Atch 1 - SOW.pdf

PDF 416 KB Posted

Attached to
Adm 1 - 18 SDS - CONSOLE WORKPLACE FURNITURE
Solicitation number
FA461026Q1585
Issued by

About this file

This is a Statement of Work (SOW) for console workplace furniture procurement and installation at Building 8401, Room 254, Vandenberg Space Force Base, California, with an effective date of September 2, 2026.

The contractor shall provide design, pricing, purchase, removal of existing furniture, and installation of new console furniture. The project is a commercial acquisition solicited competitively via SAM.gov under FAR Part 12, with award on a Best Value to the Government basis to the responsible quoter meeting all technical requirements at the lowest fair and reasonable evaluated price. Deliverables include three 2-person training consoles (CW01), three 3-person training consoles (CW02), one trainers podium (CW03), and fifteen task chairs (C01). All console furniture shall feature Wilsonart high-pressure laminate panels with specific finishes, integrated communications tray pathways at top and bottom of vertical panels capable of carrying fiber optic and copper wiring, removable access panels, equipment racks, two 6-outlet power supplies with 15-foot minimum pigtails per station, and adjustable LED task lights. Contractor responsibilities include complete design services with up to two minor revisions, providing three copies of floor plans and bill of materials within ten workdays of final design acceptance, delivery and storage (maximum 30 days offsite), complete installation by manufacturer-certified professionals, removal and recycling of existing furniture to Base Recycle Center B11514, final cleaning including steam cleaning and broom sweep, and coordination with 30 Space Communications Squadron for internal cabling routing. The contractor must designate a contract manager and project manager with minimum three years' experience within ten days of award, maintain customer service hours of 0730-1630 Monday through Friday excluding federal holidays, respond to Air Force inquiries within two business days, and ensure all personnel present valid REAL ID-compliant identification and receive base escorts as required. Government furnishes controlled working space and utilities, free and clear hard surface access during regular working hours, parking suitable for semi-trailer trucks within 100 feet of building entrance, and access to a freight elevator. Site conditions require current CAD drawings of building shell and building readiness with other construction tasks complete. All personnel entering the installation must comply with Vandenberg SFB security procedures, including vehicle inspection at Lompoc Gate, presentation of current vehicle registration, proof of insurance, and valid driver's licenses for all occupants; contractors are not considered mission essential and firearms are prohibited on base.

View the file

Other files

File Type Posted
QandA 20260924.docx DOCX document
Atch 1 - SOWv2.pdf PDF
RFQ - 18 SDS Furniture 20260923.pdf PDF
Atch 3 - Clauses and Provisions.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SOW OFFICE WORKPLACE FURNITURE

Page | i

SOW CONSOLE WORKPLACE

FURNITURE

B8401, Room 254, VANDENBERG SFB, CA

02 Sep 2026

Page | ii

TABLE OF CONTENTS

REVISION HISTORY ........................................................................................................................... II

1.0 BACKGROUND

2.0 SCOPE

2.1 3

CONSOLE FURNITURE

2.2 CONSOLE FURNITURE DESKING

3.0 DESCRIPTION OF WORK

3.1 GENERAL SERVICES

3.2 DESIGN WORK

3.3 PRODUCT MARKINGS/DOCUMENTATION/TOOLS

3.4 DELIVERY WORK

3.5 INSTALLATION | REMOVAL WORK

3.6 INSPECTION/ACCEPTANCE CHECKLIST

4.0 PRODUCT

4.1 PANELS AND COMPONENTS

4.2 DEMOUNTABLE WALLS -NA

5.0 GOVERNMENT FURNISHED SUPPORT

6.0 SITE CONDITIONS

7.0 VOLUNTARY PROTECTION PROGRAM (VPP)/SAFETY

8.0 BASE | INSTALLATION SPECIFICS

9.0 DELIVERABLES (CDRLS)

Revision History

Author Name Date Reason For Changes Version

Page | 3

1.0 BACKGROUND

This purchase shall include the final design, pricing, purchase, removal and/or disposal of existing furniture and installation of new furniture in support of the furniture replacement effort, building

8401, Room 254 as noted, Vandenberg SFB, CA. NOTE: This effort will be inside a secure area and contractor personnel shall be escorted at all times. Escorts will be provided by user. Effort shall follow description below and preliminary design as prepared by 30th CES/CENME, Execution Support (POC: K. Robert Griswold, 805.606-2048).

2.0 SCOPE

This effort is a commercial acquisition solicited openly and competitively via SAM.gov (Contract

Opportunities) in accordance with the Revolutionary FAR Overhaul (RFO) Part 12. The

Contractor shall propose firm-fixed pricing for all required console furniture products, seating, freight, and turnkey on-site assembly services. This project will be awarded on a competitive basis using Best Value to the Government to the responsible quoter meeting all technical requirements of this Statement of Work at the lowest fair and reasonable evaluated price.

NOTE: The furniture contractor shall strictly provide an integrated power strip with a standard plug-in pigtail (minimum 15-foot length) for each console workstation. The contractor is not responsible for facility electrical infrastructure or hard-wired connections. The customer (18 SDS and 30 CES) will be responsible for connecting the pigtails to existing facility wall power outlets.

The customer will also be responsible for installing all communications equipment (computers, cabling, switches, monitors, etc.) after the furniture has been assembled.

NOTE: All CONSOLE furniture panels shall have an integrated communications tray pathway at both the top and bottom of each vertical panel. Communications trays shall be capable of carrying both fiber optic cable and copper wiring. Installation of CONSOLE furniture shall be coordinated with 30 Space Communications Squadron (30 SCS) through the 18 SDS point of contact to allow 30 SCS time to route internal cabling as required.

NOTE: Contractor shall disassemble and remove all existing furniture and transfer all excess furniture to the Base Recycle Center, B11514. Contractor shall coordinate delivery and prepare all required paperwork for submittal of disassembled/removed furniture to the Recycle Center.

NOTE: Contractor shall be responsible to remove all packaging, trash, and debris from the installation as part of this effort. Every effort shall be made to fully recycle all materials possible.

Contractor shall be responsible for final cleaning to include broom sweep or vacuum of room, dusting/damp cloth wipe down of all installed furniture prior to final acceptance.

2.1

CONSOLE FURNITURE

For this project we require console furniture, configured per the attached drawings. Noted finishes are typical for all console furniture and are examples only; approved equals are allowed.

Typical finishes/grades are as follows:

Back rear metal: Factory finish applied paint, black metal

Panel Front and rear panels: Wilsonart high pressure laminate (HPL), standard finishes and color to be determined

Page | 4

End panels: Wilsonart high pressure laminate (HPL), standard finishes and color to be determined

Panel interior worksurface: Wilsonart high pressure laminate (HPL), standard finishes and color to be determined Panel work surface and edge: Soft Black Urethane

Back tool slat wall Black

Monitor support arms Factory finish, color to be determined

Power bar 120v/15amp, minimum (6) outlets per station

Page | 5

Console furniture workstation configurations, features, locations, and quantities are as follows:

2.2 Console Furniture Desking

For this project we require console furniture, configured per the attached drawings.

Finishes for reference only. An approved equal by other manufacturers would be acceptable.

Typical finishes/grades are as follows:

Desktop HPL worksurface: Wilsonart-Ivory -Velvet Elm-15601

Laminate vertical surface: Wilsonart-High Rise 4996-38

Desktop edge: Black soft urethane Rear and front laminate panels: Wilsonart Laminate High Rise 7909-60

Room 254 Console Furniture

Console configuration, features, locations, and quantities are as follows:

Console CW01 (2-person training console, three total):

• Overall console dimensions: 5’-4”w x 4’-0” dp

• Console base to include C-leg center support with C-leg end supports, with minimal intrusion into area under work surface

• Console bases have the following features:

o Removable access panels for each workstation, high pressure laminate finish.

Panels to be removable with simple lift action (no screws or hard connections) with integral hand holds for ease of removal o Equipment rack for installation of computer equipment, minimum 13” clear inside by 29” high. Racks to be open basket wire cable trays, rubber coated, located at top and bottom.

o Two 6-outlet power cord power supplies, with pig tail connection, 15’ length minimum, for ease of access and power connection.

o Top of console base to have removable metal access panel to gain access to top wire basket for cable connections and power access.

o Adjustable leg height, with minimum height adjustment of 1 1/2 inches.

o Slat rail tool bar, approximately 14 1/2 inches high, with two single monitor arms at each workstation (monitors will be stacked), for 27” monitor support (standard height, width, weight). Provide easy access for cable management and access to power supply. The back of the slat tool bar area shall have a high-pressure laminate panel, removable for access to communications and power cables.

• All work surfaces, side panels, removable panes to be high pressure laminate finish. Work surfaces to have the following features:

o Integral rubber edge at edges and on end of equipment run (see floor plan for location)

• Each workstation shall have an adjustable height/location LED task light for the work surface area.

Console CW02 (3-person training console, three total):

• Overall console dimensions: 8’-0”w x 4’-0” dp

• Console base to include C-leg center support with C-leg end supports, with minimal intrusion into area under work surface

• Console bases have the following features:

o Removable access panels for each workstation, high pressure laminate finish.

Panels to be removable with simple lift action (no screws or hard connections) with integral hand holds for ease of removal

Page | 6 o Equipment rack for installation of computer equipment, minimum 13” clear inside by 29” high. Racks to be open basket wire cable trays, rubber coated, located at top and bottom.

o Two 6-outlet power cord power supplies, with pig tail connection, 15’ length minimum, for ease of access and power connection.

o Top of console base to have removable metal access panel to gain access to top wire basket for cable connections and power access.

o Adjustable leg height, with minimum height adjustment of 1 1/2 inches.

o Slat rail tool bar, approximately 14 1/2 inches high, with two single monitor arms at each workstation (monitors will be stacked), for 27” monitor support (standard height, width, weight). Provide easy access for cable management and access to power supply. The back of the slat tool bar area shall have a high-pressure laminate panel, removable for access to communications and power cables.

• All work surfaces, side panels, removable panes to be high pressure laminate finish. Work surfaces to have the following features:

o Integral rubber edge at edges and on end of equipment run (see floor plan for location)

• Each workstation shall have an adjustable height/location LED task light for the work surface area.

Console CW03 (trainers podium, one total):

• Overall console dimensions: 3’-0”w x 2’-6” dp

• Console base to include four wheel caster wheels, with swivel, with two wheels minimum with integral brake

• Base shall have

• Console have the following features:

o Openable, hinged access doors, high pressure laminate finish. Above base cabinet shall be an open, fixed shelf area with heavy duty keyboard tray and mouse pad tray. Trays shall be able to extend clear of podium as well as recess inside of podium.

o Sides and face of podium shall be high pressure laminate panels, fixed.

o Two 6-outlet power cord power supplies, with pig tail connection, 15’ length minimum, for ease of access and power connection.

o Top of console base to have removable metal access panel to gain access to top wire basket for cable connections and power access.

o Slat rail tool bar, approximately 14 1/2 inches high, with single monitor arm at each workstation, for 27” monitor support (height, width, weight). Provide easy access for cable management and access to power supply. The back of the slat tool bar area shall have a high-pressure laminate panel, removable for access to communications and power cables.

o Base shall have closed bottom with grommets at both back corners for access to floor/wall outlets and possible floor outlet connections.

• Work surfaces to be high pressure laminate finish with the following features:

o Integra grommet with two CAT6 cable jacks, two USB A+C charging jacks and four AC power outlets.

• Podium shall have an adjustable height/location LED task light for the work surface area.

Task Chair C01 (15 total):

• Task chair or acceptable alternate with the following minimum features:

o Midback height with mesh back o Upholstered seat cushion, swivel-tilt and synchro tilt mechanism, Grade B minimum o Armless

Page | 7 o Adjustable lumbar support o 300lb weight capacity warranty

3.0 DESCRIPTION OF WORK

3.2 General Services

Coordination and management of all products, equipment and people required to create, deliver, and install new Console workplace furniture within an Air Force location. This includes ongoing servicing of any items defective due to manufacturing error as well as for replacement or repair of any damaged item after purchase.

3.2.1 The contractor shall perform tasks on Console Furniture in accordance with the requirements stated in this contract and the tier I Contract.

3.2.2 The contractor shall be responsible for all personnel, equipment, tools, materials, supervision, storage, assembly, transportation, incidentals and all other items and services necessary to provide and install office workplace furniture.

3.2.3 The contractor shall be knowledgeable of and shall comply with all applicable federal, state, and local laws, codes, permits, DoD, AF, and base requirements and instructions required for the performance of the duties in this Performance Work Statement (PWS).

3.2.4 The contractor shall ensure policies and procedures are established that protect the safety and welfare of customers, employees, and the community to minimize or eliminate safety or environmental risks. These policies shall follow Federal and Installation policies and procedures.

3.2.5 The contractor shall provide a contract manager who shall be responsible for the performance of the work. The name of this person and an alternate or alternates who shall act for the contractor when the manager is absent shall be designated in writing to the Contracting

Officer (CO) within 10 days after contract award. The contract manager or alternate shall have full authority to act for the contractor on all contract matters relating to the daily operations of this contract on the installation.

3.2.6 The contractor shall provide a Project Manager with a minimum of 3 years of experience installing your company's product, responsible for project site management, scheduling, coordination, and technical assistance to the Air Force representative as required throughout the project. Resumes and letters of intent shall be provided upon request.

3.2.7 Any electrician provided by the contractor shall be a licensed electrical contractor. The electrician will be paid in accordance with the current

Davis-Bacon wage determination.

3.2.8 The contractor shall submit a complete list of personnel in accordance with installation policy, including deliverymen, who will be expected to work on the installation. This list will contain Privacy Act information as required as well as the expectation that everyone will be able to present a current and valid state/federal identification complying with the REAL ID

Act, to meet local Air Force security requirements. (Please note that many installations require this information be coordinated days in advance).

Page | 8

3.2.9 The contractor shall not employ persons for work on this contract if such employee is identified to the contractor by the CO as a potential threat to the health, safety, security, general well-being or operational mission of the installation and its population. Contractor personnel shall present a neat appearance and be easily recognized as contractor employees.

3.2.10 The contractor shall be the authorized dealer of the specific console workplace furniture manufacturer proposed for the project.

3.2.11 The contractor shall manage ordering, shipment, delivery, and installation of all new furniture from manufacturer to final acceptance by the

Government Project Manager (GPM).

3.2.12 The contractor shall provide customer service during normal duty hours, 0730-1630 hours, Monday through Friday; except for federal holidays.

3.2.13 Recognized US Federal Holidays are as follows: New Year’s Day, Birthday of Martin Luther King Jr., Washington’s Birthday, Memorial Day, Juneteenth

National Independence Day, Independence Day, Labor Day, Columbus

Day, Veterans Day, Thanksgiving Day, and Christmas Day. If the holiday falls on a Saturday, it is observed on Friday. If the holiday falls on Sunday, it is observed on Monday.

3.2.14 When the contractor desires to work other than standard times, a written request shall be submitted to the GPM for approval. Written approval from the CO must be received before proceeding with the work. The request shall be submitted at least five (5) workdays prior to the proposed performance of work, and it shall indicate the day/days, time/amount of work, and reason why performance is necessary during nonstandard hours.

3.2.15 The contractor shall provide alternate work locations for employees or allow employees to take vacation during designated Government non-workdays or other periods where government offices are closed.

3.2.16 All Air Force inquiries shall be responded to by a contractor representative within two business days.

3.2.17 Meetings may periodically be held between base personnel and contrac-tor management to discuss contract status. The CO will notify the contractor in writing in advance of the place and time of required meetings.

3.2.18 Reserved

3.2.19 The contractor shall be responsible for coordination of an escort through any controlled areas through the local GPM.

3.2.20 Lost vehicle and entry passes shall be reported immediately to the

Security Police as well as the GPM in accordance with the local security forces policy.

3.2.21 The contractor shall be responsible for any storage of all office workplace furniture, components, parts, and assemblies prior to and during installation in accordance with the agreed upon delivery schedule.

3.2.22 Reserved

3.2.23 The contractor shall maintain the capability to adjust workforce in the event of unforeseen circumstances such as extended duty hours, travel, classes and education, and mission related changes. These expenses are reimbursable with prior approval of the GPM and the CO.

3.2.24 The contractor shall maintain continuity between the support operations at California and all other assigned performance locations and the contractor’s corporate offices. The contractor shall provide the necessary resources to manage and administer the contract. The contractor shall, as a minimum, maintain a single point of contact for this effort to be

Page | 9 available in person to the Contracting Officer, 30th CONS/PKB, during the same business day.

3.2.25 The contractor shall provide for the management and support of personnel, to include making necessary arrangements for employees required to travel; supporting personnel co-located on California and other locations specified with additional resources, expertise, advice;

necessary infrastructure to support work to be accomplished off-base;

conducting personnel meetings; providing administrative support for employees in a timely fashion; and providing facility and staff security requirements.

3.2.26 All personnel attending meetings, answering Government telephones, and working in other situations where their contractor status is not obvious to third parties are required to identify themselves as such to avoid creating an impression that they are Government officials. They must also ensure that all documents or reports produced by contractors are suitably marked as contractor products or that contractor participation is appropriately disclosed.

3.3 Design Work

Providing professionals versed in programming, space planning and product specification, able to communicate product capabilities to the customer, to ensure products purchased meets the requirements.

3.3.1 As a part of the request for proposal/quote process, the contractor will propose products and a design that considers site layout considerations, as well as other information gathered during initial customer review at the discounted price upon which the award will be based.

3.3.2 In no case should product prices exceed the discounted amounts set forth in the Tier I contract applicable to the contractor. The proposal shall show list price and discount and net price.

3.3.3 The contractor shall provide design services, including space planning, site verification, material selection and programming as necessary for the project.

3.3.4 The contractor shall define and furnish the necessary hardware, software, and all other equipment necessary to accomplish design tasks. Standard equipment in addition to the hardware and software shall include but not necessarily be limited to reproduction machines, plotters, paper, pencils, fax machines, and office furniture.

3.3.5 The contractor shall be responsible for collection of information relevant to the design/redesign of a space. Examples could include personnel interviews, and questionnaires and walk-through inspections of the facility, as well as the existing furniture database (if available).

3.3.6 Services shall include site evaluation to ensure proper fit of the furniture within the given space and that all structural and other anomalies are considered.

3.3.7 The contractor is responsible for notifying the GPM of all power requirements regarding location of communication, LAN and power junction boxes, with the expectation that the government will be responsible for providing and locating those junction boxes within 4'-0" of the ceiling penetration of the power pole location provided by the contractor.

3.3.8 Design shall ensure that power poles do not protrude into main walkways.

Page | 10

3.3.9 Design shall ensure that all outlets included in the design are accessible to the user, free and clear of obstacles.

3.3.10 Design shall not allow more than four cubicles to be served by a single circuit.

3.3.11 Design shall ensure that no more than two duplex outlets (four plug in points) are put onto the same circuit.

3.3.12 Design shall ensure that no existing wall outlets or thermostats are covered or concealed by panels or other systems furniture components.

3.3.13 Design shall consider utilize wall mounted applications where possible.

3.3.14 The contractor shall utilize any existing government product to its maximum as applicable when project includes add on parts to existing systems furniture.

3.3.15 All designs of furniture layouts, including original designs and any subsequent redesigns, must be accomplished by qualified professional designers and should have three years’ experience using software like that proposed for this contract.

3.3.16 The contractor shall meet with the GPM to review the installation drawings prior to submission of any revised price quote.

3.3.17 The contractor shall provide additional drawings of Console layouts, if requested by the GPM on a non-rewritable CD or DVD in both .dwg and .pdf formats unless otherwise specified in the contract.

3.3.18 The hardware/software shall perform computerized inventory, computer aided design, automated take-off function, and report generation for all product purchased. The software for this contract shall be compatible software for AutoCAD and MicroStation. The software shall be fully compatible with Microsoft Windows, the most current version.

3.3.19 Design service shall include an initial complete design with up to two additional minor revisions prior to final approval.

3.3.20 Designs of each location shall include a Basic component floor plan sheet in which all Console furniture and workstations is tagged: to include graphic symbols for all major hanging components (shelves, task lights, work surfaces, drawers, etc.) as determined by the government. This design sheet shall include station numbers and movable wall and associated product locations, in 1/4" = 1'-0" scale.

3.3.21 Designs of each location shall include a Panel and Hardware Layout sheet: to include all finish colors and fabrics, panel widths (30", 36", 42",48” etc.), in 1/4" = 1'0" scale, in addition to display hardware, keys and locksets shall be included.

3.3.22 Design sheet layouts of each location shall include a Furniture Power

Distribution sheet in 1/4" = 1'0" scale to include: the location of all powered panels, powered components, receptacles, communication ports, power poles, base electrical feeds and building connection points.

3.3.23 Within ten (10) workdays after the final design has been accepted by the base requesting organization, a bill of materials detailing all inventory, and

(3) copies of all plans including basic floor plan, movable wall, panel and electrical layouts will be provided to the GPM for the project.

3.3.24 The contractor shall maintain an updated, automated master copy of all furniture layouts, (designs/redesigns) accomplished under this contract for the duration of the warranty, after government acceptance of the project.

3.3.25 Drawing changes required to a layout due to contractor errors or omissions shall be the responsibility of the contractor and the corrected

Page | 11 drawing and bill of materials shall be delivered to the government within three calendar days of the request.

3.3.26 Contractor shall provide the GPM a copy the installation drawings and bill of materials via mutually agreed upon electronic media.

3.3.27 Contractor shall make the government aware of any discrepancies to existing conditions not previously identified.

3.4 Product Markings/Documentation/Tools

Items used after product acceptance used to identify or modify a particular product.

3.4.1 All documentation (Owner’s manuals, warranty information, assembly instructions, maintenance and care instructions, operating instructions, etc.) shall be provided to and reviewed with the GPM upon completion of the installation.

3.4.2 Special assembly tools (security hardware wrench, spare parts provided with the furnishings, etc.) shall be provided to the GPM prior to final

Government acceptance of products and services.

3.5 Delivery Work

Transportation of all products, loading, unloading, storage and all necessary movement from factory to final onsite set up.

3.5.1 The contractor Project Manager shall be responsible for on-site coordination of all staging and deliveries, to include access to and operation of any equipment needed for unloading and movement of materials or product.

3.5.2 Contractor shall be responsible for determination of the appropriate delivery method and handling, based on site conditions to include the non- existence of loading docks and equipment at any given location.

Special circumstances may be identified to and negotiated with the CO.

3.5.3 Delivery shall be in accordance with the terms of the contractor's agreement. If the ordering activity designates an accelerated delivery schedule it will be identified in the contract.

3.5.4 A maximum of 30 days offsite storage shall be included in the contractor's agreement.

3.5.5 Work shall comply with applicable building standards and codes, specifically: National Electrical Code (National Fire Protection Association

(NFPA 70) and National Life Safety Code (NFPA 101).

3.5.6 The contractor shall be responsible for following all safety and security guidelines within the area in which work is being performed, to include securing any contractor owned tools or equipment, and any on site storage being utilized.

3.5.7 The contractor shall maintain accountability and control of any keys provided and shall return them to the GPM upon completion of work.

Duplication of keys or other means of access is not authorized.

3.5.8 The contractor shall prevent its personnel from entering any area other than the designated work area.

3.5.9 The contractor shall maintain a means of egress within all designated work areas to comply with fire codes.

Page | 12

3.5.10 The contractor shall ensure its personnel eat, drink, or smoke only in designated areas.

3.6 Installation | Removal Work

Manufacturer certified professionals to install Console workplace furniture per the approved design drawings.

3.6.1 Contractor shall provide or have capability of obtaining support services to include removal and warehousing of the proposed furniture.

3.6.2 The contractor shall appoint an authorized representative who will be the company's senior representation on site for all customer communication and enforce compliance of all requirements for the project. This representative shall have a physical presence during any delivery and throughout installation unless agreed to by the GPM.

3.6.3 The contractor representative shall meet with GPM to review the installation drawings prior to installation.

3.6.4 The contractor shall install Console workplace furniture in accordance with each requirement statement and basic component floorplan, panel plan and electrical plan, designed and provided by the contractor with each purchase.

3.6.5 Contractor shall be liable for any damage to government property caused by the contractor or their representatives.

3.6.6 During installation the contractor shall protect all furniture and building materials, to include carpet, existing within the space with industry approved protective coverings inclusive of craft paper, moving blankets and such type of material. The contractor shall not use protective materials that will leave any type of residual print, outline or imaging on any furniture or building materials. Contractor shall not repair damage to finishes unless directed by CO but will be responsible to pay for damages.

The government will make repairs and back charge the installation contractor.

3.6.7 Services shall include product transportation of existing inventory as required.

3.6.8 The contractor shall uncrate/unpack all items and perform required assembly in accordance with the manufacturer instructions.

3.6.9 Services shall include inspection of product for shipping damage. If damage is found it shall be the responsibility of the contractor to notify the

GPM and make all arrangements for replacement or repair of the item(s) damaged. Damaged items are not to be installed unless otherwise directed by the GPM.

3.6.10 Services shall include assembly of product to conform to final CO approved design drawings.

3.6.11 Any furnishings attached to the building shall be attached securely.

3.6.12 Installation of office workplace furniture must be under the oversight of an onsite manufacturer certified installer.

3.6.13 The contractor shall ensure that all communication outlet faceplates are provided with the furniture, based on the unique specifications of the IT requirements at that location.

3.6.14 Services shall include removal of packing materials from the installation and cleaning of product including steam cleaning and thorough cleaning of all products.

Page | 13

3.6.15 Services shall include removal of all excess product and transport to the

GPM approved warehouse or other location as specified.

3.6.16 Services shall include removal of packing materials from the installation and cleaning of product including steam cleaning reused panels and thorough cleaning of all products.

3.6.17 All trash removed from the worksite shall be disposed offsite in accordance with state laws, and packaging and other recyclable materials shall be recycled wherever possible.

3.6.18 The contractor shall maintain environmental controls when working in any government facility, to include but not limited to keeping doors shut and lights off when not in use and turning off vehicle engines when parked.

3.6.19 Light fixtures shall have appropriate lamps and be in working order.

3.6.20 Prior to acceptance, the contractor shall clean all furniture only with the manufacturer's recommended cleaning agents/products.

3.6.21 The contractor shall provide all components, completely assembled, installed, and operational, including keys in each lock set.

3.6.22 Furniture, equipment, and accessories shall be level, square, and in proper alignment with adjoining furniture. All drawers should operate smoothly and stay closed when not in use.

3.6.23 The contractor shall inspect to ensure the furniture is free of surface dirt and defects, the installation is complete, and the furniture is ready for use.

3.7 Inspection/Acceptance Checklist

Validation between the contractor and the GPM that all product has been installed according to manufacturer guidelines and customer specifications.

3.7.1 A post-installation walkthrough shall be coordinated with the contractor’s authorized representative and GPM.

3.7.2 All areas requiring correction shall be documented in a punch list by the contractor and provided to the GPM upon completion of a joint walk through by the contractor and the GPM. No payment will be authorized while punch list items remain open.

3.7.3 A final walk through will be performed with the contractor and the GPM and the CO to ensure all punch list items have been addressed to the satisfaction of the government.

4.0 PRODUCT

4.2 Panels and Components

The contractor shall supply all panel system parts and components needed to fulfill a complete console as referenced on the plan.

4.3 Demountable Walls -NA

5.0 GOVERNMENT FURNISHED SUPPORT

5.2 Installation Support

5.2.1 Base support includes Government-controlled working space and utilities.

Page | 14

6.0 SITE CONDITIONS

6.2 Minimum Standard Site Conditions

6.2.1 Free and clear hard surface access to the receiving and installation location during regular working hours.

6.2.2 Parking and off-loading area suitable for access by a semi-trailer combination or truck within 100 feet of the building entrance closest to product installation area. Freight elevator is available for use.

6.2.3 Threat condition level of the base is Bravo. This requires dealer personnel to get base access to complete the product installation.

6.2.4 A staging area adequate to sort, stage and uncrate products along with a waste receptacle suitable for disposal of materials.

6.2.5 Includes electric power, working lights, heating and air conditioning, and access to a working freight elevator if location is on a floor other than the first floor.

6.2.6 Current and correct CAD drawings of the building shell

6.2.7 A building ready for the installation of consoles (i.e. other tasks such as flooring are complete so as not to cause any delays in performance)

6.3 Deviations

6.3.1 Contractor shall notify the CO of any deviations from the above standards, as well as any requests for equitable adjustment to the contract price based on a condition not available at site visit.

7.0 VOLUNTARY PROTECTION PROGRAM (VPP)/SAFETY

7.2 Voluntary Protection Program

7.2.1 The Air Force is part of the AOSHA VPP. All contractors are required to familiarize themselves with the requirements of the VPP. Information on

VPP can be accessed at https://www.osha.gov/vpp

7.3 Required Plans

7.3.1 (Not Applicable).

8.0 BASE | INSTALLATION SPECIFICS

8.2 Commercial Trucks

8.2.1 All commercial trucks must enter through Lompoc Gate Vehicle

Inspection Station, located at the intersection of Santa Lucia Canyon

Road and Washington Avenue south of Highway 1, for inspection. In accordance with the Installation policies, base entry procedures must adhere to delivery vehicle process requirements mandated by the Wing.

Once at Lompoc Gate, the driver must have a current base pass from

Bldg. 17595, Visitor Control Center located at the Santa Maria Gate and be able to show the following:

8.2.1.1 Current vehicle registration

8.2.1.2 Current proof of insurance

https://www.osha.gov/vpp

Page | 15

8.2.1.3 Valid and current driver’s license for the driver

8.2.1.4 Valid and current driver’s license or other state identification for any passengers in the vehicle

8.3 Gate Procedures

8.3.1 All commercial trucks must enter through Lompoc Gate Vehicle

Inspection Station, located at the intersection of Santa Lucia Canyon

Road and Washington Avenue south of Highway 1, for inspection. In accordance with the Installation policies, base entry procedures must adhere to delivery vehicle process requirements mandated by the Wing.

Once at Lompoc Gate, the driver must have a current base pass from

Bldg. 17595, Visitor Control Center located at the Santa Maria Gate and be able to show the following:

8.3.1.1 Current vehicle registration

8.3.1.2 Current proof of insurance

8.3.1.3 Valid and current driver’s license for the driver

8.3.1.4 Valid and current driver’s license or other state identification for any passengers in the vehicle

8.3.2 Once at Lompoc Gate Vehicle Inspection Station, be prepared to exit the vehicle and allow for vehicle inspection. At this time, you may ask for directions to your destination.

8.3.3 If the destination requires the driver to leave Lompoc Gate Vehicle

Inspection Station, and re-enter the base through an alternate gate, the pass received will be sufficient documentation for entry into both gates, within a pre-established time directed by the Security Forces representative.

8.3.4 Arrival at the appropriate gate after the designated allotted time will result in non-admittance to the installation.

8.3.5 This procedure will occur each time a commercial truck requests access to the base.

8.4 Bill of Lading

8.4.1 Current Bill of Lading (BOL) to get delivery driver and the vehicle on base.

BOL must include the AF installation name, date of anticipated delivery, and specific destination (including building number, street address, and point of contact information).

8.5 Personnel Requirements

8.5.1 Personnel should the following items when entering an installation:

8.5.1.1 Current Registration for all vehicles

8.5.1.2 Current Proof of Insurance for all vehicles

8.5.1.3 Valid driver’s license for each driver

8.5.1.4 Valid driver’s license or other state identification for each passenger

8.5.1.5 Depending on the current Force Protection Condition, a government representative may be required to sponsor those people in person at Pass & ID, Bldg. 17595, Visitor Control

Center, located at the Santa Maria Main Gate.

8.5.1.6 The sponsor must state the guest's purpose and destination. It is the responsibility of the contractor to validate this need with

Page | 16 their government POC prior to their arrival to coordinate the arrival time accordingly. Sponsors may request that a pass be applicable for multiple days if needed.

8.6 Sponsor Requirements

8.6.1 To sponsor 10 or more people, a typed list of those people must be submitted by the COR in Word or Excel format, stating LAST NAME then

FIRST NAME of each person. The sponsor must submit that list to Pass & ID, Bldg. 17595, Visitor Control Center, no fewer than three days prior to the anticipated arrival. Names listed must be complete names, (no nicknames), and correspond to the names on the state ID for each person.

8.7 Mission Essential Services

8.7.1 Contractors are not considered mission essential.

8.8 Prohibitions

8.8.1 Firearms may not be brought on base under any circumstances.

Individuals with criminal records are not allowed on base. Contractor personnel are prohibited from sponsoring guests onto the installation.

9.0 DELIVERABLES (CDRLS)

(CDRL A001) Design 1 LS

(CDRL A002) Delivery/Installation 1 LS

(CDRL A003) Console CW01, (3) stations 3 TOTAL

(CDRL A004) Console CW02, (3) stations 3 TOTAL

(CDRL A005) Podium CW03, (1) station 1 TOTAL

(CDRL A006) Task Chair C01 15 TOTAL

The Government has full ownership of all formal deliverables and required supporting documentation regarding use, distribution, and reproduction.

File details come from the government source that posted it. Updated .