Atch 2_Draft Drawing 06 Mechanical - Repair Dorm B542.pdf

PDF 10 MB Posted

Attached to
Project No. QKKA 171042, Repair Dorm Bldg. 542, Misawa Air Base, Japan
Solicitation number
FA520522R0001
Issued by

About this file

This pre-solicitation notice is for a firm-fixed price construction contract to renovate Dormitory Building 542 at Misawa Air Base in Japan. The contractor shall provide supervision, management, labor, equipment and materials to complete interior demolition, hazardous material abatement, structural and architectural improvements, new building systems and finishes. Work includes upgrading electrical, plumbing and HVAC systems along with telecommunications, fire alarm and suppression. The performance period is 531 calendar days with a 30 day mobilization period. The contract value is estimated between $10 million to $25 million USD. The solicitation will issue on January 31, 2022 with proposals due around 40 days later. A pre-proposal conference is scheduled for February 25, 2022 to review requirements. The award will be made to the offeror providing the best value based on past performance and price using a tradeoff process. Registration in SAM is required and the contractor must be authorized to operate in Japan. The point of contact is Mr. Akito Miura for acquisition questions.

View the file

Other files

Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DUCTWORK SYMBOLS

SUPPLY DUCT (UP & DOWN)

CEILING DIFFUSERS - CONNECT TO AUX SUPPLY

RETURN/EXHAUST DUCT (UP & DOWN)

STANDARD RADIUS ELBOW (LONG RADIUS)

NEW DUCT (INSIDE DIMENSIONS: WIDTH x DEPTH)

MANUAL VOLUME DAMPER

FLEXIBLE DUCTWORK (INSULATED)

RETURN, NO SPLITTER (45° TAP)

STANDARD BRANCH SUPPLY OR

BFP BACKFLOW PREVENTER

BHP BRAKE HORSEPOWER

BDD GRAVITY OPERATED DAMPER

BTU BRITISH THERMAL UNIT

BTUH BRITISH THERMAL UNIT PER HOUR

C CONVECTOR

CC COOLING COIL

CCD COOLING COIL CONDENSATE DRAIN

CD CEILING DIFFUSER

CENT CENTRIFUGAL

CFH CUBIC FEET PER HOUR

CFM CUBIC FEET PER MINUTE

CFT CUBIC FEET

CI CAST IRON

COP COEFFICIENT OF PERFORMANCE

COMP COMPRESSOR

CP CONDENSATE PUMP

CUH CABINET UNIT HEATER

CV CONSTANT VOLUME

CW COLD WATER (POTABLE)

EA EXHAUST AIR

EAT ENTERING AIR TEMPERATURE

EER ENERGY EFFICIENCY RATIO

EF EXHAUST FAN

EG EXHAUST GRILLE

EH EXHAUST HOOD

ENT ENTERING

EOD ELECTRICALLY OPERATED DAMPER

ERU ENERGY RECOVERY UNIT

ESP EXTERNAL STATIC PRESSURE

ET EXPANSION TANK

EIH ELECTRIC INFRARED HEATER

ETR EXISTING TO REMAIN

EUH ELECTRIC UNIT HEATER

EWT ENTERING WATER TEMPERATURE

CONTROLS SYMBOLS

A/E ARCHITECT / ENGINEER

AAHX AIR TO AIR HEAT EXCHANGER

AC AIR CONDITIONING UNIT

AD ACCESS DOOR

AFF ABOVE FINISHED FLOOR

AHU AIR-HANDLING UNIT

AMP AMPERGE

AP ACCESS PANEL

APD AIR PRESSURE DROP

ARI AIR CONDITIONING AND REFRIGERATION INSTITUTE

AS AIR SEPARATOR

ASME AMERICAN SOCIETY OF MECHANICAL ENGINEERS

THERMOSTAT

F FAHRENHEIT

F&T FLOAT AND THERMOSTATIC

FSD COMBINATION FIRE SMOKE DAMPER

FA FREE AREA

FC FLEXIBLE CONNECTION

FCU FAN COIL UNIT

FD FLOOR DRAIN

F FIRE DAMPER

FF FINAL FILTER

FG FILTER GRILLE

FM FLOW METER

FPM FEET PER MINUTE

FPS FEET PER SECOND

FS FLOW SWITCH

FSTAT FREEZESTAT

G NATURAL GAS

GA GAUGE

GAL GALLONS

GPD GALLONS PER DAY

GPH GALLONS PER HOUR

GPM GALLONS PER MINUTE

GS GALVANIZED STEEL

HC HEATING COIL

HD HEAD

HGBP REFRIGERANT HOT GAS BYBASS

HP HEAT PUMP

HP HORSEPOWER

HPR HIGH PRESSURE RETURN (STEAM CONDENSATE)

HPS HIGH PRESSURE SUPPLY (STEAM)

HSTAT HUMIDISTAT

HW HOT WATER

HWSX EXISTING HOT WATER SUPPLY PIPING

HWRX EXISTING HOT WATER RETURN PIPING

HX HEAT EXCHANGER

HZ HERTZ

D DAMPER - AUTOMATIC

DB DECIBELS

Db DRY-BULB TEMPERATURE

DDC DIRECT DIGITAL CONTROLS

DEG DEGREE

DG DOOR GRILLE

DIA DIAMETER

DN DOWN

DP DEW POINT TEMPERATURE

DUC DOOR UNDERCUT

DWH DOMESTIC WATER HEATER

DX DIRECT EXPANSION

OA OUTSIDE AIR

OD OUTSIDE DIAMETER

NA NOT APPLICABLE

NC NOISE CRITERIA

NC NORMALLY CLOSED

NO NORMALLY OPEN

NPLV NON-STANDARD PART LOAD VALUE

NPSH NET POSITIVE SUCTION HEAD

NTS NOT TO SCALE

MAT MIXED AIR TEMPERATURE

MAU MAKE-UP AIR UNIT

MAX MAXIMUM

MBH 1000 BTUH

MCA MINIMUM BRANCH CIRCUIT AMPACITY

MD MOTORIZED DAMPER

MERV MINIMUM EFFICIENCY REPORTING VALUE

MIN MINIMUM

MOP MAX OVERCURRENT PROTECTION

M.C. MECHANICAL CONTRACTOR

L LOUVER

LAT LEAVING AIR TEMPERATURE

LBS/HR POUNDS PER HOUR

LF LINEAR FOOT (FEET)

LPR LOW PRESSURE RETURN (STEAM CONDENSATE)

LPS LOW PRESSURE STEAM

LWT LEAVING WATER TEMPERATURE

kW KILOWATT kWh KILOWATT HOUR

I/O INPUT/OUTPUT

IAQ INDOOR AIR QUALITY

ID INSIDE DIAMETER

IFB INTEGRAL FACE AND BYPASS

IH INTAKE HOOD

IN INCHES

IN HG INCHES OF MERCURY

IN WC INCH WATER COLUMN

IN WG INCH WATER GAUGE

IN-LB INCH-POUND

IPLV INTERGRATED PART LOAD VALUE

T TRANSFER GRILLE

TAB TESTING, ADJUSTING, BALANCE

TCP TEMPERATURE CONTROL PANEL

TD TEMPERATURE DIFFERENCE

TG TRANSFER GRILLE

TSP TOTAL STATIC PRESSURE

TSTAT THERMOSTAT

SA SUPPLY AIR

SAT SUPPLY AIR TEMPERATURE

SC SHADING COEFFICIENT

SCFM STANDARD CUBIC FEET PER MINUTE

SD SMOKE DETECTOR

SD SLOT DIFFUSER

SF SUPPLY FAN

SG SUPPLY AIR GRILLE

SHC STEAM HEATING COIL

SI SQUARE INCHES

SP STATIC PRESSURE

SQ FT SQUARE FOOT (FEET)

SS STAINLESS STEEL

ST STEAM TRAP

SUH STEAM UNIT HEATER

SWHX STEAM TO WATER HEAT EXCHANGER

R RETURN

RA RETURN AIR

RF RETURN FAN

RG RETURN GRILLE

RH ROOF HOOD

RHC REHEAT COIL

RHG REFRIGERANT HOT GAS

RL REFRIGERANT LIQUID LINE

RLA RUN LOAD AMPERE

RPM REVOLUTIONS PER MINUTE

RS REFRIGERANT SUCTION (GAS)

RTU ROOF TOP UNIT

P PUMP

PC PUMPED CONDENSATE

PCF POUNDS PER CUBIC FOOT (FEET)

PD PRESSURE DROP

PG PRESSURE GAGE

POC POINT OF CONNECTION

PPM PARTS PER MILLION

PRV PRESSURE REGULATING VALVE

PSI POUNDS PER SQUARE INCH

PSIA POUNDS PER SQUARE INCH – ABSOLUTE

PSIG POUNDS PER SQUARE INCH – GAGE

PTAC PACKAGED TERMINAL AIR CONDITIONER

ABBREVIATIONS

UH UNIT HEATER

UV UNIT VENTILATOR

(E) EXISTING EQUIPMENT (WHEN FOLLOWED BY

EQUIPMENT ABBREVIATION)

GENERAL PIPING SYMBOLS

SIDE CONNECTION

BOTTOM CONNECTION, 45° OR 90°

TOP CONNECTION, 45° OR 90°

RISE OR DROP IN PIPE

CAPPED OUTLET

PIPE UP

PIPE DOWN

PIPING FLEXIBLE CONNECTION

EXISTING HOT WATER SUPPLY PIPING

EXISTING HOT WATER RETURN PIPING

DUCTWORK TO BE DEMOLISHED

PIPING TO BE DEMOLISHED

VENT PIPING

COOLING COIL CONDENSATE PIPING

REFRIGERANT PIPING

GENERAL SYMBOLS

AC

X CEILING CASSETTE AC UNIT (4-WAY)

CEILING ACCESS PANEL

KNOCKOUT AT CASSETTE UNIT WHERE SHOWN ON PLANS

SINGLE DIRECTIONAL CEILING AC

UNITAC

X

AIR DEVICE TAG

BDD

GRAVITY OPERATED DAMPER

EXISTING EQUIPMENT TO BE DEMOLISHED

POINT OF EXTENTS OF DEMOLITION

AND EXISTING WORK

POINT OF CONNECTION BETWEEN NEW

EXHAUST VENT WITH INTEGRAL

GRAVITY OPERATED DAMPER

FIRE DAMPER

AUTOMATIC DAMPER

EXISTING LOW PRESSURE STEAM

EXISTING HIGH PRESSURE STEAM

EXISTING HIGH PRESSURE CONDENSATE STEAM RETURN

EXISTING LOW PRESSURE CONDENSATE STEAM RETURN

NOTES

1. REFER TO ELECTRICAL FLOOR PLANS FOR ELECTRICAL SERVICES LOCATIONS. FIELD VERIFY

ALL EXISTING ELECTRICAL EQUIPMENT LOCATIONS.

GENERAL NOTES

1. REFER TO DRAWING M-504 FOR REFRIGERANT CAPACITY PER SYSTEM RISER.

2. CONFORM TO ALL REQUIREMENTS OF THE BUILDING AND MECHANICAL CODES, US AIR

FORCE BASE AGENCIES HAVING JURISDICTION, AND OTHER APPLICABLE REGULATIONS FOR

THE PROJECT.

3. CONTRACTOR SHALL VERIFY ALL FIELD CONDITIONS PRIOR TO BID AND CONSTRUCTION.

4. COORDINATE ALL WORK WITH OTHER TRADES TO AVOID INTERFERENCE AND DELAYS.

5. PROVIDE ACCESS PANELS FOR ALL ITEMS UNDER THIS SECTION REQUIRING SERVICING,

INSPECTION, MAINTENANCE AND ADJUSTMENT.

6. THE PHASING OF WORK SHALL BE COORDINATED WITH UTILITY AGENCY TO IDENTIFY THE

CENTRAL PIPING LOOP TO BE TAKEN OUT OF SERVICE, AND TO MINIMIZE ANY DOWN TIME

TO UNITS NOT ASSOCIATED WITH THIS PROJECT.

7. CONTRACTOR SHALL OBTAIN ALL NECESSARY INFORMATION FROM THE UTILITY AGENCY

TO MAKE ALL FINAL EQUIPMENT CONNECTIONS. FINAL CONNECTIONS SHALL INCLUDE BUT

NOT BE LIMITED TO HOT AND COLD WATER SHUTOFF VALVES, P-TRAPS, VACUUM BREAKERS,

UNIONS, WASTE AND INDIRECT WASTE CONNECTIONS, REGULATORS, ETC.

8. OMISSIONS: IT IS THE INTENT OF THE PLANS AND SPECIFICATIONS TO PROVIDE A COMPLETE

INSTALLATION. SHOULD THERE BE OMISSIONS, THE CONTRACTOR SHALL CALL THE

ATTENTION OF THE CONTRACTING OFFICER TO SUCH OMISSIONS TEN (10) DAYS IN ADVANCE

OF THE DATE OF BID OPENING SO THAT THE NECESSARY CORRECTIONS CAN BE MADE.

9. THE INSTALLATION SHALL CONFORM TO THE LATEST APPLICABLE INDUSTRY STANDARDS

UNLESS SPECIFICALLY NOTED OTHERWISE.

10. ADDITIONAL WORK: THE DESIGN IS BASED ON EQUIPMENT AS DESCRIBED IN THE DRAWINGS.

ANY CHANGE IN ELECTRICAL, WIRING, CONDUIT, CONNECTIONS, PIPING, CONTROLS, AND

OPENINGS REQUIRED BY ALTERNATE EQUIPMENT SPECIFIED AND SUBMITTED AND

APPROVED SHALL BE PAID FOR BY THIS CONTRACTOR.

11. PRODUCT DELIVERY, STORAGE AND HANDLING: FURNISH NEW FIXTURES, MATERIALS AND

ACCESSORIES BEARING THE MANUFACTURER IDENTIFICATION. COORDINATE DELIVERIES

TO AVOID INTERFERENCE OF CONSTRUCTION DELAYS. PROTECT PRODUCTS DURING

DELIVERY, STORAGE, INSTALLATIONS, AND THE REMAINDER OF THE CONSTRUCTION PERIOD

AFTER INSTALLATION.

12. EXISTING EQUIPMENT, DUCTWORK, AND PIPING IS LOCATED ABOVE EXISTING CEILINGS

UNLESS OTHERWISE NOTED.

INSTALLATION:

1. PREPARATION: VISIT THE WORK SITE AND BECOME FULLY AWARE OF ALL EXISTING

CONDITIONS. INVESTIGATE THE CONTRACT DOCUMENTS AND MAKE PROPER PROVISIONS

TO AVOID INTERFERENCE OR CONSTRUCTION DELAYS. FURNISH OTHER TRADES WITH

INFORMATION TO PROPERLY LOCATE AND SIZE OPENINGS IN THE STRUCTURE REQUIRED

FOR THIS WORK. FURNISH ANCHOR BOLTS, SLEEVES, INSERTS AND SUPPORT REQUIRED

FOR THIS WORK.

2. INSTALLATION: PERFORM WORK USING PERSONNEL SKILLED IN THE TRADE INVOLVED.

PROVIDE COMPETENT SUPERVISION. FURNISH NEW MATERIALS, AND ACCESSORIES

BEARING THE MANUFACTURER'S IDENTIFICATION, AND CONFORMING TO THE RECOGNIZED

COMMERCIAL STANDARDS.

3. FIELD QUALITY CONTROL: TEST SYSTEMS IN ACCORDANCE WITH APPLICABLE STANDARDS,

CODES AND MANUFACTURER'S RECOMMENDATIONS. PERFORM TESTS IN THE PRESENCE

OF GOVERNMENT REPRESENTATIVE.

4. BALANCING, ADJUSTMENT AND CLEANING: CLEAN UP WORK AREAS AND FIXTURES. ADJUST

SYSTEM FOR PROPER OPERATION, READY FOR USE. TOUCH UP WITH MATCHING PAINT ALL

DAMAGED FACTORY FINISHES.

5. CLEANING AND ADJUSTING: AT THE COMPLETION OF THE WORK, ALL PARTS OF THE

INSTALLATION SHALL BE THOROUGHLY CLEANED. PIPE, VALVES, AND FITTINGS SHALL BE

CLEANSED OF GREASE, METAL CUTTINGS, AND SLUDGE THAT MAY HAVE ACCUMULATED BY

OPERATION OF THE SYSTEM FOR TESTING ANY STOPPAGE OR DISCOLORATION OR OTHER

DAMAGE TO PARTS OF THE BUILDING, ITS FINISH, OR FURNISHING. FAILURE TO PROPERLY

CLEAN THE PIPING SYSTEM DUE TO THE CONTRACTOR SHALL BE REPAIRED BY THE

CONTRACTOR WITHOUT COST TO THE OWNER.

SG-3

AIR DEVICE TAG

AIRFLOW (CMM)

DOOR UNDERCUTU

R

EP

A

IR

D O

R M

, B

M

IS

A

W A

A

IR

B A

SE

JA

PA

N

(Q

KK

A1

2)

FA

-1

8- F-

JU

N

E

, 2

SHEET

IDENTIFICATION

D

ES

IG

N

ED

B

Y:

D W

N B

Y:

C

KD

B

Y:

SO

LI

C

IT

AT

IO

N

N O

D

AT

E:

C O

N

TR

AC

T

N O

SU

BM

IT

TE

D

B Y:

U .S

. A

IR

F O

R C

E C

IV

IL

E N

G

IN

EE

R

C

EN

TE

R

O

TI

E R

S& H

J O

IN

T

VE

N

TU

R

E

N

. M

AY

FA

IR

R O

AD

S

U

IT

E

M

IL

W

AU

KE

E, W

I 5

A

B

C

D

1 2 3 4 5

M A

R K

D

ES

C R

IP

TI

O N

D A

TE

FINAL DESIGN

SIGNED

THIS WORK WAS PREPARED

BY ME OR UNDER MY

SUPERVISION

SHEET OF 232

PA

U

L

VA

N D

EN

BE

R G

S.

H

ER

M

EN

IN

G

KL

N

TT

W

M-001

G

EN

ER

AL

N O

TE

S, S

YM

BO

LS

A N

D A

BB

R

EV

IA

TI

O

N S

DRAFT

AutoCAD SHX Text

DN

AutoCAD SHX Text

UP

AutoCAD SHX Text

DN

AutoCAD SHX Text

UP

AutoCAD SHX Text 10/8

AutoCAD SHX Text 45%%d

AutoCAD SHX Text T

AutoCAD SHX Text

UNION

AutoCAD SHX Text

(E)HWS

AutoCAD SHX Text

(E)HWR

AutoCAD SHX Text V

AutoCAD SHX Text

CD

AutoCAD SHX Text

RP

AutoCAD SHX Text

BDD

AutoCAD SHX Text

(E)LPS

AutoCAD SHX Text

(E)HPS

AutoCAD SHX Text

(E)HPR

AutoCAD SHX Text

(E)LRP

A

02 03 04 05 06 07 08 09 11 12 13 14

B

C

D

E

F

14'10

STAIR 2

STAIR 1

UNIT 124STORAGE 1

UNIT 119 UNIT 121 UNIT 123

LAUNDRY 1

JANITOR 1

CORRIDOR 1W

DAY ROOM 1

MECHANICAL RM

LINEN 1

UNIT 114UNIT 112UNIT 110UNIT 108

UNIT 113UNIT 111UNIT 109UNIT 107UNIT 105UNIT 103UNIT 101

UNIT 102 UNIT 104 UNIT 106

RRM 1

LOBBY

CORRIDOR 1

OFFICE

M

ATC

H

LIN

E

(E) HWS

(E)40 (E)50

(E)40 (E)40 (E)40

(E)40 (E)40 (E)40(E)65 (E)80 (E)80 (E)100

(E)32 (E)100

(E)20

(E)25

(E)100 (E)32 (E)40

(E)40 (E)100(E) HWS (E) HWR

(E) HWS

MD401

MD401

MD402

MD401

MD401

MD401

MD401

MD401

MD401

MD401

MD401

MD402

MD403

MD403

MD401

A

14 15 16 17 18 19 20

B

C

D

E

F

14'

STAIR 3

UNIT 130UNIT 128UNIT 126 UNIT 136

UNIT 135

UNIT 134

UNIT 133UNIT 125 UNIT 127 UNIT 129

UNIT 132

UNIT 131

CORRIDOR 1E

M

ATC

H

LIN

E

(E) HWS

(E)100

(E)40

(E)40

(E)80

(E)80

(E)40

(E)40 (E)50

(E)65

(E)40

(E)40

(E) HWS

MD401

MD401

MD401

MD401

MD401

MD401

SCALE:

MECHANICAL DEMOLITION PLAN - FIRST FLOOR

1:1001

GENERAL NOTES:

1. REFER TO ENLARGED PLANS FOR PIPE DEMOLITION

REQUIRED IN INDIVIDUAL SPACES.

2. EXISTING MECHANICAL SYSTEMS ARE TO BE

DEMOLISHED COMPLETE UNLESS NOTED OTHERWISE.

(EQUIPMENT / DUCTWORK AND ACCESSORIES /

SUPPORTS / CONTROLS / WIRING)

3. REFER TO MD402 / MD403 FOR ADDITIONAL DETAIL FOR

DEMOLITION REQUIREMENTS.

4. REMOVE ALL (E)HWS & (E)HWR PIPING INCLUDING

ABOVE CEILINGS, IN ACCESSIBLE CRAWL SPACES, AND

PITS UNDER BUILDING INCLUDING VERTICAL CHASES.

CAP HWS & HWR PIPING SERVICE PIPING AT OR JUST

OUTSIDE BUILDING LINE IN ACCESSIBLE LOCATION.

REFER TO ARCHITECTURAL DRAWINGS AND

SPECIFICATIONS FOR PATCHING REQUIREMENTS.

5. COORDINATE REMOVAL AND ABATEMENT OF

ASBESTOS CONTAINING MATERIALS - REFER TO

HAZMAT PLAN SHEETS FOR ADDITIONAL DEMOLITION

NOTES.

6. CONTRACTOR IS RESPONSIBLE FOR PATCHING OF ALL

OPENINGS IN CEILINGS, WALLS AND FLOORS THAT

RESULT FROM DEMOLITION WORK, UNLESS OPENING IS

TO BE RE-USED. PATCHING OF OPENINGS OR OTHER

DAMAGE RESULTING FROM DEMO WORK TO MATCH

ADJACENT SURFACES.

7. LOCATION OF EQUIPMENT, PIPING AND DUCTWORK IS

APPROXIMATE, CONTRACTOR SHALL FIELD VERIFY.

8. COORDINATE SHUT DOWN OF EXISTING CENTRAL HOT

WATER HEATING SYSTEM, ALONG WITH POWER TO

DWELLING UNITS WITH AF BASE PRIOR TO DEMOLITION.

HWS/HWR MAIN VALVE SHALL BE SHUT-OFF, AND

SYSTEM TO BE COMPLETELY DRAINED PRIOR TO

DEMOLITION. PIPING SHALL BE CAPPED WATER-TIGHT

WHERE PIPING DEMOLITION OCCURS.

KEYNOTES

0 700030001000

R

EP

A

IR

D O

R M

, B

M

IS

A

W A

A

IR

B A

SE

JA

PA

N

(Q

KK

A1

2)

FA

-1

8- F-

JU

N

E

, 2

SHEET

IDENTIFICATION

D

ES

IG

N

ED

B

Y:

D W

N B

Y:

C

KD

B

Y:

SO

LI

C

IT

AT

IO

N

N O

D

AT

E:

C O

N

TR

AC

T

N O

SU

BM

IT

TE

D

B Y:

U .S

. A

IR

F O

R C

E C

IV

IL

E N

G

IN

EE

R

C

EN

TE

R

O

TI

E R

S& H

J O

IN

T

VE

N

TU

R

E

N

. M

AY

FA

IR

R O

AD

S

U

IT

E

M

IL

W

AU

KE

E, W

I 5

A

B

C

D

1 2 3 4 5

M A

R K

D

ES

C R

IP

TI

O N

D A

TE

FINAL DESIGN

SIGNED

THIS WORK WAS PREPARED

BY ME OR UNDER MY

SUPERVISION

SHEET OF 232

PA

U

L

VA

N D

EN

BE

R G

S.

H

ER

M

EN

IN

G

KL

N

TT

W

MD101

M

EC

H

AN

IC

AL

D

EM

O

LI

TI

O

N P

LA

N

FI

R

ST

F

LO

O R

REMOVE EXISTING HOT WATER SUPPLY HORIZONTAL MAIN.

PLAN

NORTH

DRAFT

02 03 04 05 06 07 08 09 11 12 13 14

B

C

D

E

F

14'10

STAIR 2

STAIR 1

UNIT 223UNIT 221

UNIT 224UNIT 222

UNIT 219

UNIT 218

STORAGE 2

CORRIDOR 2W

LOUNGE 2

LAUNDRY 2

UNIT 216UNIT 214UNIT 212UNIT 210UNIT 208UNIT 206UNIT 204UNIT 202

UNIT 201 UNIT 203 UNIT 205 UNIT 207 UNIT 209 UNIT 211 UNIT 213

JANITOR 2

CORRIDOR 2

M

ATC

H

LIN

E

MD401

MD401

MD402

MD401

MD401

MD401

MD401

MD401

MD401

MD401

MD401

MD401

MD402

MD401

A

14 15 16 17 18 19 20

B

C

D

E

F

14'

STAIR 3

UNIT 233UNIT 231UNIT 229UNIT 227UNIT 225

UNIT 232UNIT 230UNIT 228UNIT 226 UNIT 236UNIT 234

UNIT 235

CORRIDOR 2E

M

ATC

H

LIN

E

MD401

MD401

MD401

MD401

MD401

MD401

SCALE:

MECHANICAL DEMOLITION PLAN - SECOND FLOOR

1:1001 0 700030001000

R

EP

A

IR

D O

R M

, B

M

IS

A

W A

A

IR

B A

SE

JA

PA

N

(Q

KK

A1

2)

FA

-1

8- F-

JU

N

E

, 2

SHEET

IDENTIFICATION

D

ES

IG

N

ED

B

Y:

D W

N B

Y:

C

KD

B

Y:

SO

LI

C

IT

AT

IO

N

N O

D

AT

E:

C O

N

TR

AC

T

N O

SU

BM

IT

TE

D

B Y:

U .S

. A

IR

F O

R C

E C

IV

IL

E N

G

IN

EE

R

C

EN

TE

R

O

TI

E R

S& H

J O

IN

T

VE

N

TU

R

E

N

. M

AY

FA

IR

R O

AD

S

U

IT

E

M

IL

W

AU

KE

E, W

I 5

A

B

C

D

1 2 3 4 5

M A

R K

D

ES

C R

IP

TI

O N

D A

TE

FINAL DESIGN

SIGNED

THIS WORK WAS PREPARED

BY ME OR UNDER MY

SUPERVISION

SHEET OF 232

PA

U

L

VA

N D

EN

BE

R G

S.

H

ER

M

EN

IN

G

KL

N

TT

W

MD102

M

EC

H

AN

IC

AL

D

EM

O

LI

TI

O

N P

LA

N

SE

C O

N D

F

LO

O R

GENERAL NOTES:

1. REFER TO ENLARGED PLANS FOR PIPE DEMOLITION

REQUIRED IN INDIVIDUAL SPACES.

2. EXISTING MECHANICAL SYSTEMS ARE TO BE

DEMOLISHED COMPLETE UNLESS NOTED OTHERWISE.

(EQUIPMENT / DUCTWORK AND ACCESSORIES /

SUPPORTS / CONTROLS / WIRING)

3. REFER TO MD402 / MD403 FOR ADDITIONAL DETAIL FOR

DEMOLITION REQUIREMENTS.

4. REMOVE ALL (E)HWS & (E)HWR PIPING INCLUDING

ABOVE CEILINGS, IN ACCESSIBLE CRAWL SPACES, AND

PITS UNDER BUILDING INCLUDING VERTICAL CHASES.

CAP HWS & HWR PIPING SERVICE PIPING AT OR JUST

OUTSIDE BUILDING LINE IN ACCESSIBLE LOCATION.

REFER TO ARCHITECTURAL DRAWINGS AND

SPECIFICATIONS FOR PATCHING REQUIREMENTS.

5. COORDINATE REMOVAL AND ABATEMENT OF

ASBESTOS CONTAINING MATERIALS - REFER TO

HAZMAT PLAN SHEETS FOR ADDITIONAL DEMOLITION

NOTES.

6. CONTRACTOR IS RESPONSIBLE FOR PATCHING OF ALL

OPENINGS IN CEILINGS, WALLS AND FLOORS THAT

RESULT FROM DEMOLITION WORK, UNLESS OPENING IS

TO BE RE-USED. PATCHING OF OPENINGS OR OTHER

DAMAGE RESULTING FROM DEMO WORK TO MATCH

ADJACENT SURFACES.

7. LOCATION OF EQUIPMENT, PIPING AND DUCTWORK IS

APPROXIMATE, CONTRACTOR SHALL FIELD VERIFY.

8. COORDINATE SHUT DOWN OF EXISTING CENTRAL HOT

WATER HEATING SYSTEM, ALONG WITH POWER TO

DWELLING UNITS WITH AF BASE PRIOR TO DEMOLITION.

HWS/HWR MAIN VALVE SHALL BE SHUT-OFF, AND

SYSTEM TO BE COMPLETELY DRAINED PRIOR TO

DEMOLITION. PIPING SHALL BE CAPPED WATER-TIGHT

WHERE PIPING DEMOLITION OCCURS.

PLAN

NORTH

02 03 04 05 06 07 08 09 11 12 13 14

B

C

D

E

F

14'10

STAIR 2

STAIR 1

UNIT 318

UNIT 319 UNIT 321 UNIT 323

UNIT 324UNIT 322

LOUNGE 3 STORAGE 3

CORRIDOR 3W

LAUNDRY 3UNIT 316UNIT 314UNIT 312UNIT 310UNIT 308UNIT 306UNIT 304UNIT 302

UNIT 301 UNIT 303 UNIT 305 UNIT 307 UNIT 309 UNIT 311 UNIT 313

JANITOR 3

CORRIDOR 3

M

ATC

H

LIN

E

MD401

MD401

MD402

MD401

MD401

MD401

MD401

MD401

MD401

MD401

MD401

MD401

MD402

MD401

A

14 15 16 17 18 19 20

B

C

D

E

F

14'

STAIR 3

UNIT 333

UNIT 332UNIT 330

UNIT 331UNIT 325 UNIT 327 UNIT 329

UNIT 328UNIT 326 UNIT 334

UNIT 335

UNIT 336

CORRIDOR 3E

M

ATC

H

LIN

E

MD401

MD401

MD401

MD401

MD401

MD401

SCALE:

MECHANICAL DEMOLITION PLAN - THIRD FLOOR

1:1001 0 700030001000

R

EP

A

IR

D O

R M

, B

M

IS

A

W A

A

IR

B A

SE

JA

PA

N

(Q

KK

A1

2)

FA

-1

8- F-

JU

N

E

, 2

SHEET

IDENTIFICATION

D

ES

IG

N

ED

B

Y:

D W

N B

Y:

C

KD

B

Y:

SO

LI

C

IT

AT

IO

N

N O

D

AT

E:

C O

N

TR

AC

T

N O

SU

BM

IT

TE

D

B Y:

U .S

. A

IR

F O

R C

E C

IV

IL

E N

G

IN

EE

R

C

EN

TE

R

O

TI

E R

S& H

J O

IN

T

VE

N

TU

R

E

N

. M

AY

FA

IR

R O

AD

S

U

IT

E

M

IL

W

AU

KE

E, W

I 5

A

B

C

D

1 2 3 4 5

M A

R K

D

ES

C R

IP

TI

O N

D A

TE

FINAL DESIGN

SIGNED

THIS WORK WAS PREPARED

BY ME OR UNDER MY

SUPERVISION

SHEET OF 232

PA

U

L

VA

N D

EN

BE

R G

S.

H

ER

M

EN

IN

G

KL

N

TT

W

MD103

M

EC

H

AN

IC

AL

D

EM

O

LI

TI

O

N P

LA

N

TH

IR

D

F

LO

O R

PLAN

NORTH

GENERAL NOTES:

1. REFER TO ENLARGED PLANS FOR PIPE DEMOLITION

REQUIRED IN INDIVIDUAL SPACES.

2. EXISTING MECHANICAL SYSTEMS ARE TO BE

DEMOLISHED COMPLETE UNLESS NOTED OTHERWISE.

(EQUIPMENT / DUCTWORK AND ACCESSORIES /

SUPPORTS / CONTROLS / WIRING)

3. REFER TO MD402 / MD403 FOR ADDITIONAL DETAIL FOR

DEMOLITION REQUIREMENTS.

4. REMOVE ALL (E)HWS & (E)HWR PIPING INCLUDING

ABOVE CEILINGS, IN ACCESSIBLE CRAWL SPACES, AND

PITS UNDER BUILDING INCLUDING VERTICAL CHASES.

CAP HWS & HWR PIPING SERVICE PIPING AT OR JUST

OUTSIDE BUILDING LINE IN ACCESSIBLE LOCATION.

REFER TO ARCHITECTURAL DRAWINGS AND

SPECIFICATIONS FOR PATCHING REQUIREMENTS.

5. COORDINATE REMOVAL AND ABATEMENT OF

ASBESTOS CONTAINING MATERIALS - REFER TO

HAZMAT PLAN SHEETS FOR ADDITIONAL DEMOLITION

NOTES.

6. CONTRACTOR IS RESPONSIBLE FOR PATCHING OF ALL

OPENINGS IN CEILINGS, WALLS AND FLOORS THAT

RESULT FROM DEMOLITION WORK, UNLESS OPENING IS

TO BE RE-USED. PATCHING OF OPENINGS OR OTHER

DAMAGE RESULTING FROM DEMO WORK TO MATCH

ADJACENT SURFACES.

7. LOCATION OF EQUIPMENT, PIPING AND DUCTWORK IS

APPROXIMATE, CONTRACTOR SHALL FIELD VERIFY.

8. COORDINATE SHUT DOWN OF EXISTING CENTRAL HOT

WATER HEATING SYSTEM, ALONG WITH POWER TO

DWELLING UNITS WITH AF BASE PRIOR TO DEMOLITION.

HWS/HWR MAIN VALVE SHALL BE SHUT-OFF, AND

SYSTEM TO BE COMPLETELY DRAINED PRIOR TO

DEMOLITION. PIPING SHALL BE CAPPED WATER-TIGHT

WHERE PIPING DEMOLITION OCCURS.

02 03 04 05 06 07 08 09 11 12 13 14

B

C

D

E

F

14'10

STAIR 2

STAIR 1

DAY ROOM 4

UNIT 418

UNIT 419 UNIT 423

STORAGE 4

UNIT 422 UNIT 424UNIT 416UNIT 414UNIT 412UNIT 410UNIT 408UNIT 406UNIT 404UNIT 402

UNIT 401 UNIT 403 UNIT 405 UNIT 407 UNIT 409 UNIT 411 UNIT 413

LAUNDRY 4

JANITOR 4

UNIT 421

CORRIDOR 4CORRIDOR 4W

RRM 4

M

ATC

H

LIN

E

(E)40

(E)40

(E)HWR

(E)HWR

(E)40

(E)40 (E)100

(E)65 (E)40

(E)32 (E)100

(E)50

(E)40

(E)20

(E)25

(E)HWR

(E)HWR

(E)32

(E)32

(E)HWR

(E)HWR

(E)100 (E)100

(E)40

(E)40

(E)100

(E)65

(E)40(E)40 (E)100

(E)80(E)40(E)100

MD401

MD401

MD402

MD401

MD401

MD401

MD401

MD401

MD401

MD401

MD401

MD402

MD401

MD401

A

14 15 16 17 18 19 20

B

C

D

E

F

14'

STAIR 3

UNIT 425

UNIT 434UNIT 426 UNIT 428 UNIT 430 UNIT 432

UNIT 427 UNIT 429 UNIT 431 UNIT 433 UNIT 435

CORRIDOR 4E

UNIT 436

M

ATC

H

LIN

E

MD401

MD401

MD401

(E)HWR

(E)HWR

(E)40 (E)100

(E)80

(E)100

(E)65 (E)40

(E)40

(E)40

(E)40

(E)40

(E)100

(E)100

2(TYP.)

MD401

MD401

MD401

SCALE:

MECHANICAL DEMOLITION PLAN - FOURTH FLOOR

1:1001 0 700030001000

R

EP

A

IR

D O

R M

, B

M

IS

A

W A

A

IR

B A

SE

JA

PA

N

(Q

KK

A1

2)

FA

-1

8- F-

JU

N

E

, 2

SHEET

IDENTIFICATION

D

ES

IG

N

ED

B

Y:

D W

N B

Y:

C

KD

B

Y:

SO

LI

C

IT

AT

IO

N

N O

D

AT

E:

C O

N

TR

AC

T

N O

SU

BM

IT

TE

D

B Y:

U .S

. A

IR

F O

R C

E C

IV

IL

E N

G

IN

EE

R

C

EN

TE

R

O

TI

E R

S& H

J O

IN

T

VE

N

TU

R

E

N

. M

AY

FA

IR

R O

AD

S

U

IT

E

M

IL

W

AU

KE

E, W

I 5

A

B

C

D

1 2 3 4 5

M A

R K

D

ES

C R

IP

TI

O N

D A

TE

FINAL DESIGN

SIGNED

THIS WORK WAS PREPARED

BY ME OR UNDER MY

SUPERVISION

SHEET OF 232

PA

U

L

VA

N D

EN

BE

R G

S.

H

ER

M

EN

IN

G

KL

N

TT

W

MD104

M

EC

H

AN

IC

AL

D

EM

O

LI

TI

O

N P

LA

N

FO

U R

TH

F

LO

O

R

KEYNOTES

1 REMOVE EXISTING HOT WATER SUPPLY HORIZONTAL MAIN.

GENERAL NOTES:

1. REFER TO ENLARGED PLANS FOR PIPE DEMOLITION

REQUIRED IN INDIVIDUAL SPACES.

2. EXISTING MECHANICAL SYSTEMS ARE TO BE

DEMOLISHED COMPLETE UNLESS NOTED OTHERWISE.

(EQUIPMENT / DUCTWORK AND ACCESSORIES /

SUPPORTS / CONTROLS / WIRING)

3. REFER TO MD402 / MD403 FOR ADDITIONAL DETAIL FOR

DEMOLITION REQUIREMENTS.

4. REMOVE ALL (E)HWS & (E)HWR PIPING INCLUDING

ABOVE CEILINGS, IN ACCESSIBLE CRAWL SPACES, AND

PITS UNDER BUILDING INCLUDING VERTICAL CHASES.

CAP HWS & HWR PIPING SERVICE PIPING AT OR JUST

OUTSIDE BUILDING LINE IN ACCESSIBLE LOCATION.

REFER TO ARCHITECTURAL DRAWINGS AND

SPECIFICATIONS FOR PATCHING REQUIREMENTS.

5. COORDINATE REMOVAL AND ABATEMENT OF

ASBESTOS CONTAINING MATERIALS - REFER TO

HAZMAT PLAN SHEETS FOR ADDITIONAL DEMOLITION

NOTES.

6. CONTRACTOR IS RESPONSIBLE FOR PATCHING OF ALL

OPENINGS IN CEILINGS, WALLS AND FLOORS THAT

RESULT FROM DEMOLITION WORK, UNLESS OPENING IS

TO BE RE-USED. PATCHING OF OPENINGS OR OTHER

DAMAGE RESULTING FROM DEMO WORK TO MATCH

ADJACENT SURFACES.

7. LOCATION OF EQUIPMENT, PIPING AND DUCTWORK IS

APPROXIMATE, CONTRACTOR SHALL FIELD VERIFY.

8. COORDINATE SHUT DOWN OF EXISTING CENTRAL HOT

WATER HEATING SYSTEM, ALONG WITH POWER TO

DWELLING UNITS WITH AF BASE PRIOR TO DEMOLITION.

HWS/HWR MAIN VALVE SHALL BE SHUT-OFF, AND

SYSTEM TO BE COMPLETELY DRAINED PRIOR TO

DEMOLITION. PIPING SHALL BE CAPPED WATER-TIGHT

WHERE PIPING DEMOLITION OCCURS.

PLAN

NORTH

-500

GL

14'

9 300

FLOOR 4

6 200

FLOOR 3

14131211090807060504030201

12 400

TO WALL

3 100

FLOOR 2

FLOOR 1

M

ATC

H

LIN

E

1 1 1 1 1 1 1

1 11 1 1 1 11

FLOOR 1

FLOOR 2

3 100

TO WALL

12 400

14 15 16 17 18 19 20

FLOOR 3

6 200

FLOOR 4

9 300

14'

GL

-500

M

ATC

H

LIN

E

1 1 1 111

SCALE:

MECHANICAL DEMOLITION EXTERIOR ELEVATION - SOUTH

1:1001

KEYNOTES

1 EXISTING MECHANICAL WALL OPENINGS TO BE INFILLED.

REFER TO ARCHITECTURAL DRAWINGS.

0 700030001000

R

EP

A

IR

D O

R M

, B

M

IS

A

W A

A

IR

B A

SE

JA

PA

N

(Q

KK

A1

2)

FA

-1

8- F-

JU

N

E

, 2

SHEET

IDENTIFICATION

D

ES

IG

N

ED

B

Y:

D W

N B

Y:

C

KD

B

Y:

SO

LI

C

IT

AT

IO

N

N O

D

AT

E:

C O

N

TR

AC

T

N O

SU

BM

IT

TE

D

B Y:

U .S

. A

IR

F O

R C

E C

IV

IL

E N

G

IN

EE

R

C

EN

TE

R

O

TI

E R

S& H

J O

IN

T

VE

N

TU

R

E

N

. M

AY

FA

IR

R O

AD

S

U

IT

E

M

IL

W

AU

KE

E, W

I 5

A

B

C

D

1 2 3 4 5

M A

R K

D

ES

C R

IP

TI

O N

D A

TE

FINAL DESIGN

SIGNED

THIS WORK WAS PREPARED

BY ME OR UNDER MY

SUPERVISION

SHEET OF 232

PA

U

L

VA

N D

EN

BE

R G

S.

H

ER

M

EN

IN

G

KL

N

TT

W

MD201

M

EC

H

AN

IC

AL

D

EM

O

LI

TI

O

N E

XT

ER

IO

R

E

LE

VA

TI

O N

SO

U

TH

GENERAL NOTES:

1. REFER TO ENLARGED PLANS FOR PIPE DEMOLITION

REQUIRED IN INDIVIDUAL SPACES.

2. EXISTING MECHANICAL SYSTEMS ARE TO BE

DEMOLISHED COMPLETE UNLESS NOTED OTHERWISE.

(EQUIPMENT / DUCTWORK AND ACCESSORIES /

SUPPORTS / CONTROLS / WIRING)

3. REFER TO MD402 / MD403 FOR ADDITIONAL DETAIL FOR

DEMOLITION REQUIREMENTS.

4. REMOVE ALL (E)HWS & (E)HWR PIPING INCLUDING ABOVE

CEILINGS, IN ACCESSIBLE CRAWL SPACES, AND PITS

UNDER BUILDING INCLUDING VERTICAL CHASES. CAP

HWS & HWR PIPING SERVICE PIPING AT OR JUST OUTSIDE

BUILDING LINE IN ACCESSIBLE LOCATION. REFER TO

ARCHITECTURAL DRAWINGS AND SPECIFICATIONS FOR

PATCHING REQUIREMENTS.

5. COORDINATE REMOVAL AND ABATEMENT OF ASBESTOS

CONTAINING MATERIALS - REFER TO HAZMAT PLAN

SHEETS FOR ADDITIONAL DEMOLITION NOTES.

6. CONTRACTOR IS RESPONSIBLE FOR PATCHING OF ALL

OPENINGS IN CEILINGS, WALLS AND FLOORS THAT

RESULT FROM DEMOLITION WORK, UNLESS OPENING IS

TO BE RE-USED. PATCHING OF OPENINGS OR OTHER

DAMAGE RESULTING FROM DEMO WORK TO MATCH

ADJACENT SURFACES.

7. LOCATION OF EQUIPMENT, PIPING AND DUCTWORK IS

APPROXIMATE, CONTRACTOR SHALL FIELD VERIFY.

8. ALL OPENINGS NOT IDENTIFIED AS BEING REUSED FOR

EXHAUST OR OA INTAKE ARE TO BE INFILLED.

9. COORDINATE SHUT DOWN OF EXISTING CENTRAL HOT

WATER HEATING SYSTEM, ALONG WITH POWER TO

DWELLING UNITS WITH AF BASE PRIOR TO DEMOLITION.

HWS/HWR MAIN VALVE SHALL BE SHUT-OFF, AND SYSTEM

TO BE COMPLETELY DRAINED PRIOR TO DEMOLITION.

PIPING SHALL BE CAPPED WATER-TIGHT WHERE PIPING

DEMOLITION OCCURS.

10. WALL OPENINGS SHOWN ON ELEVATION BUT NOT

IDENTIFIED BY NOTES ARE NOT MECHANICAL RELATED

OPENINGS. REFER TO ARCHITECTURAL DRAWINGS.

2 EXISTING MECHANICAL WALL OPENINGS TO REMAIN. REFER

TO ARCHITECTURAL DRAWINGS.

3 NATURAL VENTILATION WALL OPENINGS SHOWN FOR

REFERENCE. REFER TO ARCHITECTURAL DRAWINGS.DRAFT

-500

GL

14'

9 300

FLOOR 4

6 200

FLOOR 3

14 13 12 11 09 08 07 06 05 04 03 02 01

12 400

TO WALL

3 100

FLOOR 2

FLOOR 1

M

ATC

H

LIN

E

1 1 1 1 11 1 1 1 1 11 1

1 3 3

FLOOR 1

FLOOR 2

3 100

TO WALL

12 400

14151617181920

FLOOR 3

6 200

FLOOR 4

9 300

14'

GL

-500

M

ATC

H

LIN

E

11 1 11 1

SCALE:

MECHANICAL DEMOLITION EXTERIOR ELEVATION - NORTH

1:1001 0 700030001000

R

EP

A

IR

D O

R M

, B

M

IS

A

W A

A

IR

B A

SE

JA

PA

N

(Q

KK

A1

2)

FA

-1

8- F-

JU

N

E

, 2

SHEET

IDENTIFICATION

D

ES

IG

N

ED

B

Y:

D W

N B

Y:

C

KD

B

Y:

SO

LI

C

IT

AT

IO

N

N O

D

AT

E:

C O

N

TR

AC

T

N O

SU

BM

IT

TE

D

B Y:

U .S

. A

IR

F O

R C

E C

IV

IL

E N

G

IN

EE

R

C

EN

TE

R

O

TI

E R

S& H

J O

IN

T

VE

N

TU

R

E

N

. M

AY

FA

IR

R O

AD

S

U

IT

E

M

IL

W

AU

KE

E, W

I 5

A

B

C

D

1 2 3 4 5

M A

R K

D

ES

C R

IP

TI

O N

D A

TE

FINAL DESIGN

SIGNED

THIS WORK WAS PREPARED

BY ME OR UNDER MY

SUPERVISION

SHEET OF 232

PA

U

L

VA

N D

EN

BE

R G

S.

H

ER

M

EN

IN

G

KL

N

TT

W

MD202

M

EC

H

AN

IC

AL

D

EM

O

LI

TI

O

N E

XT

ER

IO

R

E

LE

VA

TI

O N

N

O R

TH

KEYNOTES

EXISTING MECHANICAL WALL OPENINGS FOR CLOTHES

DRYER EXHAUST TO BE REUSED FOR EXHAUST.

GENERAL NOTES:

1. REFER TO ENLARGED PLANS FOR PIPE DEMOLITION

REQUIRED IN INDIVIDUAL SPACES.

2. EXISTING MECHANICAL SYSTEMS ARE TO BE

DEMOLISHED COMPLETE UNLESS NOTED OTHERWISE.

(EQUIPMENT / DUCTWORK AND ACCESSORIES /

SUPPORTS / CONTROLS / WIRING)

3. REFER TO MD402 / MD403 FOR ADDITIONAL DETAIL FOR

DEMOLITION REQUIREMENTS.

4. REMOVE ALL (E)HWS & (E)HWR PIPING INCLUDING

ABOVE CEILINGS, IN ACCESSIBLE CRAWL SPACES, AND

PITS UNDER BUILDING INCLUDING VERTICAL CHASES.

CAP HWS & HWR PIPING SERVICE PIPING AT OR JUST

OUTSIDE BUILDING LINE IN ACCESSIBLE LOCATION.

REFER TO ARCHITECTURAL DRAWINGS AND

SPECIFICATIONS FOR PATCHING REQUIREMENTS.

5. COORDINATE REMOVAL AND ABATEMENT OF

ASBESTOS CONTAINING MATERIALS - REFER TO

HAZMAT PLAN SHEETS FOR ADDITIONAL DEMOLITION

NOTES.

6. CONTRACTOR IS RESPONSIBLE FOR PATCHING OF ALL

OPENINGS IN CEILINGS, WALLS AND FLOORS THAT

RESULT FROM DEMOLITION WORK, UNLESS OPENING IS

TO BE RE-USED. PATCHING OF OPENINGS OR OTHER

DAMAGE RESULTING FROM DEMO WORK TO MATCH

ADJACENT SURFACES.

7. LOCATION OF EQUIPMENT, PIPING AND DUCTWORK IS

APPROXIMATE, CONTRACTOR SHALL FIELD VERIFY.

8. ALL OPENINGS NOT IDENTIFIED AS BEING REUSED FOR

EXHAUST OR OA INTAKE ARE TO BE INFILLED.

9. COORDINATE SHUT DOWN OF EXISTING CENTRAL HOT

WATER HEATING SYSTEM, ALONG WITH POWER TO

DWELLING UNITS WITH AF BASE PRIOR TO DEMOLITION.

HWS/HWR MAIN VALVE SHALL BE SHUT-OFF, AND

SYSTEM TO BE COMPLETELY DRAINED PRIOR TO

DEMOLITION. PIPING SHALL BE CAPPED WATER-TIGHT

WHERE PIPING DEMOLITION OCCURS.

10. WALL OPENINGS SHOWN ON ELEVATION BUT NOT

IDENTIFIED BY NOTES ARE NOT MECHANICAL RELATED

OPENINGS. REFER TO ARCHITECTURAL DRAWINGS.

EXISTING MECHANICAL WALL OPENINGS TO BE INFILLED.

REFER TO ARCHITECTURAL DRAWINGS.

EXISTING MECHANICAL WALL OPENING TO BE REUSED.

REFER TO ARCHITECTURAL DRAWINGS.

NATURAL VENTILATION WALL OPENING. REFE TO

ARCHITECTURAL DRAWINGS.

4DRAFT

UNIT 107UNIT 105

(E)100Ø

(E)20

(E)100Ø

(E)20

(E)377x126

(E )H

W S(E

)H W

R

(E )H

W S (E

)H W

R

(E)150Ø (E)150Ø

(E)FCU (E)FCU

(E)377x126

(E)150x150(E)150x150

TT

UNIT 405 UNIT 407(E)300Ø

(E)200Ø (E)20

(E)377x126

(E)20

(E )H

W S(E

)H W

R

(E )H

W S (E

)H W

R

(E)FCU (E)FCU

(E)377x126

(E)100Ø (E)100Ø

(E)150Ø (E)150Ø

(E)HWR

(E)HWR

(E)40 (E)100

(E)40

(E)150x150

TT

UNIT 408UNIT 406

(E)200Ø

(E)300Ø

(E)200Ø

(E)20

(E)377x126

(E)20

(E )H

W S

(E )H

W R (E

)H W

S (E

)H W

R

(E)FCU (E)FCU

(E)377x126

(E)100Ø (E)100Ø

(E)150Ø (E)150Ø

(E)HWR

(E)80(E)40

(E)150x150

TT

2 2

SCALE:

MECHANICAL DEMOLITION PLAN - TYPICAL UNITS

1:501

GENERAL NOTES:

1. EXISTING MECHANICAL SYSTEMS ARE TO BE

DEMOLISHED COMPLETE UNLESS NOTED OTHERWISE.

(EQUIPMENT / DUCTWORK AND ACCESSORIES /

SUPPORTS / CONTROLS / WIRING)

2. REFER TO MD402 / MD403 FOR ADDITIONAL DETAIL FOR

DEMOLITION REQUIREMENTS.

3. REMOVE ALL (E)HWS & (E)HWR PIPING INCLUDING

ABOVE CEILINGS, IN ACCESSIBLE CRAWL SPACES, AND

PITS UNDER BUILDING INCLUDING VERTICAL CHASES.

CAP HWS & HWR PIPING SERVICE PIPING AT OR JUST

OUTSIDE BUILDING LINE IN ACCESSIBLE LOCATION.

REFER TO ARCHITECTURAL DRAWINGS AND

SPECIFICATIONS FOR PATCHING REQUIREMENTS.

4. COORDINATE REMOVAL AND ABATEMENT OF

ASBESTOS CONTAINING MATERIALS - REFER TO

HAZMAT PLAN SHEETS FOR ADDITIONAL DEMOLITION

NOTES.

5. CONTRACTOR IS RESPONSIBLE FOR PATCHING OF ALL

OPENINGS IN CEILINGS, WALLS AND FLOORS THAT

RESULT FROM DEMOLITION WORK, UNLESS OPENING IS

TO BE RE-USED. PATCHING OF OPENINGS OR OTHER

DAMAGE RESULTING FROM DEMO WORK TO MATCH

ADJACENT SURFACES.

6. LOCATION OF EQUIPMENT, PIPING AND DUCTWORK IS

APPROXIMATE, CONTRACTOR SHALL FIELD VERIFY.

7. COORDINATE SHUT DOWN OF EXISTING CENTRAL HOT

WATER HEATING SYSTEM, ALONG WITH POWER TO

DWELLING UNITS WITH AF BASE PRIOR TO DEMOLITION.

HWS/HWR MAIN VALVE SHALL BE SHUT-OFF, AND

SYSTEM TO BE COMPLETELY DRAINED PRIOR TO

DEMOLITION. PIPING SHALL BE CAPPED WATER-TIGHT

WHERE PIPING DEMOLITION OCCURS.

KEYNOTES

1 EXHAUST FAN AT FOURTH FLOOR AND ASSOCIATED

DUCTWORK ON ALL FLOORS TO BE DEMOLISHED.

2 REMOVAL OF EXISTING WALL CAP / HOOD IS BY OTHERS.

REFER TO ARCHITECTURAL PLANS FOR ADDITIONAL

INFORMATION.

0 35001500500

R

EP

A

IR

D O

R M

, B

M

IS

A

W A

A

IR

B A

SE

JA

PA

N

(Q

KK

A1

2)

FA

-1

8- F-

JU

N

E

, 2

SHEET

IDENTIFICATION

D

ES

IG

N

ED

B

Y:

D W

N B

Y:

C

KD

B

Y:

SO

LI

C

IT

AT

IO

N

N O

D

AT

E:

C O

N

TR

AC

T

N O

SU

BM

IT

TE

D

B Y:

U .S

. A

IR

F O

R C

E C

IV

IL

E N

G

IN

EE

R

C

EN

TE

R

O

TI

E R

S& H

J O

IN

T

VE

N

TU

R

E

N

. M

AY

FA

IR

R O

AD

S

U

IT

E

M

IL

W

AU

KE

E, W

I 5

A

B

C

D

1 2 3 4 5

M A

R K

D

ES

C R

IP

TI

O N

D A

TE

FINAL DESIGN

SIGNED

THIS WORK WAS PREPARED

BY ME OR UNDER MY

SUPERVISION

SHEET OF 232

PA

U

L

VA

N D

EN

BE

R G

S.

H

ER

M

EN

IN

G

KL

N

TT

W

MD401

M

EC

H

AN

IC

AL

D

EM

O

LI

TI

O

N P

LA

N

TY

PI

C

AL

U

N

IT

S

SCALE:

MECHANICAL DEMOLITION PLAN - TYPICAL 4TH FLOOR SOUTH UNITS

1:502 0 35001500500 SCALE:

MECHANICAL DEMOLITION PLAN - TYPICAL 4TH FLOOR NORTH UNITS

1:503 0 35001500500

4 EXISTING FAN COIL UNIT, DUCTWORK AND CONTROLS TO

BE DEMOLISHED.

EXISTING HWS/HWR RISERS TO BE REMOVED. INFILL OF

EXISTING OPENINGS IS BY OTHERS. REFER TO

ARCHITECTURAL PLANS FOR ADDITIONAL INFORMATION.

5 EXISTING EXHAUST CHASE TO REMAIN. CHASE WILL NOT BE

REUSED. INFILL OF EXISTING OPENINGS BY OTHERS. REFER

TO ARCHITECTURAL PLANS FOR ADDITIONAL INFORMATION.

6 EXISTING FIRE DAMPER TO BE REMOVED, PATCH WALL

OPENING WITH CONCRETE SUCH THAT EXISTING FIRE

RATING IS PRESERVED.

DAY ROOM 1

RRM 1

OFFICE

(E)20

(E)20

(E)HWS

(E)HWR

(E)FCU(E)FCU(E)FCU

(E )H

W S

(E )H

W R

(E)377x126(E)377x126

(E)32

9 9 9

STORAGE 2

LOUNGE 2

(E)20

(E)20

(E)HWS

(E)HWR

(E)FCU(E)FCU

(E )H

W S

(E )H

W R

377x126 (E)300Ø

(E)200Ø

STAIR 1

LAUNDRY 2

JANITOR 2

CORRIDOR 2

(E)DRYER

(E)DRYER

(E)DRYER

(E)EF

(E)150Ø

2 5

(E)20

(E)40

(E)UH

LAUNDRY 1

JANITOR 1

CORRIDOR 1

(E)EF 6

(E)20

(E)25

(E) HWS

(E)UH 4

(E)150Ø

(E)DRYER

(E)DRYER

(E)DRYER

SCALE:

MECHANICAL DEMOLITION PLAN - 1ST AND 4TH FLOOR LOUNGES

1:503 0 35001500500 0 35001500500SCALE:

MECHANICAL DEMOLITION PLAN - 2ND AND 3RD FLOOR LOUNGES

1:504

SCALE:

MECHANICAL DEMOLITION PLAN - 2ND, 3RD, AND 4TH FLOOR LAUNDRY

1:502 0 35001500500

R

EP

A

IR

D O

R M

, B

M

IS

A

W A

A

IR

B A

SE

JA

PA

N

(Q

KK

A1

2)

FA

-1

8- F-

JU

N

E

, 2

SHEET

IDENTIFICATION

D

ES

IG

N

ED

B

Y:

D W

N B

Y:

C

KD

B

Y:

SO

LI

C

IT

AT

IO

N

N O

D

AT

E:

C O

N

TR

AC

T

N O

SU

BM

IT

TE

D

B Y:

U .S

. A

IR

F O

R C

E C

IV

IL

E N

G

IN

EE

R

C

EN

TE

R

O

TI

E R

S& H

J O

IN

T

VE

N

TU

R

E

N

. M

AY

FA

IR

R O

AD

S

U

IT

E

M

IL

W

AU

KE

E, W

I 5

A

B

C

D

1 2 3 4 5

M A

R K

D

ES

C R

IP

TI

O N

D A

TE

FINAL DESIGN

SIGNED

THIS WORK WAS PREPARED

BY ME OR UNDER MY

SUPERVISION

SHEET OF 232

PA

U

L

VA

N D

EN

BE

R G

S.

H

ER

M

EN

IN

G

KL

N

TT

W

MD402

M

EC

H

AN

IC

AL

D

EM

O

LI

TI

O

N E

N

LA

R G

ED

P

LA

N

S

SCALE:

MECHANICAL DEMOLITION PLAN - 1ST FLOOR LAUNDRY

1:501 0 35001500500

GENERAL NOTES:

1. EXISTING MECHANICAL SYSTEMS ARE TO BE DEMOLISHED

COMPLETE UNLESS NOTED OTHERWISE. (EQUIPMENT /

DUCTWORK AND ACCESSORIES / SUPPORTS / CONTROLS /

WIRING)

2. REFER TO MD403 FOR ADDITIONAL DETAIL FOR DEMOLITION

REQUIREMENTS.

3. REMOVE ALL (E)HWS & (E)HWR PIPING INCLUDING ABOVE

CEILINGS, IN ACCESSIBLE CRAWL SPACES, AND PITS UNDER

BUILDING INCLUDING VERTICAL CHASES. CAP HWS & HWR

PIPING SERVICE PIPING AT OR JUST OUTSIDE BUILDING LINE IN

ACCESSIBLE LOCATION. REFER TO ARCHITECTURAL DRAWINGS

AND SPECIFICATIONS FOR PATCHING REQUIREMENTS.

4. COORDINATE REMOVAL AND ABATEMENT OF ASBESTOS

CONTAINING MATERIALS - REFER TO HAZMAT PLAN SHEETS

FOR ADDITIONAL DEMOLITION NOTES.

5. CONTRACTOR IS RESPONSIBLE FOR PATCHING OF ALL

OPENINGS IN CEILINGS, WALLS AND FLOORS THAT RESULT

FROM DEMOLITION WORK, UNLESS OPENING IS TO BE RE-USED.

PATCHING OF OPENINGS OR OTHER DAMAGE RESULTING FROM

DEMO WORK TO MATCH ADJACENT SURFACES.

6. LOCATION OF EQUIPMENT, PIPING AND DUCTWORK IS

APPROXIMATE, CONTRACTOR SHALL FIELD VERIFY.

7. REMOVE DRYER VENTING SYSTEM COMPLETE. REFER TO

GENERAL NOTE #1.

8. COORDINATE SHUT DOWN OF EXISTING CENTRAL HOT WATER

HEATING SYSTEM, ALONG WITH POWER TO DWELLING UNITS

WITH AF BASE PRIOR TO DEMOLITION. HWS/HWR MAIN VALVE

SHALL BE SHUT-OFF, AND SYSTEM TO BE COMPLETELY

DRAINED PRIOR TO DEMOLITION. PIPING SHALL BE CAPPED

WATER-TIGHT WHERE PIPING DEMOLITION OCCURS.

KEYNOTES

1 EXHAUST FAN TO BE DEMOLISHED.

3 EXISTING HWS/HWR RISERS TO BE REMOVED. INFILL OF

EXISTING OPENINGS IS BY OTHERS. REFER TO

ARCHITECTURAL PLANS FOR ADDITIONAL INFORMATION.

5 REFER TO M SERIES SHEETS FOR DIRECTION ON WHICH

WALL OPENINGS ARE REUSED ON INFILLED. GENERAL

CONTRACTOR SHALL BE RESPONSIBLE FOR INFILLING ANY

OPENINGS THAT ARE NOT REUSED.

6 REMOVE DRYER VENTING SYSTEM COMPLETE. REFER TO

GENERAL NOTE #1.

REMOVAL OF EXISTING WALL CAP / HOOD IS BY OTHERS.

REFER TO ARCHITECTURAL PLANS FOR ADDITIONAL

INFORMATION.

EXISTING HOT WATER UNIT HEATER AND PIPING TO BE

REMOVED. REMOVE UNIT HEATER CONTROL.

7 EXISTING LAUNDRY ROOM EXHAUST FAN AND DUCT TO BE

DEMOLISHED. GENERAL CONTRACTOR SHALL BE

RESPONSIBLE FOR INFILLING OPENINGS.

8 EXISTING KITCHEN HWR TO BE DEMOLISHED.

9 EXISTING FAN COIL UNIT, DUCTWORK AND CONTROLS TO

BE DEMOLISHED.DRAFT

11 12 13

STAIR 1

UNIT 124

MECHANICAL RM

LINEN 1

CORRIDOR 1

(E)300/300

(E)400/250

(E)400/300 (E)230/305

(E)300/300

(E)300Ø

(E)400/250

(E)400/250

11 12 13

STAIR 1

UNIT 124

MECHANICAL RM

LINEN 1

CORRIDOR 1

(E)EXPANSION

TANK

(E)125

(E)25

(E)100

(E)65

(E)65

(E)150 (E)150

(E)125 (E)100

(E)150

(E)125

(E)PUMP

(E )H

W R

(E )H

W S

(E)65

(E)150

(E)40

(E)50

(E)50

(E)HWS

(E)100

TO DHW TANK

(E)20

(E)100

(E)100

(E)20

(E)32

(E)20

(E)32

(E)100 (E)25

(E)100

(E)100 (E)40

(E)40(E) HWR

(E) HWS

R

EP

A

IR

D O

R M

, B

M

IS

A

W A

A

IR

B A

SE

JA

PA

N

(Q

KK

A1

2)

FA

-1

8- F-

JU

N

E

, 2

SHEET

IDENTIFICATION

D

ES

IG

N

ED

B

Y:

D W

N B

Y:

C

KD

B

Y:

SO

LI

C

IT

AT

IO

N

N O

D

AT

E:

C O

N

TR

AC

T

N O

SU

BM

IT

TE

D

B Y:

U .S

. A

IR

F O

R C

E C

IV

IL

E N

G

IN

EE

R

C

EN

TE

R

O

TI

E R

S& H

J O

IN

T

VE

N

TU

R

E

N

. M

AY

FA

IR

R O

AD

S

U

IT

E

M

IL

W

AU

KE

E, W

I 5

A

B

C

D

1 2 3 4 5

M A

R K

D

ES

C R

IP

TI

O N

D A

TE

FINAL DESIGN

SIGNED

THIS WORK WAS PREPARED

BY ME OR UNDER MY

SUPERVISION

SHEET OF 232

PA

U

L

VA

N D

EN

BE

R G

S.

H

ER

M

EN

IN

G

KL

N

TT

W

MD403

M

EC

H

AN

IC

AL

D

EM

O

LI

TI

O

N

EN

LA

R G

ED

P

LA

N

S

0 35001500500SCALE:

MECHANICAL DEMOLITION PLAN PIPING - MECHANICAL ROOM

1:501 0 35001500500SCALE:

MECHANICAL DEMOLITION PLAN DUCTWORK - MECHANICAL ROOM

1:502

GENERAL NOTES:

1. EXISTING MECHANICAL SYSTEMS ARE TO BE

DEMOLISHED COMPLETE UNLESS NOTED OTHERWISE.

(EQUIPMENT / DUCTWORK AND ACCESSORIES /

SUPPORTS / CONTROLS / WIRING)

2. REFER TO MD402 FOR ADDITIONAL DETAIL FOR

DEMOLITION REQUIREMENTS.

3. REMOVE ALL (E)HWS & (E)HWR PIPING INCLUDING

ABOVE CEILINGS, IN ACCESSIBLE CRAWL SPACES, AND

PITS UNDER BUILDING INCLUDING VERTICAL CHASES.

CAP HWS & HWR PIPING SERVICE PIPING AT OR JUST

OUTSIDE BUILDING LINE IN ACCESSIBLE LOCATION.

REFER TO ARCHITECTURAL DRAWINGS AND

SPECIFICATIONS FOR PATCHING REQUIREMENTS.

4. COORDINATE REMOVAL AND ABATEMENT OF

ASBESTOS CONTAINING MATERIALS - REFER TO

HAZMAT PLAN SHEETS FOR ADDITIONAL DEMOLITION

NOTES.

5. CONTRACTOR IS RESPONSIBLE FOR PATCHING OF ALL

OPENINGS IN CEILINGS, WALLS AND FLOORS THAT

RESULT FROM DEMOLITION WORK, UNLESS OPENING IS

TO BE RE-USED. PATCHING OF OPENINGS OR OTHER

DAMAGE RESULTING FROM DEMO WORK TO MATCH

ADJACENT SURFACES.

6. LOCATION OF EQUIPMENT, PIPING AND DUCTWORK IS

APPROXIMATE, CONTRACTOR SHALL FIELD VERIFY.

7. COORDINATE SHUT DOWN OF EXISTING CENTRAL HOT

WATER HEATING SYSTEM, ALONG WITH POWER TO

DWELLING UNITS WITH AF BASE PRIOR TO DEMOLITION.

HWS/HWR MAIN VALVE SHALL BE SHUT-OFF, AND

SYSTEM TO BE COMPLETELY DRAINED PRIOR TO

DEMOLITION. PIPING SHALL BE CAPPED WATER-TIGHT

WHERE PIPING DEMOLITION OCCURS.

KEYNOTES

1 EXHAUST FAN TO BE DEMOLISHED.

4 EXISTING EXHAUST LOUVERS TO REMAIN FOR REUSE.

EXISTING HEAT EXCHANGER / PUMPS / PIPING / SUPPORTS /

ACCESSORIES TO BE REMOVED.

EXISTING HWS/HWR RISERS TO BE REMOVED. INFILL OF

EXISTING OPENINGS IS BY OTHERS. REFER TO

ARCHITECTURAL PLANS FOR ADDITIONAL INFORMATION.

02 03 04 05 06 07 08 09 11 12 13 14

B

C

D

E

F

14'10

S2

STAIR 2

S1

STAIR 1

UNIT 124

ST1

STORAGE 1

UNIT 119

UNIT 121

UNIT 123

LD1

LAUNDRY 1

J1

JANITOR 1

C1W

CORRIDOR 1W

LG1

DAY ROOM 1

MECHANICAL RM

LINEN 1

UNIT 114

UNIT 112

UNIT 110

UNIT 108

UNIT 113

UNIT 111

UNIT 109

UNIT 107

UNIT 105

UNIT 103

UNIT 101

UNIT 102

UNIT 104

UNIT 106

RR1

RRM 1

LOBBY

FACP ROOM

C1

CORRIDOR 1

M

ATC

H

LIN

E

M-401

M-402

M-402

M-403

M-401

M-401

M-401

M-401

M-4011

HP

HP

HP

HP

ACU

EF

EF

ACU

ACU

EF

EF

ACU

HP

HP

HP

HP

ACU

EF

EF

ACU

ACU

EF

EF

ACU

HP

HP

HP

HP

ACU

EF

EF

ACU

ACU

EF

EF

ACU

HP

HP

HP

HP

ACU

EF

EF

ACU

ACU

EF

HP

HP

HP

HP

HP

HP

HP

EUH

ACU

ACU

ACU

EF

EF

ACU

EF

EUH

EUH

EF

ACU

EF

ACU

EF

ACU

ACU100Ø

M-401

M-401

A

14 15 16 17 18 19 20

B

C

D

E

F

14'

S3

STAIR 3

UNIT 130

UNIT 128

UNIT 126

UNIT 136

UNIT 135

UNIT 134

UNIT 133

UNIT 125

UNIT 127

UNIT 129

UNIT 132

UNIT 131

C1E

CORRIDOR 1E

M

ATC

H

LIN

E

M-401

M-401

M-401

M-401

M-401

M-401

HP

HP

HP

HP

ACU

EF

EF

ACU

ACU

EF

EF

ACU

HP

HP

HP

HP

ACU

EF

EF

ACU

ACU

EF

EF

ACU

HP

HP

ACU

EF

EF

ACU

ACU

EF

EF

ACU

HP

HP

HP

EUH

ACU 100Ø

M-401

SCALE:

MECHANICAL PLAN - FIRST FLOOR

1:1001

KEYNOTES

1 HEAT PUMPS SERVE TYPICAL FOUR (4) DORM ROOMS ON

RISER UNLESS NOTED OTHERWISE. REFER TO ELEVATION

1/M-504 FOR REFRIGERANT PIPE RISER.

4 HP SERVES DORM ROOMS ON 2ND, 3RD, AND 4TH FLOORS.

REFER TO ELEVATION 1/M-504 FOR REFRIGERANT RISER.

3 HP SERVES LAUNDRY ROOMS ON 2ND, 3RD, AND 4TH

FLOORS. REFER TO ELEVATION 1/M-202 FOR REFRIGERANT

RISER.

0 700030001000

PLAN

NORTH

R

EP

A

IR

D O

R M

, B

M

IS

A

W A

A

IR

B A

SE

JA

PA

N

(Q

KK

A1

2)

FA

-1

8- F-

JU

N

E

, 2

SHEET

IDENTIFICATION

D

ES

IG

N

ED

B

Y:

D W

N B

Y:

C

KD

B

Y:

SO

LI

C

IT

AT

IO

N

N O

D

AT

E:

C O

N

TR

AC

T

N O

SU

BM

IT

TE

D

B Y:

U .S

. A

IR

F O

R C

E C

IV

IL

E N

G

IN

EE

R

C

EN

TE

R

O

TI

E R

S& H

J O

IN

T

VE

N

TU

R

E

N

. M

AY

FA

IR

R O

AD

S

U

IT

E

M

IL

W

AU

KE

E, W

I 5

A

B

C

D

1 2 3 4 5

M A

R K

D

ES

C R

IP

TI

O N

D A

TE

FINAL DESIGN

SIGNED

THIS WORK WAS PREPARED

BY ME OR UNDER MY

SUPERVISION

SHEET OF 232

PA

U

L

VA

N D

EN

BE

R G

S.

H

ER

M

EN

IN

G

KL

N

TT

W

M-101

M

EC

H

AN

IC

AL

P

LA

N

FI

R

ST

F

LO

O

R

6 STORAGE ROOMS - NO HEATING OR COOLING. NATURAL

VENTILATION USING EXISTING WALL OPENINGS.

REFER TO DETAIL 4/M-501 FOR WALL MOUNTED HEAT PUMP

INSTALLATION.

NEW OUTDOOR AIR INTAKE REFER TO 1/M-201 & 1/M-202

FOR ELEVATION. (TYPICAL)

UP THROUGH FLOOR REFER TO 1/M-102 FOR

CONTINUATION.

GENERAL NOTES:

1. LOCATION OF NEW EQUIPMENT TO BE INSTALLED SHOWN ON

DRAWINGS IS APPROXIMATE - FIELD VERIFY ALL EXISTING

CONDITIONS PRIOR TO INSTALLATION OF NEW EQUIPMENT.

2. GENERAL CONTRACTOR IS RESPONSIBLE FOR PATCHING ALL

OPENINGS IN CEILINGS, WALLS AND FLOORS THAT RESULT

FROM DEMOLITION WORK OR REMOVED EQUIPMENT, UNLESS

OPENING IS TO BE REUSED. PATCHING OF OPENINGS OR

OTHER DAMAGE IS TO MATCH ADJACENT SURFACES,

MATERIALS AND CONDITIONS.

HEAT PUMP (GRADE MOUNTED) SERVES (2) DAY ROOMS, (2)

LOUNGES, (1) FACP ROOM, AND (1) LOBBY.

02 03 04 05 06 07 08 09 11 12 13 14

B

C

D

E

F

14'10

S2

STAIR 2

S1

STAIR 1

UNIT 223

UNIT 221

UNIT 224

UNIT 222

UNIT 219

UNIT 218

ST2

STORAGE 2

C2W

CORRIDOR 2W

LG2

LOUNGE 2

LD2

LAUNDRY 2

UNIT 216

UNIT 214

UNIT 212

UNIT 210

UNIT 208

UNIT 206

UNIT 204

UNIT 202

UNIT 201

UNIT 203

UNIT 205

UNIT 207

UNIT 209

UNIT 211

UNIT 213

J2

JANITOR 2

C2

CORRIDOR 2

M

ATC

H

LIN

E

ACU

ACU

EF

ACU

M-402

M-402

M-401

ACU

EF

EF

ACU

ACU

EF

EF

ACU

ACU

EF

EF

ACU

ACU

EF

EF

ACU

ACU

EF

EF

ACU

ACU

EF

EF

ACU

ACU

EF

EF

ACU

ACU

EF

EF

ACU

ACU

EF

EF

ACU

EF

ACU

EF

ACU

EF

ACU

M-401

M-401

M-401

M-401

M-401

M-401

M-401

BDDBDD

T

T

100Ø

M-401

M-401

A

14 15 16 17 18 19 20

B

C

D

E

F

14'

S3

STAIR 3

UNIT 233

UNIT 231

UNIT 229

UNIT 227

UNIT 225

UNIT 232

UNIT 230

UNIT 228

UNIT 226

UNIT 236

UNIT 234

UNIT 235

C2E

CORRIDOR 2E

M

ATC

H

LIN

E

ACU

ACU

EF

EF

ACU

ACU

EF

EF

ACU

ACU

EF

EF

ACU

ACU

EF

EF

ACU

ACU

EF

EF

ACU

ACU

EF

EF

ACU

M-401

M-401

M-401

M-401

M-401

100Ø

M-401

M-401

SCALE:

MECHANICAL PLAN - SECOND FLOOR

1:1001

KEYNOTES

0 700030001000

R

EP

A

IR

D O

R M

, B

M

IS

A

W A

A

IR

B A

SE

JA

PA

N

(Q

KK

A1

2)

FA

-1

8- F-

JU

N

E

, 2

SHEET

IDENTIFICATION

D

ES

IG

N

ED

B

Y:

D W

N B

Y:

C

KD

B

Y:

SO

LI

C

IT

AT

IO

N

N O

D

AT

E:

C O

N

TR

AC

T

N O

SU

BM

IT

TE

D

B Y:

U .S

. A

IR

F O

R C

E C

IV

IL

E N

G

IN

EE

R

C

EN

TE

R

O

TI

E R

S& H

J O

IN

T

VE

N

TU

R

E

N

. M

AY

FA

IR

R O

AD

S

U

IT

E

M

IL

W

AU

KE

E, W

I 5

A

B

C

D

1 2 3 4 5

M A

R K

D

ES

C R

IP

TI

O N

D A

TE

FINAL DESIGN

SIGNED

THIS WORK WAS PREPARED

BY ME OR UNDER MY

SUPERVISION

SHEET OF 232

PA

U

L

VA

N D

EN

BE

R G

S.

H

ER

M

EN

IN

G

KL

N

TT

W

M-102

M

EC

H

AN

IC

AL

P

LA

N

SE

C

O N

D F

LO

O

R

NEW OUTDOOR AIR INTAKE REFER TO 1/M-201 & 1/M-202

FOR ELEVATION.

WALL OPENING AND INFILL BY GENERAL CONTRACTOR TO

ALLOW ACCESS TO INSTALL DUCT.

PLAN

NORTH

GENERAL NOTES:

1. LOCATION OF NEW EQUIPMENT TO BE INSTALLED SHOWN ON

DRAWINGS IS APPROXIMATE - FIELD VERIFY ALL EXISTING

CONDITIONS PRIOR TO INSTALLATION OF NEW EQUIPMENT.

2. GENERAL CONTRACTOR IS RESPONSIBLE FOR PATCHING ALL

OPENINGS IN CEILINGS, WALLS AND FLOORS THAT RESULT

FROM DEMOLITION WORK OR REMOVED EQUIPMENT, UNLESS

OPENING IS TO BE REUSED. PATCHING OF OPENINGS OR

OTHER DAMAGE IS TO MATCH ADJACENT SURFACES,

MATERIALS AND CONDITIONS.

INTAKE DUCT FROM DAY ROOM LG TO BE TERMINATED 1'-6"

ABOVE ROOF OF CANOPY.

EXHAUST FROM DAY ROOM TO TOILET RR1 TO TERMINATE

AT THE SAME ELEVATION AS THE KITCHEN HOOD EXHAUST.

TOILET ROOM EXHAUST FROM UNIT 119 TO TERMINATE

ABOVE DAY ROOM TOILET EXHAUST.

STORAGE ROOM - NO HEATING OR COOLING. NATURAL

VENTILATION USING EXISTING WALL OPENINGS.

02 03 04 05 06 07 08 09 11 12 13 14

B

C

D

E

F

14'10

S2

STAIR 2

S1

STAIR 1

UNIT 318

UNIT 319

UNIT 321

UNIT 323

UNIT 324

UNIT 322

LG3

LOUNGE 3

ST3

STORAGE 3

C3W

CORRIDOR 3W

LD3

LAUNDRY 3

UNIT 316

UNIT 314

UNIT 312

UNIT 310

UNIT 308

UNIT 306

UNIT 304

UNIT 302

UNIT 301

UNIT 303

UNIT 305

UNIT 307

UNIT 309

UNIT 311

UNIT 313

J3

JANITOR 3

C3

CORRIDOR 3

M

ATC

H

LIN

E

ACU

ACU

EF

ACU

M-402

M-402

M-401

ACU

EF

EF

ACU

ACU

EF

EF

ACU

ACU

EF

EF

ACU

ACU

EF

EF

ACU

ACU

EF

EF

ACU 1

ACU

EF

EF

ACU

ACU

EF

EF

ACU

ACU

EF

EF

ACU

ACU

EF

EF

ACU

EF

ACU

EF

ACU

EF

ACU

M-401

M-401

M-401

M-401

M-401

M-401

M-401

BDDBDD

T

100Ø

M-401

M-401

A

14 15 16 17 18 19 20

B

C

D

E

F

14'

S3

STAIR 3

UNIT 333

UNIT 332

UNIT 330

UNIT 331

UNIT 325

UNIT 327

UNIT 329

UNIT 328

UNIT 326

UNIT 334

UNIT 335

UNIT 336

C3E

CORRIDOR 3E

M

ATC

H

LIN

E

ACU

ACU

EF

EF

ACU

ACU

EF

EF

ACU

ACU

EF

EF

ACU

ACU

EF

EF

ACU

ACU

EF

EF

ACU

ACU

EF

EF

ACU

M-401

M-401

M-401

M-401

M-401

100Ø

M-401

M-401

SCALE:

MECHANICAL PLAN - THIRD FLOOR

1:1001 0 700030001000

R

EP

A

IR

D O

R M

, B

M

IS

A

W A

A

IR

B A

SE

JA

PA

N

(Q

KK

A1

2)

FA

-1

8- F-

JU

N

E

, 2

SHEET

IDENTIFICATION

D

ES

IG

N

ED

B

Y:

D W

N B

Y:

C

KD

B

Y:

SO

LI

C

IT

AT

IO

N

N O

D

AT

E:

C O

N

TR

AC

T

N O

SU

BM

IT

TE

D

B Y:

U .S

. A

IR

F O

R C

E C

IV

IL

E N

G

IN

EE

R

C

EN

TE

R

O

TI

E R

S& H

J O

IN

T

VE

N

TU

R

E

N

. M

AY

FA

IR

R O

AD

S

U

IT

E

M

IL

W

AU

KE

E, W

I 5

A

B

C

D

1 2 3 4 5

M A

R K

D

ES

C R

IP

TI

O N

D A

TE

FINAL DESIGN

SIGNED

THIS WORK WAS PREPARED

BY ME OR UNDER MY

SUPERVISION

SHEET OF 232

PA

U

L

VA

N D

EN

BE

R G

S.

H

ER

M

EN

IN

G

KL

N

TT

W

M-103

M

EC

H

AN

IC

AL

P

LA

N

TH

IR

D F

LO

O

R

KEYNOTES

1 NEW OUTDOOR AIR INTAKE REFER TO 1/M-201 & 1/M-202

FOR ELEVATION.

2 STORAGE ROOM - NO HEATING OR COOLING. NATURAL

VENTILATION USING EXISTING WALL OPENINGS.

PLAN

NORTH

GENERAL NOTES:

1. LOCATION OF NEW EQUIPMENT TO BE INSTALLED SHOWN ON

DRAWINGS IS APPROXIMATE - FIELD VERIFY ALL EXISTING

CONDITIONS PRIOR TO INSTALLATION OF NEW EQUIPMENT.

2. GENERAL CONTRACTOR IS RESPONSIBLE FOR PATCHING ALL

OPENINGS IN CEILINGS, WALLS AND FLOORS THAT RESULT

FROM DEMOLITION WORK OR REMOVED EQUIPMENT, UNLESS

OPENING IS TO BE REUSED. PATCHING OF OPENINGS OR

OTHER DAMAGE IS TO MATCH ADJACENT SURFACES,

MATERIALS AND CONDITIONS.

02 03 04 05 06 07 08 09 11 12 13 14

B

C

D

E

F

14'10

S2

STAIR 2

S1

STAIR 1

LG4

DAY ROOM 4

UNIT 418

UNIT 419

UNIT 423ST4

STORAGE 4

UNIT 422

UNIT 424

UNIT 416

UNIT 414

UNIT 412

UNIT 410

UNIT 408

UNIT 406

UNIT 404

UNIT 402

UNIT 401

UNIT 403

UNIT 405

UNIT 407

UNIT 409

UNIT 411

UNIT 413

LD4

LAUNDRY 4

J4

JANITOR 4

UNIT 421

C4

CORRIDOR 4

C4W

CORRIDOR 4W

RR4

RRM 4

M

ATC

H

LIN

E

M-402

M-402

M-401

M-401

M-401

M-401

M-401

M-401

M-401

M-401

M-401

M-401

ACU

ACU

EF

EF

ACU

ACU

EF

EF

ACU

ACU

EF

EF

ACU

ACU

EF

EF

ACU

ACU

EF

EF

ACU

ACU

EF

EF

ACU

ACU

ACU

ACU

ACU

ACU

EF

EF

ACU

EF

ACU

EF

ACU

ACU

EF

EF

ACU

EF

EF

EF

EF

EF

M-401

M-401

100Ø

M-401

A

14 15 16 17 18 19 20

B

C

D

E

F

14'

S3

STAIR 3

UNIT 425

UNIT 434

UNIT 426

UNIT 428

UNIT 430

UNIT 432

UNIT 427

UNIT 429

UNIT 431

UNIT 433

UNIT 435

C4E

CORRIDOR 4E

UNIT 436

M

ATC

H

LIN

E

M-401

M-401

M-401

M-401

M-401

M-401

M-401

ACU

ACU

EF

EF

ACU

ACU

EF

EF

ACU

ACU

EF

EF

ACU

ACU

EF

EF

ACU

ACU

ACU

EF

EF

ACU

ACU

EF

EF

100Ø

SCALE:

MECHANICAL PLAN - FOURTH FLOOR

1:1001 0 700030001000

R

EP

A

IR

D O

R M

, B

M

IS

A

W A

A

IR

B A

SE

JA

PA

N

(Q

KK

A1

2)

FA

-1

8- F-

JU

N

E

, 2

SHEET

IDENTIFICATION

D

ES

IG

N

ED

B

Y:

D W

N B

Y:

C

KD

B

Y:

SO

LI

C

IT

AT

IO

N

N O

D

AT

E:

C O

N

TR

AC

T

N O

SU

BM

IT

TE

D

B Y:

U .S

. A

IR

F O

R C

E C

IV

IL

E N

G

IN

EE

R

C

EN

TE

R

O

TI

E R

S& H

J O

IN

T

VE

N

TU

R

E

N

. M

AY

FA

IR

R O

AD

S

U

IT

E

M

IL

W

AU

KE

E, W

I 5

A

B

C

D

1 2 3 4 5

M A

R K

D

ES

C R

IP

TI

O N

D A

TE

FINAL DESIGN

SIGNED

THIS WORK WAS PREPARED

BY ME OR UNDER MY

SUPERVISION

SHEET OF 232

PA

U

L

VA

N D

EN

BE

R G

S.

H

ER

M

EN

IN

G

KL

N

TT

W

M-104

M

EC

H

AN

IC

AL

P

LA

N

FO

U

R

TH

F

LO

O R

KEYNOTES

1 STORAGE ROOM - NO HEATING OR COOLING. NATURAL

VENTILATION USING EXISTING WALL OPENINGS.

PLAN

NORTH

GENERAL NOTES:

1. LOCATION OF NEW EQUIPMENT TO BE INSTALLED SHOWN ON

DRAWINGS IS APPROXIMATE - FIELD VERIFY ALL EXISTING

CONDITIONS PRIOR TO INSTALLATION OF NEW EQUIPMENT.

2. GENERAL CONTRACTOR IS RESPONSIBLE FOR PATCHING ALL

OPENINGS IN CEILINGS, WALLS AND FLOORS THAT RESULT

FROM DEMOLITION WORK OR REMOVED EQUIPMENT, UNLESS

OPENING IS TO BE REUSED. PATCHING OF OPENINGS OR

OTHER DAMAGE IS TO MATCH ADJACENT SURFACES,

FLOOR 1

FLOOR 2

TO WALL

12400

01 02 03 04 05 06 07 08 09 11 12 13 14

FLOOR 3

FLOOR 4

14'

GL

-500

M

ATC

H

LIN

E

5 4(TYP.) (TYP.) (TYP.)

FLOOR 1

FLOOR 2

TO WALL

12400

14 15 16 17 18 19 20

FLOOR 3

FLOOR 4

14'

GL

-500

M

ATC

H

LIN

E

(TYP.)

6 (TYP.)

(TYP.)

SCALE:

MECHANICAL EXTERIOR ELEVATION - SOUTH

1:1001 0 700030001000

R

EP

A

IR

D O

R M

, B

M

IS

A

W A

A

IR

B A

SE

JA

PA

N

(Q

KK

A1

2)

FA

-1

8- F-

JU

N

E

, 2

SHEET

IDENTIFICATION

D

ES

IG

N

ED

B

Y:

D W

N B

Y:

C

KD

B

Y:

SO

LI

C

IT

AT

IO

N

N O

D

AT

E:

C O

N

TR

AC

T

N O

SU

BM

IT

TE

D

B Y:

U .S

. A

IR

F O

R C

E C

IV

IL

E N

G

IN

EE

R

C

EN

TE

R

O

TI

E R

S& H

J O

IN

T

VE

N

TU

R

E

N

. M

AY

FA

IR

R O

AD

S

U

IT

E

M

IL

W

AU

KE

E, W

I 5

A

B

C

D

1 2 3 4 5

M A

R K

D

ES

C R

IP

TI

O N

D A

TE

FINAL DESIGN

SIGNED

THIS WORK WAS PREPARED

BY ME OR UNDER MY

SUPERVISION

SHEET OF 232

PA

U

L

VA

N D

EN

BE

R G

S.

H

ER

M

EN

IN

G

KL

N

TT

W

M-201

M

EC

H

AN

IC

AL

E

XT

ER

IO

R E

LE

VA

TI

O

N

SO

U

TH

KEYNOTES

1 REFRIGERANT RISERS INSTALLED IN ENCLOSURE.

HEAT PUMP INSTALLED ON WALL MOUNTED BRACKET.2

3 GRADE MOUNTED HEAT PUMP. PROVIDE 6" CONCRETE PAD.

4 OUTDOOR INTAKE OPENINGS WITH HOOD. REFER TO M-401

FOR UNIT PLANS AND LOCATION OF NEW PENETRATION.

5 OUTDOOR EXHAUST OPENINGS WITH HOOD. REFER TO

M-401 FOR UNIT PLANS AND LOCATION OF NEW

PENETRATION.

6 CANOPY OVER WALL MOUNTED HEAT PUMP UNITS BY

OTHERS. REFER TO ARCHITECTURAL DRAWINGS.

GENERAL NOTES:

1. LOCATION OF NEW EQUIPMENT TO BE INSTALLED SHOWN ON

DRAWINGS IS APPROXIMATE - FIELD VERIFY ALL EXISTING

CONDITIONS PRIOR TO INSTALLATION OF NEW EQUIPMENT.

2. GENERAL CONTRACTOR IS RESPONSIBLE FOR PATCHING ALL

OPENINGS IN CEILINGS, WALLS AND FLOORS THAT RESULT

FROM DEMOLITION WORK OR REMOVED EQUIPMENT, UNLESS

OPENING IS TO BE REUSED. PATCHING OF OPENINGS OR

OTHER DAMAGE IS TO MATCH ADJACENT SURFACES,

FLOOR 1

FLOOR 2

TO WALL

12400

01020304050607080911121314

FLOOR 3

FLOOR 4

14'

GL

-500

M

ATC

H

LIN

E

FLOOR 1

FLOOR 2

TO WALL

12400

01020304050607080911121314

FLOOR 3

FLOOR 4

14'

GL

-500

M

ATC

H

LIN

E

4 5 4

(TYP.)

(TYP.)

(TYP.) (TYP.) (TYP.)

FLOOR 1

FLOOR 2

TO WALL

12400

14151617181920

FLOOR 3

FLOOR 4

14'

GL

-500

M

ATC

H

LIN

E

SCALE:

MECHANICAL EXTERIOR ELEVATION - NORTH

1:1001 0 700030001000

R

EP

A

IR

D O

R M

, B

M

IS

A

W A

A

IR

B A

SE

JA

PA

N

(Q

KK

A1

2)

FA

-1

8- F-

JU

N

E

, 2

SHEET

IDENTIFICATION

D

ES

IG

N

ED

B

Y:

D W

N B

Y:

C

KD

B

Y:

SO

LI

C

IT

AT

IO

N

N O

D

AT

E:

C O

N

TR

AC

T

N O

SU

BM

IT

TE

D

B Y:

U .S

. A

IR

F O

R C

E C

IV

IL

E N

G

IN

EE

R

C

EN

TE

R

O

TI

E R

S& H

J O

IN

T

VE

N

TU

R

E

N

. M

AY

FA

IR

R O

AD

S

U

IT

E

M

IL

W

AU

KE

E, W

I 5

A

B

C

D

1 2 3 4 5

M A

R K

D

ES

C R

IP

TI

O N

D A

TE

FINAL DESIGN

SIGNED

THIS WORK WAS PREPARED

BY ME OR UNDER MY

SUPERVISION

SHEET OF 232

PA

U

L

VA

N D

EN

BE

R G

S.

H

ER

M

EN

IN

G

KL

N

TT

W

M-202

M

EC

H

AN

IC

AL

E

XT

ER

IO

R E

LE

VA

TI

O

N

N O

R

TH

KEYNOTES

1 REFRIGERANT RISERS INSTALLED IN ENCLOSURE.

HEAT PUMP INSTALLED ON WALL MOUNTED BRACKET.2

3 GRADE MOUNTED HEAT PUMP. PROVIDE 6" CONCRETE PAD.

4 OUTDOOR INTAKE OPENINGS WITH HOOD. REFER TO M-401

FOR UNIT PLANS AND LOCATION OF NEW PENETRATION.

5 OUTDOOR EXHAUST OPENINGS WITH HOOD. REFER TO

M-401 FOR UNIT PLANS AND LOCATION OF NEW

PENETRATION.

6 CANOPY OVER WALL MOUNTED HEAT PUMP UNITS BY

OTHERS. REFER TO ARCHITECTURAL DRAWINGS.

GENERAL NOTES:

1. LOCATION OF NEW EQUIPMENT TO BE INSTALLED SHOWN ON

DRAWINGS IS APPROXIMATE - FIELD VERIFY ALL EXISTING

CONDITIONS PRIOR TO INSTALLATION OF NEW EQUIPMENT.

2. GENERAL CONTRACTOR IS RESPONSIBLE FOR PATCHING ALL

OPENINGS IN CEILINGS, WALLS AND FLOORS THAT RESULT

FROM DEMOLITION WORK OR REMOVED EQUIPMENT, UNLESS

OPENING IS TO BE REUSED. PATCHING OF OPENINGS OR

OTHER DAMAGE IS TO MATCH ADJACENT SURFACES,

MATERIALS AND CONDITIONS.

7 DRYER VENT WALL OPENING.

UNIT 107

UNIT 105

T

ACU-1

ACU

R P

EF

T

ACU-1

ACU

R P

EF

6.35 (RL)

12.7 (RS)

6.35 (RL)

12.7 (RS)

C D C D

25mm25mm

UNIT 135

T

ACU-1

ACU

EF

C D

100Ø

EUH

HP

RP

6.35 (RL)

12.7 (RS)

HP

25mm

UNIT 405

UNIT 407

T

ACU-1

ACU

R P

EF

T

ACU-1

ACU

R P

EF

1 1

6.35 (RL)

12.7 (RS)

6.35 (RL)

12.7 (RS)

150Ø150Ø

100Ø100Ø

CD CD

25mm25mm

UNIT 433

UNIT 435

T

ACU-1

ACU

EF

EF

6.35 (RL)

12.7 (RS)

RP

150Ø

CD

25mm (TYP)

150Ø150Ø

SCALE:

MECHANICAL PLAN - TYPICAL 1ST, 2ND, & 3RD FLOOR UNITS

1:501

GENERAL NOTES:

8. REFER TO DRAWING 1/M-201 & 1/M-202 ELEVATION FOR

LOCATION OF EXHAUST AND OUTDOOR AIR INTAKE

OPENINGS.

KEYNOTES

1 REFER TO DETAIL 2/M-501 FOR EXHAUST AND OUTDOOR AIR

TERMINATION DETAIL. BALANCE OUTDOOR AIR FLOW TO 24

LPS.

2 EF-1 INTERLOCKED WITH LIGHT SWITCH. MAKE-UP AIR FOR

EF-1 IS SUPPLIED FROM ACU-1 AND TRANSFERED THROUGH

THE DOOR UNDERCUT IN THE BATHROOM DOOR.

3 38 mm COOLING COIL CONDENSATE RISER FROM ABOVE

4TH FLOOR CEILING TO ABOVE 1ST FLOOR SLAB. RISER

WILL DISCHARGE TO EXTERIOR PER DETAIL 4/M-502.

0 35001500500 0 35001500500SCALE:

MECHANICAL PLAN - TYPICAL 1ST, 2ND, & 3RD FLOOR CORNER UNITS

1:502

SCALE:

MECHANICAL PLAN - 4TH FLOOR TYPICAL UNITS

1:503 0 35001500500 0 35001500500SCALE:

MECHANICAL PLAN - 4TH FLOOR TYPICAL CORNER UNITS

1:504

R

EP

A

IR

D O

R M

, B

M

IS

A

W A

A

IR

B A

SE

JA

PA

N

(Q

KK

A1

2)

FA

-1

8- F-

JU

N

E

, 2

SHEET

IDENTIFICATION

D

ES

IG

N

ED

B

Y:

D W

N B

Y:

C

KD

B

Y:

SO

LI

C

IT

AT

IO

N

N O

D

AT

E:

C O

N

TR

AC

T

N O

SU

BM

IT

TE

D

B Y:

U .S

. A

IR

F O

R C

E C

IV

IL

E N

G

IN

EE

R

C

EN

TE

R

O

TI

E R

S& H

J O

IN

T

VE

N

TU

R

E

N

. M

AY

FA

IR

R O

AD

S

U

IT

E

M

IL

W

AU

KE

E, W

I 5

A

B

C

D

1 2 3 4 5

M A

R K

D

ES

C R

IP

TI

O N

D A

TE

FINAL DESIGN

SIGNED

THIS WORK WAS PREPARED

BY ME OR UNDER MY

SUPERVISION

SHEET OF 232

PA

U

L

VA

N D

EN

BE

R G

S.

H

ER

M

EN

IN

G

KL

N

TT

W

M-401

M

EC

H

AN

IC

AL

P

LA

N

TY

PI

C

AL

U N

IT

S

1. PROVIDE NEW HEAT PUMP AIR COOLED CONDENSING UNIT AS

SHOWN. PROVIDE CLEAR SPACE AROUND UNIT PER

MANUFACTURER'S INSTRUCTIONS. PROVIDE FINGER-PROOF

SAFETY GRILLE AT HEAT PUMP. WIRE TO NEW EMCS SYSTEM.

2. PROVIDE ALL NECESSARY PIPING, WIRING, DDC CONTROLS

AND SUPPORTS FOR INDOOR HEAT PUMPS AS RECOMMENDED

BY EQUIPMENT MANUFACTURER.

3. NEW THERMOSTATS SHALL BE INSTALLED AT LOCATION OF

PREVIOUS THERMOSTAT AND WIRED THRU EXISTING CONDUIT.

4. ROUTE RP AND CD IN EXTERIOR PRE-MANUFACTURED

PLASTIC ENCLOSURE WHERE PIPING IS SHOWN ON BUILDING

EXTERIOR WITHIN BALCONIES. REFER TO ARCHITECTURAL

DRAWINGS FOR EXACT LOCATION.

5. PROVIDE HEAT PUMPS WITH INTEGRAL CONDENSATE PUMP.

PITCH ALL CONDENSATE PIPING TOWARDS TERMINATION

POINT AT EXISTING FLOOR DRAIN IN CORNER OF BALCONY. DO

NOT DISCHARGE CONDENSATE ON OPPOSITE SIDE OF

EXISTING FLOOR DRAIN WHERE FLOOR PITCHES TO DRAIN.

6. NO REFRIGERANT TUBE SEAMS OR COUPLINGS SHALL BE

ALLOWED TO BE CONCEALED ABOVE EXISTING DRYWALL

CEILINGS, OR IN NEW VERTICAL CHASES. ALL BREAKS IN

REFRIGERANT PIPING SHALL BE ACCESSIBLE AT DX

EQUIPMENT, OR AT NEW OR EXISTING ACCESS PANELS.

7. ACCESS PANELS SHOWN ON THIS PLAN FOR REFERENCE.

COORDINATE EXACT LOCATION WITH ACTUAL EQUIPMENT

ACCESS, ALONG WITH ADJACENT CEILING-MOUNTED DEVICES.

REFER TO ARCHITECTURAL PLANS FOR SCOPE OF WORK.

4 SEE TYPICAL REFRIGERANT PIPING RISER.

LG1

DAY ROOM 1

RR1

RRM 1

LOBBY

FACP ROOM

C1

EF

ACU

ACU

R P

RP

R P

150Ø

150Ø

25mm

CDCD

ACU

T

T

150Ø

STORAGE 2LG2

LOUNGE 2

R P

ACU

150Ø

CD 2

EF

EF

175Ø

175Ø

BDDBDD

T

LD1

LAUNDRY 1

J1

JANITOR 1

CORRIDOR 1

ACU

EF

RP

TG

TG

150Ø

600/150

25mmCD

T

150Ø

150Ø

250Ø

M-503

LD2

LAUNDRY 2

J2

JANITOR 2

CORRIDOR 2

ACU

EF

RP

TG

TG

600/150

2 4

25mmCD

150Ø

T

150Ø

250Ø

M-503

LG4

DAY ROOM 4

RR4

RRM 4

EF

ACU

R P

150Ø

150Ø

CD

T

STORAGE 2LG2

LOUNGE 2

R P

ACU

150Ø

CD 2

EF

EF

175Ø

175Ø

BDDBDD

T

SCALE:

MECHANICAL PLAN - 1ST FLOOR LOUNGE

1:503

KEYNOTES

0 35001500500

0 35001500500SCALE:

MECHANICAL PLAN - 2ND FLOOR LOUNGE

1:504

SCALE:

MECHANICAL PLAN - 2ND, 3RD, AND 4TH FLOOR LAUNDRY

1:502 0 35001500500

R

EP

A

IR

D O

R M

, B

M

IS

A

W A

A

IR

B A

SE

JA

PA

N

(Q

KK

A1

2)

FA

-1

8- F-

JU

N

E

, 2

SHEET

IDENTIFICATION

D

ES

IG

N

ED

B

Y:

D W

N B

Y:

C

KD

B

Y:

SO

LI

C

IT

AT

IO

N

N O

D

AT

E:

C O

N

TR

AC

T

N O

SU

BM

IT

TE

D

B Y:

U .S

. A

IR

F O

R C

E C

IV

IL

E N

G

IN

EE

R

C

EN

TE

R

O

TI

E R

S& H

J O

IN

T

VE

N

TU

R

E

N

. M

AY

FA

IR

R O

AD

S

U

IT

E

M

IL

W

AU

KE

E, W

I 5

A

B

C

D

1 2 3 4 5

M A

R K

D

ES

C R

IP

TI

O N

D A

TE

FINAL DESIGN

SIGNED

THIS WORK WAS PREPARED

BY ME OR UNDER MY

SUPERVISION

SHEET OF 232

PA

U

L

VA

N D

EN

BE

R G

S.

H

ER

M

EN

IN

G

KL

N

TT

W

M-402

M

EC

H

AN

IC

AL

E N

LA

R

G

ED

P

LA

N S

0 35001500500SCALE:

MECHANICAL PLAN - 1ST FLOOR LAUNDRY

1:501

0 35001500500SCALE:

MECHANICAL PLAN - 4TH FLOOR LOUNGE

1:505

OUTDOOR AIR NOT REQUIRED FOR LOBBY OR FACP ROOM.

REFER TO 2/M-502 FOR ELEVATION OF DRYER DUCT AND

LINT TRAP INSTALLATION.

EXISTING EXHAUST WALL OPENINGS TO BE REUSED.3

NEW INTAKE/EXHAUST AIR…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .