This document is a Temporary Facilities and Controls specification for a construction project at Vicksburg National Military Park, specifically for the Preserve Wisconsin State Monument (PMIS 209569). The specification outlines comprehensive requirements for temporary site infrastructure, including utilities, facilities, security, and protection measures. Key provisions include: contractors must provide their own water (non-potable and potable water are not available within park boundaries), temporary electric power via portable generators, portable toilets, site enclosure fencing, fire protection equipment, and environmental controls. The project will be executed at the Atlanta Federal Center 1924 Building, with strict requirements for site management, such as maintaining facilities in good condition, limiting site disturbance, ensuring equipment cleanliness to prevent exotic species introduction, and implementing robust safety and security protocols including fire prevention, pest control, and temporary enclosures.
View the file
Other files for this federal contract opportunity
Show all 17
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
VICK 209569 01 50 00 - 1
092922 TEMPORARY FACILITIES AND CONTROLS
VICKSBURG NATIONAL MILITARY PARK
Preserve Wisconsin State Monument
PMIS 209569
PROJECT SPECIFICATIONS
NPS INTERIOR REGIONS 1, 2, AND 4
ATLANTA FEDERAL CENTER 1924 BUILDING
100 ALABAMA STREET SW
ATLANTA, GEORGIA 30303
SECTION 01 50 00 - TEMPORARY FACILITIES AND CONTROLS
PART 1 - GENERAL
1.1 SUMMARY
A. Section includes requirements for temporary utilities, support facilities, and security and protection facilities.
1.2 DEFINITIONS
A. Permanent Enclosure: As determined by Contracting Officer (CO), permanent or temporary roofing is complete, insulated, and weathertight; exterior walls are insulated and weathertight;
and openings are closed with permanent construction or substantial temporary closures.
1.3 USE CHARGES
A. General: Cost or use charges for temporary facilities shall be included in Contract Sum as required.
B. Water Service: Potable Water from existing water system is NOT available for use. Provide temporary mobile water tank as required for construction operations without any additional permit costs.
C. Electric Power Service: There is no electrical service or infrastructure at the project site. The contractor shall provide temporary power services as required for construction operations without any additional permit costs.
1.4 QUALITY ASSURANCE
A. Electric Service: Comply with National Electrical Contractors Association (NECA), National
Electrical Manufacturers Association (NEMA), and Underwriter Laboratories (UL) standards and regulations for temporary electric service. Install service to comply with National Fire Protection
Association (NFPA) 70.
B. Environmental Protection: Provide environmental protection as required by agency(ies) with jurisdiction and as indicated in Contract Documents. Coordinate with requirements of the following:
VICK 209569 01 50 00 - 2
1. Regulatory Requirements
2. Noise and Acoustics Management
3. Environmental Management
4. Construction Waste Management
C. Accessible Temporary Egress: Comply with applicable provisions in the United States (U.S.)
Architectural & Transportation Barriers Compliance Board’s Architectural Barriers Act
Accessibility Standard (ABAAS) Accessibility Guidelines.
1.5 PROJECT CONDITIONS
A. Temporary Use of Permanent Facilities: Installer of each permanent service shall assume responsibility for operation, maintenance, and protection of each permanent service during its use as a construction facility before NPS acceptance, regardless of previously assigned responsibilities.
PART 2 - PRODUCTS
2.1 MATERIALS
A. Temporary materials may be new or used, but must be adequate in capacity for required usage, must not create unsafe conditions, and must not violate requirements of applicable codes and standards.
B. Safety Barrier Fence: Chain-link section portable fencing, min 6 ft high.
C. Barrier Tape: Yellow tape Imprinted with "CAUTION: CONSTRUCTION AREA," manufactured by Reef Industries, Inc., Houston, Texas, or approved equal.
2.2 TEMPORARY FACILITIES
A. Field Offices, General: Prefabricated or mobile units with serviceable finishes, temperature controls, and foundations adequate for normal loading.
B. Storage and Fabrication Sheds: Temporary weather tight sheds or other covered facilities for storage of materials subject to weather damage. Number and size of structures shall be subject to
Contracting Officer's approval.
C. Toilets: Sufficiently lighted and ventilated toilet facilities in weatherproof, sight proof, handicap accessible, sturdy enclosures with privacy locks.
2.3 EQUIPMENT
A. Fire Extinguishers: Portable, UL rated; with class and extinguishing agent as required by locations and classes of fire exposures.
VICK 209569 01 50 00 - 3
PART 3 - EXECUTION
3.1 INSTALLATION, GENERAL
A. Locate facilities where they will serve Project adequately and result in minimum interference with performance of the Work. Relocate and modify facilities as required by progress of the Work. .
1. Locate facilities to limit site disturbance and as directed by the Contracting Officer.
B. Provide each facility ready for use when needed to avoid delay. Do not remove until facilities are no longer needed or are replaced by authorized use of completed permanent facilities.
3.2 TEMPORARY UTILITY INSTALLATION
A. General: Install temporary service or connect to existing service.
1. Arrange with utility company, NPS, and existing users for time when service can be interrupted, if necessary, to make connections for temporary services. Acquire necessary permits.
B. Non-potable water for construction is NOT available within park boundaries. The Contractor shall furnish non-potable water from a source outside the park boundary.
C. Potable water is NOT available within park boundaries.
D. Sanitary Facilities: Provide temporary toilets, and wash facilities for use by construction personnel.
1. Place in approved locations secluded from public observation and convenient to work stations. Relocate as work progress requires.
2. Maintain and clean toilet facilities at least weekly.
3. Completely remove sanitary facilities on completion of work.
E. Electric Power Service: There is no electric power at the project site. Temporary power service such as portable generators will be permitted, as long as equipment is maintained in a condition acceptable to NPS.
F. Electric Power Service: Provide electric power service and distribution system of sufficient size, capacity, and power characteristics required for construction operations.
3.3 SUPPORT FACILITIES INSTALLATION
A. General: Comply with the following:
1. Provide incombustible construction for offices, shops, and sheds located within construction area or within 50 feet of building lines. Comply with NFPA 241.
VICK 209569 01 50 00 - 4
2. Maintain support facilities until near Substantial Completion. Remove structures, equipment, and furnishings, and terminate services after punch list is 100 percent completed or when directed by Contracting Officer. Personnel remaining after Substantial
Completion will be permitted to use permanent facilities, under conditions acceptable to
Contracting Officer.
B. Parking: Provide temporary parking areas for construction personnel. Limit parking at project site for work trucks only for accessing tools, etc. on a continuing basis.
C. Dewatering Facilities and Drains: Comply with requirements of the agency(ies) with jurisdiction.
Maintain Project site, excavations, and construction free of water.
1. Dispose of rainwater in lawful manner that will not result in flooding Project or adjoining properties nor endanger permanent Work or temporary facilities.
2. Remove snow and ice as required to minimize accumulations.
D. Project Identification and Temporary Signs: Provide Project identification and other signs .Fence, barricade, or otherwise block off the immediate work area to prevent unauthorized entry.
1. Provide temporary, directional signs for construction personnel and visitors.
2. Maintain and touchup signs so they are legible at all times.
3. Erect and maintain sufficient detour signs at road closures and along detour routes.
E. Waste Disposal Facilities: Provide waste-collection containers in sizes adequate to handle waste from construction operations. Comply with requirements of agency(ies) with jurisdiction.
F. Lifts and Hoists: Provide facilities necessary for hoisting materials and personnel.
1. Truck cranes and similar devices used for hoisting materials are considered "tools and equipment" and not temporary facilities.
G. Scaffolding:
1. See Specification Section 015010
3.4 SECURITY AND PROTECTION FACILITIES INSTALLATION
A. Environmental Protection: Provide protection, operate temporary facilities, and conduct construction in ways and by methods that comply with environmental regulations and minimize possible air, waterway, and subsoil contamination or pollution or other undesirable effects.
B. Cleaning of Equipment: Contractor shall ensure prior to moving on to Project Area, equipment, is free of soil, seeds, vegetative matter, or other debris that could contain or hold seeds. Ensure equipment has been pressure washed and is free of exotic species. Equipment shall be considered free of soil, seeds, and other debris when visual inspection does not disclose such material.
Disassembly of equipment components or specialized inspection tools are not required.
C. Temporary Erosion and Sedimentation Control: Refer to Section 01 57 23 "Temporary Storm
Water Pollution Prevention".
D. Tree and Plant Protection: Refer to Section 01 11 00 "Summary of Work".
VICK 209569 01 50 00 - 5
E. Pest Control: Follow NPS requirements to minimize attraction and harboring of rodents, roaches, and other pests and perform extermination and control procedures at regular intervals so Project will be free of pests and residues at Substantial Completion. Perform control operations lawfully, using environmentally safe materials.
F. Site Enclosure Fence: Before construction operations begin, furnish and install to prevent people and animals from easily entering site except by entrance gates.
1. Extent of Fence: As required to enclose entire Project site or portion determined sufficient to accommodate construction operations.
2. Locate vehicular gates to avoid interference with traffic on public thoroughfares.
3. Locate pedestrian entrance gates as required to provide controlled personnel entry.
4. Maintain security by limiting number of keys and restricting distribution to authorized personnel. Provide Contracting Officer with one set of keys.
G. Security Enclosure and Lockup: Install substantial temporary enclosure around areas of construction. Provide lockable entrances to prevent unauthorized entrance, vandalism, theft, and similar violations of security.
H. Barricades, Warning Signs, and Lights: Comply with requirements of agency(ies) with jurisdiction for erecting structurally adequate barricades, including warning signs and lighting.
I. Temporary Enclosures: Provide temporary enclosures for protection of construction, in progress and completed, from exposure, foul weather, other construction operations, and similar activities.
Provide temporary weathertight enclosure for building exterior.
1. Where heating or cooling is needed and permanent enclosure is not complete, insulate temporary enclosures.
J. Temporary Fire Protection: Install and maintain temporary fire-protection facilities of types needed to protect against reasonably predictable and controllable fire losses. Comply with NFPA
241.
1. Responsible Person: Capable and qualified person shall be placed in charge of fire protection. Responsibilities shall include locating and maintaining fire protective equipment and establishing and maintaining safe torch cutting and welding procedures.
2. Tobacco Use, Smoking, and Vaping: Smoking within buildings or temporary storage sheds is prohibited.
3. Develop and supervise overall fire-prevention and -protection program for personnel at
Project Site. Review needs with local fire department and establish procedures to be followed. Instruct personnel in methods and procedures. Post warnings and information.
4. Hazard Control: Take necessary precautions to prevent fire during construction. Do not store flammable or combustible liquids in historic structures. Provide adequate ventilation during use of volatile or noxious substances. Ensure cleanup procedures and storage requirements are followed at close of every work session.
5. Spark Arresters: Equip gasoline or diesel powered equipment used during periods of potential fire hazards or in potential forest and grass fire locations with spark arresters approved by United States Department of Agriculture (USDA) Forest Service.
a. Written determinations of periods and areas of potential fire hazard will be issued by Contracting Officer.
VICK 209569 01 50 00 - 6
6. Buildings: Furnish a minimum of one extinguisher for each 1,500 square feet of area or major fraction thereof.
a. Travel distance from any work station to nearest extinguisher shall not exceed 75 feet.
7. Vehicles and Equipment: Provide one extinguisher on each vehicle or piece of equipment.
8. Service and Refueling Areas: Locate areas a minimum of 50feet from buildings. Shut down equipment for a minimum of 15 minutes before refueling.
3.5 OPERATION, TERMINATION, AND REMOVAL
A. Supervision: Enforce strict discipline in use of temporary facilities. Minimize waste and abuse, limit availability of temporary facilities to essential and intended uses.
B. Maintenance: Maintain facilities in good operating condition until removal.
1. Maintain operation of temporary enclosures, heating, cooling, humidity control, ventilation, and similar facilities on 24-hour basis where required to achieve indicated results and avoid possibility of damage.
C. Temporary Facility Changeover: Do not change over from using temporary security and protection facilities to permanent facilities until Substantial Completion.
D. Termination and Removal: Remove each temporary facility when need for its service has ended, when it has been replaced by authorized use of a permanent facility, or no later than Substantial
Completion. Complete or, if necessary, restore permanent construction that may have been delayed because of interference with temporary facility. Repair damaged Work, clean exposed surfaces, and replace construction that cannot be satisfactorily repaired.
1. Materials and facilities that constitute temporary facilities are property of Contractor. NPS reserves right to take possession of Project identification signs.
2. At Substantial Completion, clean and renovate permanent facilities used during construction period.
END OF SECTION 01 50 00