Atch 2_Draft Drawing 02 Hazmat - Repair Dorm B542.pdf
PDF 4 MB Posted
- Solicitation number
- FA520522R0001
About this file
This pre-solicitation notice and related documents outline requirements for a firm-fixed-price construction contract to renovate Dormitory Building 542 at Misawa Air Base in Japan. The contractor shall provide supervision, management, labor and materials to demolish hazardous materials, renovate building systems including electrical, plumbing and HVAC, install new finishes and windows, and complete site improvements. The performance period is 531 calendar days including 30 days for mobilization. The estimated contract value is between $10-25 million USD or YEN1,064,531,000-YEN2,661,327,500. The solicitation is expected to be issued on January 31, 2022 with proposals due approximately 40 days later. A pre-proposal conference will be held on February 25, 2022 to review the RFP and project sites. The contract will be awarded using the subjective tradeoff process to the offeror providing the best value based on past performance and price factors. Registration in the System for Award Management is required and the contractor must obtain necessary licenses to work in Japan.
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
MATCHLINE
14 15 16 17 18 19 2014'
STAIR 3
UNIT 130UNIT 128UNIT 126 UNIT 136
UNIT 135
UNIT 134
UNIT 133UNIT 125 UNIT 127 UNIT 129
UNIT 132
UNIT 131
CORRIDOR 1E
MATCHLINE
OFFICE
CORRIDOR 1
LOBBY
RRM 1
UNIT 106UNIT 104UNIT 102
UNIT 101 UNIT 103 UNIT 105 UNIT 107 UNIT 109 UNIT 111 UNIT 113
UNIT 108 UNIT 110 UNIT 112 UNIT 114
LINEN 1
MECHANICAL RM
DAY ROOM 1
CORRIDOR 1W
JANITOR 1
LAUNDRY 1
UNIT 123UNIT 121UNIT 119
STORAGE 1 UNIT 124
STAIR 1
STAIR 2
10 14'
F
E
D
C
B
141312110908070605040302
A
KEYNOTES
REMOVE AND DISPOSE OF ASBESTOS CONTAINING MASTIC
AND ASSOCIATED 12" X 12" VINYL FLOOR TILES
GENERAL NOTES:
1. USE APPROPRIATE ENGINEERING CONTROLS AND WORKER PROTECTION FOR ALL
REMOVAL WORK AFFECTED BY CONSTRUCTION.
2. JOINT COMPOUND ON GYPSUM WALL AND CEILING BOARD CONTAINS MORE THAN
0.1% ASBESTOS.
3. COMPLY WITH THE JEGS AND ALL JAPANESE REGULATIONS REGARDING MATERIALS
CONTAINING MORE THAN 0.1% ASBESTOS.
4. ALL PIPE FLANGE GASKETS ARE PRESUMED TO BE ACM. ALL PIPE FLANGES THAT
WILL BE REMOVED DURING THIS PROJECT SHOULD BE REMOVED BY CUTTING THE
PIPING ON BOTH SIDES OF THE FLANGE, REMOVING FLANGE ASSEMBLY INTACT
WITHOUT DISTURBING THE GASKET MATERIAL WHICH IS PRESUMED TO BE ACM,
DISPOSE OF FLANGE ASSEMBLY AS HAZARDOUS MATERIAL.
5. LEAD-BASED PAINT IS PRESENT IN THE BUILDING ON COMPONENTS INCLUDING BUT
NOT LIMITED TO, STEEL DOORS AND FRAMES, HAND RAILS, PIPING AND OTHER
PAINTED STEEL COMPONENTS. IF THE COMPONENTS ARE SCHEDULED TO BE
REMOVED, THE WORK SHALL BE DONE IN A MANNER THAT DOES NOT DISTURB THE
PAINT TO A POINT WHERE ABATEMENT ACTIVITIES INVOLVING SPECIALLY TRAINED
WORKERS IS REQUIRED. DEMOLITION ACTIVITIES SHALL NOT INVOLVE HIGH-SPEED
SANDING, GRINDING, OR CUTTING WHICH CAN MAKE THE PAINT MATERIAL TO
BECOME AIRBORNE AND RESPIRIABLE
6. THE CONTRACTOR MUST PROVIDE THEIR OWN BILINGUAL WARNING SIGNS.
7. MANOMETERS SHOULD RUN 24 HOURS A DAY, EVERY DAY UNTIL FINAL CLEARANCE IS
APPROVED BY THE CONTRACTING OFFICER.
8. UPON COMPLETION OF ALL WORK CONTRACTORS SHALL PROVIDE ASBUILT
DRAWINGS SHOWING WHERE ALL ACM WAS REMOVED TO 35 CES ENVIRONMENTAL.
9. SEE ARCHITECTURAL DRAWINGS FOR THE LOCATIONS WHERE DEMOLITION /
CONSTRUCTION WORK WILL DISTURB ACM.
REMOVE AND DISPOSE OF GYPSUM WALL BOARD WITH ASBESTOS
CONTAINING JOINT COMPOUND FROM WALLS.
REMOVE AND DISPOSE OF GYPSUM CEILING BOARD WITH ASBESTOS
CONTAINING JOINT COMPOUND FROM CEILINGS.
REMOVE AND DISPOSE OF VINYL COVE BASE WITH ACM MASTIC.
SCALE:
HAZARDOUS DEMOLITION FIRST FLOOR PLAN
1:1001 0 700030001000
R
EP
A
IR
D O
R M
M
IS
A W
A A
IR
B
A
SE
JA
PA
N
(Q
KK
A1
2)
FA
-1
8- F-
6-
-2
SHEET
IDENTIFICATION
D
ES
IG
N
ED
B
Y:
D W
N B
Y:
C
KD
B
Y:
SO
LI
C
IT
AT
IO
N
N O
D
AT
E:
C O
N
TR
AC
T
N O
SU
BM
IT
TE
D
B Y:
U .S
. A
IR
F O
R C
E C
IV
IL
E N
G
IN
EE
R
C
EN
TE
R
O
TI
E R
S& H
J O
IN
T
VE
N
TU
R
E
N
. M
AY
FA
IR
R O
AD
S
U
IT
E
M
IL
W
AU
KE
E, W
I 5
A
B
C
D
1 2 3 4 5
M A
R K
D
ES
C R
IP
TI
O N
D A
TE
FINAL DESIGN
SIGNED
THIS WORK WAS PREPARED
BY ME OR UNDER MY
SUPERVISION
SHEET OF 232
PA
U
L
VA
N D
EN
BE
R G
W .R
AN
D
AL
L
C
YO
W R
HD-101
H
AZ
AR
D
O U
S D
EM
O
LI
TI
O N
F
IR
ST
F
LO
O
R P
LA
N
A BLACK ASPHALTIC WATERPROOFING COATING MAY BE
PRESENT BETWEEN THE CONCRETE SLAB AND MORTAR
BENEATH THE BATHROOM FLOOR TILES. IF ENCOUNTERED
CONTACT THE CONTRACTING OFFICER PRIOR TO CONTINUING
WORK
REMOVE AND DISPOSE OF ASBESTOS CONTAINING PIPE ELBOW TSI.
6DRAFT
MATCHLINE
14 15 16 17 18 19 2014'
STAIR 3
UNIT x33UNIT x31UNIT x29UNIT x27UNIT x25
UNIT x32UNIT x30UNIT x28UNIT x26 UNIT x36UNIT x34
UNIT x35
CORRIDOR xE
MATCHLINE
CORRIDOR x
JANITOR x
UNIT x13UNIT x11UNIT x09UNIT x07UNIT x05UNIT x03UNIT x01
UNIT x02 UNIT x04 UNIT x06 UNIT x08 UNIT x10 UNIT x12 UNIT x14 UNIT x16 LAUNDRY x
LOUNGE x
CORRIDOR xW
STORAGE x
UNIT x18
UNIT x19
UNIT x22 UNIT x24
UNIT x21 UNIT x23
STAIR 1
STAIR 2
10 14'
F
E
D
C
B
141312110908070605040302
A
FOR ROOM IDENTIFICATION NUMBERS
x REPRESENTS THE FLOOR NUMBER, WHERE x22 IS ROOM:
222 ON THE SECOND FLOOR
322 ON THE THIRD FLOOR
422 ON THE FOURTH FLOOR
R
EP
A
IR
D O
R M
M
IS
A W
A A
IR
B
A
SE
JA
PA
N
(Q
KK
A1
2)
FA
-1
8- F-
6-
-2
SHEET
IDENTIFICATION
D
ES
IG
N
ED
B
Y:
D W
N B
Y:
C
KD
B
Y:
SO
LI
C
IT
AT
IO
N
N O
D
AT
E:
C O
N
TR
AC
T
N O
SU
BM
IT
TE
D
B Y:
U .S
. A
IR
F O
R C
E C
IV
IL
E N
G
IN
EE
R
C
EN
TE
R
O
TI
E R
S& H
J O
IN
T
VE
N
TU
R
E
N
. M
AY
FA
IR
R O
AD
S
U
IT
E
M
IL
W
AU
KE
E, W
I 5
A
B
C
D
1 2 3 4 5
M A
R K
D
ES
C R
IP
TI
O N
D A
TE
FINAL DESIGN
SIGNED
THIS WORK WAS PREPARED
BY ME OR UNDER MY
SUPERVISION
SHEET OF 232
PA
U
L
VA
N D
EN
BE
R G
W .R
AN
D
AL
L
C
YO
W R
HD-102
H
AZ
AR
D
O U
S D
EM
O
LI
TI
O N
SE
C
O N
D T
O F
O U
R
TH
F
LO
O R
P
LA
N
SCALE:
HAZARDOUS DEMOLITION SECOND TO FOURTH FLOOR PLAN
1:1001 0 700030001000
KEYNOTES
REMOVE AND DISPOSE OF ASBESTOS CONTAINING MASTIC
AND ASSOCIATED 12" X 12" VINYL FLOOR TILES
GENERAL NOTES:
1. USE APPROPRIATE ENGINEERING CONTROLS AND WORKER PROTECTION FOR ALL
REMOVAL WORK AFFECTED BY CONSTRUCTION.
2. JOINT COMPOUND ON GYPSUM WALL AND CEILING BOARD CONTAINS MORE THAN
0.1% ASBESTOS.
3. COMPLY WITH THE JEGS AND ALL JAPANESE REGULATIONS REGARDING MATERIALS
CONTAINING MORE THAN 0.1% ASBESTOS.
4. ALL PIPE FLANGE GASKETS ARE PRESUMED TO BE ACM. ALL PIPE FLANGES THAT
WILL BE REMOVED DURING THIS PROJECT SHOULD BE REMOVED BY CUTTING THE
PIPING ON BOTH SIDES OF THE FLANGE, REMOVING FLANGE ASSEMBLY INTACT
WITHOUT DISTURBING THE GASKET MATERIAL WHICH IS PRESUMED TO BE ACM,
DISPOSE OF FLANGE ASSEMBLY AS HAZARDOUS MATERIAL.
5. LEAD-BASED PAINT IS PRESENT IN THE BUILDING ON COMPONENTS INCLUDING BUT
NOT LIMITED TO, STEEL DOORS AND FRAMES, HAND RAILS, PIPING AND OTHER
PAINTED STEEL COMPONENTS. IF THE COMPONENTS ARE SCHEDULED TO BE
REMOVED, THE WORK SHALL BE DONE IN A MANNER THAT DOES NOT DISTURB THE
PAINT TO A POINT WHERE ABATEMENT ACTIVITIES INVOLVING SPECIALLY TRAINED
WORKERS IS REQUIRED. DEMOLITION ACTIVITIES SHALL NOT INVOLVE HIGH-SPEED
SANDING, GRINDING, OR CUTTING WHICH CAN MAKE THE PAINT MATERIAL TO
BECOME AIRBORNE AND RESPIRIABLE
6. THE CONTRACTOR MUST PROVIDE THEIR OWN BILINGUAL WARNING SIGNS.
7. MANOMETERS SHOULD RUN 24 HOURS A DAY, EVERY DAY UNTIL FINAL CLEARANCE IS
APPROVED BY THE CONTRACTING OFFICER.
8. UPON COMPLETION OF ALL WORK CONTRACTORS SHALL PROVIDE ASBUILT
DRAWINGS SHOWING WHERE ALL ACM WAS REMOVED TO 35 CES ENVIRONMENTAL.
9. SEE ARCHITECTURAL DRAWINGS FOR THE LOCATIONS WHERE DEMOLITION /
CONSTRUCTION WORK WILL DISTURB ACM.
REMOVE AND DISPOSE OF GYPSUM WALL BOARD WITH ASBESTOS
CONTAINING JOINT COMPOUND FROM WALLS.
REMOVE AND DISPOSE OF GYPSUM CEILING BOARD WITH ASBESTOS
CONTAINING JOINT COMPOUND FROM CEILINGS.
REMOVE AND DISPOSE OF VINYL COVE BASE WITH ACM MASTIC.
A BLACK ASPHALTIC WATERPROOFING COATING MAY BE
PRESENT BETWEEN THE CONCRETE SLAB AND MORTAR
BENEATH THE BATHROOM FLOOR TILES. IF ENCOUNTERED
CONTACT THE CONTRACTING OFFICER PRIOR TO CONTINUING
WORK
5DRAFT
| DORM_542_HD_1ST_FLOOR-Layout1 |
| Sheets and Views |
| Layout1 |
| DORM_542_HD_2ND-4TH_FLOORS-Layout1 |
| Sheets and Views |
| Layout1 |
File details come from the government source that posted it. Updated .