAL NOTES:

1. ALL DWELLING UNITS ARE FED FROM FLOOR BELOW. DWV AND

WATER SUPPLY RUNS ON FLOOR BELOW UNIT IT SERVES.

2. COORDINATE SHUT DOWN OF DOMESTIC HOT AND COLD WATER

SYSTEM TO DWELLING UNITS WITH CONTRACTING OFFICER

PRIOR TO DEMOLITION.

3. ALL EXISTING PLUMBING FIXTURES AND ASSOCIATED

COMPONENTS SHALL BE REMOVED AND REPLACED.

4. ALL EXISTING APPURTENANCES CONNECTED TO AND

ASSOCIATED WITH FIXTURES SHOWN AS DEMO SHALL BE

REMOVED OTHERWISE NOTED. THIS INCLUDES (BUT IS NOT

LIMITED TO) ASSOCIATED FAUCETS, STOP VALVES, P-TRAPS,

CONNECTORS PIPING, SUPPORTS AND ACCESSORIES.

5. REPLACEMENT OF EXISTING PLUMBING DISTRIBUTION SYSTEM

SHALL INCLUDE EXISTING DWV AND WATER SUPPLY RISERS,

LOCATED IN EXISTING CHASE WALL BETWEEN BATHROOMS,

AND EXISTING LOBBY CHASES. REFER TO PLUMBING ISOMETRIC

DRAWINGS FOR EXTENT OF PLUMBING RISER REPLACEMENT

WORK.

6. LOCATION OF PIPING TO BE REMOVED SHOWN ON DRAWINGS IS

APPROXIMATE - FIELD VERIFY ALL PIPING PRIOR TO REMOVAL.

7.…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .