This pre-solicitation notice is for a firm-fixed price construction contract to renovate Dormitory Building 542 at Misawa Air Base in Japan. The contractor shall provide supervision, management, labor, equipment and materials to complete interior demolition, hazardous material abatement, structural and architectural improvements, new building systems and finishes. Work includes upgrading electrical, plumbing and HVAC systems along with telecommunications, fire alarm and suppression. The performance period is 531 calendar days with a 30 day mobilization period. The contract value is estimated between $10 million to $25 million USD. The solicitation will issue on January 31, 2022 with proposals due around 40 days later. A pre-proposal conference is scheduled for February 25, 2022 to review requirements. The award will be made to the offeror providing the best value based on past performance and price using a tradeoff process. Registration in SAM is required and the contractor must be authorized to operate in Japan. The point of contact is Mr. Akito Miura for acquisition questions.
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DUCTWORK SYMBOLS
SUPPLY DUCT (UP & DOWN)
CEILING DIFFUSERS - CONNECT TO AUX SUPPLY
RETURN/EXHAUST DUCT (UP & DOWN)
STANDARD RADIUS ELBOW (LONG RADIUS)
NEW DUCT (INSIDE DIMENSIONS: WIDTH x DEPTH)
MANUAL VOLUME DAMPER
FLEXIBLE DUCTWORK (INSULATED)
RETURN, NO SPLITTER (45° TAP)
STANDARD BRANCH SUPPLY OR
BFP BACKFLOW PREVENTER
BHP BRAKE HORSEPOWER
BDD GRAVITY OPERATED DAMPER
BTU BRITISH THERMAL UNIT
BTUH BRITISH THERMAL UNIT PER HOUR
C CONVECTOR
CC COOLING COIL
CCD COOLING COIL CONDENSATE DRAIN
CD CEILING DIFFUSER
CENT CENTRIFUGAL
CFH CUBIC FEET PER HOUR
CFM CUBIC FEET PER MINUTE
CFT CUBIC FEET
CI CAST IRON
COP COEFFICIENT OF PERFORMANCE
COMP COMPRESSOR
CP CONDENSATE PUMP
CUH CABINET UNIT HEATER
CV CONSTANT VOLUME
CW COLD WATER (POTABLE)
EA EXHAUST AIR
EAT ENTERING AIR TEMPERATURE
EER ENERGY EFFICIENCY RATIO
EF EXHAUST FAN
EG EXHAUST GRILLE
EH EXHAUST HOOD
ENT ENTERING
EOD ELECTRICALLY OPERATED DAMPER
ERU ENERGY RECOVERY UNIT
ESP EXTERNAL STATIC PRESSURE
ET EXPANSION TANK
EIH ELECTRIC INFRARED HEATER
ETR EXISTING TO REMAIN
EUH ELECTRIC UNIT HEATER
EWT ENTERING WATER TEMPERATURE
CONTROLS SYMBOLS
A/E ARCHITECT / ENGINEER
AAHX AIR TO AIR HEAT EXCHANGER
AC AIR CONDITIONING UNIT
AD ACCESS DOOR
AFF ABOVE FINISHED FLOOR
AHU AIR-HANDLING UNIT
AMP AMPERGE
AP ACCESS PANEL
APD AIR PRESSURE DROP
ARI AIR CONDITIONING AND REFRIGERATION INSTITUTE
AS AIR SEPARATOR
ASME AMERICAN SOCIETY OF MECHANICAL ENGINEERS
THERMOSTAT
F FAHRENHEIT
F&T FLOAT AND THERMOSTATIC
FSD COMBINATION FIRE SMOKE DAMPER
FA FREE AREA
FC FLEXIBLE CONNECTION
FCU FAN COIL UNIT
FD FLOOR DRAIN
F FIRE DAMPER
FF FINAL FILTER
FG FILTER GRILLE
FM FLOW METER
FPM FEET PER MINUTE
FPS FEET PER SECOND
FS FLOW SWITCH
FSTAT FREEZESTAT
G NATURAL GAS
GA GAUGE
GAL GALLONS
GPD GALLONS PER DAY
GPH GALLONS PER HOUR
GPM GALLONS PER MINUTE
GS GALVANIZED STEEL
HC HEATING COIL
HD HEAD
HGBP REFRIGERANT HOT GAS BYBASS
HP HEAT PUMP
HP HORSEPOWER
HPR HIGH PRESSURE RETURN (STEAM CONDENSATE)
HPS HIGH PRESSURE SUPPLY (STEAM)
HSTAT HUMIDISTAT
HW HOT WATER
HWSX EXISTING HOT WATER SUPPLY PIPING
HWRX EXISTING HOT WATER RETURN PIPING
HX HEAT EXCHANGER
HZ HERTZ
D DAMPER - AUTOMATIC
DB DECIBELS
Db DRY-BULB TEMPERATURE
DDC DIRECT DIGITAL CONTROLS
DEG DEGREE
DG DOOR GRILLE
DIA DIAMETER
DN DOWN
DP DEW POINT TEMPERATURE
DUC DOOR UNDERCUT
DWH DOMESTIC WATER HEATER
DX DIRECT EXPANSION
OA OUTSIDE AIR
OD OUTSIDE DIAMETER
NA NOT APPLICABLE
NC NOISE CRITERIA
NC NORMALLY CLOSED
NO NORMALLY OPEN
NPLV NON-STANDARD PART LOAD VALUE
NPSH NET POSITIVE SUCTION HEAD
NTS NOT TO SCALE
MAT MIXED AIR TEMPERATURE
MAU MAKE-UP AIR UNIT
MAX MAXIMUM
MBH 1000 BTUH
MCA MINIMUM BRANCH CIRCUIT AMPACITY
MD MOTORIZED DAMPER
MERV MINIMUM EFFICIENCY REPORTING VALUE
MIN MINIMUM
MOP MAX OVERCURRENT PROTECTION
M.C. MECHANICAL CONTRACTOR
L LOUVER
LAT LEAVING AIR TEMPERATURE
LBS/HR POUNDS PER HOUR
LF LINEAR FOOT (FEET)
LPR LOW PRESSURE RETURN (STEAM CONDENSATE)
LPS LOW PRESSURE STEAM
LWT LEAVING WATER TEMPERATURE
kW KILOWATT kWh KILOWATT HOUR
I/O INPUT/OUTPUT
IAQ INDOOR AIR QUALITY
ID INSIDE DIAMETER
IFB INTEGRAL FACE AND BYPASS
IH INTAKE HOOD
IN INCHES
IN HG INCHES OF MERCURY
IN WC INCH WATER COLUMN
IN WG INCH WATER GAUGE
IN-LB INCH-POUND
IPLV INTERGRATED PART LOAD VALUE
T TRANSFER GRILLE
TAB TESTING, ADJUSTING, BALANCE
TCP TEMPERATURE CONTROL PANEL
TD TEMPERATURE DIFFERENCE
TG TRANSFER GRILLE
TSP TOTAL STATIC PRESSURE
TSTAT THERMOSTAT
SA SUPPLY AIR
SAT SUPPLY AIR TEMPERATURE
SC SHADING COEFFICIENT
SCFM STANDARD CUBIC FEET PER MINUTE
SD SMOKE DETECTOR
SD SLOT DIFFUSER
SF SUPPLY FAN
SG SUPPLY AIR GRILLE
SHC STEAM HEATING COIL
SI SQUARE INCHES
SP STATIC PRESSURE
SQ FT SQUARE FOOT (FEET)
SS STAINLESS STEEL
ST STEAM TRAP
SUH STEAM UNIT HEATER
SWHX STEAM TO WATER HEAT EXCHANGER
R RETURN
RA RETURN AIR
RF RETURN FAN
RG RETURN GRILLE
RH ROOF HOOD
RHC REHEAT COIL
RHG REFRIGERANT HOT GAS
RL REFRIGERANT LIQUID LINE
RLA RUN LOAD AMPERE
RPM REVOLUTIONS PER MINUTE
RS REFRIGERANT SUCTION (GAS)
RTU ROOF TOP UNIT
P PUMP
PC PUMPED CONDENSATE
PCF POUNDS PER CUBIC FOOT (FEET)
PD PRESSURE DROP
PG PRESSURE GAGE
POC POINT OF CONNECTION
PPM PARTS PER MILLION
PRV PRESSURE REGULATING VALVE
PSI POUNDS PER SQUARE INCH
PSIA POUNDS PER SQUARE INCH – ABSOLUTE
PSIG POUNDS PER SQUARE INCH – GAGE
PTAC PACKAGED TERMINAL AIR CONDITIONER
ABBREVIATIONS
UH UNIT HEATER
UV UNIT VENTILATOR
(E) EXISTING EQUIPMENT (WHEN FOLLOWED BY
EQUIPMENT ABBREVIATION)
GENERAL PIPING SYMBOLS
SIDE CONNECTION
BOTTOM CONNECTION, 45° OR 90°
TOP CONNECTION, 45° OR 90°
RISE OR DROP IN PIPE
CAPPED OUTLET
PIPE UP
PIPE DOWN
PIPING FLEXIBLE CONNECTION
EXISTING HOT WATER SUPPLY PIPING
EXISTING HOT WATER RETURN PIPING
DUCTWORK TO BE DEMOLISHED
PIPING TO BE DEMOLISHED
VENT PIPING
COOLING COIL CONDENSATE PIPING
REFRIGERANT PIPING
GENERAL SYMBOLS
AC
X CEILING CASSETTE AC UNIT (4-WAY)
CEILING ACCESS PANEL
KNOCKOUT AT CASSETTE UNIT WHERE SHOWN ON PLANS
SINGLE DIRECTIONAL CEILING AC
UNITAC
X
AIR DEVICE TAG
BDD
GRAVITY OPERATED DAMPER
EXISTING EQUIPMENT TO BE DEMOLISHED
POINT OF EXTENTS OF DEMOLITION
AND EXISTING WORK
POINT OF CONNECTION BETWEEN NEW
EXHAUST VENT WITH INTEGRAL
GRAVITY OPERATED DAMPER
FIRE DAMPER
AUTOMATIC DAMPER
EXISTING LOW PRESSURE STEAM
EXISTING HIGH PRESSURE STEAM
EXISTING HIGH PRESSURE CONDENSATE STEAM RETURN
EXISTING LOW PRESSURE CONDENSATE STEAM RETURN
NOTES
1. REFER TO ELECTRICAL FLOOR PLANS FOR ELECTRICAL SERVICES LOCATIONS. FIELD VERIFY
ALL EXISTING ELECTRICAL EQUIPMENT LOCATIONS.
GENERAL NOTES
1. REFER TO DRAWING M-504 FOR REFRIGERANT CAPACITY PER SYSTEM RISER.
2. CONFORM TO ALL REQUIREMENTS OF THE BUILDING AND MECHANICAL CODES, US AIR
FORCE BASE AGENCIES HAVING JURISDICTION, AND OTHER APPLICABLE REGULATIONS FOR
THE PROJECT.
3. CONTRACTOR SHALL VERIFY ALL FIELD CONDITIONS PRIOR TO BID AND CONSTRUCTION.
4. COORDINATE ALL WORK WITH OTHER TRADES TO AVOID INTERFERENCE AND DELAYS.
5. PROVIDE ACCESS PANELS FOR ALL ITEMS UNDER THIS SECTION REQUIRING SERVICING,
INSPECTION, MAINTENANCE AND ADJUSTMENT.
6. THE PHASING OF WORK SHALL BE COORDINATED WITH UTILITY AGENCY TO IDENTIFY THE
CENTRAL PIPING LOOP TO BE TAKEN OUT OF SERVICE, AND TO MINIMIZE ANY DOWN TIME
TO UNITS NOT ASSOCIATED WITH THIS PROJECT.
7. CONTRACTOR SHALL OBTAIN ALL NECESSARY INFORMATION FROM THE UTILITY AGENCY
TO MAKE ALL FINAL EQUIPMENT CONNECTIONS. FINAL CONNECTIONS SHALL INCLUDE BUT
NOT BE LIMITED TO HOT AND COLD WATER SHUTOFF VALVES, P-TRAPS, VACUUM BREAKERS,
UNIONS, WASTE AND INDIRECT WASTE CONNECTIONS, REGULATORS, ETC.
8. OMISSIONS: IT IS THE INTENT OF THE PLANS AND SPECIFICATIONS TO PROVIDE A COMPLETE
INSTALLATION. SHOULD THERE BE OMISSIONS, THE CONTRACTOR SHALL CALL THE
ATTENTION OF THE CONTRACTING OFFICER TO SUCH OMISSIONS TEN (10) DAYS IN ADVANCE
OF THE DATE OF BID OPENING SO THAT THE NECESSARY CORRECTIONS CAN BE MADE.
9. THE INSTALLATION SHALL CONFORM TO THE LATEST APPLICABLE INDUSTRY STANDARDS
UNLESS SPECIFICALLY NOTED OTHERWISE.
10. ADDITIONAL WORK: THE DESIGN IS BASED ON EQUIPMENT AS DESCRIBED IN THE DRAWINGS.
ANY CHANGE IN ELECTRICAL, WIRING, CONDUIT, CONNECTIONS, PIPING, CONTROLS, AND
OPENINGS REQUIRED BY ALTERNATE EQUIPMENT SPECIFIED AND SUBMITTED AND
APPROVED SHALL BE PAID FOR BY THIS CONTRACTOR.
11. PRODUCT DELIVERY, STORAGE AND HANDLING: FURNISH NEW FIXTURES, MATERIALS AND
ACCESSORIES BEARING THE MANUFACTURER IDENTIFICATION. COORDINATE DELIVERIES
TO AVOID INTERFERENCE OF CONSTRUCTION DELAYS. PROTECT PRODUCTS DURING
DELIVERY, STORAGE, INSTALLATIONS, AND THE REMAINDER OF THE CONSTRUCTION PERIOD
AFTER INSTALLATION.
12. EXISTING EQUIPMENT, DUCTWORK, AND PIPING IS LOCATED ABOVE EXISTING CEILINGS
UNLESS OTHERWISE NOTED.
INSTALLATION:
1. PREPARATION: VISIT THE WORK SITE AND BECOME FULLY AWARE OF ALL EXISTING
CONDITIONS. INVESTIGATE THE CONTRACT DOCUMENTS AND MAKE PROPER PROVISIONS
TO AVOID INTERFERENCE OR CONSTRUCTION DELAYS. FURNISH OTHER TRADES WITH
INFORMATION TO PROPERLY LOCATE AND SIZE OPENINGS IN THE STRUCTURE REQUIRED
FOR THIS WORK. FURNISH ANCHOR BOLTS, SLEEVES, INSERTS AND SUPPORT REQUIRED
FOR THIS WORK.
2. INSTALLATION: PERFORM WORK USING PERSONNEL SKILLED IN THE TRADE INVOLVED.
PROVIDE COMPETENT SUPERVISION. FURNISH NEW MATERIALS, AND ACCESSORIES
BEARING THE MANUFACTURER'S IDENTIFICATION, AND CONFORMING TO THE RECOGNIZED
COMMERCIAL STANDARDS.
3. FIELD QUALITY CONTROL: TEST SYSTEMS IN ACCORDANCE WITH APPLICABLE STANDARDS,
CODES AND MANUFACTURER'S RECOMMENDATIONS. PERFORM TESTS IN THE PRESENCE
OF GOVERNMENT REPRESENTATIVE.
4. BALANCING, ADJUSTMENT AND CLEANING: CLEAN UP WORK AREAS AND FIXTURES. ADJUST
SYSTEM FOR PROPER OPERATION, READY FOR USE. TOUCH UP WITH MATCHING PAINT ALL
DAMAGED FACTORY FINISHES.
5. CLEANING AND ADJUSTING: AT THE COMPLETION OF THE WORK, ALL PARTS OF THE
INSTALLATION SHALL BE THOROUGHLY CLEANED. PIPE, VALVES, AND FITTINGS SHALL BE
CLEANSED OF GREASE, METAL CUTTINGS, AND SLUDGE THAT MAY HAVE ACCUMULATED BY
OPERATION OF THE SYSTEM FOR TESTING ANY STOPPAGE OR DISCOLORATION OR OTHER
DAMAGE TO PARTS OF THE BUILDING, ITS FINISH, OR FURNISHING. FAILURE TO PROPERLY
CLEAN THE PIPING SYSTEM DUE TO THE CONTRACTOR SHALL BE REPAIRED BY THE
CONTRACTOR WITHOUT COST TO THE OWNER.
SG-3
AIR DEVICE TAG
AIRFLOW (CMM)
DOOR UNDERCUTU
R
EP
A
IR
D O
R M
, B
M
IS
A
W A
A
IR
B A
SE
JA
PA
N
(Q
KK
A1
2)
FA
-1
8- F-
JU
N
E
, 2
SHEET
IDENTIFICATION
D
ES
IG
N
ED
B
Y:
D W
N B
Y:
C
KD
B
Y:
SO
LI
C
IT
AT
IO
N
N O
D
AT
E:
C O
N
TR
AC
T
N O
SU
BM
IT
TE
D
B Y:
U .S
. A
IR
F O
R C
E C
IV
IL
E N
G
IN
EE
R
C
EN
TE
R
O
TI
E R
S& H
J O
IN
T
VE
N
TU
R
E
N
. M
AY
FA
IR
R O
AD
S
U
IT
E
M
IL
W
AU
KE
E, W
I 5
A
B
C
D
1 2 3 4 5
M A
R K
D
ES
C R
IP
TI
O N
D A
TE
FINAL DESIGN
SIGNED
THIS WORK WAS PREPARED
BY ME OR UNDER MY
SUPERVISION
SHEET OF 232
PA
U
L
VA
N D
EN
BE
R G
S.
H
ER
M
EN
IN
G
KL
N
TT
W
M-001
G
EN
ER
AL
N O
TE
S, S
YM
BO
LS
A N
D A
BB
R
EV
IA
TI
O
N S
DRAFT
AutoCAD SHX Text
DN
AutoCAD SHX Text
UP
AutoCAD SHX Text
DN
AutoCAD SHX Text
UP
AutoCAD SHX Text 10/8
AutoCAD SHX Text 45%%d
AutoCAD SHX Text T
AutoCAD SHX Text
UNION
AutoCAD SHX Text
(E)HWS
AutoCAD SHX Text
(E)HWR
AutoCAD SHX Text V
AutoCAD SHX Text
CD
AutoCAD SHX Text
RP
AutoCAD SHX Text
BDD
AutoCAD SHX Text
(E)LPS
AutoCAD SHX Text
(E)HPS
AutoCAD SHX Text
(E)HPR
AutoCAD SHX Text
(E)LRP
A
02 03 04 05 06 07 08 09 11 12 13 14
B
C
D
E
F
14'10
STAIR 2
STAIR 1
UNIT 124STORAGE 1
UNIT 119 UNIT 121 UNIT 123
LAUNDRY 1
JANITOR 1
CORRIDOR 1W
DAY ROOM 1
MECHANICAL RM
LINEN 1
UNIT 114UNIT 112UNIT 110UNIT 108
UNIT 113UNIT 111UNIT 109UNIT 107UNIT 105UNIT 103UNIT 101
UNIT 102 UNIT 104 UNIT 106
RRM 1
LOBBY
CORRIDOR 1
OFFICE
M
ATC
H
LIN
E
(E) HWS
(E)40 (E)50
(E)40 (E)40 (E)40
(E)40 (E)40 (E)40(E)65 (E)80 (E)80 (E)100
(E)32 (E)100
(E)20
(E)25
(E)100 (E)32 (E)40
(E)40 (E)100(E) HWS (E) HWR
(E) HWS
MD401
MD401
MD402
MD401
MD401
MD401
MD401
MD401
MD401
MD401
MD401
MD402
MD403
MD403
MD401
A
14 15 16 17 18 19 20
B
C
D
E
F
14'
STAIR 3
UNIT 130UNIT 128UNIT 126 UNIT 136
UNIT 135
UNIT 134
UNIT 133UNIT 125 UNIT 127 UNIT 129
UNIT 132
UNIT 131
CORRIDOR 1E
M
ATC
H
LIN
E
(E) HWS
(E)100
(E)40
(E)40
(E)80
(E)80
(E)40
(E)40 (E)50
(E)65
(E)40
(E)40
(E) HWS
MD401
MD401
MD401
MD401
MD401
MD401
SCALE:
MECHANICAL DEMOLITION PLAN - FIRST FLOOR
1:1001
GENERAL NOTES:
1. REFER TO ENLARGED PLANS FOR PIPE DEMOLITION
REQUIRED IN INDIVIDUAL SPACES.
2. EXISTING MECHANICAL SYSTEMS ARE TO BE
DEMOLISHED COMPLETE UNLESS NOTED OTHERWISE.
(EQUIPMENT / DUCTWORK AND ACCESSORIES /
SUPPORTS / CONTROLS / WIRING)
3. REFER TO MD402 / MD403 FOR ADDITIONAL DETAIL FOR
DEMOLITION REQUIREMENTS.
4. REMOVE ALL (E)HWS & (E)HWR PIPING INCLUDING
ABOVE CEILINGS, IN ACCESSIBLE CRAWL SPACES, AND
PITS UNDER BUILDING INCLUDING VERTICAL CHASES.
CAP HWS & HWR PIPING SERVICE PIPING AT OR JUST
OUTSIDE BUILDING LINE IN ACCESSIBLE LOCATION.
REFER TO ARCHITECTURAL DRAWINGS AND
SPECIFICATIONS FOR PATCHING REQUIREMENTS.
5. COORDINATE REMOVAL AND ABATEMENT OF
ASBESTOS CONTAINING MATERIALS - REFER TO
HAZMAT PLAN SHEETS FOR ADDITIONAL DEMOLITION
NOTES.
6. CONTRACTOR IS RESPONSIBLE FOR PATCHING OF ALL
OPENINGS IN CEILINGS, WALLS AND FLOORS THAT
RESULT FROM DEMOLITION WORK, UNLESS OPENING IS
TO BE RE-USED. PATCHING OF OPENINGS OR OTHER
DAMAGE RESULTING FROM DEMO WORK TO MATCH
ADJACENT SURFACES.
7. LOCATION OF EQUIPMENT, PIPING AND DUCTWORK IS
APPROXIMATE, CONTRACTOR SHALL FIELD VERIFY.
8. COORDINATE SHUT DOWN OF EXISTING CENTRAL HOT
WATER HEATING SYSTEM, ALONG WITH POWER TO
DWELLING UNITS WITH AF BASE PRIOR TO DEMOLITION.
HWS/HWR MAIN VALVE SHALL BE SHUT-OFF, AND
SYSTEM TO BE COMPLETELY DRAINED PRIOR TO
DEMOLITION. PIPING SHALL BE CAPPED WATER-TIGHT
WHERE PIPING DEMOLITION OCCURS.
KEYNOTES
0 700030001000
R
EP
A
IR
D O
R M
, B
M
IS
A
W A
A
IR
B A
SE
JA
PA
N
(Q
KK
A1
2)
FA
-1
8- F-
JU
N
E
, 2
SHEET
IDENTIFICATION
D
ES
IG
N
ED
B
Y:
D W
N B
Y:
C
KD
B
Y:
SO
LI
C
IT
AT
IO
N
N O
D
AT
E:
C O
N
TR
AC
T
N O
SU
BM
IT
TE
D
B Y:
U .S
. A
IR
F O
R C
E C
IV
IL
E N
G
IN
EE
R
C
EN
TE
R
O
TI
E R
S& H
J O
IN
T
VE
N
TU
R
E
N
. M
AY
FA
IR
R O
AD
S
U
IT
E
M
IL
W
AU
KE
E, W
I 5
A
B
C
D
1 2 3 4 5
M A
R K
D
ES
C R
IP
TI
O N
D A
TE
FINAL DESIGN
SIGNED
THIS WORK WAS PREPARED
BY ME OR UNDER MY
SUPERVISION
SHEET OF 232
PA
U
L
VA
N D
EN
BE
R G
S.
H
ER
M
EN
IN
G
KL
N
TT
W
MD101
M
EC
H
AN
IC
AL
D
EM
O
LI
TI
O
N P
LA
N
FI
R
ST
F
LO
O R
REMOVE EXISTING HOT WATER SUPPLY HORIZONTAL MAIN.
PLAN
NORTH
DRAFT
02 03 04 05 06 07 08 09 11 12 13 14
B
C
D
E
F
14'10
STAIR 2
STAIR 1
UNIT 223UNIT 221
UNIT 224UNIT 222
UNIT 219
UNIT 218
STORAGE 2
CORRIDOR 2W
LOUNGE 2
LAUNDRY 2
UNIT 216UNIT 214UNIT 212UNIT 210UNIT 208UNIT 206UNIT 204UNIT 202
UNIT 201 UNIT 203 UNIT 205 UNIT 207 UNIT 209 UNIT 211 UNIT 213
JANITOR 2
CORRIDOR 2
M
ATC
H
LIN
E
MD401
MD401
MD402
MD401
MD401
MD401
MD401
MD401
MD401
MD401
MD401
MD401
MD402
MD401
A
14 15 16 17 18 19 20
B
C
D
E
F
14'
STAIR 3
UNIT 233UNIT 231UNIT 229UNIT 227UNIT 225
UNIT 232UNIT 230UNIT 228UNIT 226 UNIT 236UNIT 234
UNIT 235
CORRIDOR 2E
M
ATC
H
LIN
E
MD401
MD401
MD401
MD401
MD401
MD401
SCALE:
MECHANICAL DEMOLITION PLAN - SECOND FLOOR
1:1001 0 700030001000
R
EP
A
IR
D O
R M
, B
M
IS
A
W A
A
IR
B A
SE
JA
PA
N
(Q
KK
A1
2)
FA
-1
8- F-
JU
N
E
, 2
SHEET
IDENTIFICATION
D
ES
IG
N
ED
B
Y:
D W
N B
Y:
C
KD
B
Y:
SO
LI
C
IT
AT
IO
N
N O
D
AT
E:
C O
N
TR
AC
T
N O
SU
BM
IT
TE
D
B Y:
U .S
. A
IR
F O
R C
E C
IV
IL
E N
G
IN
EE
R
C
EN
TE
R
O
TI
E R
S& H
J O
IN
T
VE
N
TU
R
E
N
. M
AY
FA
IR
R O
AD
S
U
IT
E
M
IL
W
AU
KE
E, W
I 5
A
B
C
D
1 2 3 4 5
M A
R K
D
ES
C R
IP
TI
O N
D A
TE
FINAL DESIGN
SIGNED
THIS WORK WAS PREPARED
BY ME OR UNDER MY
SUPERVISION
SHEET OF 232
PA
U
L
VA
N D
EN
BE
R G
S.
H
ER
M
EN
IN
G
KL
N
TT
W
MD102
M
EC
H
AN
IC
AL
D
EM
O
LI
TI
O
N P
LA
N
SE
C O
N D
F
LO
O R
GENERAL NOTES:
1. REFER TO ENLARGED PLANS FOR PIPE DEMOLITION
REQUIRED IN INDIVIDUAL SPACES.
2. EXISTING MECHANICAL SYSTEMS ARE TO BE
DEMOLISHED COMPLETE UNLESS NOTED OTHERWISE.
(EQUIPMENT / DUCTWORK AND ACCESSORIES /
SUPPORTS / CONTROLS / WIRING)
3. REFER TO MD402 / MD403 FOR ADDITIONAL DETAIL FOR
DEMOLITION REQUIREMENTS.
4. REMOVE ALL (E)HWS & (E)HWR PIPING INCLUDING
ABOVE CEILINGS, IN ACCESSIBLE CRAWL SPACES, AND
PITS UNDER BUILDING INCLUDING VERTICAL CHASES.
CAP HWS & HWR PIPING SERVICE PIPING AT OR JUST
OUTSIDE BUILDING LINE IN ACCESSIBLE LOCATION.
REFER TO ARCHITECTURAL DRAWINGS AND
SPECIFICATIONS FOR PATCHING REQUIREMENTS.
5. COORDINATE REMOVAL AND ABATEMENT OF
ASBESTOS CONTAINING MATERIALS - REFER TO
HAZMAT PLAN SHEETS FOR ADDITIONAL DEMOLITION
NOTES.
6. CONTRACTOR IS RESPONSIBLE FOR PATCHING OF ALL
OPENINGS IN CEILINGS, WALLS AND FLOORS THAT
RESULT FROM DEMOLITION WORK, UNLESS OPENING IS
TO BE RE-USED. PATCHING OF OPENINGS OR OTHER
DAMAGE RESULTING FROM DEMO WORK TO MATCH
ADJACENT SURFACES.
7. LOCATION OF EQUIPMENT, PIPING AND DUCTWORK IS
APPROXIMATE, CONTRACTOR SHALL FIELD VERIFY.
8. COORDINATE SHUT DOWN OF EXISTING CENTRAL HOT
WATER HEATING SYSTEM, ALONG WITH POWER TO
DWELLING UNITS WITH AF BASE PRIOR TO DEMOLITION.
HWS/HWR MAIN VALVE SHALL BE SHUT-OFF, AND
SYSTEM TO BE COMPLETELY DRAINED PRIOR TO
DEMOLITION. PIPING SHALL BE CAPPED WATER-TIGHT
WHERE PIPING DEMOLITION OCCURS.
PLAN
NORTH
02 03 04 05 06 07 08 09 11 12 13 14
B
C
D
E
F
14'10
STAIR 2
STAIR 1
UNIT 318
UNIT 319 UNIT 321 UNIT 323
UNIT 324UNIT 322
LOUNGE 3 STORAGE 3
CORRIDOR 3W
LAUNDRY 3UNIT 316UNIT 314UNIT 312UNIT 310UNIT 308UNIT 306UNIT 304UNIT 302
UNIT 301 UNIT 303 UNIT 305 UNIT 307 UNIT 309 UNIT 311 UNIT 313
JANITOR 3
CORRIDOR 3
M
ATC
H
LIN
E
MD401
MD401
MD402
MD401
MD401
MD401
MD401
MD401
MD401
MD401
MD401
MD401
MD402
MD401
A
14 15 16 17 18 19 20
B
C
D
E
F
14'
STAIR 3
UNIT 333
UNIT 332UNIT 330
UNIT 331UNIT 325 UNIT 327 UNIT 329
UNIT 328UNIT 326 UNIT 334
UNIT 335
UNIT 336
CORRIDOR 3E
M
ATC
H
LIN
E
MD401
MD401
MD401
MD401
MD401
MD401
SCALE:
MECHANICAL DEMOLITION PLAN - THIRD FLOOR
1:1001 0 700030001000
R
EP
A
IR
D O
R M
, B
M
IS
A
W A
A
IR
B A
SE
JA
PA
N
(Q
KK
A1
2)
FA
-1
8- F-
JU
N
E
, 2
SHEET
IDENTIFICATION
D
ES
IG
N
ED
B
Y:
D W
N B
Y:
C
KD
B
Y:
SO
LI
C
IT
AT
IO
N
N O
D
AT
E:
C O
N
TR
AC
T
N O
SU
BM
IT
TE
D
B Y:
U .S
. A
IR
F O
R C
E C
IV
IL
E N
G
IN
EE
R
C
EN
TE
R
O
TI
E R
S& H
J O
IN
T
VE
N
TU
R
E
N
. M
AY
FA
IR
R O
AD
S
U
IT
E
M
IL
W
AU
KE
E, W
I 5
A
B
C
D
1 2 3 4 5
M A
R K
D
ES
C R
IP
TI
O N
D A
TE
FINAL DESIGN
SIGNED
THIS WORK WAS PREPARED
BY ME OR UNDER MY
SUPERVISION
SHEET OF 232
PA
U
L
VA
N D
EN
BE
R G
S.
H
ER
M
EN
IN
G
KL
N
TT
W
MD103
M
EC
H
AN
IC
AL
D
EM
O
LI
TI
O
N P
LA
N
TH
IR
D
F
LO
O R
PLAN
NORTH
GENERAL NOTES:
1. REFER TO ENLARGED PLANS FOR PIPE DEMOLITION
REQUIRED IN INDIVIDUAL SPACES.
2. EXISTING MECHANICAL SYSTEMS ARE TO BE
DEMOLISHED COMPLETE UNLESS NOTED OTHERWISE.
(EQUIPMENT / DUCTWORK AND ACCESSORIES /
SUPPORTS / CONTROLS / WIRING)
3. REFER TO MD402 / MD403 FOR ADDITIONAL DETAIL FOR
DEMOLITION REQUIREMENTS.
4. REMOVE ALL (E)HWS & (E)HWR PIPING INCLUDING
ABOVE CEILINGS, IN ACCESSIBLE CRAWL SPACES, AND
PITS UNDER BUILDING INCLUDING VERTICAL CHASES.
CAP HWS & HWR PIPING SERVICE PIPING AT OR JUST
OUTSIDE BUILDING LINE IN ACCESSIBLE LOCATION.
REFER TO ARCHITECTURAL DRAWINGS AND
SPECIFICATIONS FOR PATCHING REQUIREMENTS.
5. COORDINATE REMOVAL AND ABATEMENT OF
ASBESTOS CONTAINING MATERIALS - REFER TO
HAZMAT PLAN SHEETS FOR ADDITIONAL DEMOLITION
NOTES.
6. CONTRACTOR IS RESPONSIBLE FOR PATCHING OF ALL
OPENINGS IN CEILINGS, WALLS AND FLOORS THAT
RESULT FROM DEMOLITION WORK, UNLESS OPENING IS
TO BE RE-USED. PATCHING OF OPENINGS OR OTHER
DAMAGE RESULTING FROM DEMO WORK TO MATCH
ADJACENT SURFACES.
7. LOCATION OF EQUIPMENT, PIPING AND DUCTWORK IS
APPROXIMATE, CONTRACTOR SHALL FIELD VERIFY.
8. COORDINATE SHUT DOWN OF EXISTING CENTRAL HOT
WATER HEATING SYSTEM, ALONG WITH POWER TO
DWELLING UNITS WITH AF BASE PRIOR TO DEMOLITION.
HWS/HWR MAIN VALVE SHALL BE SHUT-OFF, AND
SYSTEM TO BE COMPLETELY DRAINED PRIOR TO
DEMOLITION. PIPING SHALL BE CAPPED WATER-TIGHT
WHERE PIPING DEMOLITION OCCURS.
02 03 04 05 06 07 08 09 11 12 13 14
B
C
D
E
F
14'10
STAIR 2
STAIR 1
DAY ROOM 4
UNIT 418
UNIT 419 UNIT 423
STORAGE 4
UNIT 422 UNIT 424UNIT 416UNIT 414UNIT 412UNIT 410UNIT 408UNIT 406UNIT 404UNIT 402
UNIT 401 UNIT 403 UNIT 405 UNIT 407 UNIT 409 UNIT 411 UNIT 413
LAUNDRY 4
JANITOR 4
UNIT 421
CORRIDOR 4CORRIDOR 4W
RRM 4
M
ATC
H
LIN
E
(E)40
(E)40
(E)HWR
(E)HWR
(E)40
(E)40 (E)100
(E)65 (E)40
(E)32 (E)100
(E)50
(E)40
(E)20
(E)25
(E)HWR
(E)HWR
(E)32
(E)32
(E)HWR
(E)HWR
(E)100 (E)100
(E)40
(E)40
(E)100
(E)65
(E)40(E)40 (E)100
(E)80(E)40(E)100
MD401
MD401
MD402
MD401
MD401
MD401
MD401
MD401
MD401
MD401
MD401
MD402
MD401
MD401
A
14 15 16 17 18 19 20
B
C
D
E
F
14'
STAIR 3
UNIT 425
UNIT 434UNIT 426 UNIT 428 UNIT 430 UNIT 432
UNIT 427 UNIT 429 UNIT 431 UNIT 433 UNIT 435
CORRIDOR 4E
UNIT 436
M
ATC
H
LIN
E
MD401
MD401
MD401
(E)HWR
(E)HWR
(E)40 (E)100
(E)80
(E)100
(E)65 (E)40
(E)40
(E)40
(E)40
(E)40
(E)100
(E)100
2(TYP.)
MD401
MD401
MD401
SCALE:
MECHANICAL DEMOLITION PLAN - FOURTH FLOOR
1:1001 0 700030001000
R
EP
A
IR
D O
R M
, B
M
IS
A
W A
A
IR
B A
SE
JA
PA
N
(Q
KK
A1
2)
FA
-1
8- F-
JU
N
E
, 2
SHEET
IDENTIFICATION
D
ES
IG
N
ED
B
Y:
D W
N B
Y:
C
KD
B
Y:
SO
LI
C
IT
AT
IO
N
N O
D
AT
E:
C O
N
TR
AC
T
N O
SU
BM
IT
TE
D
B Y:
U .S
. A
IR
F O
R C
E C
IV
IL
E N
G
IN
EE
R
C
EN
TE
R
O
TI
E R
S& H
J O
IN
T
VE
N
TU
R
E
N
. M
AY
FA
IR
R O
AD
S
U
IT
E
M
IL
W
AU
KE
E, W
I 5
A
B
C
D
1 2 3 4 5
M A
R K
D
ES
C R
IP
TI
O N
D A
TE
FINAL DESIGN
SIGNED
THIS WORK WAS PREPARED
BY ME OR UNDER MY
SUPERVISION
SHEET OF 232
PA
U
L
VA
N D
EN
BE
R G
S.
H
ER
M
EN
IN
G
KL
N
TT
W
MD104
M
EC
H
AN
IC
AL
D
EM
O
LI
TI
O
N P
LA
N
FO
U R
TH
F
LO
O
R
KEYNOTES
1 REMOVE EXISTING HOT WATER SUPPLY HORIZONTAL MAIN.
GENERAL NOTES:
1. REFER TO ENLARGED PLANS FOR PIPE DEMOLITION
REQUIRED IN INDIVIDUAL SPACES.
2. EXISTING MECHANICAL SYSTEMS ARE TO BE
DEMOLISHED COMPLETE UNLESS NOTED OTHERWISE.
(EQUIPMENT / DUCTWORK AND ACCESSORIES /
SUPPORTS / CONTROLS / WIRING)
3. REFER TO MD402 / MD403 FOR ADDITIONAL DETAIL FOR
DEMOLITION REQUIREMENTS.
4. REMOVE ALL (E)HWS & (E)HWR PIPING INCLUDING
ABOVE CEILINGS, IN ACCESSIBLE CRAWL SPACES, AND
PITS UNDER BUILDING INCLUDING VERTICAL CHASES.
CAP HWS & HWR PIPING SERVICE PIPING AT OR JUST
OUTSIDE BUILDING LINE IN ACCESSIBLE LOCATION.
REFER TO ARCHITECTURAL DRAWINGS AND
SPECIFICATIONS FOR PATCHING REQUIREMENTS.
5. COORDINATE REMOVAL AND ABATEMENT OF
ASBESTOS CONTAINING MATERIALS - REFER TO
HAZMAT PLAN SHEETS FOR ADDITIONAL DEMOLITION
NOTES.
6. CONTRACTOR IS RESPONSIBLE FOR PATCHING OF ALL
OPENINGS IN CEILINGS, WALLS AND FLOORS THAT
RESULT FROM DEMOLITION WORK, UNLESS OPENING IS
TO BE RE-USED. PATCHING OF OPENINGS OR OTHER
DAMAGE RESULTING FROM DEMO WORK TO MATCH
ADJACENT SURFACES.
7. LOCATION OF EQUIPMENT, PIPING AND DUCTWORK IS
APPROXIMATE, CONTRACTOR SHALL FIELD VERIFY.
8. COORDINATE SHUT DOWN OF EXISTING CENTRAL HOT
WATER HEATING SYSTEM, ALONG WITH POWER TO
DWELLING UNITS WITH AF BASE PRIOR TO DEMOLITION.
HWS/HWR MAIN VALVE SHALL BE SHUT-OFF, AND
SYSTEM TO BE COMPLETELY DRAINED PRIOR TO
DEMOLITION. PIPING SHALL BE CAPPED WATER-TIGHT
WHERE PIPING DEMOLITION OCCURS.
PLAN
NORTH
-500
GL
14'
9 300
FLOOR 4
6 200
FLOOR 3
14131211090807060504030201
12 400
TO WALL
3 100
FLOOR 2
FLOOR 1
M
ATC
H
LIN
E
1 1 1 1 1 1 1
1 11 1 1 1 11
FLOOR 1
FLOOR 2
3 100
TO WALL
12 400
14 15 16 17 18 19 20
FLOOR 3
6 200
FLOOR 4
9 300
14'
GL
-500
M
ATC
H
LIN
E
1 1 1 111
SCALE:
MECHANICAL DEMOLITION EXTERIOR ELEVATION - SOUTH
1:1001
KEYNOTES
1 EXISTING MECHANICAL WALL OPENINGS TO BE INFILLED.
REFER TO ARCHITECTURAL DRAWINGS.
0 700030001000
R
EP
A
IR
D O
R M
, B
M
IS
A
W A
A
IR
B A
SE
JA
PA
N
(Q
KK
A1
2)
FA
-1
8- F-
JU
N
E
, 2
SHEET
IDENTIFICATION
D
ES
IG
N
ED
B
Y:
D W
N B
Y:
C
KD
B
Y:
SO
LI
C
IT
AT
IO
N
N O
D
AT
E:
C O
N
TR
AC
T
N O
SU
BM
IT
TE
D
B Y:
U .S
. A
IR
F O
R C
E C
IV
IL
E N
G
IN
EE
R
C
EN
TE
R
O
TI
E R
S& H
J O
IN
T
VE
N
TU
R
E
N
. M
AY
FA
IR
R O
AD
S
U
IT
E
M
IL
W
AU
KE
E, W
I 5
A
B
C
D
1 2 3 4 5
M A
R K
D
ES
C R
IP
TI
O N
D A
TE
FINAL DESIGN
SIGNED
THIS WORK WAS PREPARED
BY ME OR UNDER MY
SUPERVISION
SHEET OF 232
PA
U
L
VA
N D
EN
BE
R G
S.
H
ER
M
EN
IN
G
KL
N
TT
W
MD201
M
EC
H
AN
IC
AL
D
EM
O
LI
TI
O
N E
XT
ER
IO
R
E
LE
VA
TI
O N
SO
U
TH
GENERAL NOTES:
1. REFER TO ENLARGED PLANS FOR PIPE DEMOLITION
REQUIRED IN INDIVIDUAL SPACES.
2. EXISTING MECHANICAL SYSTEMS ARE TO BE
DEMOLISHED COMPLETE UNLESS NOTED OTHERWISE.
(EQUIPMENT / DUCTWORK AND ACCESSORIES /
SUPPORTS / CONTROLS / WIRING)
3. REFER TO MD402 / MD403 FOR ADDITIONAL DETAIL FOR
DEMOLITION REQUIREMENTS.
4. REMOVE ALL (E)HWS & (E)HWR PIPING INCLUDING ABOVE
CEILINGS, IN ACCESSIBLE CRAWL SPACES, AND PITS
UNDER BUILDING INCLUDING VERTICAL CHASES. CAP
HWS & HWR PIPING SERVICE PIPING AT OR JUST OUTSIDE
BUILDING LINE IN ACCESSIBLE LOCATION. REFER TO
ARCHITECTURAL DRAWINGS AND SPECIFICATIONS FOR
PATCHING REQUIREMENTS.
5. COORDINATE REMOVAL AND ABATEMENT OF ASBESTOS
CONTAINING MATERIALS - REFER TO HAZMAT PLAN
SHEETS FOR ADDITIONAL DEMOLITION NOTES.
6. CONTRACTOR IS RESPONSIBLE FOR PATCHING OF ALL
OPENINGS IN CEILINGS, WALLS AND FLOORS THAT
RESULT FROM DEMOLITION WORK, UNLESS OPENING IS
TO BE RE-USED. PATCHING OF OPENINGS OR OTHER
DAMAGE RESULTING FROM DEMO WORK TO MATCH
ADJACENT SURFACES.
7. LOCATION OF EQUIPMENT, PIPING AND DUCTWORK IS
APPROXIMATE, CONTRACTOR SHALL FIELD VERIFY.
8. ALL OPENINGS NOT IDENTIFIED AS BEING REUSED FOR
EXHAUST OR OA INTAKE ARE TO BE INFILLED.
9. COORDINATE SHUT DOWN OF EXISTING CENTRAL HOT
WATER HEATING SYSTEM, ALONG WITH POWER TO
DWELLING UNITS WITH AF BASE PRIOR TO DEMOLITION.
HWS/HWR MAIN VALVE SHALL BE SHUT-OFF, AND SYSTEM
TO BE COMPLETELY DRAINED PRIOR TO DEMOLITION.
PIPING SHALL BE CAPPED WATER-TIGHT WHERE PIPING
DEMOLITION OCCURS.
10. WALL OPENINGS SHOWN ON ELEVATION BUT NOT
IDENTIFIED BY NOTES ARE NOT MECHANICAL RELATED
OPENINGS. REFER TO ARCHITECTURAL DRAWINGS.
2 EXISTING MECHANICAL WALL OPENINGS TO REMAIN. REFER
TO ARCHITECTURAL DRAWINGS.
3 NATURAL VENTILATION WALL OPENINGS SHOWN FOR
REFERENCE. REFER TO ARCHITECTURAL DRAWINGS.DRAFT
-500
GL
14'
9 300
FLOOR 4
6 200
FLOOR 3
14 13 12 11 09 08 07 06 05 04 03 02 01
12 400
TO WALL
3 100
FLOOR 2
FLOOR 1
M
ATC
H
LIN
E
1 1 1 1 11 1 1 1 1 11 1
1 3 3
FLOOR 1
FLOOR 2
3 100
TO WALL
12 400
14151617181920
FLOOR 3
6 200
FLOOR 4
9 300
14'
GL
-500
M
ATC
H
LIN
E
11 1 11 1
SCALE:
MECHANICAL DEMOLITION EXTERIOR ELEVATION - NORTH
1:1001 0 700030001000
R
EP
A
IR
D O
R M
, B
M
IS
A
W A
A
IR
B A
SE
JA
PA
N
(Q
KK
A1
2)
FA
-1
8- F-
JU
N
E
, 2
SHEET
IDENTIFICATION
D
ES
IG
N
ED
B
Y:
D W
N B
Y:
C
KD
B
Y:
SO
LI
C
IT
AT
IO
N
N O
D
AT
E:
C O
N
TR
AC
T
N O
SU
BM
IT
TE
D
B Y:
U .S
. A
IR
F O
R C
E C
IV
IL
E N
G
IN
EE
R
C
EN
TE
R
O
TI
E R
S& H
J O
IN
T
VE
N
TU
R
E
N
. M
AY
FA
IR
R O
AD
S
U
IT
E
M
IL
W
AU
KE
E, W
I 5
A
B
C
D
1 2 3 4 5
M A
R K
D
ES
C R
IP
TI
O N
D A
TE
FINAL DESIGN
SIGNED
THIS WORK WAS PREPARED
BY ME OR UNDER MY
SUPERVISION
SHEET OF 232
PA
U
L
VA
N D
EN
BE
R G
S.
H
ER
M
EN
IN
G
KL
N
TT
W
MD202
M
EC
H
AN
IC
AL
D
EM
O
LI
TI
O
N E
XT
ER
IO
R
E
LE
VA
TI
O N
N
O R
TH
KEYNOTES
EXISTING MECHANICAL WALL OPENINGS FOR CLOTHES
DRYER EXHAUST TO BE REUSED FOR EXHAUST.
GENERAL NOTES:
1. REFER TO ENLARGED PLANS FOR PIPE DEMOLITION
REQUIRED IN INDIVIDUAL SPACES.
2. EXISTING MECHANICAL SYSTEMS ARE TO BE
DEMOLISHED COMPLETE UNLESS NOTED OTHERWISE.
(EQUIPMENT / DUCTWORK AND ACCESSORIES /
SUPPORTS / CONTROLS / WIRING)
3. REFER TO MD402 / MD403 FOR ADDITIONAL DETAIL FOR
DEMOLITION REQUIREMENTS.
4. REMOVE ALL (E)HWS & (E)HWR PIPING INCLUDING
ABOVE CEILINGS, IN ACCESSIBLE CRAWL SPACES, AND
PITS UNDER BUILDING INCLUDING VERTICAL CHASES.
CAP HWS & HWR PIPING SERVICE PIPING AT OR JUST
OUTSIDE BUILDING LINE IN ACCESSIBLE LOCATION.
REFER TO ARCHITECTURAL DRAWINGS AND
SPECIFICATIONS FOR PATCHING REQUIREMENTS.
5. COORDINATE REMOVAL AND ABATEMENT OF
ASBESTOS CONTAINING MATERIALS - REFER TO
HAZMAT PLAN SHEETS FOR ADDITIONAL DEMOLITION
NOTES.
6. CONTRACTOR IS RESPONSIBLE FOR PATCHING OF ALL
OPENINGS IN CEILINGS, WALLS AND FLOORS THAT
RESULT FROM DEMOLITION WORK, UNLESS OPENING IS
TO BE RE-USED. PATCHING OF OPENINGS OR OTHER
DAMAGE RESULTING FROM DEMO WORK TO MATCH
ADJACENT SURFACES.
7. LOCATION OF EQUIPMENT, PIPING AND DUCTWORK IS
APPROXIMATE, CONTRACTOR SHALL FIELD VERIFY.
8. ALL OPENINGS NOT IDENTIFIED AS BEING REUSED FOR
EXHAUST OR OA INTAKE ARE TO BE INFILLED.
9. COORDINATE SHUT DOWN OF EXISTING CENTRAL HOT
WATER HEATING SYSTEM, ALONG WITH POWER TO
DWELLING UNITS WITH AF BASE PRIOR TO DEMOLITION.
HWS/HWR MAIN VALVE SHALL BE SHUT-OFF, AND
SYSTEM TO BE COMPLETELY DRAINED PRIOR TO
DEMOLITION. PIPING SHALL BE CAPPED WATER-TIGHT
WHERE PIPING DEMOLITION OCCURS.
10. WALL OPENINGS SHOWN ON ELEVATION BUT NOT
IDENTIFIED BY NOTES ARE NOT MECHANICAL RELATED
OPENINGS. REFER TO ARCHITECTURAL DRAWINGS.
EXISTING MECHANICAL WALL OPENINGS TO BE INFILLED.
REFER TO ARCHITECTURAL DRAWINGS.
EXISTING MECHANICAL WALL OPENING TO BE REUSED.
REFER TO ARCHITECTURAL DRAWINGS.
NATURAL VENTILATION WALL OPENING. REFE TO
ARCHITECTURAL DRAWINGS.
4DRAFT
UNIT 107UNIT 105
(E)100Ø
(E)20
(E)100Ø
(E)20
(E)377x126
(E )H
W S(E
)H W
R
(E )H
W S (E
)H W
R
(E)150Ø (E)150Ø
(E)FCU (E)FCU
(E)377x126
(E)150x150(E)150x150
TT
UNIT 405 UNIT 407(E)300Ø
(E)200Ø (E)20
(E)377x126
(E)20
(E )H
W S(E
)H W
R
(E )H
W S (E
)H W
R
(E)FCU (E)FCU
(E)377x126
(E)100Ø (E)100Ø
(E)150Ø (E)150Ø
(E)HWR
(E)HWR
(E)40 (E)100
(E)40
(E)150x150
TT
UNIT 408UNIT 406
(E)200Ø
(E)300Ø
(E)200Ø
(E)20
(E)377x126
(E)20
(E )H
W S
(E )H
W R (E
)H W
S (E
)H W
R
(E)FCU (E)FCU
(E)377x126
(E)100Ø (E)100Ø
(E)150Ø (E)150Ø
(E)HWR
(E)80(E)40
(E)150x150
TT
2 2
SCALE:
MECHANICAL DEMOLITION PLAN - TYPICAL UNITS
1:501
GENERAL NOTES:
1. EXISTING MECHANICAL SYSTEMS ARE TO BE
DEMOLISHED COMPLETE UNLESS NOTED OTHERWISE.
(EQUIPMENT / DUCTWORK AND ACCESSORIES /
SUPPORTS / CONTROLS / WIRING)
2. REFER TO MD402 / MD403 FOR ADDITIONAL DETAIL FOR
DEMOLITION REQUIREMENTS.
3. REMOVE ALL (E)HWS & (E)HWR PIPING INCLUDING
ABOVE CEILINGS, IN ACCESSIBLE CRAWL SPACES, AND
PITS UNDER BUILDING INCLUDING VERTICAL CHASES.
CAP HWS & HWR PIPING SERVICE PIPING AT OR JUST
OUTSIDE BUILDING LINE IN ACCESSIBLE LOCATION.
REFER TO ARCHITECTURAL DRAWINGS AND
SPECIFICATIONS FOR PATCHING REQUIREMENTS.
4. COORDINATE REMOVAL AND ABATEMENT OF
ASBESTOS CONTAINING MATERIALS - REFER TO
HAZMAT PLAN SHEETS FOR ADDITIONAL DEMOLITION
NOTES.
5. CONTRACTOR IS RESPONSIBLE FOR PATCHING OF ALL
OPENINGS IN CEILINGS, WALLS AND FLOORS THAT
RESULT FROM DEMOLITION WORK, UNLESS OPENING IS
TO BE RE-USED. PATCHING OF OPENINGS OR OTHER
DAMAGE RESULTING FROM DEMO WORK TO MATCH
ADJACENT SURFACES.
6. LOCATION OF EQUIPMENT, PIPING AND DUCTWORK IS
APPROXIMATE, CONTRACTOR SHALL FIELD VERIFY.
7. COORDINATE SHUT DOWN OF EXISTING CENTRAL HOT
WATER HEATING SYSTEM, ALONG WITH POWER TO
DWELLING UNITS WITH AF BASE PRIOR TO DEMOLITION.
HWS/HWR MAIN VALVE SHALL BE SHUT-OFF, AND
SYSTEM TO BE COMPLETELY DRAINED PRIOR TO
DEMOLITION. PIPING SHALL BE CAPPED WATER-TIGHT
WHERE PIPING DEMOLITION OCCURS.
KEYNOTES
1 EXHAUST FAN AT FOURTH FLOOR AND ASSOCIATED
DUCTWORK ON ALL FLOORS TO BE DEMOLISHED.
2 REMOVAL OF EXISTING WALL CAP / HOOD IS BY OTHERS.
REFER TO ARCHITECTURAL PLANS FOR ADDITIONAL
INFORMATION.
0 35001500500
R
EP
A
IR
D O
R M
, B
M
IS
A
W A
A
IR
B A
SE
JA
PA
N
(Q
KK
A1
2)
FA
-1
8- F-
JU
N
E
, 2
SHEET
IDENTIFICATION
D
ES
IG
N
ED
B
Y:
D W
N B
Y:
C
KD
B
Y:
SO
LI
C
IT
AT
IO
N
N O
D
AT
E:
C O
N
TR
AC
T
N O
SU
BM
IT
TE
D
B Y:
U .S
. A
IR
F O
R C
E C
IV
IL
E N
G
IN
EE
R
C
EN
TE
R
O
TI
E R
S& H
J O
IN
T
VE
N
TU
R
E
N
. M
AY
FA
IR
R O
AD
S
U
IT
E
M
IL
W
AU
KE
E, W
I 5
A
B
C
D
1 2 3 4 5
M A
R K
D
ES
C R
IP
TI
O N
D A
TE
FINAL DESIGN
SIGNED
THIS WORK WAS PREPARED
BY ME OR UNDER MY
SUPERVISION
SHEET OF 232
PA
U
L
VA
N D
EN
BE
R G
S.
H
ER
M
EN
IN
G
KL
N
TT
W
MD401
M
EC
H
AN
IC
AL
D
EM
O
LI
TI
O
N P
LA
N
TY
PI
C
AL
U
N
IT
S
SCALE:
MECHANICAL DEMOLITION PLAN - TYPICAL 4TH FLOOR SOUTH UNITS
1:502 0 35001500500 SCALE:
MECHANICAL DEMOLITION PLAN - TYPICAL 4TH FLOOR NORTH UNITS
1:503 0 35001500500
4 EXISTING FAN COIL UNIT, DUCTWORK AND CONTROLS TO
BE DEMOLISHED.
EXISTING HWS/HWR RISERS TO BE REMOVED. INFILL OF
EXISTING OPENINGS IS BY OTHERS. REFER TO
ARCHITECTURAL PLANS FOR ADDITIONAL INFORMATION.
5 EXISTING EXHAUST CHASE TO REMAIN. CHASE WILL NOT BE
REUSED. INFILL OF EXISTING OPENINGS BY OTHERS. REFER
TO ARCHITECTURAL PLANS FOR ADDITIONAL INFORMATION.
6 EXISTING FIRE DAMPER TO BE REMOVED, PATCH WALL
OPENING WITH CONCRETE SUCH THAT EXISTING FIRE
RATING IS PRESERVED.
DAY ROOM 1
RRM 1
OFFICE
(E)20
(E)20
(E)HWS
(E)HWR
(E)FCU(E)FCU(E)FCU
(E )H
W S
(E )H
W R
(E)377x126(E)377x126
(E)32
9 9 9
STORAGE 2
LOUNGE 2
(E)20
(E)20
(E)HWS
(E)HWR
(E)FCU(E)FCU
(E )H
W S
(E )H
W R
377x126 (E)300Ø
(E)200Ø
STAIR 1
LAUNDRY 2
JANITOR 2
CORRIDOR 2
(E)DRYER
(E)DRYER
(E)DRYER
(E)EF
(E)150Ø
2 5
(E)20
(E)40
(E)UH
LAUNDRY 1
JANITOR 1
CORRIDOR 1
(E)EF 6
(E)20
(E)25
(E) HWS
(E)UH 4
(E)150Ø
(E)DRYER
(E)DRYER
(E)DRYER
SCALE:
MECHANICAL DEMOLITION PLAN - 1ST AND 4TH FLOOR LOUNGES
1:503 0 35001500500 0 35001500500SCALE:
MECHANICAL DEMOLITION PLAN - 2ND AND 3RD FLOOR LOUNGES
1:504
SCALE:
MECHANICAL DEMOLITION PLAN - 2ND, 3RD, AND 4TH FLOOR LAUNDRY
1:502 0 35001500500
R
EP
A
IR
D O
R M
, B
M
IS
A
W A
A
IR
B A
SE
JA
PA
N
(Q
KK
A1
2)
FA
-1
8- F-
JU
N
E
, 2
SHEET
IDENTIFICATION
D
ES
IG
N
ED
B
Y:
D W
N B
Y:
C
KD
B
Y:
SO
LI
C
IT
AT
IO
N
N O
D
AT
E:
C O
N
TR
AC
T
N O
SU
BM
IT
TE
D
B Y:
U .S
. A
IR
F O
R C
E C
IV
IL
E N
G
IN
EE
R
C
EN
TE
R
O
TI
E R
S& H
J O
IN
T
VE
N
TU
R
E
N
. M
AY
FA
IR
R O
AD
S
U
IT
E
M
IL
W
AU
KE
E, W
I 5
A
B
C
D
1 2 3 4 5
M A
R K
D
ES
C R
IP
TI
O N
D A
TE
FINAL DESIGN
SIGNED
THIS WORK WAS PREPARED
BY ME OR UNDER MY
SUPERVISION
SHEET OF 232
PA
U
L
VA
N D
EN
BE
R G
S.
H
ER
M
EN
IN
G
KL
N
TT
W
MD402
M
EC
H
AN
IC
AL
D
EM
O
LI
TI
O
N E
N
LA
R G
ED
P
LA
N
S
SCALE:
MECHANICAL DEMOLITION PLAN - 1ST FLOOR LAUNDRY
1:501 0 35001500500
GENERAL NOTES:
1. EXISTING MECHANICAL SYSTEMS ARE TO BE DEMOLISHED
COMPLETE UNLESS NOTED OTHERWISE. (EQUIPMENT /
DUCTWORK AND ACCESSORIES / SUPPORTS / CONTROLS /
WIRING)
2. REFER TO MD403 FOR ADDITIONAL DETAIL FOR DEMOLITION
REQUIREMENTS.
3. REMOVE ALL (E)HWS & (E)HWR PIPING INCLUDING ABOVE
CEILINGS, IN ACCESSIBLE CRAWL SPACES, AND PITS UNDER
BUILDING INCLUDING VERTICAL CHASES. CAP HWS & HWR
PIPING SERVICE PIPING AT OR JUST OUTSIDE BUILDING LINE IN
ACCESSIBLE LOCATION. REFER TO ARCHITECTURAL DRAWINGS
AND SPECIFICATIONS FOR PATCHING REQUIREMENTS.
4. COORDINATE REMOVAL AND ABATEMENT OF ASBESTOS
CONTAINING MATERIALS - REFER TO HAZMAT PLAN SHEETS
FOR ADDITIONAL DEMOLITION NOTES.
5. CONTRACTOR IS RESPONSIBLE FOR PATCHING OF ALL
OPENINGS IN CEILINGS, WALLS AND FLOORS THAT RESULT
FROM DEMOLITION WORK, UNLESS OPENING IS TO BE RE-USED.
PATCHING OF OPENINGS OR OTHER DAMAGE RESULTING FROM
DEMO WORK TO MATCH ADJACENT SURFACES.
6. LOCATION OF EQUIPMENT, PIPING AND DUCTWORK IS
APPROXIMATE, CONTRACTOR SHALL FIELD VERIFY.
7. REMOVE DRYER VENTING SYSTEM COMPLETE. REFER TO
GENERAL NOTE #1.
8. COORDINATE SHUT DOWN OF EXISTING CENTRAL HOT WATER
HEATING SYSTEM, ALONG WITH POWER TO DWELLING UNITS
WITH AF BASE PRIOR TO DEMOLITION. HWS/HWR MAIN VALVE
SHALL BE SHUT-OFF, AND SYSTEM TO BE COMPLETELY
DRAINED PRIOR TO DEMOLITION. PIPING SHALL BE CAPPED
WATER-TIGHT WHERE PIPING DEMOLITION OCCURS.
KEYNOTES
1 EXHAUST FAN TO BE DEMOLISHED.
3 EXISTING HWS/HWR RISERS TO BE REMOVED. INFILL OF
EXISTING OPENINGS IS BY OTHERS. REFER TO
ARCHITECTURAL PLANS FOR ADDITIONAL INFORMATION.
5 REFER TO M SERIES SHEETS FOR DIRECTION ON WHICH
WALL OPENINGS ARE REUSED ON INFILLED. GENERAL
CONTRACTOR SHALL BE RESPONSIBLE FOR INFILLING ANY
OPENINGS THAT ARE NOT REUSED.
6 REMOVE DRYER VENTING SYSTEM COMPLETE. REFER TO
GENERAL NOTE #1.
REMOVAL OF EXISTING WALL CAP / HOOD IS BY OTHERS.
REFER TO ARCHITECTURAL PLANS FOR ADDITIONAL
INFORMATION.
EXISTING HOT WATER UNIT HEATER AND PIPING TO BE
REMOVED. REMOVE UNIT HEATER CONTROL.
7 EXISTING LAUNDRY ROOM EXHAUST FAN AND DUCT TO BE
DEMOLISHED. GENERAL CONTRACTOR SHALL BE
RESPONSIBLE FOR INFILLING OPENINGS.
8 EXISTING KITCHEN HWR TO BE DEMOLISHED.
9 EXISTING FAN COIL UNIT, DUCTWORK AND CONTROLS TO
BE DEMOLISHED.DRAFT
11 12 13
STAIR 1
UNIT 124
MECHANICAL RM
LINEN 1
CORRIDOR 1
(E)300/300
(E)400/250
(E)400/300 (E)230/305
(E)300/300
(E)300Ø
(E)400/250
(E)400/250
11 12 13
STAIR 1
UNIT 124
MECHANICAL RM
LINEN 1
CORRIDOR 1
(E)EXPANSION
TANK
(E)125
(E)25
(E)100
(E)65
(E)65
(E)150 (E)150
(E)125 (E)100
(E)150
(E)125
(E)PUMP
(E )H
W R
(E )H
W S
(E)65
(E)150
(E)40
(E)50
(E)50
(E)HWS
(E)100
TO DHW TANK
(E)20
(E)100
(E)100
(E)20
(E)32
(E)20
(E)32
(E)100 (E)25
(E)100
(E)100 (E)40
(E)40(E) HWR
(E) HWS
R
EP
A
IR
D O
R M
, B
M
IS
A
W A
A
IR
B A
SE
JA
PA
N
(Q
KK
A1
2)
FA
-1
8- F-
JU
N
E
, 2
SHEET
IDENTIFICATION
D
ES
IG
N
ED
B
Y:
D W
N B
Y:
C
KD
B
Y:
SO
LI
C
IT
AT
IO
N
N O
D
AT
E:
C O
N
TR
AC
T
N O
SU
BM
IT
TE
D
B Y:
U .S
. A
IR
F O
R C
E C
IV
IL
E N
G
IN
EE
R
C
EN
TE
R
O
TI
E R
S& H
J O
IN
T
VE
N
TU
R
E
N
. M
AY
FA
IR
R O
AD
S
U
IT
E
M
IL
W
AU
KE
E, W
I 5
A
B
C
D
1 2 3 4 5
M A
R K
D
ES
C R
IP
TI
O N
D A
TE
FINAL DESIGN
SIGNED
THIS WORK WAS PREPARED
BY ME OR UNDER MY
SUPERVISION
SHEET OF 232
PA
U
L
VA
N D
EN
BE
R G
S.
H
ER
M
EN
IN
G
KL
N
TT
W
MD403
M
EC
H
AN
IC
AL
D
EM
O
LI
TI
O
N
EN
LA
R G
ED
P
LA
N
S
0 35001500500SCALE:
MECHANICAL DEMOLITION PLAN PIPING - MECHANICAL ROOM
1:501 0 35001500500SCALE:
MECHANICAL DEMOLITION PLAN DUCTWORK - MECHANICAL ROOM
1:502
GENERAL NOTES:
1. EXISTING MECHANICAL SYSTEMS ARE TO BE
DEMOLISHED COMPLETE UNLESS NOTED OTHERWISE.
(EQUIPMENT / DUCTWORK AND ACCESSORIES /
SUPPORTS / CONTROLS / WIRING)
2. REFER TO MD402 FOR ADDITIONAL DETAIL FOR
DEMOLITION REQUIREMENTS.
3. REMOVE ALL (E)HWS & (E)HWR PIPING INCLUDING
ABOVE CEILINGS, IN ACCESSIBLE CRAWL SPACES, AND
PITS UNDER BUILDING INCLUDING VERTICAL CHASES.
CAP HWS & HWR PIPING SERVICE PIPING AT OR JUST
OUTSIDE BUILDING LINE IN ACCESSIBLE LOCATION.
REFER TO ARCHITECTURAL DRAWINGS AND
SPECIFICATIONS FOR PATCHING REQUIREMENTS.
4. COORDINATE REMOVAL AND ABATEMENT OF
ASBESTOS CONTAINING MATERIALS - REFER TO
HAZMAT PLAN SHEETS FOR ADDITIONAL DEMOLITION
NOTES.
5. CONTRACTOR IS RESPONSIBLE FOR PATCHING OF ALL
OPENINGS IN CEILINGS, WALLS AND FLOORS THAT
RESULT FROM DEMOLITION WORK, UNLESS OPENING IS
TO BE RE-USED. PATCHING OF OPENINGS OR OTHER
DAMAGE RESULTING FROM DEMO WORK TO MATCH
ADJACENT SURFACES.
6. LOCATION OF EQUIPMENT, PIPING AND DUCTWORK IS
APPROXIMATE, CONTRACTOR SHALL FIELD VERIFY.
7. COORDINATE SHUT DOWN OF EXISTING CENTRAL HOT
WATER HEATING SYSTEM, ALONG WITH POWER TO
DWELLING UNITS WITH AF BASE PRIOR TO DEMOLITION.
HWS/HWR MAIN VALVE SHALL BE SHUT-OFF, AND
SYSTEM TO BE COMPLETELY DRAINED PRIOR TO
DEMOLITION. PIPING SHALL BE CAPPED WATER-TIGHT
WHERE PIPING DEMOLITION OCCURS.
KEYNOTES
1 EXHAUST FAN TO BE DEMOLISHED.
4 EXISTING EXHAUST LOUVERS TO REMAIN FOR REUSE.
EXISTING HEAT EXCHANGER / PUMPS / PIPING / SUPPORTS /
ACCESSORIES TO BE REMOVED.
EXISTING HWS/HWR RISERS TO BE REMOVED. INFILL OF
EXISTING OPENINGS IS BY OTHERS. REFER TO
ARCHITECTURAL PLANS FOR ADDITIONAL INFORMATION.
02 03 04 05 06 07 08 09 11 12 13 14
B
C
D
E
F
14'10
S2
STAIR 2
S1
STAIR 1
UNIT 124
ST1
STORAGE 1
UNIT 119
UNIT 121
UNIT 123
LD1
LAUNDRY 1
J1
JANITOR 1
C1W
CORRIDOR 1W
LG1
DAY ROOM 1
MECHANICAL RM
LINEN 1
UNIT 114
UNIT 112
UNIT 110
UNIT 108
UNIT 113
UNIT 111
UNIT 109
UNIT 107
UNIT 105
UNIT 103
UNIT 101
UNIT 102
UNIT 104
UNIT 106
RR1
RRM 1
LOBBY
FACP ROOM
C1
CORRIDOR 1
M
ATC
H
LIN
E
M-401
M-402
M-402
M-403
M-401
M-401
M-401
M-401
M-4011
HP
HP
HP
HP
ACU
EF
EF
ACU
ACU
EF
EF
ACU
HP
HP
HP
HP
ACU
EF
EF
ACU
ACU
EF
EF
ACU
HP
HP
HP
HP
ACU
EF
EF
ACU
ACU
EF
EF
ACU
HP
HP
HP
HP
ACU
EF
EF
ACU
ACU
EF
HP
HP
HP
HP
HP
HP
HP
EUH
ACU
ACU
ACU
EF
EF
ACU
EF
EUH
EUH
EF
ACU
EF
ACU
EF
ACU
ACU100Ø
M-401
M-401
A
14 15 16 17 18 19 20
B
C
D
E
F
14'
S3
STAIR 3
UNIT 130
UNIT 128
UNIT 126
UNIT 136
UNIT 135
UNIT 134
UNIT 133
UNIT 125
UNIT 127
UNIT 129
UNIT 132
UNIT 131
C1E
CORRIDOR 1E
M
ATC
H
LIN
E
M-401
M-401
M-401
M-401
M-401
M-401
HP
HP
HP
HP
ACU
EF
EF
ACU
ACU
EF
EF
ACU
HP
HP
HP
HP
ACU
EF
EF
ACU
ACU
EF
EF
ACU
HP
HP
ACU
EF
EF
ACU
ACU
EF
EF
ACU
HP
HP
HP
EUH
ACU 100Ø
M-401
SCALE:
MECHANICAL PLAN - FIRST FLOOR
1:1001
KEYNOTES
1 HEAT PUMPS SERVE TYPICAL FOUR (4) DORM ROOMS ON
RISER UNLESS NOTED OTHERWISE. REFER TO ELEVATION
1/M-504 FOR REFRIGERANT PIPE RISER.
4 HP SERVES DORM ROOMS ON 2ND, 3RD, AND 4TH FLOORS.
REFER TO ELEVATION 1/M-504 FOR REFRIGERANT RISER.
3 HP SERVES LAUNDRY ROOMS ON 2ND, 3RD, AND 4TH
FLOORS. REFER TO ELEVATION 1/M-202 FOR REFRIGERANT
RISER.
0 700030001000
PLAN
NORTH
R
EP
A
IR
D O
R M
, B
M
IS
A
W A
A
IR
B A
SE
JA
PA
N
(Q
KK
A1
2)
FA
-1
8- F-
JU
N
E
, 2
SHEET
IDENTIFICATION
D
ES
IG
N
ED
B
Y:
D W
N B
Y:
C
KD
B
Y:
SO
LI
C
IT
AT
IO
N
N O
D
AT
E:
C O
N
TR
AC
T
N O
SU
BM
IT
TE
D
B Y:
U .S
. A
IR
F O
R C
E C
IV
IL
E N
G
IN
EE
R
C
EN
TE
R
O
TI
E R
S& H
J O
IN
T
VE
N
TU
R
E
N
. M
AY
FA
IR
R O
AD
S
U
IT
E
M
IL
W
AU
KE
E, W
I 5
A
B
C
D
1 2 3 4 5
M A
R K
D
ES
C R
IP
TI
O N
D A
TE
FINAL DESIGN
SIGNED
THIS WORK WAS PREPARED
BY ME OR UNDER MY
SUPERVISION
SHEET OF 232
PA
U
L
VA
N D
EN
BE
R G
S.
H
ER
M
EN
IN
G
KL
N
TT
W
M-101
M
EC
H
AN
IC
AL
P
LA
N
FI
R
ST
F
LO
O
R
6 STORAGE ROOMS - NO HEATING OR COOLING. NATURAL
VENTILATION USING EXISTING WALL OPENINGS.
REFER TO DETAIL 4/M-501 FOR WALL MOUNTED HEAT PUMP
INSTALLATION.
NEW OUTDOOR AIR INTAKE REFER TO 1/M-201 & 1/M-202
FOR ELEVATION. (TYPICAL)
UP THROUGH FLOOR REFER TO 1/M-102 FOR
CONTINUATION.
GENERAL NOTES:
1. LOCATION OF NEW EQUIPMENT TO BE INSTALLED SHOWN ON
DRAWINGS IS APPROXIMATE - FIELD VERIFY ALL EXISTING
CONDITIONS PRIOR TO INSTALLATION OF NEW EQUIPMENT.
2. GENERAL CONTRACTOR IS RESPONSIBLE FOR PATCHING ALL
OPENINGS IN CEILINGS, WALLS AND FLOORS THAT RESULT
FROM DEMOLITION WORK OR REMOVED EQUIPMENT, UNLESS
OPENING IS TO BE REUSED. PATCHING OF OPENINGS OR
OTHER DAMAGE IS TO MATCH ADJACENT SURFACES,
MATERIALS AND CONDITIONS.
HEAT PUMP (GRADE MOUNTED) SERVES (2) DAY ROOMS, (2)
LOUNGES, (1) FACP ROOM, AND (1) LOBBY.
02 03 04 05 06 07 08 09 11 12 13 14
B
C
D
E
F
14'10
S2
STAIR 2
S1
STAIR 1
UNIT 223
UNIT 221
UNIT 224
UNIT 222
UNIT 219
UNIT 218
ST2
STORAGE 2
C2W
CORRIDOR 2W
LG2
LOUNGE 2
LD2
LAUNDRY 2
UNIT 216
UNIT 214
UNIT 212
UNIT 210
UNIT 208
UNIT 206
UNIT 204
UNIT 202
UNIT 201
UNIT 203
UNIT 205
UNIT 207
UNIT 209
UNIT 211
UNIT 213
J2
JANITOR 2
C2
CORRIDOR 2
M
ATC
H
LIN
E
ACU
ACU
EF
ACU
M-402
M-402
M-401
ACU
EF
EF
ACU
ACU
EF
EF
ACU
ACU
EF
EF
ACU
ACU
EF
EF
ACU
ACU
EF
EF
ACU
ACU
EF
EF
ACU
ACU
EF
EF
ACU
ACU
EF
EF
ACU
ACU
EF
EF
ACU
EF
ACU
EF
ACU
EF
ACU
M-401
M-401
M-401
M-401
M-401
M-401
M-401
BDDBDD
T
T
100Ø
M-401
M-401
A
14 15 16 17 18 19 20
B
C
D
E
F
14'
S3
STAIR 3
UNIT 233
UNIT 231
UNIT 229
UNIT 227
UNIT 225
UNIT 232
UNIT 230
UNIT 228
UNIT 226
UNIT 236
UNIT 234
UNIT 235
C2E
CORRIDOR 2E
M
ATC
H
LIN
E
ACU
ACU
EF
EF
ACU
ACU
EF
EF
ACU
ACU
EF
EF
ACU
ACU
EF
EF
ACU
ACU
EF
EF
ACU
ACU
EF
EF
ACU
M-401
M-401
M-401
M-401
M-401
100Ø
M-401
M-401
SCALE:
MECHANICAL PLAN - SECOND FLOOR
1:1001
KEYNOTES
0 700030001000
R
EP
A
IR
D O
R M
, B
M
IS
A
W A
A
IR
B A
SE
JA
PA
N
(Q
KK
A1
2)
FA
-1
8- F-
JU
N
E
, 2
SHEET
IDENTIFICATION
D
ES
IG
N
ED
B
Y:
D W
N B
Y:
C
KD
B
Y:
SO
LI
C
IT
AT
IO
N
N O
D
AT
E:
C O
N
TR
AC
T
N O
SU
BM
IT
TE
D
B Y:
U .S
. A
IR
F O
R C
E C
IV
IL
E N
G
IN
EE
R
C
EN
TE
R
O
TI
E R
S& H
J O
IN
T
VE
N
TU
R
E
N
. M
AY
FA
IR
R O
AD
S
U
IT
E
M
IL
W
AU
KE
E, W
I 5
A
B
C
D
1 2 3 4 5
M A
R K
D
ES
C R
IP
TI
O N
D A
TE
FINAL DESIGN
SIGNED
THIS WORK WAS PREPARED
BY ME OR UNDER MY
SUPERVISION
SHEET OF 232
PA
U
L
VA
N D
EN
BE
R G
S.
H
ER
M
EN
IN
G
KL
N
TT
W
M-102
M
EC
H
AN
IC
AL
P
LA
N
SE
C
O N
D F
LO
O
R
NEW OUTDOOR AIR INTAKE REFER TO 1/M-201 & 1/M-202
FOR ELEVATION.
WALL OPENING AND INFILL BY GENERAL CONTRACTOR TO
ALLOW ACCESS TO INSTALL DUCT.
PLAN
NORTH
GENERAL NOTES:
1. LOCATION OF NEW EQUIPMENT TO BE INSTALLED SHOWN ON
DRAWINGS IS APPROXIMATE - FIELD VERIFY ALL EXISTING
CONDITIONS PRIOR TO INSTALLATION OF NEW EQUIPMENT.
2. GENERAL CONTRACTOR IS RESPONSIBLE FOR PATCHING ALL
OPENINGS IN CEILINGS, WALLS AND FLOORS THAT RESULT
FROM DEMOLITION WORK OR REMOVED EQUIPMENT, UNLESS
OPENING IS TO BE REUSED. PATCHING OF OPENINGS OR
OTHER DAMAGE IS TO MATCH ADJACENT SURFACES,
MATERIALS AND CONDITIONS.
INTAKE DUCT FROM DAY ROOM LG TO BE TERMINATED 1'-6"
ABOVE ROOF OF CANOPY.
EXHAUST FROM DAY ROOM TO TOILET RR1 TO TERMINATE
AT THE SAME ELEVATION AS THE KITCHEN HOOD EXHAUST.
TOILET ROOM EXHAUST FROM UNIT 119 TO TERMINATE
ABOVE DAY ROOM TOILET EXHAUST.
STORAGE ROOM - NO HEATING OR COOLING. NATURAL
VENTILATION USING EXISTING WALL OPENINGS.
02 03 04 05 06 07 08 09 11 12 13 14
B
C
D
E
F
14'10
S2
STAIR 2
S1
STAIR 1
UNIT 318
UNIT 319
UNIT 321
UNIT 323
UNIT 324
UNIT 322
LG3
LOUNGE 3
ST3
STORAGE 3
C3W
CORRIDOR 3W
LD3
LAUNDRY 3
UNIT 316
UNIT 314
UNIT 312
UNIT 310
UNIT 308
UNIT 306
UNIT 304
UNIT 302
UNIT 301
UNIT 303
UNIT 305
UNIT 307
UNIT 309
UNIT 311
UNIT 313
J3
JANITOR 3
C3
CORRIDOR 3
M
ATC
H
LIN
E
ACU
ACU
EF
ACU
M-402
M-402
M-401
ACU
EF
EF
ACU
ACU
EF
EF
ACU
ACU
EF
EF
ACU
ACU
EF
EF
ACU
ACU
EF
EF
ACU 1
ACU
EF
EF
ACU
ACU
EF
EF
ACU
ACU
EF
EF
ACU
ACU
EF
EF
ACU
EF
ACU
EF
ACU
EF
ACU
M-401
M-401
M-401
M-401
M-401
M-401
M-401
BDDBDD
T
100Ø
M-401
M-401
A
14 15 16 17 18 19 20
B
C
D
E
F
14'
S3
STAIR 3
UNIT 333
UNIT 332
UNIT 330
UNIT 331
UNIT 325
UNIT 327
UNIT 329
UNIT 328
UNIT 326
UNIT 334
UNIT 335
UNIT 336
C3E
CORRIDOR 3E
M
ATC
H
LIN
E
ACU
ACU
EF
EF
ACU
ACU
EF
EF
ACU
ACU
EF
EF
ACU
ACU
EF
EF
ACU
ACU
EF
EF
ACU
ACU
EF
EF
ACU
M-401
M-401
M-401
M-401
M-401
100Ø
M-401
M-401
SCALE:
MECHANICAL PLAN - THIRD FLOOR
1:1001 0 700030001000
R
EP
A
IR
D O
R M
, B
M
IS
A
W A
A
IR
B A
SE
JA
PA
N
(Q
KK
A1
2)
FA
-1
8- F-
JU
N
E
, 2
SHEET
IDENTIFICATION
D
ES
IG
N
ED
B
Y:
D W
N B
Y:
C
KD
B
Y:
SO
LI
C
IT
AT
IO
N
N O
D
AT
E:
C O
N
TR
AC
T
N O
SU
BM
IT
TE
D
B Y:
U .S
. A
IR
F O
R C
E C
IV
IL
E N
G
IN
EE
R
C
EN
TE
R
O
TI
E R
S& H
J O
IN
T
VE
N
TU
R
E
N
. M
AY
FA
IR
R O
AD
S
U
IT
E
M
IL
W
AU
KE
E, W
I 5
A
B
C
D
1 2 3 4 5
M A
R K
D
ES
C R
IP
TI
O N
D A
TE
FINAL DESIGN
SIGNED
THIS WORK WAS PREPARED
BY ME OR UNDER MY
SUPERVISION
SHEET OF 232
PA
U
L
VA
N D
EN
BE
R G
S.
H
ER
M
EN
IN
G
KL
N
TT
W
M-103
M
EC
H
AN
IC
AL
P
LA
N
TH
IR
D F
LO
O
R
KEYNOTES
1 NEW OUTDOOR AIR INTAKE REFER TO 1/M-201 & 1/M-202
FOR ELEVATION.
2 STORAGE ROOM - NO HEATING OR COOLING. NATURAL
VENTILATION USING EXISTING WALL OPENINGS.
PLAN
NORTH
GENERAL NOTES:
1. LOCATION OF NEW EQUIPMENT TO BE INSTALLED SHOWN ON
DRAWINGS IS APPROXIMATE - FIELD VERIFY ALL EXISTING
CONDITIONS PRIOR TO INSTALLATION OF NEW EQUIPMENT.
2. GENERAL CONTRACTOR IS RESPONSIBLE FOR PATCHING ALL
OPENINGS IN CEILINGS, WALLS AND FLOORS THAT RESULT
FROM DEMOLITION WORK OR REMOVED EQUIPMENT, UNLESS
OPENING IS TO BE REUSED. PATCHING OF OPENINGS OR
OTHER DAMAGE IS TO MATCH ADJACENT SURFACES,
MATERIALS AND CONDITIONS.
02 03 04 05 06 07 08 09 11 12 13 14
B
C
D
E
F
14'10
S2
STAIR 2
S1
STAIR 1
LG4
DAY ROOM 4
UNIT 418
UNIT 419
UNIT 423ST4
STORAGE 4
UNIT 422
UNIT 424
UNIT 416
UNIT 414
UNIT 412
UNIT 410
UNIT 408
UNIT 406
UNIT 404
UNIT 402
UNIT 401
UNIT 403
UNIT 405
UNIT 407
UNIT 409
UNIT 411
UNIT 413
LD4
LAUNDRY 4
J4
JANITOR 4
UNIT 421
C4
CORRIDOR 4
C4W
CORRIDOR 4W
RR4
RRM 4
M
ATC
H
LIN
E
M-402
M-402
M-401
M-401
M-401
M-401
M-401
M-401
M-401
M-401
M-401
M-401
ACU
ACU
EF
EF
ACU
ACU
EF
EF
ACU
ACU
EF
EF
ACU
ACU
EF
EF
ACU
ACU
EF
EF
ACU
ACU
EF
EF
ACU
ACU
ACU
ACU
ACU
ACU
EF
EF
ACU
EF
ACU
EF
ACU
ACU
EF
EF
ACU
EF
EF
EF
EF
EF
M-401
M-401
100Ø
M-401
A
14 15 16 17 18 19 20
B
C
D
E
F
14'
S3
STAIR 3
UNIT 425
UNIT 434
UNIT 426
UNIT 428
UNIT 430
UNIT 432
UNIT 427
UNIT 429
UNIT 431
UNIT 433
UNIT 435
C4E
CORRIDOR 4E
UNIT 436
M
ATC
H
LIN
E
M-401
M-401
M-401
M-401
M-401
M-401
M-401
ACU
ACU
EF
EF
ACU
ACU
EF
EF
ACU
ACU
EF
EF
ACU
ACU
EF
EF
ACU
ACU
ACU
EF
EF
ACU
ACU
EF
EF
100Ø
SCALE:
MECHANICAL PLAN - FOURTH FLOOR
1:1001 0 700030001000
R
EP
A
IR
D O
R M
, B
M
IS
A
W A
A
IR
B A
SE
JA
PA
N
(Q
KK
A1
2)
FA
-1
8- F-
JU
N
E
, 2
SHEET
IDENTIFICATION
D
ES
IG
N
ED
B
Y:
D W
N B
Y:
C
KD
B
Y:
SO
LI
C
IT
AT
IO
N
N O
D
AT
E:
C O
N
TR
AC
T
N O
SU
BM
IT
TE
D
B Y:
U .S
. A
IR
F O
R C
E C
IV
IL
E N
G
IN
EE
R
C
EN
TE
R
O
TI
E R
S& H
J O
IN
T
VE
N
TU
R
E
N
. M
AY
FA
IR
R O
AD
S
U
IT
E
M
IL
W
AU
KE
E, W
I 5
A
B
C
D
1 2 3 4 5
M A
R K
D
ES
C R
IP
TI
O N
D A
TE
FINAL DESIGN
SIGNED
THIS WORK WAS PREPARED
BY ME OR UNDER MY
SUPERVISION
SHEET OF 232
PA
U
L
VA
N D
EN
BE
R G
S.
H
ER
M
EN
IN
G
KL
N
TT
W
M-104
M
EC
H
AN
IC
AL
P
LA
N
FO
U
R
TH
F
LO
O R
KEYNOTES
1 STORAGE ROOM - NO HEATING OR COOLING. NATURAL
VENTILATION USING EXISTING WALL OPENINGS.
PLAN
NORTH
GENERAL NOTES:
1. LOCATION OF NEW EQUIPMENT TO BE INSTALLED SHOWN ON
DRAWINGS IS APPROXIMATE - FIELD VERIFY ALL EXISTING
CONDITIONS PRIOR TO INSTALLATION OF NEW EQUIPMENT.
2. GENERAL CONTRACTOR IS RESPONSIBLE FOR PATCHING ALL
OPENINGS IN CEILINGS, WALLS AND FLOORS THAT RESULT
FROM DEMOLITION WORK OR REMOVED EQUIPMENT, UNLESS
OPENING IS TO BE REUSED. PATCHING OF OPENINGS OR
OTHER DAMAGE IS TO MATCH ADJACENT SURFACES,
FLOOR 1
FLOOR 2
TO WALL
12400
01 02 03 04 05 06 07 08 09 11 12 13 14
FLOOR 3
FLOOR 4
14'
GL
-500
M
ATC
H
LIN
E
5 4(TYP.) (TYP.) (TYP.)
FLOOR 1
FLOOR 2
TO WALL
12400
14 15 16 17 18 19 20
FLOOR 3
FLOOR 4
14'
GL
-500
M
ATC
H
LIN
E
(TYP.)
6 (TYP.)
(TYP.)
SCALE:
MECHANICAL EXTERIOR ELEVATION - SOUTH
1:1001 0 700030001000
R
EP
A
IR
D O
R M
, B
M
IS
A
W A
A
IR
B A
SE
JA
PA
N
(Q
KK
A1
2)
FA
-1
8- F-
JU
N
E
, 2
SHEET
IDENTIFICATION
D
ES
IG
N
ED
B
Y:
D W
N B
Y:
C
KD
B
Y:
SO
LI
C
IT
AT
IO
N
N O
D
AT
E:
C O
N
TR
AC
T
N O
SU
BM
IT
TE
D
B Y:
U .S
. A
IR
F O
R C
E C
IV
IL
E N
G
IN
EE
R
C
EN
TE
R
O
TI
E R
S& H
J O
IN
T
VE
N
TU
R
E
N
. M
AY
FA
IR
R O
AD
S
U
IT
E
M
IL
W
AU
KE
E, W
I 5
A
B
C
D
1 2 3 4 5
M A
R K
D
ES
C R
IP
TI
O N
D A
TE
FINAL DESIGN
SIGNED
THIS WORK WAS PREPARED
BY ME OR UNDER MY
SUPERVISION
SHEET OF 232
PA
U
L
VA
N D
EN
BE
R G
S.
H
ER
M
EN
IN
G
KL
N
TT
W
M-201
M
EC
H
AN
IC
AL
E
XT
ER
IO
R E
LE
VA
TI
O
N
SO
U
TH
KEYNOTES
1 REFRIGERANT RISERS INSTALLED IN ENCLOSURE.
HEAT PUMP INSTALLED ON WALL MOUNTED BRACKET.2
3 GRADE MOUNTED HEAT PUMP. PROVIDE 6" CONCRETE PAD.
4 OUTDOOR INTAKE OPENINGS WITH HOOD. REFER TO M-401
FOR UNIT PLANS AND LOCATION OF NEW PENETRATION.
5 OUTDOOR EXHAUST OPENINGS WITH HOOD. REFER TO
M-401 FOR UNIT PLANS AND LOCATION OF NEW
PENETRATION.
6 CANOPY OVER WALL MOUNTED HEAT PUMP UNITS BY
OTHERS. REFER TO ARCHITECTURAL DRAWINGS.
GENERAL NOTES:
1. LOCATION OF NEW EQUIPMENT TO BE INSTALLED SHOWN ON
DRAWINGS IS APPROXIMATE - FIELD VERIFY ALL EXISTING
CONDITIONS PRIOR TO INSTALLATION OF NEW EQUIPMENT.
2. GENERAL CONTRACTOR IS RESPONSIBLE FOR PATCHING ALL
OPENINGS IN CEILINGS, WALLS AND FLOORS THAT RESULT
FROM DEMOLITION WORK OR REMOVED EQUIPMENT, UNLESS
OPENING IS TO BE REUSED. PATCHING OF OPENINGS OR
OTHER DAMAGE IS TO MATCH ADJACENT SURFACES,
FLOOR 1
FLOOR 2
TO WALL
12400
01020304050607080911121314
FLOOR 3
FLOOR 4
14'
GL
-500
M
ATC
H
LIN
E
FLOOR 1
FLOOR 2
TO WALL
12400
01020304050607080911121314
FLOOR 3
FLOOR 4
14'
GL
-500
M
ATC
H
LIN
E
4 5 4
(TYP.)
(TYP.)
(TYP.) (TYP.) (TYP.)
FLOOR 1
FLOOR 2
TO WALL
12400
14151617181920
FLOOR 3
FLOOR 4
14'
GL
-500
M
ATC
H
LIN
E
SCALE:
MECHANICAL EXTERIOR ELEVATION - NORTH
1:1001 0 700030001000
R
EP
A
IR
D O
R M
, B
M
IS
A
W A
A
IR
B A
SE
JA
PA
N
(Q
KK
A1
2)
FA
-1
8- F-
JU
N
E
, 2
SHEET
IDENTIFICATION
D
ES
IG
N
ED
B
Y:
D W
N B
Y:
C
KD
B
Y:
SO
LI
C
IT
AT
IO
N
N O
D
AT
E:
C O
N
TR
AC
T
N O
SU
BM
IT
TE
D
B Y:
U .S
. A
IR
F O
R C
E C
IV
IL
E N
G
IN
EE
R
C
EN
TE
R
O
TI
E R
S& H
J O
IN
T
VE
N
TU
R
E
N
. M
AY
FA
IR
R O
AD
S
U
IT
E
M
IL
W
AU
KE
E, W
I 5
A
B
C
D
1 2 3 4 5
M A
R K
D
ES
C R
IP
TI
O N
D A
TE
FINAL DESIGN
SIGNED
THIS WORK WAS PREPARED
BY ME OR UNDER MY
SUPERVISION
SHEET OF 232
PA
U
L
VA
N D
EN
BE
R G
S.
H
ER
M
EN
IN
G
KL
N
TT
W
M-202
M
EC
H
AN
IC
AL
E
XT
ER
IO
R E
LE
VA
TI
O
N
N O
R
TH
KEYNOTES
1 REFRIGERANT RISERS INSTALLED IN ENCLOSURE.
HEAT PUMP INSTALLED ON WALL MOUNTED BRACKET.2
3 GRADE MOUNTED HEAT PUMP. PROVIDE 6" CONCRETE PAD.
4 OUTDOOR INTAKE OPENINGS WITH HOOD. REFER TO M-401
FOR UNIT PLANS AND LOCATION OF NEW PENETRATION.
5 OUTDOOR EXHAUST OPENINGS WITH HOOD. REFER TO
M-401 FOR UNIT PLANS AND LOCATION OF NEW
PENETRATION.
6 CANOPY OVER WALL MOUNTED HEAT PUMP UNITS BY
OTHERS. REFER TO ARCHITECTURAL DRAWINGS.
GENERAL NOTES:
1. LOCATION OF NEW EQUIPMENT TO BE INSTALLED SHOWN ON
DRAWINGS IS APPROXIMATE - FIELD VERIFY ALL EXISTING
CONDITIONS PRIOR TO INSTALLATION OF NEW EQUIPMENT.
2. GENERAL CONTRACTOR IS RESPONSIBLE FOR PATCHING ALL
OPENINGS IN CEILINGS, WALLS AND FLOORS THAT RESULT
FROM DEMOLITION WORK OR REMOVED EQUIPMENT, UNLESS
OPENING IS TO BE REUSED. PATCHING OF OPENINGS OR
OTHER DAMAGE IS TO MATCH ADJACENT SURFACES,
MATERIALS AND CONDITIONS.
7 DRYER VENT WALL OPENING.
UNIT 107
UNIT 105
T
ACU-1
ACU
R P
EF
T
ACU-1
ACU
R P
EF
6.35 (RL)
12.7 (RS)
6.35 (RL)
12.7 (RS)
C D C D
25mm25mm
UNIT 135
T
ACU-1
ACU
EF
C D
100Ø
EUH
HP
RP
6.35 (RL)
12.7 (RS)
HP
25mm
UNIT 405
UNIT 407
T
ACU-1
ACU
R P
EF
T
ACU-1
ACU
R P
EF
1 1
6.35 (RL)
12.7 (RS)
6.35 (RL)
12.7 (RS)
150Ø150Ø
100Ø100Ø
CD CD
25mm25mm
UNIT 433
UNIT 435
T
ACU-1
ACU
EF
EF
6.35 (RL)
12.7 (RS)
RP
150Ø
CD
25mm (TYP)
150Ø150Ø
SCALE:
MECHANICAL PLAN - TYPICAL 1ST, 2ND, & 3RD FLOOR UNITS
1:501
GENERAL NOTES:
8. REFER TO DRAWING 1/M-201 & 1/M-202 ELEVATION FOR
LOCATION OF EXHAUST AND OUTDOOR AIR INTAKE
OPENINGS.
KEYNOTES
1 REFER TO DETAIL 2/M-501 FOR EXHAUST AND OUTDOOR AIR
TERMINATION DETAIL. BALANCE OUTDOOR AIR FLOW TO 24
LPS.
2 EF-1 INTERLOCKED WITH LIGHT SWITCH. MAKE-UP AIR FOR
EF-1 IS SUPPLIED FROM ACU-1 AND TRANSFERED THROUGH
THE DOOR UNDERCUT IN THE BATHROOM DOOR.
3 38 mm COOLING COIL CONDENSATE RISER FROM ABOVE
4TH FLOOR CEILING TO ABOVE 1ST FLOOR SLAB. RISER
WILL DISCHARGE TO EXTERIOR PER DETAIL 4/M-502.
0 35001500500 0 35001500500SCALE:
MECHANICAL PLAN - TYPICAL 1ST, 2ND, & 3RD FLOOR CORNER UNITS
1:502
SCALE:
MECHANICAL PLAN - 4TH FLOOR TYPICAL UNITS
1:503 0 35001500500 0 35001500500SCALE:
MECHANICAL PLAN - 4TH FLOOR TYPICAL CORNER UNITS
1:504
R
EP
A
IR
D O
R M
, B
M
IS
A
W A
A
IR
B A
SE
JA
PA
N
(Q
KK
A1
2)
FA
-1
8- F-
JU
N
E
, 2
SHEET
IDENTIFICATION
D
ES
IG
N
ED
B
Y:
D W
N B
Y:
C
KD
B
Y:
SO
LI
C
IT
AT
IO
N
N O
D
AT
E:
C O
N
TR
AC
T
N O
SU
BM
IT
TE
D
B Y:
U .S
. A
IR
F O
R C
E C
IV
IL
E N
G
IN
EE
R
C
EN
TE
R
O
TI
E R
S& H
J O
IN
T
VE
N
TU
R
E
N
. M
AY
FA
IR
R O
AD
S
U
IT
E
M
IL
W
AU
KE
E, W
I 5
A
B
C
D
1 2 3 4 5
M A
R K
D
ES
C R
IP
TI
O N
D A
TE
FINAL DESIGN
SIGNED
THIS WORK WAS PREPARED
BY ME OR UNDER MY
SUPERVISION
SHEET OF 232
PA
U
L
VA
N D
EN
BE
R G
S.
H
ER
M
EN
IN
G
KL
N
TT
W
M-401
M
EC
H
AN
IC
AL
P
LA
N
TY
PI
C
AL
U N
IT
S
1. PROVIDE NEW HEAT PUMP AIR COOLED CONDENSING UNIT AS
SHOWN. PROVIDE CLEAR SPACE AROUND UNIT PER
MANUFACTURER'S INSTRUCTIONS. PROVIDE FINGER-PROOF
SAFETY GRILLE AT HEAT PUMP. WIRE TO NEW EMCS SYSTEM.
2. PROVIDE ALL NECESSARY PIPING, WIRING, DDC CONTROLS
AND SUPPORTS FOR INDOOR HEAT PUMPS AS RECOMMENDED
BY EQUIPMENT MANUFACTURER.
3. NEW THERMOSTATS SHALL BE INSTALLED AT LOCATION OF
PREVIOUS THERMOSTAT AND WIRED THRU EXISTING CONDUIT.
4. ROUTE RP AND CD IN EXTERIOR PRE-MANUFACTURED
PLASTIC ENCLOSURE WHERE PIPING IS SHOWN ON BUILDING
EXTERIOR WITHIN BALCONIES. REFER TO ARCHITECTURAL
DRAWINGS FOR EXACT LOCATION.
5. PROVIDE HEAT PUMPS WITH INTEGRAL CONDENSATE PUMP.
PITCH ALL CONDENSATE PIPING TOWARDS TERMINATION
POINT AT EXISTING FLOOR DRAIN IN CORNER OF BALCONY. DO
NOT DISCHARGE CONDENSATE ON OPPOSITE SIDE OF
EXISTING FLOOR DRAIN WHERE FLOOR PITCHES TO DRAIN.
6. NO REFRIGERANT TUBE SEAMS OR COUPLINGS SHALL BE
ALLOWED TO BE CONCEALED ABOVE EXISTING DRYWALL
CEILINGS, OR IN NEW VERTICAL CHASES. ALL BREAKS IN
REFRIGERANT PIPING SHALL BE ACCESSIBLE AT DX
EQUIPMENT, OR AT NEW OR EXISTING ACCESS PANELS.
7. ACCESS PANELS SHOWN ON THIS PLAN FOR REFERENCE.
COORDINATE EXACT LOCATION WITH ACTUAL EQUIPMENT
ACCESS, ALONG WITH ADJACENT CEILING-MOUNTED DEVICES.
REFER TO ARCHITECTURAL PLANS FOR SCOPE OF WORK.
4 SEE TYPICAL REFRIGERANT PIPING RISER.
LG1
DAY ROOM 1
RR1
RRM 1
LOBBY
FACP ROOM
C1
EF
ACU
ACU
R P
RP
R P
150Ø
150Ø
25mm
CDCD
ACU
T
T
150Ø
STORAGE 2LG2
LOUNGE 2
R P
ACU
150Ø
CD 2
EF
EF
175Ø
175Ø
BDDBDD
T
LD1
LAUNDRY 1
J1
JANITOR 1
CORRIDOR 1
ACU
EF
RP
TG
TG
150Ø
600/150
25mmCD
T
150Ø
150Ø
250Ø
M-503
LD2
LAUNDRY 2
J2
JANITOR 2
CORRIDOR 2
ACU
EF
RP
TG
TG
600/150
2 4
25mmCD
150Ø
T
150Ø
250Ø
M-503
LG4
DAY ROOM 4
RR4
RRM 4
EF
ACU
R P
150Ø
150Ø
CD
T
STORAGE 2LG2
LOUNGE 2
R P
ACU
150Ø
CD 2
EF
EF
175Ø
175Ø
BDDBDD
T
SCALE:
MECHANICAL PLAN - 1ST FLOOR LOUNGE
1:503
KEYNOTES
0 35001500500
0 35001500500SCALE:
MECHANICAL PLAN - 2ND FLOOR LOUNGE
1:504
SCALE:
MECHANICAL PLAN - 2ND, 3RD, AND 4TH FLOOR LAUNDRY
1:502 0 35001500500
R
EP
A
IR
D O
R M
, B
M
IS
A
W A
A
IR
B A
SE
JA
PA
N
(Q
KK
A1
2)
FA
-1
8- F-
JU
N
E
, 2
SHEET
IDENTIFICATION
D
ES
IG
N
ED
B
Y:
D W
N B
Y:
C
KD
B
Y:
SO
LI
C
IT
AT
IO
N
N O
D
AT
E:
C O
N
TR
AC
T
N O
SU
BM
IT
TE
D
B Y:
U .S
. A
IR
F O
R C
E C
IV
IL
E N
G
IN
EE
R
C
EN
TE
R
O
TI
E R
S& H
J O
IN
T
VE
N
TU
R
E
N
. M
AY
FA
IR
R O
AD
S
U
IT
E
M
IL
W
AU
KE
E, W
I 5
A
B
C
D
1 2 3 4 5
M A
R K
D
ES
C R
IP
TI
O N
D A
TE
FINAL DESIGN
SIGNED
THIS WORK WAS PREPARED
BY ME OR UNDER MY
SUPERVISION
SHEET OF 232
PA
U
L
VA
N D
EN
BE
R G
S.
H
ER
M
EN
IN
G
KL
N
TT
W
M-402
M
EC
H
AN
IC
AL
E N
LA
R
G
ED
P
LA
N S
0 35001500500SCALE:
MECHANICAL PLAN - 1ST FLOOR LAUNDRY
1:501
0 35001500500SCALE:
MECHANICAL PLAN - 4TH FLOOR LOUNGE
1:505
OUTDOOR AIR NOT REQUIRED FOR LOBBY OR FACP ROOM.
REFER TO 2/M-502 FOR ELEVATION OF DRYER DUCT AND
LINT TRAP INSTALLATION.
EXISTING EXHAUST WALL OPENINGS TO BE REUSED.3
NEW INTAKE/EXHAUST AIR…