This is a Statement of Work (SOW) for carpet and tile flooring removal and installation services at Whiteman Air Force Base (WAFB) in Missouri, issued by the 509 Civil Engineer Squadron on March 28, 2025.

The contractor must provide all supervision, personnel, equipment, tools, materials, storage, and disposal services for flooring projects including removal of existing flooring and installation of new carpet, vinyl composition tile (VCT), luxury vinyl tile (LVT), porcelain tile, rubber flooring, wall base, stair treads, risers, and related accessories. All materials must be new, unused, and free from defects, stored at the contractor's climate-controlled facility, and delivered to job sites in manufacturer's original packaging. The contractor is responsible for furniture movement, material disposal via dumpster service, building protection, and comprehensive cleanup. Work occurs in various occupied WAFB buildings with the immediate work area unoccupied, and the contractor must coordinate with the Technical Point of Contact (TPOC) and building occupants. The contract includes a one-year base period with four one-year option years for a total of five years, with possible six-month extensions. The contractor must provide samples and product literature prior to award for government approval, submit a detailed proposal within five working days of notification, and establish a full-time contract manager or alternate physically present on base during work. Deliverables include material safety data sheets, hazardous material handling plans, asbestos-free certifications, environmental compliance documentation, and manufacturer maintenance manuals. Payment is structured as progress payments for materials and final payment upon completion, with the contractor responsible for all punch list corrections. All work must comply with federal, state, and local regulations, ADA accessibility requirements, fire resistance standards per ASTM E648 and E662, and industry standards referenced in Appendix A.

View the file

Other files

File Type Posted
COMBO_26Q1067 Revised 17Aug2026.pdf PDF
Atch 1 SOW - Flooring Revised 12Aug2026.pdf PDF
Atch 2 FY26 Flooring Bid Schedule_V4.xlsx XLSX spreadsheet
Atch 2 FY26 Flooring Bid Schedule_V3.xlsx XLSX spreadsheet
Atch 6 QA Solicitation FA462526Q1067.pdf PDF
Atch 2 FY26 Flooring Bid Schedule_V2.xlsx XLSX spreadsheet
Atch 4 Past Performance Questionnaire_V2.docx DOCX document
Atch 3 Wage Determination_CAO 20260513.pdf PDF
Atch 4 Past Performance Questionnaire.docx DOCX document
Atch 2 FY26 Flooring Bid Schedule.xlsx XLSX spreadsheet
COMBO_26Q1067.pdf PDF
Atch 5-Provisions and Clauses.pdf PDF
Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

509 Civil Engineer Squadron

660 Tenth Street, Suite 201

Whiteman AFB MO 65305

U.S. Air Force

3/28/2025

STATEMENT OF WORK (SOW)

Carpet & Tile Flooring Requirements

Carpet & Tile Flooring Requirements March 28, 2025 Page 2 of 28

Table of Contents

1. Requirement

2. Contractor Responsibilities

3. Government Responsibilities

4. Quality Control

5. General Information

Appendix A

Carpet & Tile Flooring Requirements March 28, 2025 Page 3 of 28

1. Requirement

1.1. The Contractor shall provide all supervision, personnel, equipment, tools, transportation, materials, supplies, off base storage and disposal as required to perform removal and installation of carpet and floor tile at Whiteman Air Force Base (WAFB), Missouri. The Government will not provide storage for excessive carpet, tiles, or materials apart from up to two boxes of carpet tile and/or hard tile at the installation location if requested on the delivery order. The Contractor shall provide material to include but not limited to vinyl composition tile (VCT), luxury vinyl tile (LVT), rubber flooring, adhesives for tile and accessories, rubber cove base, ceramic tile, porcelain tile, Quarry tile, grout, seam sealers, floor patch, rubber transition strips, rubber stair thread, nosing and riser, wood base sealers and finishes, fastening and all hardware and other materials as needed and technically accepted by the designated Technical Point of Contact (TPOC) and approved by the Contracting Officer (CO).

The Government shall identify all carpet and carpet adhesives required for a particular project in the SOW for that project. All products shall be stored and applied per manufactures guidelines.

Occasionally, projects may require using material provided directly from the Government. This type of work will be specified in the delivery order and billed under the specific Contract Line- Item Numbers (CLINs). All work shall be in accordance with applicable federal, state, and local regulations, specifications, commercial practices, industry standards, and this SOW. Any substitutions of Contractor supplied material, or products will be approved by the Government.

At the completion of each project, the Contractor shall remove all materials unless specified in writing by the Government. This introduction describes materials and work in general terms and shall be used in conjunction with the entire SOW. Work includes but is not limited to the following:

1.1.1. Removal of existing flooring and accessories; installation of new flooring and accessories. Sanding and finishing wood base. Removal of existing stair treads, landing and risers. Lifting, moving and relocating furniture to facilitate the installation of the new material and upon completion, replacing the furniture to its original location. Work area clean-up includes removal of all debris, cleaning and removing all exposed adhesives, and vacuuming of carpeted areas to a clean condition with no visible defects.

1.1.2. Installation of new flooring, trim, stair treads, nosing, risers, stringers, and accessories shall be in accordance with the products listed in this SOW and Manufacturer’s specifications.

1.2. The Contractor shall furnish to include but not limited to all: flooring materials, seam sealer, seam tape, tack strips, tools, equipment, supplies, accessories, etc. required to remove, prep, and install all floor coverings.

1.3. Prior to contract award, Contractor shall supply the Government with samples and product literature of all products specified in the SOW. Samples will be approved by the Government and

Carpet & Tile Flooring Requirements March 28, 2025 Page 4 of 28 limited to selections the Contracting Officer (CO) approves, based on technical recommendations from the Technical Point of Contact (TPOC). The following information is required:

A. Description of products to be provided; technical data showing compliance with specifications.

B. Application and installation instructions, including proposed deviation from specifications.

C. The Contractor shall supply a tile pallet board showing the types and colors of all tiles and other products that can be installed.

1.4. Material Disposal: Contractor shall be responsible for providing dumpster and/or hauling service for each delivery order. The Government shall not furnish the Contractor with a dumpster. If a dumpster is used the Contractor shall inform the Government of the size of the dumpster needed for the job and will place the dumpster in the location as directed by the Government.

1.5. Work Locations: Whiteman Air Force Base is in Johnson County, near the town of Knob Noster, Missouri. The work occurs in various buildings in indefinite quantities. All work shall be done with the buildings occupied and immediate work area unoccupied. The Contractor shall coordinate all work with the designated Technical Point of Contact (TPOC) and the occupants.

2. Contractor Responsibilities

2.1. Carpet and Tile Procurement: The Contractor shall procure and deliver all flooring materials, adhesives, underlayments, and trim required to complete each task order as specified. All procured materials must be new, unused, and free from defects.

2.2. Carpet Installation: (General information) Installed carpet must be even, uniform, and secure at the seams. Run side seams toward the light where practical and where such layout does not increase the number of seams. Install breadths parallel with carpet pile in the same direction.

Match patterned goods according to manufacturer’s recommendations. Fit cutouts such as doorjambs, columns, ducts, with minor gaps (less than 1/8 of an inch). Locate carpet seams at doorways parallel to and centered directly under doors. Do not seam at doorways perpendicular to door or at pivot points. Follow the wall line parallel to the carpet direction for seams at corridor changes of direction. All carpet and tile installation shall be fully Americans with Disabilities ACT (ADA) Compliant. If carpet is used as a floor, then it shall be securely attached; Exposed edges of carpet shall be fastened to floor surfaces and have trim along the entire length of the exposed edge.

2.3. Carpet Location: Install carpet wall-to-wall in rooms and areas indicated in the drawings.

Include all material indicated, specified, or necessary for a completely finished installation by the installation method specified.

Carpet & Tile Flooring Requirements March 28, 2025 Page 5 of 28

2.4. Porcelain tile and Stone Pavers: Tiles for floors and walls shall be a minimum 4”X 4” and a maximum of 12” X 12” as specified by the government. Floor tiles shall be 1/4" to 5/16” thick.

Tiles will be American Olean class IV or approved equal and meet the following characteristics.

All flooring shall be extra heavy traffic as rated by the manufacturer when tested in accordance with American Society for Testing and Materials (ASTM) C 1027 and ANSI A326.3.

2.4.1 General product Requirements (all colors and materials shall be selected or approved by the Government):

A. American National Standard Institute (ANSI) standard for ceramic tile. Furnish all tiles, setting and grouting products that comply with “Standards Grade” requirements.

B. Product Performance Criteria:

a. Static Coefficient of Friction (ANSI A326.3) .6 Dry and .6 Wet

b. Break strength (ASTM C 648): 421lbs

c. Bond strength (ASTM C 482): 97lbs

d. Water absorption (ASTM C 373): .06%

e. Abrasion Wear Resistance (ASTM C 501): 270

C. Setting and Grouting Materials

a. Latex Portland Cement Thin-set Mortar, ANSI A 118.6

b. Acrylic Latex Portland Cement Grout, ANSI A 118.6

2.4. Vinyl Composition Tile (VCT): VCT shall conform ASTM F- 1066 (Class 2) and shall be twelve inches square and 1/8 inch thick and utilized in high traffic commercial type installations.

Materials shall be from the same lot and have the shade and pattern. Vinyl tiles shall be asbestos free and conform to ASTM F 1700.

2.4.1. Installation of Vinyl-Composition Tile (VCT): Color and pattern shall be uniformly distributed throughout distributed through the thickness of the tile.

2.4.2. Tile Flooring shall be installed with adhesive in accordance with the manufacturer’s installation instructions. Tile line and joints shall be kept square, symmetrical, tight, and even.

2.4.3. Edge width shall vary as necessary to maintain full size tiles in the field, but no edge tile shall be less than one-half the field size, except where irregular shaped rooms make it impossible.

2.4.4. Flooring shall be cut to, and fitted around, all permanent fixtures, built-in furniture and cabinets, pipes, and outlets.

2.4.5. Edge tiles shall be cut, fitted, and scribed to walls and partitions after flooring has been applied.

Carpet & Tile Flooring Requirements March 28, 2025 Page 6 of 28

2.4.6. VCT shall be waxed prior to final inspection.

2.4.7. Color and patterns will be selected by the TPOC from the contractor's pre-approved submittal palette.

2.4.8. Adhesive for Vinyl Composition Tile: Cutback adhesive for installation of tile over concrete, above, on, or above grade. Moisture and Alkali resistant. Non-asbestos formulated or a latex adhesive recommended by flooring manufacture.

2.5. Stair Tread/Nosing: Stair tread/nosing shall conform to ASTM F2169 (Type TS Vulcanized rubber) and be one piece rubber. Surface of treads shall be raised, non-slip, studs, diamond, rectangle or ribbed pattern as selected by government.

2.6. Luxury Vinyl Tile: LVT shall include both squares and planks and shall conform to ASTM F1700 (Class 3) with a minimum wear layer thickness of 20mil (.5mm, .02”). Minimum overall thickness 2.5mm (.09”).

2.6.1. Installation of LVT: Install using glue down method and only use adhesive recommended by the manufacture for maximum warranty and apply in accordance with manufacturer’s directions.

2.6.2. Install flooring and accessories in accordance with manufacturer’s printed installation instructions.

2.6.3. LVT selections shall include both stone and wood options be Type A (smooth) and Type B (embossed).

2.6.4. Plank sizes shall be available in nominal 6” and 12” Widths and nominal 24”, 36” and 48” lengths.

2.6.5. Keep tile lines and joints square, symmetrical, tight, and even.

2.6.6. Keep floor in true, level plane, except where slope is indicated.

2.6.7. Vary edge width as necessary to maintain full-size tiles in the field, on edge tile to be less than one-half the field size, except where irregular shape rooms make it impossible.

2.6.8. Cut flooring to fit around all permanent fixtures, built in furniture, cabinets, pipes, and outlets.

2.6.9. Edge tile shall be cut, fitted, and scribed to walls and partitions after flooring has been applied.

2.6.10. Tile shall be ADA compliant, ASTM D 2047.

2.6.11. Have a static load of 750 psi (lbs/sq in) -0.005, ASTM F 970.

2.7. Rubber Base Cove: Surfaces on which a new base cove is to be applied shall be free of foreign materials. Vinyl base shall conform to ASTM F-1861, Type TP, Group 1 or 2, Style B (standard toe cove). Base shall be 4”, 4.5”, 6”, or 6.5” high, as required, have a minimum

Carpet & Tile Flooring Requirements March 28, 2025 Page 7 of 28 thickness of 1/8”, and be Roll/Coil- type only. 4’ Lengths are not acceptable. Rubber tile and products shall conform to ASTM F 1344. Base cove material shall be standard 120”. Color shall be identified in the delivery order. Manufacturers preformed inside and outside corners shall match the straight length of base cove. The Contractor shall not use straight lengths of base cove that are bent, folded, tucked or creased around corners.

2.8. Wooden Base Boards: There may be buildings or rooms with wooden baseboards that that require removal prior to installation of new floor coverings. Wooden baseboards shall remain installed unless otherwise stated in the delivery order. Care shall be taken when removing and reinstalling them as not to split or break the wood. All nail holes will be filled, and filling shall match the wood color. If base boards are removed staining may be required due to filling nail holes. Staining will normally match existing stain unless determined otherwise by the government. The government will determine need to remove and/or stain and will be billed under the appropriate CLIN. If baseboards are damaged during removal or installation of flooring materials, the contractor will be required to replace at no additional expense to the Government.

2.9. Rubber Wall Base: Rubber wall base shall conform to ASTM F-1861, Type TP, Group 1 or 2 as determined by the Government, Style B (standard toe cove). Base shall be 4”, 4.5”, 6”, or 6.5” high as required, have a minimum thickness of 1/8”, and shall be 120’ Roll/Coil-type only, 4’ Lengths are not acceptable. Colors will be selected by the Government from manufacturer’s standard colors.

2.9.1. Installation of Wall Base: Wall base shall be installed with adhesive in accordance with the manufacturer’s written instructions.

2.9.2. Base joints shall be tight, and base shall be even with the adjacent resilient flooring.

2.9.3. Voids along the top edge of base at masonry walls shall be filled with caulk.

2.9.4. Where wall base is used in conjunction with the wall covering, cut the wall covering off ¼ inch below top of the base.

2.9.5. Roll entire surface of base with hand roller and press toe of base with a straight piece of wood to ensure proper alignment.

2.9.6. Avoid excess adhesive in corners

2.9.7. Adhesive for wall base: Adhesive for wall base shall be emulsified acrylic latex; non-flammable

2.10. Rubber Treads and Risers: Rubber stair tread and riser shall conform to ASTM F-2169, Type TS and shall be Roppe Corporation #96, raised circular vantage design with riser, or approved equal. Note: Raised circular vantage profile without riser (#98) can be used but shall be installed with matching separate risers.

2.10.1. Stair treads and riser shall be installed with adhesives in accordance with the manufacturer’s written instructions.

Carpet & Tile Flooring Requirements March 28, 2025 Page 8 of 28

2.10.2. Treads and risers shall cover the full width of the stairs.

2.10.3. Stairs wider than manufacturer’s standard lengths shall have equal length pieces butted together to cover treads.

2.10.4. Treads and risers used shall be appropriate for the substrate per the manufacturer.

2.10.5. Colors will be selected by the Government from manufacturer’s standards.

2.11. Air Tread, Risers, and Stringers: Treads, risers, and stringers shall conform to composition rubber compound form a mixture of synthetic and reclaimed rubber. Overall thickness at treads shall be not less than 1/8 inch. Durometer hardness shall be 90, plus or minus 5, when tested in accordance with ASTM D 2240. Treads to have 80 percent of back and nose sanded by manufacturer to assure good adhesion; provide manufacturer’s epoxy filler to completely fill gap between stair and tread nose for all treads. Design shall be either a one-piece nosing/tread/riser or a two-piece nosing/tread with a matching coved riser. Installation shall include stringer angles on both the wall and banister sides, and landing trim

2.12. Edge stripes: Provide edging strips where flooring terminates at points higher than continuous finished flooring, except where thresholds are provided. Secure plastic strips with adhesive. Provide carpet reducer or tile reducer of vinyl.

2.12.1. Carpet Edge Strips, Feather Strips, and Adapters:

A. Metal carpet edge strips shall be aluminum, have a hammered surface and be pin less clamp-down type designed for the type of carpet being installed.

B. Finish shall be natural color anodized, pre-finished color or gold.

C. Floor flanges shall have a minimum 1 ½ inch wide and face shall be a minimum 5/8 inch wide.

D. Vinyl carpet edge strips shall be heavy duty and designed for the type of carpet being installed.

E. Floor flange shall be a minimum 2” wide.

F. Limit vertical lips in edge trips to ¼ inch; limit total rise to 1/2inch

G. Color shall be chosen by the Government from manufacturer’s standards.

H. Vinyl to carpet adapters shall be Roppe Corporation #155 single flange track with #155 snap down edging or approved equal.

I. Feature strips shall be rubber, 1 inch wide, and of thickness to match the flooring

J. Colors shall be chosen by the Government from manufacturer’s standards.

2.12.2. Tackless Strips: For installation of carpet (stretch–in over cushion), water resistant plywood strips with two (2) and three (3) row of rust-resistant angular pins shall be used.

Carpet & Tile Flooring Requirements March 28, 2025 Page 9 of 28

A. For areas over thirty feet long, tackles strips with three rows of pins shall be used.

B. Pins of the proper length shall be used to penetrate through the carpet backing but not so long as to be seen from the surface or be a safety hazard.

C. Tackless strips shall be a minimum of 1” wide and ¼ inch thick, suitable for the cushion thickness specified or as recommended by the manufacturer.

2.13. Rubber Matting (Floor Tile): Rubber matting shall conform to ASTM F-1344, Class 1 and shall be Roppe Corporation #996, raised circular vantage design, or approved equal.

A. Tile dimensions shall be 19 11/16” square, 1/8” gauge.

B. Colors shall be selected by the Government from Manufacture’s standards

2.14. Carpet stair nosing: Stair nosing shall be Roppe Corporation #11 single flange rubber carpet stair nosing or approved equal. Colors shall be selected by the Government for Manufacture’s standards.

2.15. Wood Base: Wood Base shall be solid, no pressed board ready-for-painting, and shall match adjacent in size and shape. For bidding purposes, the majority of the based is 4” high in standard off-the-shelf profile.

2.16. Description. The work will consist of demolishing existing flooring material, removal and disposal of old material, and installing new flooring material, wall base, and accessories as specified in this SOW. Types of floor coverings and accessories include carpet (broadloom or tile), padding, VCT, LVT, Porcelain tile, sheet vinyl, rubber tile, transition strips, binder bars, stair treads, nosing, thresholds, wall base, etc. All work shall be done with the building occupied and the immediate work area unoccupied. The Contractor shall schedule and coordinate all work with the COR and building occupants.

2.17. Ordering Procedures.

2.18. As the need exists for performance under the terms of the contract, the CO will notify the Contractor of an existing requirement and provide the Contractor with a general scope of work.

2.19. Upon receipt of the notification, the Contractor shall respond to the needs of the Government within five (5) working days by visiting the proposed work site in the company of the designated TPOC or Facility Manager and an authorized representative for purposes of conducting a scope validation site visit and conference for proposal submission. The Contractor shall be required to examine drawings and the Statement of Work, perform a site visit, and take site measurements. The contractor shall use the bid schedule spreadsheet when compiling the estimate for all flooring purchases. Amount of adhesive is calculated as described in the bid schedule, 4 gallons per 120 square yards of carpet. The contractor shall submit, to the CO, an estimate containing the unit priced bid items and quantities necessary to complete the work as shown or as indicated. An explanation of the bid and quantities may be required. The Contractor’s proposed unit price bid items and their associated quantities shall be determined using measurements taken from field measurements taken at the site using drawings for locations. The

Carpet & Tile Flooring Requirements March 28, 2025 Page 10 of 28

Contractor is responsible for verifying all dimensions in the field as well as other conditions affecting the work. Differences between the Contractor’s independently prepared proposal and the Government estimate will be resolved through negotiations with the CO or Contract Administrator (CA) and the COR. Once the agreement has been reached, a firm-fixed price delivery order containing the negotiated unit priced bid items, their quantities, and the performance time will be issued to the Contractor. No changes to the negotiated quantities will be made, and no additional unit priced bid items will be added unless the drawings and/or description of work is modified by the CO to accommodate differing site condition(s) encountered or additional work required. The Contractor is responsible for notifying the CO and COR immediately upon differing site condition(s). No separate payment will be made for compliance with any provisions of “special provision for measurements” or site evaluation as stated above.

2.20. Upon establishment of the scope of work of the identifying project/requirement, the contactor shall prepare a detailed proposal by refining quantities and preparing a proposal sample for submission to the CO.

2.21. Delivery orders:

2.21.1 Work requirements will be identified through the issuance of Delivery Order(s) (DOs).

Each DO will designate the required line item(s), quantities, dollar amount(s), the building number where the work will be accomplished and the point of contact at the job site. Upon receipt of the DO the contractor shall order all materials required and arrange for delivery to their climate-controlled facility. When all materials are in possession by the contractor the Government will schedule and coordinate the installation day with the facility manager and the contract manager.

2.21.2. Products: All materials shall be delivered to the job site in the manufacturer’s original unopened wrappings and packages clearly labeled with the manufacture’s name, brand name, size, dye lot number, and related information as applicable. All materials shall be stored in a clean, dry, well-ventilated area, protected from damage and soiling, maintained in a temperature above 60 degrees F and relative humidity between 10% and 65% for two (2) days prior to installation, and stacked according to manufacturer’s recommendations.

2.22. Occupied Areas: The work to be performed on this project will include work in occupied buildings. The Contractor will be responsible for damage to equipment or facilities as a result of negligence on the part of the Contractor. The Contractor shall coordinate the work of all activities whereby both the Government and the Contactor can continue operations with the least possible interference and inconvenience. The Contractor shall conduct all work to coordinate the means of ingress and egress from any facility that is maintained. The Contractor shall be responsible for furnishing, installing and maintaining Government approved warning tape, barricades, roped barriers, fencing, etc. to warn occupants of hazardous areas at the jobsite for the duration of the contract.

2.23. Moving Furniture and other Items: The Contractor shall be responsible for the removal, reinstallation, or movement of furniture required for floor cover installation as specified in the

Carpet & Tile Flooring Requirements March 28, 2025 Page 11 of 28 delivery order. Any furniture moved by the Contractor shall be returned to its original location.

Any damage caused by the moving of furniture will be repaired or replaced by the Contractor, at the CO’s discretion, at no additional cost to the Government. If repair is selected over replacement, it will be at no additional cost to the Government. The Contractor shall coordinate and store furniture in the same facility. Furniture required to be moved normally is typical office furniture such as desks, bookcases, cabinets, small tables, boxes, filing cabinets, etc. Note: chairs, trash cans, etc. are part of an incidental to the movement of desks or tables. Occasionally other items the contractor shall move include but is not limited to safes, pool tables, vending machines, refrigerators, auditorium seating, conference tables, etc.

2.23.1. System and modular furniture: The Contractor shall disassemble, move, and reassemble system and modular furniture only to the extent necessary for the removal and reinstallation of floor coverings. Any missing pieces or hardware must be identified to the COR at time of disassembly. Any pieces or hardware found missing at the time of reassembly not previously identified prior to disassembly will be replaced by the Contractor at no additional cost to the Government.

2.24. Contract Manager: The Contractor shall provide a contract manager and alternate(s) authorized to make all decisions. The Contractor shall have a full-time contract manager or alternate physically on Whiteman AFB MO to always serve as a Government point of contact work is being conducted under this contract. The contract manager/alternate shall be responsible for all work underway. The Contract manager and alternates shall be appointed in writing for each delivery order and submitted to the CO and COR before work begins in the event concurrent delivery orders are ongoing.

2.24.1. Contract Manager: The contract manager or alternate shall be available during normal duty hours within 24 hours to meet on the installation with Government personnel designated by the Government to discuss work requirements or problem areas.

A. The contract manager/alternate must be able to converse in English, both orally and in writing.

B. All moves, or relocation shall be coordinated by CES.

2.25. Additional Installation Requirements

2.25.1. Substrate Penetration: Before installation, verify that concrete floors comply with requirements on moisture content recommended by adhesive or carpet manufacturer’s instructions. Repair holes, cracks, depressions, or rough areas using material recommended by the carpet or adhesive manufacturer. Grind ridges smooth and level with surrounding surface. Provide floor free of any foreign materials, and at a minimum swept broom clean. Comply with requirements for conditioning adhesives and minimum floor temperature before, during, and after installation as recommended by the carpet and adhesive manufacture’s instruction. Carpet installation constitutes validation by the contractor that the substrate and conditions in the area meet all manufacturer’s requirements and recommendations for satisfactory installation.

Carpet & Tile Flooring Requirements March 28, 2025 Page 12 of 28

2.25.2. Self-leveling Underlayment: Self-leveling Underlayment shall be “Ultra plain Easy” with:

U.P. Primer/Rapid” (where applicable) as manufactured by MAPEI or approved equal. This product shall be Cementitious, flowable, self-leveling, rapid hardening compound with a minimum compressive strength of 4100psi

2.25.3. Indoor Air Quality Installation Guidelines: When installing the carpet with adhesives, the Contractor shall always ventilate with fresh air (open doors and/or windows, use exhaust fans, etc.) during all phases of installation and at least for 72 hours thereafter. The installer shall follow the installation guidelines outlined in CRI 104 published by the CRI. In addition, the Contractor shall vacuum old carpet before removal to minimize the amount of dust particles. The Contractor shall also vacuum the floor after the old carpet and cushion have been removed.

2.25.4. Surface Preparation: Flooring shall be smooth, true, level, and plane, except where indicated as sloped. Before any work under this section has begun, all defects such as rough or scaling concrete, low spots, and uneven surfaces shall have been corrected, and any damaged portions of concrete slabs shall be repaired as recommended by the flooring manufacturer.

2.25.5. Adhesives: Adhesives and concrete primers for installation of VCT, and rubber base shall be waterproof, nonflammable, meet local air quality standards, and shall be as recommended by the flooring manufacturer. Seam adhesives shall be waterproof, nonflammable and non- staining as recommended by the carpet manufacturer. Cutback adhesive for installation of tile over concrete, above, on, or above grade. Moisture and Alkali resistant. Non-asbestos formulated or a latex adhesive recommended by flooring manufacture. Adhesives shall meet all criteria identified by the manufacturer of the product being applied.

2.25.6. Flooring: Apply in patterns indicated by product manufacturer. Start in center of room or area, and work toward edges. Keep tile lines and joints square, symmetrical, tight, and even. Keep each floor in true, level plane, except where slope is indicated. Vary width of edge tiles as necessary to maintain full size tiles in field, but no edge tile shall be less than one-half full size, except where irregular-shape makes it impossible.

2.25.7. Cutting: Cut floor edges and scribe to walls and partitions after field flooring has been applied.

2.25.8. Scheduling: Resilient flooring application shall be scheduled after the completion of other work which would damage the finished surface of the flooring.

2.25.9. Warranty: Contractor is responsible for providing a one (1) year warranty on all workmanship for labor. The contractor shall manage and utilize the manufacturer’s full warranty for all materials and for each product installed (i.e. carpet, tile, wall base, transitions, accessories, etc.).

2.25.10. Underlayment: Underlayment shall be latex type, as recommended by the flooring manufacturer.

Carpet & Tile Flooring Requirements March 28, 2025 Page 13 of 28

2.25.11. Polish/Finish: Polish shall conform to ASTM D 4078. Use flooring manufacturer’s standard high- solids finish for shine without buffing; non-flammable, compatible with factory-applied finish; may be buffed or burnished for maximum gloss.

2.25.12. Manufacturer’s Color and Texture: Color and distinct pattern shall be uniformly distributed throughout thickness of tile. Flooring in continuous area or replacement of damaged flooring in continuous area shall be from same production run with same shade and pattern.

2.25.13. Safety Issue: Carpet adhesives may contain toxic volatile components. Follow ventilation personal protection, and other safety precautions as recommended by the manufacturer of adhesive.

2.25.14. Regulation Requirements Indoor Air Quality: Carpet shall bear the Carpet and Rug Institute (CRI) Indoor Air Quality (IAQ) label. Carpet type bearing the label will indicate that the carpet has been tested and meets the criteria of the CRI Green Label Requirements for IAQ Test Criteria.

2.25.15. Fire Resistance Requirements: Flooring in corridors and exits shall have a minimum average critical radiant flux of 0.22 watts per square centimeter when tested in accordance with ASTM E 648. The smoke density rating shall be less than 450 when tested in accordance with

ASTM E 662.

2.25.16. Application Requirements: Areas to receive resilient flooring shall be maintained at a temperature above 70 degrees F. and below 100 degrees F. for two (2) days before application, during application and two (2) days after application. A minimum temperature of 55 degrees F.

shall be maintained thereafter. Provide adequate ventilation to remove moisture from area and to comply with regulation limiting concentrations of hazardous vapors.

2.25.17. Substitutions: The Contractor shall provide products that match “as close as possible”, the products listed above. “Close as possible” shall be determined by the CO and the CES COR and includes but not limited to, color, pattern, and the additional requirements in Section four (4) of this specification. Do not assume that the product submitted will be approved.

2.26. Cleaning and Protection

2.26.1. The Contractor shall vacuum installed carpet using a machine with a face-beater element.

Remove spots or stains and replace flooring material where spots cannot be removed and clean base cove of all foreign materials. The Contractor shall clean all other flooring materials according to the manufacturer’s recommendation and specifications. The Contractor shall be responsible for removing all waste materials and debris from the installation site and discarding at a State-permitted disposal site. The Contractor shall be responsible for removing and storing all materials and equipment off base at their own expense.

2.26.2. Immediately upon completion of installation of tile in a room or an area, the flooring and adjacent surfaces shall be dry-cleaned to remove all surplus adhesives in accordance with manufacturer’s written instructions.

Carpet & Tile Flooring Requirements March 28, 2025 Page 14 of 28

2.26.3. Tile surfaces shall be thoroughly cleaned in accordance with manufacturer’s approved cleaning instructions. Acid will NOT be used for cleaning glazed tile. Floor tile with resinous grout or with factory mixed grout shall be cleaned in accordance with manufacturer’s approved cleaning instructions.

2.26.4. Raised pattern rubber flooring, rubber tile, sheet rubber flooring, rubber stair treads, and static control vinyl tile shall be cleaned and maintained as recommended by the manufacturer.

After grout is cured, all surfaces shall be given a protective coat of grout sealer or other approved method of protection as approved by the Government. Tiled floor areas shall be covered with building paper before foot traffic is permitted over the finished tile floors. Board walkways shall be laid on tiled floors that are continuously used as passageways by workman. Damaged or defective tile shall be replaced by the Contractor at no additional expense to the Government

2.26.5. Prior to acceptance by the Government, the Contractor shall thoroughly clean the installation area including flooring, base, walls, stairs, and landings, and surrounding area.

2.26.6. Vinyl flooring except pre-waxed flooring and flooring designate as no-wax or never-wax by manufacture, shall be buffed to an even sheen without polish with an electric polishing machine, using lamb’s wool pad when dry buffing. Translucent or transparent-surfaced sheet vinyl flooring shall be cleaned by damp mopping. DO NOT buff finish. Follow flooring manufacturer’s instructions.

2.27. Protection. From the time of laying until acceptance, flooring shall be protected from damage as recommended by the flooring manufacturer. Flooring which becomes damages, loose, broken, or curled, Style C flooring which fails to achieve complete tension and cove base which is not tight to backing shall be removed and replaced.

2.28. Building and fixture protection. The Contractor shall take all necessary action and precautions to protect the building and fixtures from damage during execution of all associated work. Fire/smoke detection equipment may need to be covered if excessive dust is produced to prevent alarming. The contractor shall coordinate all covering with the government. Covering of detection equipment shall be at no additional cost to the government. If the building or any portion thereof is damaged due to the Contractor’s operation or negligence, the Contractor shall replace or repair such, to its condition prior to the commencement of the project. This will be done at no additional cost to the Government. Repair or replacement will be determined by the

CO

2.29. All Asbestos Containing Materials *(ACM) specified by Environmental Protection Agency (EPA) and Occupational Safety and Health Administration (OSHA) laws and regulations, shall be provided by the Contractor.

2.30. Submittals, Color, & Material Selection

2.30.1. At the beginning of the contract, the Contractor shall submit one (1) copy of all Contractor-supplied material manufacturer’s maintenance manuals to the COR and up to three (3) copies to the CO for record purposes. These manuals should include but are not limited to

Carpet & Tile Flooring Requirements March 28, 2025 Page 15 of 28 recommended type of cleaning equipment and materials, spotting and cleaning methods, cleaning cycles, and specifications.

2.31. Project Submittals: Definitions.

A. Submittals: A submittal is a package of information, samples, drawings, schedules, certificates, etc., submitted to the CO for Government review.

B. Deviation: A specific submittal where an item is identified as not agreeing with contracts requirement and the Contractor are requesting a substitution or change.

2.31.1. Approval/Disapproval: Specific judgments reserved to the CO concerning a submittal’s compliance with the plans and specifications.

2.31.2. Authority: The Contractor is wholly responsible for the contents of a submittal. Through the physical act of submitting, the Contractor certificates that all items listed or implied, fully meet the intended purpose, functionality, and quality requirements of the plans and specifications or as submitted as specific deviations thereto.

A. The Contractor shall assure that submittal materials provided, including those provided directly by their suppliers accurately describes the items in the necessary detail required for a full review.

B. The Submittals of a “System”, either as a routine action or as a deviation, shall be considered a submittal of an integrated collection of component parts, each part of which shall be equally bound by paragraphs of this specification.

C. The Government’s approval of a submittal, in whole or part, will not be construed as approval of any substitutions, of any deviations, or any factor that places an item not in compliance with the plans and specifications, unless said item is specifically processed as a deviation.

D. All deviations from those stated requirements of the plans and specifications, shall be identified by the Contractor, specifically in writing as submittal deviation, for either the system as a whole or for a specific item of whole upon which the deviation is to be exercise. The deviation shall be submitted to the CO for review.

2.32. Project Submittals: Procedures

2.32.1. Submittals requiring approval of materials shall be submitted to the CO and the COR well in advance such that the work will not be delayed. Submittals shall be made by the Contractor as minimum on each specific item addressed in the specifications and drawings.

2.32.2. Reference: The Contractor shall refer to the applicable paragraph in the contract specifications and/or sheet in chronological of the contract drawings that require the submittal.

2.32.3 Furnishing of the submittals shall not be interpreted as relieving the Contractor of his obligation to comply with all the contract requirements for the items listed in the specifications and drawings. Payment will not be made for any material or equipment that does not comply with contract requirements.

Carpet & Tile Flooring Requirements March 28, 2025 Page 16 of 28

2.32.4. Submittals shall be submitted electronically except for color selection and type material and as otherwise noted. A minimum of seven (7) workdays shall be allowed for review and approval and possible re-submittal of submittals disapproved by the Government.

2.33. Color and Materials Selections:

2.33.1. No color selections and no material selections will be made by the Government until the Contractor submits all samples of all materials requiring color selections to the Government in accordance with the SOW. The contract shall supply physical samples, with all available color options for all types of tiles identified in this SOW. In addition, prior to the Government selecting colors, the Contractor shall certify in writing that all colors and samples submitted are current and are acceptable to the Contractor for the Government selection of colors at no additional cost to the Government.

2.33.2. Any samples that are not applicable to the contract shall be carefully removed from the submittal by the Contractor. The Contractor shall be submitted, for Government selection, the manufacturer’s full range pf applicable colors, patterns, and textures for the various materials that are required by the contract and within the guidelines hereinbefore stated.

2.33.3. In the event that discontinued, non-current, or non-applicable colors, textures, or samples are submitted by the Contractor to the Government and their selection is made by the Government, the Contractor shall bear all labor and material correction costs for fabrication, shipping, restocking, removal, repair of damaged materials, and installing of all materials required by the Government to correct the project.

2.33.4. The Contractor is responsible for notifying the Government in writing when all submittals requiring color selections have been submitted. All products requiring color selections shall be submitted on individual material approval submittal forms, one item per form.

2.33.5. Availability: The Contractor shall guarantee the availability of the approved product for a period of one (1) year from the date of execution of this contract. At the end of the one (1) year period, the Government and the supplier may agree to extend the availability of the products for an additional period of time, or the supplier may request substitutions of new products in accordance with the specifications identified herein. The contractor shall, upon option year acceptance, verify all samples are correct, currently available, and will be available throughout the option year through verification with the supplier. Any change to material selection should be made at that time.

2.34. Environmental Requirements:

2.34.1. The Contractor shall submit a Hazardous Handling Material Plan for review. All work shall be accomplished in accordance with Environmental Protection Agency (EPA), and other applicable federal, state, and local regulations governing carpet, vinyl, tile flooring, ceramic tile, hazardous waste/special waste, and recycling, including Air Force Instruction (AFI) 32-7001 (Hazardous Material Management) paragraphs 29-30 standards and in accordance with this SOW.

Carpet & Tile Flooring Requirements March 28, 2025 Page 17 of 28

2.34.2. For the purposes of this document Hazardous Materials (HM) is defined as any product, material, chemical, or substance listed in 49 Code of Federal Regulations CFR 172.101 (revised) and 40 CFR 302-304 (revised). Specifically, a HM is any substance or material, in any quantity or form that has the potential to harm human health or the environment or displays specific characteristics (reactive, corrosive, ignitable, and/or toxic).

2.34.3. Absolutely no HM shall be brought onto Whiteman AFB until that material is registered with the Hazardous Material Pharmacy (HAZMART) per Whiteman AFB Field Instruction 32- 7001. This requirement shall apply for all HM that the Contractor intends to bring onto Government property for any/all processes or applications. The Contractor shall submit a complete hazardous material inventory list including Material Safety Data Sheets (MSDS), Safety Data Sheets, (SDS) and any other supporting documentation for each and all HMs used prior to contract start or introduction of that material to Whiteman AFB. The HM inventory shall include the contract number, performance period, and a contractor point of contract for HM matters. All excess material and empty containers are the responsibility of the Contractor and shall be removed at project completion or when the container is empty. Should the Contractor’s HM requirements change during the performance period, the Contractor shall immediately notify the HAZMART of such changes in writing.

2.34.4. Storage/Use of Hazardous Materials: Only temporary storage is available at each job site.

All HM to be used or temporary stored at Whiteman AFB must have the approval of and be coordinated with the 509th CED/CEV, the base Fire Department (CES/CEF), and Wing Safety.

The Contractor shall observe HM management practices in accordance with AFI 32-7286.

2.34.5. All Contractor personnel shall immediately report to the CO and the COR any hazardous materials, chemicals, or contaminated areas encountered. Further, the Contractor personnel shall immediately cease work in area unless the work is of an emergency nature and the risk of exposure can be mitigated by the use of personnel protective equipment (PPE) or clothing. The Government will determine the best means of sampling and corrective action and will notify the Contractor accordingly.

2.34.6. The Contractor shall not use, store, or handle and Class 1 ozone-depleting substances (ODS) during this contract.

2.34.7. All hazardous waste or special waste generated by the Contractor during or as a result of this project shall be identified, characterized, and transported to a permitted disposal facility off base in strict accordance with the requirements of 40 CFR 260-279 (Hazardous Waste and Used Oil Regulations, Missouri Revised Statutes (Mo. Rev. Stat.) 307.177, Mo. Rev. Stat. 226.008, and 11 Missouri Code of State Regulations 30-6.010 Industrial and Hazardous Waste regulations, and Whiteman AFB Hazardous Waste management Plan. Any anticipated hazardous or special waste generation shall be identified to the CO, COR, and Base Environmental Coordinator (BEC) prior to ANY generation of such waste. The BEC will assist the Contractor with information on any special handling or storage procedures. The Contractor shall be responsible for transportation and disposal to an off-base facility at no cost to the Government.

Carpet & Tile Flooring Requirements March 28, 2025 Page 18 of 28

2.34.8. The Contractor shall provide a completed Uniform Hazardous Waste manifest to document all authorized parties and locations involved in the generation, transportation, storage, and disposal of all hazardous and special wastes. The Contractor shall provide the CO, COR, and BEC a draft copy of the manifest, for review, no less than three (3) working days prior to any hazardous or special waste shipments from the installation. The BEC will sign as the generator for Whiteman AFB. The Contractor shall submit the completed original manifest to the CO, COR, and BEC not later than 30 days after waste disposal has been shipped from the base.

2.34.9. Unidentified hazardous or regulated material/waste encountered by the Contractor: The Contractor shall notify the CO and COR upon encountering any material, not identified in the contract documents, thought to be hazardous to workers, personnel in the area, or the environment. The Government will be responsible for characterization, storage, transportation and disposal of waste, if necessary. The Contractor shall immediately contact the BEC upon discovery of identified materials/waste who shall assist the Contractor in determining the appropriate procedures to be used. The Contractor shall be responsible for transportation and disposal to an off-base facility at no cost to the Government.

2.35. Asbestos

2.35.1. Asbestos Testing of facilities will be conducted by CES.

2.35.2. Asbestos Containing Building Materials: No asbestos containing materials shall be used on this contract. The Contractor shall certify in writing to the CO, COR, and BEC that no asbestos containing materials will be used in this contract.

2.35.3. Should the Contractor encounter previously unidentified or suspected Asbestos Containing Material (ACM) which must be disturbed to comply with the contract documents, the Contractor shall cease all work that would disturb the suspect material and shall immediately notify the CO and the COR. The Government shall take steps as appropriate, to ascertain the material’s composition and determine any remedial action.

2.36. Carpet Adhesives: Carpet adhesives may contain toxic volatile components. Follow ventilation, personal protection, and other safety precautions as recommended by the manufacturer of the adhesive.

3. Government Responsibilities

3.1 Government Provided Training. Airfield driving training is provided by 509 CES and requirements may change during the duration of this contract. If airfield driving training requirements change during the contract period, the Contractor shall adhere to the new requirements. The Contractor shall coordinate airfield driving qualified escorts prior to coming to the installation if training requirements have not been obtained. Vehicle operators and employees entering the PL-2 area for purpose of collection shall be US citizens. Non-US citizens are not provided clearance for this area.

Carpet & Tile Flooring Requirements March 28, 2025 Page 19 of 28

3.2 Government Parts/Items. The Government may provide parts/items for repairs to the Contractor. The Government is under no obligation to provide any parts/items for repairs to the Contractor; however, if parts/items are available, the Government may decide to make these available to the Contractor. If parts/items are made available to the Contractor, these parts/items will not be considered Government Furnished Property because the items are incidental to the place of performance, Contractor personnel will perform work related to this contract on a government installation, and the parts/items used by the Contractor will remain accountable to the Government. As part of the PM task, the Contractor shall recommend a list of long lead time parts/items (defined as parts/items with a delivery period more than two (2) weeks) for the Government’s consideration for storage on-base. The Government is under no obligation to store any long lead time parts/items for repairs on-base. The Government may store long lead time parts/items for repairs on-base only when the CO determines that it is in the best interest of the Government. Any long lead time parts/items will be initially procured and replenished as required using the SO procedure (SOW Section 4.1.4).

3.3 Utilities: The Government shall furnish utilities when available for the Contractor to perform services as described in this SOW. The Contractor shall always conserve use of utilities.

Electricity, sewage, and water will be made available where existing. No temporary connections shall be allowed until the Contractor has submitted a detailed plan for the connection and has received approval from the Government for the connection. The plan shall include a detailed description on how the connection shall be restored to its original condition or better.

3.3.1 Any alterations or temporary connections to Government utilities shall be…