This pre-solicitation notice and related documents outline requirements for a firm-fixed-price construction contract to renovate Dormitory Building 542 at Misawa Air Base in Japan. The contractor shall provide supervision, management, labor and materials to demolish hazardous materials, renovate building systems including electrical, plumbing and HVAC, install new finishes and windows, and complete site improvements. The performance period is 531 calendar days including 30 days for mobilization. The estimated contract value is between $10-25 million USD or YEN1,064,531,000-YEN2,661,327,500. The solicitation is expected to be issued on January 31, 2022 with proposals due approximately 40 days later. A pre-proposal conference will be held on February 25, 2022 to review the RFP and project sites. The contract will be awarded using the subjective tradeoff process to the offeror providing the best value based on past performance and price factors. Registration in the System for Award Management is required and the contractor must obtain necessary licenses to work in Japan.

View the file

Other files

Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

MATCHLINE

14 15 16 17 18 19 2014'

STAIR 3

UNIT 130UNIT 128UNIT 126 UNIT 136

UNIT 135

UNIT 134

UNIT 133UNIT 125 UNIT 127 UNIT 129

UNIT 132

UNIT 131

CORRIDOR 1E

MATCHLINE

OFFICE

CORRIDOR 1

LOBBY

RRM 1

UNIT 106UNIT 104UNIT 102

UNIT 101 UNIT 103 UNIT 105 UNIT 107 UNIT 109 UNIT 111 UNIT 113

UNIT 108 UNIT 110 UNIT 112 UNIT 114

LINEN 1

MECHANICAL RM

DAY ROOM 1

CORRIDOR 1W

JANITOR 1

LAUNDRY 1

UNIT 123UNIT 121UNIT 119

STORAGE 1 UNIT 124

STAIR 1

STAIR 2

10 14'

F

E

D

C

B

141312110908070605040302

A

KEYNOTES

REMOVE AND DISPOSE OF ASBESTOS CONTAINING MASTIC

AND ASSOCIATED 12" X 12" VINYL FLOOR TILES

GENERAL NOTES:

1. USE APPROPRIATE ENGINEERING CONTROLS AND WORKER PROTECTION FOR ALL

REMOVAL WORK AFFECTED BY CONSTRUCTION.

2. JOINT COMPOUND ON GYPSUM WALL AND CEILING BOARD CONTAINS MORE THAN

0.1% ASBESTOS.

3. COMPLY WITH THE JEGS AND ALL JAPANESE REGULATIONS REGARDING MATERIALS

CONTAINING MORE THAN 0.1% ASBESTOS.

4. ALL PIPE FLANGE GASKETS ARE PRESUMED TO BE ACM. ALL PIPE FLANGES THAT

WILL BE REMOVED DURING THIS PROJECT SHOULD BE REMOVED BY CUTTING THE

PIPING ON BOTH SIDES OF THE FLANGE, REMOVING FLANGE ASSEMBLY INTACT

WITHOUT DISTURBING THE GASKET MATERIAL WHICH IS PRESUMED TO BE ACM,

DISPOSE OF FLANGE ASSEMBLY AS HAZARDOUS MATERIAL.

5. LEAD-BASED PAINT IS PRESENT IN THE BUILDING ON COMPONENTS INCLUDING BUT

NOT LIMITED TO, STEEL DOORS AND FRAMES, HAND RAILS, PIPING AND OTHER

PAINTED STEEL COMPONENTS. IF THE COMPONENTS ARE SCHEDULED TO BE

REMOVED, THE WORK SHALL BE DONE IN A MANNER THAT DOES NOT DISTURB THE

PAINT TO A POINT WHERE ABATEMENT ACTIVITIES INVOLVING SPECIALLY TRAINED

WORKERS IS REQUIRED. DEMOLITION ACTIVITIES SHALL NOT INVOLVE HIGH-SPEED

SANDING, GRINDING, OR CUTTING WHICH CAN MAKE THE PAINT MATERIAL TO

BECOME AIRBORNE AND RESPIRIABLE

6. THE CONTRACTOR MUST PROVIDE THEIR OWN BILINGUAL WARNING SIGNS.

7. MANOMETERS SHOULD RUN 24 HOURS A DAY, EVERY DAY UNTIL FINAL CLEARANCE IS

APPROVED BY THE CONTRACTING OFFICER.

8. UPON COMPLETION OF ALL WORK CONTRACTORS SHALL PROVIDE ASBUILT

DRAWINGS SHOWING WHERE ALL ACM WAS REMOVED TO 35 CES ENVIRONMENTAL.

9. SEE ARCHITECTURAL DRAWINGS FOR THE LOCATIONS WHERE DEMOLITION /

CONSTRUCTION WORK WILL DISTURB ACM.

REMOVE AND DISPOSE OF GYPSUM WALL BOARD WITH ASBESTOS

CONTAINING JOINT COMPOUND FROM WALLS.

REMOVE AND DISPOSE OF GYPSUM CEILING BOARD WITH ASBESTOS

CONTAINING JOINT COMPOUND FROM CEILINGS.

REMOVE AND DISPOSE OF VINYL COVE BASE WITH ACM MASTIC.

SCALE:

HAZARDOUS DEMOLITION FIRST FLOOR PLAN

1:1001 0 700030001000

R

EP

A

IR

D O

R M

M

IS

A W

A A

IR

B

A

SE

JA

PA

N

(Q

KK

A1

2)

FA

-1

8- F-

6-

-2

SHEET

IDENTIFICATION

D

ES

IG

N

ED

B

Y:

D W

N B

Y:

C

KD

B

Y:

SO

LI

C

IT

AT

IO

N

N O

D

AT

E:

C O

N

TR

AC

T

N O

SU

BM

IT

TE

D

B Y:

U .S

. A

IR

F O

R C

E C

IV

IL

E N

G

IN

EE

R

C

EN

TE

R

O

TI

E R

S& H

J O

IN

T

VE

N

TU

R

E

N

. M

AY

FA

IR

R O

AD

S

U

IT

E

M

IL

W

AU

KE

E, W

I 5

A

B

C

D

1 2 3 4 5

M A

R K

D

ES

C R

IP

TI

O N

D A

TE

FINAL DESIGN

SIGNED

THIS WORK WAS PREPARED

BY ME OR UNDER MY

SUPERVISION

SHEET OF 232

PA

U

L

VA

N D

EN

BE

R G

W .R

AN

D

AL

L

C

YO

W R

HD-101

H

AZ

AR

D

O U

S D

EM

O

LI

TI

O N

F

IR

ST

F

LO

O

R P

LA

N

A BLACK ASPHALTIC WATERPROOFING COATING MAY BE

PRESENT BETWEEN THE CONCRETE SLAB AND MORTAR

BENEATH THE BATHROOM FLOOR TILES. IF ENCOUNTERED

CONTACT THE CONTRACTING OFFICER PRIOR TO CONTINUING

WORK

REMOVE AND DISPOSE OF ASBESTOS CONTAINING PIPE ELBOW TSI.

6DRAFT

MATCHLINE

14 15 16 17 18 19 2014'

STAIR 3

UNIT x33UNIT x31UNIT x29UNIT x27UNIT x25

UNIT x32UNIT x30UNIT x28UNIT x26 UNIT x36UNIT x34

UNIT x35

CORRIDOR xE

MATCHLINE

CORRIDOR x

JANITOR x

UNIT x13UNIT x11UNIT x09UNIT x07UNIT x05UNIT x03UNIT x01

UNIT x02 UNIT x04 UNIT x06 UNIT x08 UNIT x10 UNIT x12 UNIT x14 UNIT x16 LAUNDRY x

LOUNGE x

CORRIDOR xW

STORAGE x

UNIT x18

UNIT x19

UNIT x22 UNIT x24

UNIT x21 UNIT x23

STAIR 1

STAIR 2

10 14'

F

E

D

C

B

141312110908070605040302

A

FOR ROOM IDENTIFICATION NUMBERS

x REPRESENTS THE FLOOR NUMBER, WHERE x22 IS ROOM:

222 ON THE SECOND FLOOR

322 ON THE THIRD FLOOR

422 ON THE FOURTH FLOOR

R

EP

A

IR

D O

R M

M

IS

A W

A A

IR

B

A

SE

JA

PA

N

(Q

KK

A1

2)

FA

-1

8- F-

6-

-2

SHEET

IDENTIFICATION

D

ES

IG

N

ED

B

Y:

D W

N B

Y:

C

KD

B

Y:

SO

LI

C

IT

AT

IO

N

N O

D

AT

E:

C O

N

TR

AC

T

N O

SU

BM

IT

TE

D

B Y:

U .S

. A

IR

F O

R C

E C

IV

IL

E N

G

IN

EE

R

C

EN

TE

R

O

TI

E R

S& H

J O

IN

T

VE

N

TU

R

E

N

. M

AY

FA

IR

R O

AD

S

U

IT

E

M

IL

W

AU

KE

E, W

I 5

A

B

C

D

1 2 3 4 5

M A

R K

D

ES

C R

IP

TI

O N

D A

TE

FINAL DESIGN

SIGNED

THIS WORK WAS PREPARED

BY ME OR UNDER MY

SUPERVISION

SHEET OF 232

PA

U

L

VA

N D

EN

BE

R G

W .R

AN

D

AL

L

C

YO

W R

HD-102

H

AZ

AR

D

O U

S D

EM

O

LI

TI

O N

SE

C

O N

D T

O F

O U

R

TH

F

LO

O R

P

LA

N

SCALE:

HAZARDOUS DEMOLITION SECOND TO FOURTH FLOOR PLAN

1:1001 0 700030001000

KEYNOTES

REMOVE AND DISPOSE OF ASBESTOS CONTAINING MASTIC

AND ASSOCIATED 12" X 12" VINYL FLOOR TILES

GENERAL NOTES:

1. USE APPROPRIATE ENGINEERING CONTROLS AND WORKER PROTECTION FOR ALL

REMOVAL WORK AFFECTED BY CONSTRUCTION.

2. JOINT COMPOUND ON GYPSUM WALL AND CEILING BOARD CONTAINS MORE THAN

0.1% ASBESTOS.

3. COMPLY WITH THE JEGS AND ALL JAPANESE REGULATIONS REGARDING MATERIALS

CONTAINING MORE THAN 0.1% ASBESTOS.

4. ALL PIPE FLANGE GASKETS ARE PRESUMED TO BE ACM. ALL PIPE FLANGES THAT

WILL BE REMOVED DURING THIS PROJECT SHOULD BE REMOVED BY CUTTING THE

PIPING ON BOTH SIDES OF THE FLANGE, REMOVING FLANGE ASSEMBLY INTACT

WITHOUT DISTURBING THE GASKET MATERIAL WHICH IS PRESUMED TO BE ACM,

DISPOSE OF FLANGE ASSEMBLY AS HAZARDOUS MATERIAL.

5. LEAD-BASED PAINT IS PRESENT IN THE BUILDING ON COMPONENTS INCLUDING BUT

NOT LIMITED TO, STEEL DOORS AND FRAMES, HAND RAILS, PIPING AND OTHER

PAINTED STEEL COMPONENTS. IF THE COMPONENTS ARE SCHEDULED TO BE

REMOVED, THE WORK SHALL BE DONE IN A MANNER THAT DOES NOT DISTURB THE

PAINT TO A POINT WHERE ABATEMENT ACTIVITIES INVOLVING SPECIALLY TRAINED

WORKERS IS REQUIRED. DEMOLITION ACTIVITIES SHALL NOT INVOLVE HIGH-SPEED

SANDING, GRINDING, OR CUTTING WHICH CAN MAKE THE PAINT MATERIAL TO

BECOME AIRBORNE AND RESPIRIABLE

6. THE CONTRACTOR MUST PROVIDE THEIR OWN BILINGUAL WARNING SIGNS.

7. MANOMETERS SHOULD RUN 24 HOURS A DAY, EVERY DAY UNTIL FINAL CLEARANCE IS

APPROVED BY THE CONTRACTING OFFICER.

8. UPON COMPLETION OF ALL WORK CONTRACTORS SHALL PROVIDE ASBUILT

DRAWINGS SHOWING WHERE ALL ACM WAS REMOVED TO 35 CES ENVIRONMENTAL.

9. SEE ARCHITECTURAL DRAWINGS FOR THE LOCATIONS WHERE DEMOLITION /

CONSTRUCTION WORK WILL DISTURB ACM.

REMOVE AND DISPOSE OF GYPSUM WALL BOARD WITH ASBESTOS

CONTAINING JOINT COMPOUND FROM WALLS.

REMOVE AND DISPOSE OF GYPSUM CEILING BOARD WITH ASBESTOS

CONTAINING JOINT COMPOUND FROM CEILINGS.

REMOVE AND DISPOSE OF VINYL COVE BASE WITH ACM MASTIC.

A BLACK ASPHALTIC WATERPROOFING COATING MAY BE

PRESENT BETWEEN THE CONCRETE SLAB AND MORTAR

BENEATH THE BATHROOM FLOOR TILES. IF ENCOUNTERED

CONTACT THE CONTRACTING OFFICER PRIOR TO CONTINUING

WORK

5DRAFT

DORM_542_HD_1ST_FLOOR-Layout1
Sheets and Views
Layout1
DORM_542_HD_2ND-4TH_FLOORS-Layout1
Sheets and Views
Layout1

File details come from the government source that posted it. Updated .