This document is a Request for Information (RFI) for a USDA-Animal and Plant Health Inspection Service construction project at the Forest Pest Management Lab on Joint Base Cape Cod in Buzzards Bay, MA. The project involves constructing a 1,600-sf warehouse addition to an existing 3,200-sf warehouse, intended to store hazardous materials like oils, gasoline, and antifreeze related to equipment maintenance. The solicitation is set aside for small businesses, with a project value between $500,000 and $1,000,000, and falls under NAICS code 236220 with a $45 million small business size standard.

The RFI document contains 16 specific questions and responses covering technical details such as PE licensing, project schedule requirements, fire alarm system specifications, construction personnel parking, site occupancy during construction, and technical specifications for elements like translucent wall panels and helical piles. Key technical clarifications include confirmation that test piles may be used in finished work, the warehouse will be intermittently occupied during construction, and a new fire alarm system will be installed that does not integrate with the existing system. The contracting officer for this solicitation is Jim Roloff, who can be reached at james.g.roloff@usda.gov.

View the file

Other files for this federal contract opportunity

Other files attached to Construct Warehouse Addition, Buzzards Bay, MA, newest first.
File Type Posted
12639525R0018-0001.pdf PDF
RFI 5.docx DOCX document
RFI 4.docx DOCX document
09_90_00 Paints and Coatings.pdf PDF
RFI 3.docx DOCX document
WH1.jpg JPG image
WH2.jpg JPG image
Contractor Sign In 13AUG25.pdf PDF
PPQ S and T FPML Geotechnical Report.pdf PDF
09 90 00 Paints and Coatings.pdf PDF
Geotechnical Engineering Report_Proposed Building Addition_USDA ARS.pdf PDF
RFI and response.docx DOCX document
Atch 3_specifications.pdf PDF
Atch 1_SOW Warehouse Addition .doc DOC document
12639525R0018.pdf PDF
Atch 5_drawings_2 of 2.pdf PDF
Atch 4_drawings_1 of 2.pdf PDF
Atch 2_Federal Construction Wage Rates_Barnstable County.pdf PDF
Show all 18

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RFIs and Responses, 12639525R0018 1.Reference Statement of Work for Construction services, dated 7-17-25: Page 6, Item 4.3; Will the contractor be responsible to provide a licensed PE in the State of Ma. to furnish the Code Analysis Report?

Not for a code analysis.

2.Reference Form SF 1422 Block # 11; Confirm 240 calendar days is correct It is correct.

3.Confirm the submission of a project schedule is required with the Technical Proposal portion of the bid package.

Yes, per SOW paragraph 3.1.

4.Please provide electrical and fire alarm as built drawings A/E does not have as builts.

5.Please provide manufacturer’s name of the Fire Alarm system and name of the company that services the system AES INTELINET manufactured the system and NOREL installed and services the alarm.

6.Will the steel handrail and bollard be color galvanized?

Yes 7.Provide painting specifications See Attached Section 09 90 00.

8.Can the Helical Pile used for the load test be used as one of the new piles?

Test piles may be used in the finished work. See specification section 31 63 26.60 paragraph 3.3.1 Test Piles for the requirements of test piles used in finish work.

9.Will the warehouse 1392 be occupied during construction?

The warehouse will be used intermittently during construction to remove or replace needed items stored there. There is no extended occupancy in the warehouse and arrangements can be made ahead of schedule to remove any items needed for the day/week. We will limit foot traffic through construction with an alternative route to access the warehouse.

10.Reference section 010100 para. 1.6,A-2; Provide copy of the regulations.

Security plan will come from ARS.

11. Identify construction personnel vehicle parking location from the Bushland area.

This will be discussed during the pre-con.

12. Can the roles of the CQC Manager onsite inspections along with the role of the SSHO be performed by the project Superintendent based on the limited scope work being performed under this contract?

The roles of SSHO and CQC Manager can be combined but they cannot be the project superintendent.

13. Provide name of manufacturer of the existing Translucent Wall Panels, and provide specifications for the new Translucent Wall Panels We do not know manufacturer of existing Translucent Wall Panels. New translucent panels must match profile of metal building wall panels, meet uplift requirements same as wall panels, be hail and wind resistant and be constructed of corrugated polycarbonate material with 100% UV Protection. Panels must be frosted to match existing with a minimum VLT of 45%.

14. Provide GEO TECH report See attached

15. Confirm existing building Bottom of Footing elevation at Column Lines 1/A , 1, and 1/C.

Existing drawings indicate that the bottom elevation of the existing footings are at elevation 95’-8”. This is based off of the existing finished floor elevation of 100’-0”. Contractor must field verify existing conditions.

16. The fire alarm schedule in the drawings (Atch+5_drawings_2+of+2.pdf) lists new devices. Are there specific details on how this new system should integrate with the existing fire alarm system in the current warehouse, or is that part of our design scope?

The F-101 drawing specs a new FACP (Autocall 4001) and Radio transmitter (keyed notes 1&2) along with the devices. The system is in the specs (28-31-070) as well. It is a new system. Does not integrate with existing.