Atch 1_SOW Warehouse Addition .doc

DOC document 83 KB Posted

Attached to
Construct Warehouse Addition, Buzzards Bay, MA Federal contract opportunity
Solicitation number
12639525R0018
Issued by
Department of Agriculture Animal and Plant Health Inspection Service Marketing and Regulatory Programs Business Services

About this file

This document is a Statement of Work (SOW) for construction services to add a 1,600-square-foot warehouse addition to the Forest Pest Management Laboratory (FPML) at Joint Base Cape Cod in Buzzards Bay, Massachusetts. The project, solicited under contract number 12639525R0018, involves constructing an unheated storage space for supplies like oils, gasoline, and antifreeze, designed by Johnson-McAdams Firm. The project is set aside for small businesses with an estimated value between $500,000 and $1,000,000, using NAICS code 236220 with a $45 million small business size standard.

The SOW outlines detailed project requirements including preconstruction and construction phase services, with a project schedule spanning approximately 229 working days. Key project contacts include Contracting Officer Jim Roloff, Engineering Project Manager Toni Mitchell, and Program Manager Dr. Scott Pfister from USDA APHIS. The contractor will be responsible for site investigations, code compliance, submittals, and adhering to various USDA sustainability and environmental guidelines. The project requires submission of itemized proposals, construction schedules, shop drawings, and final record drawings, with multiple review stages and a minimum 10-working-day government review period for each submission.

View the file

Other files for this federal contract opportunity

Other files attached to Construct Warehouse Addition, Buzzards Bay, MA, newest first.
File Type Posted
12639525R0018-0001.pdf PDF
RFI 5.docx DOCX document
RFI 4.docx DOCX document
09_90_00 Paints and Coatings.pdf PDF
RFI 3.docx DOCX document
WH1.jpg JPG image
WH2.jpg JPG image
Contractor Sign In 13AUG25.pdf PDF
09 90 00 Paints and Coatings.pdf PDF
PPQ S and T FPML Geotechnical Report.pdf PDF
Geotechnical Engineering Report_Proposed Building Addition_USDA ARS.pdf PDF
RFI 2.docx DOCX document
RFI and response.docx DOCX document
12639525R0018.pdf PDF
Atch 3_specifications.pdf PDF
Atch 5_drawings_2 of 2.pdf PDF
Atch 4_drawings_1 of 2.pdf PDF
Atch 2_Federal Construction Wage Rates_Barnstable County.pdf PDF
Show all 18

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment 1, 12639525R0018

Statement of Work

For Construction Services Date: July 17, 2025

1.0 CONTRACT PROJECT:

1.1 Title: Construction Services for Forest Pest Management Laboratory (FPML) Building 1392 Addition

1.2 Location:

USDA APHIS PPQ

1398 W Truck Rd

Joint Base Cape Cod

Buzzards Bay, MA 02542

1.3 Project Background: The Forest Pest Methods Laboratory (FPML) provides tools for detection, survey, and control of exotic plant pests to safeguard agricultural commodities, natural resources and trade.

FPML is located on property owned by the State of Massachusetts and is leased to the Department of Army. All changes to the property have been coordinated through the Army facility representatives.

The lab currently has a 3,200 SF warehouse, a pre-manufactured metal building (maintenance building), used to store equipment and supplies. Design services were recently completed by Johnson-McAdams Firm to construct a 1,600 SF addition to the current warehouse. This addition will be used to store supplies such as oils, gasoline, antifreeze, and other hazardous materials associated with light maintenance of equipment and vehicles.

1.4 Scope of the project includes the following: USDA needs construction services to build the addition to the warehouse per the final construction documents developed by Johnson-McAdams Firm. The building addition will not have heat or water but will utilize government furnished salamander heaters for occasional heat requirements. Items that are unclear within this SOW and the final construction documents shall be brought to the attention of the CO and the EPM for clarification.

1.5 Project Data: The following information is available for the Contractor’s use and compliance:

· Final Design Submittal dated March 10, 2025, developed by Johnson-McAdams Firm.

· APHIS 5170.1 APHIS Policy for Planning, Designing, and Constructing Modernized Laboratory Facilities https://www.aphis.usda.gov/sites/default/files/aphis-5170-1-laboratory-design-guidelines.pdf

· USDA ARS 242.1 Facilities Design Standards:

http://www.afm.ars.usda.gov/ppweb/PDF/242-01M.pdf

· APHIS Environmental Protection Program:

http://inside.aphis.usda.gov/mrpbs/publications/ep_manual/downloads/environmental_protection_program.pdf

· Leadership in Energy & Environmental Design (LEED), USDA Departmental Regulation DR 5500-001 found at http://www.ocio.usda.gov/directives/doc/DR5500-001.pdf

· Preferred Biobased Products found at http://www.biopreferred.gov/ProposedAndFinalItemDesignations.aspx

· Recommended Recycled-Content Construction Material found at http://www.epa.gov/epawaste/conserve/tools/cpg/products/index.htm#construct

· Designated Green Products for Federal Procurement (see separate Excel Spreadsheet: All_Green_Products_07-09.xls).

· USDA Green Purchasing Affirmative Procurement Program: http://greening.usda.gov/gpapp08.pdf

· USDA Sustainable Buildings Implementation Plan

1.6 Attachments to this Statement of Work: The following attachments are provided for the Contractor’s use and compliance:

· USDA Guidance on Electric Metering.pdf

· All_Green_Products_07-09.xls

· USDA Sustainable Buildings Implementation Plan

2.0 PROJECT CONTACTS:

2.1 APHIS Contracting Officer (CO):

Jim Roloff

USDA, APHIS, Contracting

250 Marquette Ave

Minneapolis, MN 55401

Tel. No.: 612-336-3223

Email: James.G.Roloff@usda.gov 2.2 APHIS Contracting Officer’s Representative: (COR)

Mandy Radloff

USDA, APHIS, PPQ, FO

Business Employee Services Resource Management Services

Cell No.: 608-479-1824

Email: mandy.radloff@usda.gov

2.3 APHIS Engineering Project Manager (EPM):

Toni T Mitchell

USDA, APHIS, AAMD, ESB

5601 Sunnyside Ave, Room 3-2041

Beltsville MD 20705

Tel. No.: (301)252-4333

E-mail: Toni.T.Mitchell@usda.gov 2.4 APHIS Program Manager (PM):

Dr. Scott Pfister, Ph.D.

Forest Pest Methods Laboratory Director

USDA, APHIS, PPQ, S&T

1398 West Truck Road Buzzards Bay, MA 02542

Office: 508-563-0901 Cell No: 202-579-5363

Email: Scott.e.pfister@usda.gov

2.5 APHIS Program Project Manager (PPM/COR):

Mandy Radloff

USDA, APHIS, PPQ, FO

Business Employee Services Resource Management Services

Cell No.: 608-479-1824

Email: mandy.radloff@usda.gov 2.6 APHIS PPQ S&T Property & Space Manager

Tara Otten

USDA, APHIS, PPQ, S&T

920 Main Campus Drive, Suite 500

Raleigh, NC 27606

Email: tara.otten@usda.gov 2.7 APHIS Safety, Health, and Environmental Staff:

Timothy Snidow Chief, SHEB

USDA, APHIS, EMSSD, ERCS

PPQ Professional Development Center

69 Thomas Johnson Drive

Fredrick, MD 21702

Tel. No.: (301) 904-0916

Email: Timothy.Snidow@usda.gov

Elizabeth Roether

Environmental Program Manager

USDA, APHIS, EMSSD, ERCS

Tel. No.: (301) 436-3114

Email: Elizabeth.Roether@usda.gov

2.8 APHIS Security Specialist:

TBD

2.9 Designer of Record (DOR)-Johnson McAdams

Rebecca P. Palmer 108 W. Market Street (38930) | P.O. Box 513 Greenwood, Mississippi 38935-0513 Tel. No.: (662) 455-4943

Cell No.: (662) 902-3612

Email: Becky.palmer@jmcfirm.com

3.0 SCOPE OF SERVICES:

3.1 Preconstruction Phase Services: The Contractor shall provide all professional services necessary for the accomplishment of the contract project as described in this Statement of Work and per the Final Design Documents developed by Johnson-McAdams Firm. If clarification is required for items identified in this SOW and per the Design Documents, it should be brought to the attention of the EPM. The Contractor shall provide Preconstruction Phase Services for the following tasks marked by an "X".

[X] Participate in the Pre-Bid Meeting at the construction site, as necessary. Date TBD [X] Participate in Field Investigation and Site Survey to confirm existing conditions

[X] Provide an Itemized Proposal and Proposed Construction Schedule [X] Participate in the Post Award Meeting

[X] Provide Shop Drawings, Product Data Submittals, QC and Safety Plan Submission for review and approval

[X] Provide Submittal Register for review and approval

3.2 Construction Phase Services: Construction shall be performed strictly as required by the rules, regulations, standards, codes, ordinances and laws of Local, State and Federal Governments and all other authorities that have legal jurisdiction over the site.

[X] Participate in construction progress meetings with the Project Team.

[X] Notify the CO, COR, PPM and EPM two weeks prior to final inspection for coordination.

[X] Record deficiencies during final inspection and provide Punch List to COR, DOR and EPM.

[X] Obtain warranties and turn over to CO

[X] Provide written certification to the CO that the project was constructed in compliance with design documents and is ready for final acceptance.

[X] Transfer As-Built information to Record CADD drawings. Furnish record drawings and specifications as follows:

Two half-size sets of prints and two thumb drives to PPM and EPM.

4.0 PROJECT REQUIREMENTS:

4.1 Field Investigation and Site Survey: The contractor shall coordinate, schedule, and conduct site investigations with the PPQ PPM.

4.2 Compliance with Building Codes: In accordance with Public Law 100-678, Federal Agencies must comply with National Building Codes, Local Building Codes, and Zoning Ordinances. The designer of record was required to comply with the appropriate Statutes governing the signing and sealing of engineering reports and drawings. Accordingly, final design drawings and specifications have been signed and sealed by Professional Architects and Engineers registered to practice in the state where the project is located. Project design complies with USDA Facilities Design Standards and with the requirements of Americans with Disabilities Act and be barrier free for the physically handicapped in accordance with ANSI A117.1 and the Uniform Federal Accessibility Standards.

4.3 Code Analysis: The Contractor shall submit a code analysis indicating compliance with applicable codes and environmental permitting. The topics for the code analysis are applicable codes, occupancy classifications, type of construction, fire resistance ratings, interior finishes, flame spread, and smoke develop ratings, egress, fire suppression, fire detection and alarm systems, combustible and flammable liquids, compressed gas storage, structural live loads and dead loads, wind loads, seismic design, frost depth, and sediment/erosion control.

4.4 Submittals: The Contractor shall provide product data submittals including manufacturing specifications to the EPM, COR and DOR for review and approval prior to incurring costs.

5.0 PROJECT SCHEDULE:

5.1 Project Schedule Submittal: The schedule provided indicates project requirements for each submission and review stage. It is provided for negotiation with the Contractor for setting contract time requirements for meeting contract submissions and construction deadlines. A minimum of 10 working days for review time will be required by the Government.

(Working days)

Prebid Site Visit

Date TBD

Proposal and Construction Schedule

14 days

Award

TBD

Shop Drawings, Product Data Submittals 30 days

Notice to Proceed for Construction within 5 days

Construction Period

180 days

Close out/ Warranty

30 days

6.0 SUBMITTAL DISTRIBUTION:

Itemized Proposal and Proposed Construction Schedule (Electronic)

Contracting Officer (James Roloff):

Product Data Submittals and Shop Drawings (Electronic)

Contracting Officer (Jim Roloff)

Designer of Record (Johnson-McAdams Firm)

Engineering Project Manager (Toni Mitchell)

Plant Protection & Quarantine (Scott Pfister, Mandy Radloff)

Warranty and Final Closeout Documents (Electronic)

Contracting Officer (Jim Roloff)

Designer of Record (Johnson-McAdams Firm)

Engineering Project Manager (Toni Mitchell)

Plant Protection & Quarantine (Scott Pfister, Mandy Radloff)