This file is a Contract Price Schedule for the Preserve Wisconsin State Monument project, issued by the National Park Service (NPS) Denver Service Center. The solicitation (140P5225R0008) seeks comprehensive historic preservation and restoration services for an early 20th-century monument featuring granite structure, bronze statuary, and commemorative elements honoring Wisconsin troops who fought at Vicksburg.

The price schedule details 26 base contract line items (CLINs) and two optional phases, covering restoration activities such as bronze element restoration, stone repair, mortar joint repointing, metal stain cleaning, lightning protection installation, and site improvements. The work involves precise conservation techniques including injecting through-cracks, stone dutchman repairs, pin installations, and bronze element refastening. While the document shows $0 total prices, supplemental pricing information suggests significant complexity in the restoration effort, with specific measurements for tasks like granite tooling, crack injection, and surface cleaning across various monument components.

View the file

Other files for this federal contract opportunity

Show all 17

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Price Schedule

Contract Price Schedule
National Park Service (NPS) - Denver Service Center (DSC) | 3-13-18
Solicitation Number:
PARK - PMIS:VICK - 209596
(Project Management Information System)
Developed Area:WISCONSIN MONUMENT
Project Title:PRESERVE WISCONSIN STATE MONUMENT
Notice: Offerors are required to submit, a minimum, an offer that conforms to the solicitation documents with pricing for Base line items and all
option line items. Failure to do so may render the proposal unacceptable. On lump-sum line items, provide the total price only. For all unit-priced
line items, provide the unit price and the extended total price. If no specific line item exists for a portion of the work, include the costs in a related
item. In case of error in calculation of extended prices, the unit price governs. In case of error in summation, the total of the corrected amounts
govern. Round totals and extended prices to whole dollars.Comments:
Contract Line Item Number (CLIN)Contract Line Item (CLI) TitleQuantityUnit of MeasureUnit PriceTotal Price
1Fully Restore all Bronze1LUMP SUM
2Repoint Mortar Joints at Displaced Granite25LINEAR FEET
3Tool Granite to Remove Loose Flaking28SQFT
4Inject Through-Cracks with Cementous Grout32LNFT
5Stone Dutchman Repair835CUBIC INCH
6Repair Existing Patch with Patching Mortar165CUBIC INCH
7Refasten Bit and Reins Bronze Elements1EACH
8Remove Deposits of Calcium Crust1675SQFT
9Install 1/4" Masonry Pins6EACH
10Clean Cuprous Mettalic Stain on Stone353SQFT
11Clean Ferrous Mettalic Stain on Granite621SQFT
12Replicate Bronze Plaque Fasteners32EACH
13Replicate End of Bronze Gun Barrel1LUMP SUM
14Provide Bronze Star where Missing13EACH
15Install T-Caps20EACH
16Install Crack Monitor5EACH
17Replicate Bronze Reign Piece1EACH
18Braze Bronze to Repair Hole2EACH
19Remove and Reset Loose Bollards1LUMP SUM
20Lightning Protection1LUMP SUM
21Site Underdrain362LNFT
22Topsoil Stripping349CY
23Replacement Topsoil305CY
24Earthwork Grading699SQFT
25Lawn Grass Seeding16470SQFT
26Scaffolding1LUMP SUM$0$0
TOTAL BASE PRICE (Contract Line Item Number 1-26) ---------------------------------------------------------------------------------$0(1ST PHASE) BASE PRICE INCLUDES COST FOR LINE ITEMS 1-26.

IT EXCLUDES GROUT TOPPING SLAB DEMOLITION, GROUT

TOPPING SLAB REPAIR, 100% REPOINTING OF STONE, AND CLEANING.

THE 2ND PHASE OPTION INCLUDES GROUT TOPPING SLAB

DEMOLITION, GROUT TOPPING SLAB REPAIR, 100% REPOINTING OF

STONE.

THE 3RD PHASE OPTION INCLUDES CLEANING.

1OPTION A, 2ND PHASE OPTION(Contract Line Item Numbers 1A-1C)$0$0$0
1ARepoint Stone 100%1LUMP SUM
1BGrout Topping Slab Demolition1LUMP SUM
1CGrout Topping Slab Repair1LUMP SUM
2OPTION B, 3RD PHASE OPTION(Contract Line Item Numbers 2A,2B)$0
2ACleaning at Plaza, Landings and Top of Stairs8150SQFT
2CCleaning of Elevations12395SQFT
TOTAL PRICE FOR ALL OPTIONS (Contract Line Item Number 1A-2B) -----------------------------------------------------------$0
TOTAL PROPOSED PRICE - BASE PLUS ALL OPTIONS (Contract Line Item Number 1 through 2B) --------------------------$0
All measurement and payment information is included in Division 01 Specifications Section 01 27 00 Definition of Contract Line Items.
Foundations
64772.0000060844.000000.93936$100,837
107347.000003928.000000.06064$6,510
Exterior Enclosure
545066.00000124.000000.00023$206
903336.000006198.000000.01137$10,272
4165.000000.00764$6,903
57991.000000.10639$96,108
12159.000000.02231$20,151
6912.000000.01268$11,455
980.000000.00180$1,624
73626.000000.13508$122,020
55513.000000.10185$92,002
266493.000000.48892$441,658
32.000000.00006$53
130.000000.00024$215
1725.000000.00316$2,859
30.000000.00006$50
5734.000000.01052$9,503
29537.000000.05419$48,952
386.000000.00071$640
22840.000000.04190$37,853
$88,258491.000000.00090$814
Electrical
25011.00000$41,451
Equip
31740.00000$52,602
Select Demo
59176.00000$98,073
Site Improv.
78462.0000076482.000000.97476$126,695
129975.000001944.000000.02478$3,220
Site Mech
31568.00000$52,318

Design-Bid-Build (DBB) Sample

Contract Price Schedule - Design-Bid-Build (DBB) SAMPLE
National Park Service (NPS) - Denver Service Center (DSC) | 3-13-18
Solicitation Number:N2011080811
PARK - PMIS:YELL 012345
(Project Management Information System)
Developed Area:Old Faithful
Project Title:Johnstonian Visitors Center
Notice: Offerors are required to submit, a minimum, an offer that conforms to the solicitation documents with pricing for Base line items and all
option line items. Failure to do so may render the proposal unacceptable. On lump-sum line items, provide the total price only. For all unit-priced
line items, provide the unit price and the extended total price. If no specific line item exists for a portion of the work, include the costs in a related
item. In case of error in calculation of extended prices, the unit price governs. In case of error in summation, the total of the corrected amounts
govern. Round totals and extended prices to whole dollars.
Contract Line Item Number (CLIN)Contract Line Item (CLI) TitleQuantityUnit of MeasureUnit PriceTotal Price
1Visitors Center1Lump Sum$0.00
2Water Line400Lineal Feet- 0
3Sanitary Sewer Line200Lineal Feet- 0
4Rock Excavation150Cubic Yards- 0
TOTAL BASE PRICE (Contract Line Item Number 1 through 4) ---------------------------------------------------------------------------------$0.00
5OPTION A, Geothermal Wells1Lump Sum- 0
6OPTION B, Photovoltaic System1Lump Sum- 0
TOTAL PRICE FOR ALL OPTIONS (Contract Line Item Number 5 and 6) -------------------------------------------------------------------$0.00
TOTAL PROPOSED PRICE - BASE PLUS ALL OPTIONS (Contract Line Item Number 1 through 6) ----------------------------$0.00
All measurement and payment information is included in Division 01 Specifications Section 01 27 00 Definition of Contract Line Items.

Design-Build (DB) Sample

Contract Price Schedule - Design-Build (DB) SAMPLE
National Park Service (NPS) - Denver Service Center (DSC) | 3-13-18
Solicitation Number:N2011080811
PARK - PMIS:YELL 012345
(Project Management Information System)
Developed Area:Yosemite Valley
Project Title:Design and Build a New Structure
Notice: Offerors are required to submit, a minimum, an offer that conforms to the solicitation documents with pricing for Base line items and all
option line items. Failure to do so may render the proposal unacceptable. On lump-sum line items, provide the total price only. For all unit-priced
line items, provide the unit price and the extended total price. If no specific line item exists for a portion of the work, include the costs in a related
item. In case of error in calculation of extended prices, the unit price governs. In case of error in summation, the total of the corrected amounts
govern. Round totals and extended prices to whole dollars.
Contract Line Item Number (CLIN)Contract Line Item (CLI) TitleQuantityUnit of MeasureUnit PriceTotal Price
1Design1Lump Sum$0.00
2Construction1Lump Sum- 0
TOTAL BASE PRICE (Contract Line Item Number 1 and 2) ---------------------------------------------------------------------------------------$0.00
3OPTION A, Photovoltaic System1Lump Sum- 0
TOTAL PRICE FOR ALL OPTIONS (Contract Line Item Number 3) ----------------------------------------------------------------------------$0.00
TOTAL PROPOSED PRICE - BASE PLUS ALL OPTIONS (Contract Line Item Number 1 through 3) ----------------------------$0.00
All measurement and payment information is included in Division 01 Specifications Section 01 27 00 Definition of Contract Line Items.

File details come from the government source that posted it. Updated .