These documents are architectural and engineering drawings for the ASU Residence at Rex Plumbing Renovations - Phase 1 project located at 77 Stadium Drive in Alamosa, Colorado. The project involves selective renovation of an existing four-story residential building completed in 2011, with a primary focus on interior repairs of architectural finishes that have sustained water damage and replacement of domestic water supply lines and associated equipment. The renovation is classified as a Level 1 alteration per the 2021 International Existing Building Code (IEBC) throughout most of the building, with a Level 2 alteration in the mechanical room to accommodate new domestic water storage and mixing equipment. The project does not modify the building's square footage or fire ratings, and includes repairs to broken glazing in a specific lounge area.

The project documents indicate a comprehensive renovation approach, with detailed plans for construction phasing, life safety considerations, and specific architectural and plumbing system modifications. The existing building consists of 33,657 square feet of R-2 student residences and 34,218 square feet of A-5 stadium space with 3,897 square feet of A-3 assembly areas. The renovation will involve selective demolition, plumbing line replacements, and targeted architectural repairs while maintaining the building's existing occupancy classifications and structural integrity. The drawings are prepared by Davis Partnership Architects and include extensive technical specifications for wall assemblies, ceiling treatments, and finish materials, suggesting a meticulous approach to maintaining the building's original design standards while addressing critical infrastructure needs.

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

2901 Blake Street, Suite 100 Denver, CO 80205

303.861.8555

Issue Date:

Project:

Original Issuance:

08-Feb-24 22:55:28

ASU RESIDENCE AT REX - PLUMBING

RENOVATIONS: PHASE 1

Febuary 09, 2024

77 STADIUM DRIVE

ALAMOSA, CO 81101

22808.00.000

BID PACK C

COPYRIGHT © 2022 - DAVIS PARTNERSHIP, P.C.

Selective Renovation - Architecture

YRemy Image

YRemy Text Box 02-09-2024

X-###

SIM

WALL SECTION

REFERENCE

EXTERIOR ELEVATION

REFERENCE

DIMENSION STRING

DOOR TAG

CENTERLINE

ROOM TAG ROOM NAME

#GRID LABEL - NEW

ELEVATION LABEL

INTERIOR ELEVATION

REFERENCE

8'-2"

AREA TAG AREA NAME

150 SF

INTERIOR PARTITION TYPE TAG

STOREFRONT TAG

NORTH ARROW

GRAPHIC SCALE

X-###

SIM

BUILDING SECTION

REFERENCE

X-###

SIM

SPOT ELEVATION

X-###

# TYP.

REVISION CLOUD

AND TAG

EL = 100'-0"

DETAIL CALLOUT

DETAIL ELEVATION

REFERENCE

CEILING HEIGHT TAG

CURTAIN WALL TAG

EXTERIOR SYSTEM TAG

X-#### #

####X

X-###

VIEW REFERENCE

DETAIL NUMBERING

BATTLESHIP GRID ORDER

A

B

C

D

E

1 2 3 4 5 6

FINISH TAG

KEYNOTE AND LEADER-

TYPE 1

SHADED DETAIL LOCATION

WOULD BE NUMBERED "A2" ON

THE DETAIL SHEET

F15

07 2700 - SHEET

WATERPROOFING

KEYNOTE AND LEADER-

TYPE 2

WINDOW TAG

GRID LABEL - EXISTING #

ARCHITECTURAL SYMBOLS LEGEND

Note: Not all symbols are used in this project.

STANDARD ABBREVIATIONS LEGENDGENERAL NOTES

X-###

1. IF DISCREPANCIES OCCUR BETWEEN DRAWINGS OR BETWEEN THE DRAWINGS

AND SPECIFICATIONS, SUBMIT AN RFI FOR RESOLUTION.

2. DO NOT SCALE THE DRAWINGS. SUBMIT AN RFI IF CRITICAL DIMENSIONS DO NOT

APPEAR ON THE DRAWINGS.

3. THE BUILDING EXTERIOR IS DEFINED BASED ON A SYSTEMS METHODOLOGY.

REFER TO A-700 DRAWING SERIES FOR COMPONENTS THAT COMPRISE EACH

SYSTEM.

4. PROVIDE ISOLATION BETWEEN ALL DISSIMILAR METALS WHERE THEY OCCUR TO

PREVENT ELECTROLYTIC REACTION AND CORROSION.

5. VERIFY EQUIPMENT ROUGH-IN DIMENSIONS WITH MANUFACTURER FOR

EQUIPMENT THAT IS EXISTING, REUSED, OR FURNISHED BY OWNER.

ALIGN

MAXIMUM

MINIMUM

TYPICAL

TO ACCURATELY LOCATE FACE BASED ON ADJACENT ITEMS OR

CONSTRUCTION

THE CONDITION MAY NOT VARY TO A DIMENSION GREATER THAN THAT

SHOWN WITHOUT THE APPROVAL OF THE ARCHITECT

THE CONDITION MAY NOT VARY TO A DIMENSION SMALLER THAN THAT

SHOWN WITHOUT THE APPROVAL OF THE ARCHITECT

THE CONDITION APPLIES TO SAME CONDITIONS THROUGHOUT UNLESS

NOTED OTHERWISE

DEFINITIONS

W#

C#

S#

/1 A-101

10'-10"

N

0' 4' 8' 16' 32'

SCALE: 1/8" = 1'-0"

LEVEL 1

100' - 0"

XX#

Fn2PX

F

EXISTING CONDITION

IMAGE CALLOUT

APPLICABLE BUILDING CODES:

2021 INTERNATIONAL BUILDING CODE (IBC)

2021 INTERNATIONAL EXISTING BUILDING CODE (IEBC)

2021 INTERNATIONAL MECHANICAL CODE (IMC)

2021 INTERNATIONAL ENERGY CONSERVATION CODE (IECC)

2020 NATIONAL ELECTRICAL CODE (NEC) (NFPA 70®)

2018 INTERNATIONAL PLUMBING CODE (IPC)

2018 INTERNATIONAL FUEL GAS CODE (IFGC) FIRST

2021 INTERNATIONAL FIRE CODE (IFC)

NATIONAL FIRE PROTECTION ASSOCIATION STANDARDS (NFPA)

ICC/ANSI A117.1, ACCESSIBLE AND USABLE BUILDINGS AND FACILITIES

CONSTRUCTION TYPE: EXISTING (NOT CHANGED): TYPE II-B, FULLY SPRINKLERED UNDER THE 2006 IBC

LIFE SAFETY SYSTEMS: EXISTING (NOT CHANGED)

OCCUPANCY CLASSIFICATION: EXISTING (NOT CHANGED): R-2 / A-5 / A-3 PER ORIGINAL CONSTRUCTION UNDER THE 2006 IBC

MAX. TRAVEL DISTANCE ALLOWED TO EXIT: EXISTING (NOT CHANGED)

NUMBER OF EXITS REQUIRED: EXISTING (NOT CHANGED)

NUMBER OF EXITS PROVIDED: EXISTING (NOT CHANGED)

PLUMBING FIXTURES: EXISTING (NOT CHANGED)

PROJECT DESCRIPTION:

THIS PROJECT IS FOR EXISTING BUILDING THAT WAS COMPLETED IN 2011. THE SCOPE CONSISTS OF INTERIOR REPAIRS OF ARCHITECTURAL FINISHES THAT HAVE SUSTAINED WATER DAMAGE AND THE REPLACEMENT OF PLUMBING DOMESTIC WATER SUPPLY LINES AND ASSOCIATED EQUIPMENT.

THE EXISTING BUILDING CONSISTS OF 33,657 SQUARE FEET OF R-2 STUDENT RESIDENCES; AND 34,218 SQUARE FEET OF A-5 STADIUM WITH 3,897 SQUARE FEET OF A-3 ASSEMBLY PER THE 2006 IBC. THE SQUARE FOOTAGE AND FIRE RATINGS OF THE BUILDING WILL NOT BE MODIFIED IN ANY WAY.

ADDITIONAL SCOPE ITEMS INCLUDE NEW PLUMBING EQUIPMENT AND A NEW MIXING VALVE THERMOSTAT IN MECHANICAL ROOM #159 AND REPAIRS TO BROKEN

GLAZING IN LOUNGE #412.

THIS PROJECT IS PRIMARILY A LEVEL 1 ALTERATION PER THE 2021 IEBC THROUGHOUT THE WHOLE EXTENTS OF THE EXISTING BUILDING. IT IS A LEVEL 2 ALTERATION PER THE 2021 IEBC AT THE EXISTING MECHANICAL ROOM #159 TO ALLOW FOR NEW DOMESTIC WATER STORAGE TANK (BUFFER TANK), NEW

THERMAL EXPANSION TANK, & NEW DIGITAL WATER MIXING VALVE.

THIS PROJECT DOES NOT INCLUDE DEFERRED SUBMITTALS.

CODE ANALYSIS

2901 Blake Street, Suite 100 Denver, CO 80205

303.861.8555

Location Map

Project Team

Sheet Index

DPA Project:

Sheet Number:

Sheet Title:

Revisions Date No.

Sheet Information

Project Information

Issuance Date

Consultant(s)

Stamp

-F eb -2

:5 5:

OWNER

ADAMS STATE UNIVERSITY

208 EDGEMONT BLVD.

ALAMOSA, CO 81101

719.587.8353

BRUCE DELTONDO

bdeltond@adams.edu

ARCHITECT

DAVIS PARTNERSHIP ARCHITECTS

2901 BLAKE STREET

SUITE 100

DENVER, CO 80205

303.861.8555

BRIAN ERICKSON

brian.erickson@davispartnership.com

MEP ENGINEER

BRIDGERS & PAXTON

1365 GARDEN OF THE GODS RD.

SUITE 260

COLORADO SPRINGS, CO 80907

719.550.5605

STEVE TAYLOR, PE, LEED AP

smtaylor@bpce.com

22808.00.000

G-001 C

AS

U

R

ES

ID

EN

C E

AT

R

EX

PL

U

M B

IN

G

R

EN

O

VA

TI

O

N S:

P H

AS

E

Se le ct iv e

R en ov at io n

-A rc hi te ct ur e

CODE SUMMARY,

SHEET INDEX, &

PROJECT DATA

02/09/2024BID PACK C

COPYRIGHT © 2022 - DAVIS PARTNERSHIP, P.C.

S

TA

D

IU

M

D R

IV

E

AL

AM

O

SA

, C O

ACT ACOUSTICAL CEILING TILE

ADD ADDENDUM

AFF ABOVE FINISHED FLOOR

AL ALUMINUM

ALT ALTERNATE

ALUM ALUMINUM

ANOD ANODIZED

APPROX APPROXIMATE(LY)

ARCH ARCHITECT or ARCHITECTURAL

ASI ARCHITECT'S SUPPLEMENTAL INSTRUCTIONS

AUX AUXILIARY

BLDG BUILDING

BSMT BASEMENT

BTWN BETWEEN

CD CONSTRUCTION DOCUMENTS or CONTRACT DOCUMENTS CJ CONSTRUCTION JOINT or CONTROL JOINT

CLG CEILING

CLR CLEAR

CMU CONCRETE MASONRY UNIT

CONC CONCRETE

CORR CORRIDOR

DBL DOUBLE

DEMO DEMOLISH or DEMOLITION

DF DRINKING FOUNTAIN

DIA DIAMETER

DIM DIMENSION or DIMENSIONAL

DW DISHWASHER

DWG DRAWING

EA EACH

EJ EXPANSION JOINT

ELEC ELECTRIC(AL)

ELEV ELEVATOR

EMER EMERGENCY

EOS EDGE OF SLAB

EQ EQUAL

EQUIP EQUIPMENT

EWC ELECTRIC WATER COOLER

EXIST EXISTING

FD FLOOR DRAIN

FDC FIRE DEPARTMENT CONNECTION

FE FIRE EXTINGUISHER

FEC FIRE EXTINGUISHER CABINET

FFE FURNITURE, FIXTURES AND EQUIPMENT

FHC FIRE HOSE CABINET

GA GAUGE

GALV GALVANIZED

HB HOSE BIBB

HORIZ HORIZONTAL

HT HEIGHT

HVAC HEATING, VENTILATION and AIR CONDITIONING

IBC INTERNATIONAL BUILDING CODE

JAN JANITOR

JT JOINT

L ANGLE

MAX MAXIMUM

MECH MECHANICAL

MEP MECHANICAL, ELECTRICAL and PLUMBING

MEZZ MEZZANINE

MIN MINIMUM

MISC MISCELLANEOUS

MO MASONRY OPENING

NA NOT APPLICABLE

NIC NOT IN CONTRACT

NO. NUMBER

NOTE: FOR ADDITIONAL ABBREVATIONS; REFER TO SPECIFICATION 01 4200 FOR

COMPLETE INDUSTRY STANDARD ABBREVIATION LIST

NRC NOISE REDUCTION COEFFICIENT

NTS NOT TO SCALE

OC ON-CENTER

OPNG OPENING

OPP OPPOSITE

PERIM PERIMETER

PR PAIR or PROPOSAL REQUEST

PSF POUNDS PER SQUARE FOOT

PSI POUNDS PER SQUARE INCH

PT PAINT(ED), POST-TENSIONED SLAB or PRESSURE TREATED

QTY QUANTITY

R RADIUS, RISER or THERMAL RESISTANCE

RCP REFLECTED CEILING PLAN

RD ROAD or ROOF DRAIN RE REFER TO or REFERENCE REV REVISE, REVISED or REVISION

RM ROOM

RO ROUGH OPENING

ROW RIGHT-OF-WAY

RTU ROOFTOP UNIT

SAN SANITARY

SF SQUARE FOOT (FEET)

SHT SHEET

SIM SIMILAR

SPEC SPECIFICATION(S)

SQ SQUARE

STC SOUND TRANSMISSION CLASS

STL STEEL

STOR STORAGE

TO TOP OF

TOC TOP OF CONCRETE

TOP TOP OF PARAPET

TOS TOP OF STEEL

TOW TOP OF WALL

TYP TYPICAL

UNO UNLESS NOTED OTHERWISE

VIF VERIFY IN FIELD

W/ WITH

W/O WITHOUT

WD WOOD

WP WORKING POINT

WT WEIGHT

Code Summary

Sheet Index

PROJECT LOCATION

N

# Name Is su an ce

Sh ee t I ss ue D at e

R ev is io n N am e

R ev is io n D at e

General

G-000 C COVER - BID PACK C BID PACK C 02/09/2024

G-001 C CODE SUMMARY, SHEET INDEX, & PROJECT DATA BID PACK C 02/09/2024 ADDENDUM #02 04/05/2023

G-002 C CONSTRUCTION ACCESS SITE PLAN BID PACK C 02/09/2024

G-101 C CONSTRUCTION PHASE PLAN - LEVEL 01 & LEVEL 02 BID PACK C 02/09/2024 ADDENDUM #02 04/05/2023 G-102 C CONSTRUCTION PHASE PLAN - LEVEL 03 & LEVEL 04 BID PACK C 02/09/2024 ADDENDUM #02 04/05/2023

Life Safety

LS-101 C LIFE SAFETY PLAN - LEVEL 01 & LEVEL 02 BID PACK C 02/09/2024

LS-102 C LIFE SAFETY PLAN - LEVEL 03 & LEVEL 04 BID PACK C 02/09/2024

Architectural

A-101.A FLOOR PLAN - LEVEL 01 - AREA A BID PACK C 02/09/2024

A-101.B FLOOR PLAN - LEVEL 01 - AREA B BID PACK C 02/09/2024

A-102.A FLOOR PLAN - LEVEL 02 - AREA A BID PACK C 02/09/2024

A-102.B FLOOR PLAN - LEVEL 02 - AREA B BID PACK C 02/09/2024

A-103.A FLOOR PLAN - LEVEL 03 - AREA A BID PACK C 02/09/2024

A-103.B FLOOR PLAN - LEVEL 03 - AREA B BID PACK C 02/09/2024

A-104.A FLOOR PLAN - LEVEL 04 - AREA A BID PACK C 02/09/2024

A-104.B FLOOR PLAN - LEVEL 04 - AREA B BID PACK C 02/09/2024

A-151.A REFLECTED CEILING PLAN - LEVEL 01 - AREA A BID PACK C 02/09/2024 ADDENDUM #01 03/10/2023 A-151.B REFLECTED CEILING PLAN - LEVEL 01 - AREA B BID PACK C 02/09/2024 ADDENDUM #01 03/10/2023 A-152.A REFLECTED CEILING PLAN - LEVEL 02 - AREA A BID PACK C 02/09/2024 ADDENDUM #01 03/10/2023 A-152.B REFLECTED CEILING PLAN - LEVEL 02 - AREA B BID PACK C 02/09/2024 ADDENDUM #01 03/10/2023 A-153.A REFLECTED CEILING PLAN - LEVEL 03 - AREA A BID PACK C 02/09/2024 ADDENDUM #01 03/10/2023 A-153.B REFLECTED CEILING PLAN - LEVEL 03 - AREA B BID PACK C 02/09/2024 ADDENDUM #01 03/10/2023 A-154.A REFLECTED CEILING PLAN - LEVEL 04 - AREA A BID PACK C 02/09/2024 ADDENDUM #01 03/10/2023 A-154.B REFLECTED CEILING PLAN - LEVEL 04 - AREA B BID PACK C 02/09/2024 ADDENDUM #01 03/10/2023 A-550 INTERIOR DETAILS, FINISH SCHEDULE, & WINDOW ELEVATION BID PACK C 02/09/2024

ADDENDUM #01 03/10/2023 001

ADDENDUM #02 04/05/2023 002

YRemy Image

YRemy

DNDN

DN

DN

DN

FD

FD

REF.FD

FD

REF.

DN

R

EF

.REF. FD

FD

FD

FD

FD

FD

FD

FD

FD

FD

FD

FDDN

DN

R

EF

.DN

REF.

REF.

REF.

REF.

REF.

REF.

REF.

REF.

REF.

REF.

REF.

REF.

REF.

FD

FD

FDFD

FD

V A N

VAN

10 20 03 04 05 40 30 20 10

03 04 05 40 30 20 10

C O

C O

C O

C O

C O x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x

PUBLIC ACCESS TO

REMAIN FOR

PEDESTRIAN AND

MAINTENANCE

VEHICLES.

TEMP CONSTRUCTION AREA FENCE

(Field office, staging/layout, dumpster)

NO CONSTRUCTION PARKING

PROTECT LANDSCAPING

CONSTRUCTION PARKING

SITE ACCESS LEGEND

2901 Blake Street, Suite 100 Denver, CO 80205

303.861.8555

DPA Project:

Sheet Number:

Sheet Title:

Revisions Date No.

Sheet Information

Project Information

Issuance Date

Consultant(s)

A

B

C

D

E

F

2 3 4 5 6

1 2 3 4 5 6

A

B

C

D

E

F

Stamp

-F eb -2

:5 5:

22808.00.000

G-002 C

AS

U

R

ES

ID

EN

C E

AT

R

EX

PL

U

M B

IN

G

R

EN

O

VA

TI

O

N S:

P H

AS

E

Se le ct iv e

R en ov at io n

-A rc hi te ct ur e

CONSTRUCTION

ACCESS SITE

PLAN

02/09/2024BID PACK C

COPYRIGHT © 2022 - DAVIS PARTNERSHIP, P.C.

S

TA

D

IU

M

D R

IV

E

AL

AM

O

SA

, C O

1" = 30'-0"B1 CONSTRUCTION ACCESS SITE PLAN CONSTRUCTION PARKING DIAGRAM

OVERFLOW

PARKING

O

VE

R

FL

O W

PA

R

KI

N G

C

IT

Y

PA

R

KI

N G

CITY PARKING

YRemy Image

YRemy

UP

UP

UP

UP

UP

UP

FD

FD

DN

UP

FD

DN

DN

UP

FD

UP

DN

UP UP

UP

DN

UP

FD

FD

FD

FD

FD

FD

AREA A AREA B

AREA A AREA B

AREA OF CONSTRUCTION PHASE #2

AREA OF CONSTRUCTION PHASE #1

NOT IN SCOPE

AREA A AREA B

AREA A AREA B

AREA OF CONSTRUCTION PHASE #1

CONSTRUCTION PHASE NOTES & DESCRIPTIONS

NOTE:

CONTRACTOR TO PRICE PHASE #1 & #2 SEPARATELY.

PHASE #1

INCLUDES ALL WORK ON THE

RESIDENTIAL SIDE OF THE BUILDING

AND THE MAIN MECHANICAL ROOM

UPGRADES ON THE STADIUM SIDE.

PHASE #2

INCLUDES ALL REMAINING WORK ON

THE STADIUM SIDE OF THE BUILDING.

2901 Blake Street, Suite 100 Denver, CO 80205

303.861.8555

DPA Project:

Sheet Number:

Sheet Title:

Revisions Date No.

Sheet Information

Project Information

Issuance Date

Consultant(s)

A

B

C

D

E

F

2 3 4 5 6

1 2 3 4 5 6

A

B

C

D

E

F

Stamp

-F eb -2

:5 6:

22808.00.000

G-101 C

AS

U

R

ES

ID

EN

C E

AT

R

EX

PL

U

M B

IN

G

R

EN

O

VA

TI

O

N S:

P H

AS

E

Se le ct iv e

R en ov at io n

-A rc hi te ct ur e

CONSTRUCTION

PHASE PLAN -

LEVEL 01 & LEVEL

02/09/2024BID PACK C

COPYRIGHT © 2022 - DAVIS PARTNERSHIP, P.C.

S

TA

D

IU

M

D R

IV

E

AL

AM

O

SA

, C O

1/16" = 1'-0"A1 CONSTRUCTION PHASE PLAN - LEVEL 01

1/16" = 1'-0"C1 CONSTRUCTION PHASE PLAN - LEVEL 02

ADDENDUM #02 04/05/2023 001

YRemy Image

YRemy

UP DN UPDN

DN

UP

FD

FD

FD

FD

FD

DN DN UP

DN

FD

DN

DN

FD

FD

FD

FD

AREA A AREA B

AREA A AREA B

AREA OF CONSTRUCTION PHASE #2

AREA OF CONSTRUCTION PHASE #1

NOT IN SCOPE

AREA A AREA B

AREA A AREA B

AREA OF CONSTRUCTION PHASE #1

AREA OF CONSTRUCTION PHASE #2

NOT IN SCOPE

CONSTRUCTION PHASE NOTES & DESCRIPTIONS

NOTE:

CONTRACTOR TO PRICE PHASE #1 & #2 SEPARATELY.

PHASE #1

INCLUDES ALL WORK ON THE

RESIDENTIAL SIDE OF THE BUILDING

AND THE MAIN MECHANICAL ROOM

UPGRADES ON THE STADIUM SIDE.

PHASE #2

INCLUDES ALL REMAINING WORK ON

THE STADIUM SIDE OF THE BUILDING.

2901 Blake Street, Suite 100 Denver, CO 80205

303.861.8555

DPA Project:

Sheet Number:

Sheet Title:

Revisions Date No.

Sheet Information

Project Information

Issuance Date

Consultant(s)

A

B

C

D

E

F

2 3 4 5 6

1 2 3 4 5 6

A

B

C

D

E

F

Stamp

-F eb -2

:5 6:

22808.00.000

G-102 C

AS

U

R

ES

ID

EN

C E

AT

R

EX

PL

U

M B

IN

G

R

EN

O

VA

TI

O

N S:

P H

AS

E

Se le ct iv e

R en ov at io n

-A rc hi te ct ur e

CONSTRUCTION

PHASE PLAN -

LEVEL 03 & LEVEL

02/09/2024BID PACK C

COPYRIGHT © 2022 - DAVIS PARTNERSHIP, P.C.

S

TA

D

IU

M

D R

IV

E

AL

AM

O

SA

, C O

1/16" = 1'-0"A1 CONSTRUCTION PHASE PLAN - LEVEL 03

1/16" = 1'-0"C1 CONSTRUCTION PHASE PLAN - LEVEL 04

ADDENDUM #02 04/05/2023 001

YRemy Image

YRemy

UP

UP

UP

UP

UP

FD

FD

DN

UP

FD

DN

DN

UP

FD

UP

DN

UP UP

UP

DN

UP

FD

FD

FD

FD

FD

FD

LIFE SAFETY LEGEND

EXIT

EXISTING EXIT DISCHARGE

EXISTING EXIT ACCESS

LIFE SAFETY GENERAL NOTES

1. THE SCOPE OF WORK REQUIRED FOR THIS

PROJECT WILL NOT MODIFY ANY EXISTING EGRESS

PATHS OR OCCUPANCY LOADS.

2. THE LIFE SAFETY PLANS HAVE BEEN PROVIDED AS

REFERENCE FOR WALL RATING LOCATIONS.

3. THE CONTRACTOR IS RESPONSIBLE FOR ENSURING

THE WALL RATINGS REMAIN UNCHANGED AFTER

THE PLUMBING REPAIRS AND OTHER SCOPE ITEMS

INCLUDED IN THIS PROJECT HAVE BEEN

COMPLETED.

4. IF THE EXISTING CONDITIONS ARE FOUND TO BE

DIFFERENT FROM THE RATINGS SHOWN ON THE

LIFE SAFETY PLANS AND THE CORESPONDING

WALL REPAIR DETAILS ON SHEET A-550, THE

CONTRACTOR IS RESPONSIBLE FOR INFORMING

THE ARCHITECT OF THE DISCREPANCY TO OBTAIN

CLARIFICATION BEFORE THE REPAIRS ARE

FINALIZED.

1HREXISTING

FIRE PARTITION

(c)

FIRE RATED WALL LEGEND

EXISTING

FIRE WALL 2HR

EXISTING

FIRE BARRIER

FI

R

E / S

M

KE

RA

TI

NG

M

O

DI

FI

ER

S

NO

N-

RA

TE

D

SMOKE PARTITION (V)

EXISTING WALL

(HALFTONE)

2HR

1HR

1HR

EXISTING

FIRE BARRIER -

MIXED OCCUPANCY

SEPERATION

EXIT

EX

IT

EXIT

EXIT

EXIT

EXISTING

1-HOUR RATED LID ON STORAGE

ROOM UNDER STAIR LANDING

PER IBC 2006 SECTION 1009.5.3.

EX

IT

EX

IT

EX

IT

EXITEX

IT

EXIT

EX

IT

EXIT

EX

IT

EX

IT

EXIT

EXISTING

INCIDENTAL USE AREA PER IBC 2006

TABLE 508.2 AND SECTION 508.2.2.1.

EXIT

EXISTING

1-HOUR RATED LID ON EQUIP.

STORAGE ROOM AND

VESTIBULE UNDER STAIR

LANDING PER IBC 2006 SECTION

1009.5.3.

EXISTING

1-HOUR LID ON FIRE PUMP ROOM PER

NFPA-20, EXCEPTION 2.

EX

IT

EX

IT

EX

IT

EXISTING

2-HOUR FIRE-

RATED SHAFT

WALLS

EXISTING

1-HOUR SMOKE BARRIER LID ON MECH ROOM.

EXISTING

2-HOUR LID ON EXIT

VESTIBULE

EXISTING

1-HOUR SMOKE BARRIER

LID ON LAUNDRY ROOM.

EXISTING

1-HOUR FIRE-RATED LID

ON ELEC. / MECH. ROOM.

EXISTING

2-HOUR LID TO CLOSE

AND MAINTAIN STAIR

ENCLOSURE RATING

AT FLOOR ABOVE.

EISTING

2-HOUR FIRE-

RATED WALL

EXISTING

2-HOUR FIRE-

RATED LID

EXISTING

2-HOUR FIRE-RATED WALL

EXISTING

2-HOUR FIRE-RATED

SHAFT WALLS

EXISTING

2-HOUR FIRE-RATED

SHAFT WALLS

EXISTING

2-HOUR FIRE-RATED

SHAFT WALLS

EXISTING

2-HOUR FIRE-RATED

SHAFT WALLS

EXISTING

2-HOUR FIRE-RATED

SHAFT WALLS

EXISTING

2-HOUR FIRE-RATED

SHAFT WALLS

EXISTING

2-HOUR RATED LID UNDER

LANDING ABOVE TO ENCLOSE

PIPE PENETRATIONS

THROUGH STAIR.

EXIT

EXIT

EXIT

EXIT

EXIT

EXIT

EXISTING

2-HOUR FIRE-RATED

SHAFT WALLS

EXISTING

2-HOUR FIRE-RATED

SHAFT WALLS

EXISTING

2-HOUR FIRE-RATED

SHAFT WALLS

EXISTING

2-HOUR FIRE-RATED

SHAFT WALLS

EXISTING

2-HOUR FIRE-

RATED SHAFT

WALLS

EXISITING

2-HOUR FIRE-RATED

SHAFT WALLS

EXISTING

2-HOUR FIRE-RATED

SHAFT WALLS

EXISTING

2-HOUR FIRE-RATED

SHAFT WALLS

EXISTING

2-HOUR RATED LID UNDER

LANDING ABOVE TO ENCLOSE PIPE

PENETRATIONS THROUGH STAIR.

EXISTING

1/2-HOUR FIRE-

RATED FLOOR

EXISTING

1/2-HOUR FIRE-

RATED FLOOR

EXISTING

1-HOUR FIRE-RATED FLOOR

UNDER APARTMENT AND

CABLE/TV ROOM, THIS

LOCATION ONLY

2901 Blake Street, Suite 100 Denver, CO 80205

303.861.8555

DPA Project:

Sheet Number:

Sheet Title:

Revisions Date No.

Sheet Information

Project Information

Issuance Date

Consultant(s)

A

B

C

D

E

F

2 3 4 5 6

1 2 3 4 5 6

A

B

C

D

E

F

Stamp

-F eb -2

:5 7:

22808.00.000

LS-101

C

AS

U

R

ES

ID

EN

C E

AT

R

EX

PL

U

M B

IN

G

R

EN

O

VA

TI

O

N S:

P H

AS

E

Se le ct iv e

R en ov at io n

-A rc hi te ct ur e

LIFE SAFETY

PLAN - LEVEL 01 &

LEVEL 02

02/09/2024BID PACK C

COPYRIGHT © 2022 - DAVIS PARTNERSHIP, P.C.

S

TA

D

IU

M

D R

IV

E

AL

AM

O

SA

, C O

1/16" = 1'-0"A1 LIFE SAFETY PLAN - LEVEL 01

1/16" = 1'-0"C1 LIFE SAFETY PLAN - LEVEL 02

YRemy Image

YRemy

UP DN UPDN

DN

UP

FD

FD

FD

FD

FD

DN DN UP

DN

FD

DN

DN

FD

FD

FD

FD

LIFE SAFETY LEGEND

EXIT

EXISTING EXIT DISCHARGE

EXISTING EXIT ACCESS

LIFE SAFETY GENERAL NOTES

1. THE SCOPE OF WORK REQUIRED FOR THIS

PROJECT WILL NOT MODIFY ANY EXISTING EGRESS

PATHS OR OCCUPANCY LOADS.

2. THE LIFE SAFETY PLANS HAVE BEEN PROVIDED AS

REFERENCE FOR WALL RATING LOCATIONS.

3. THE CONTRACTOR IS RESPONSIBLE FOR ENSURING

THE WALL RATINGS REMAIN UNCHANGED AFTER

THE PLUMBING REPAIRS AND OTHER SCOPE ITEMS

INCLUDED IN THIS PROJECT HAVE BEEN

COMPLETED.

4. IF THE EXISTING CONDITIONS ARE FOUND TO BE

DIFFERENT FROM THE RATINGS SHOWN ON THE

LIFE SAFETY PLANS AND THE CORESPONDING

WALL REPAIR DETAILS ON SHEET A-550, THE

CONTRACTOR IS RESPONSIBLE FOR INFORMING

THE ARCHITECT OF THE DISCREPANCY TO OBTAIN

CLARIFICATION BEFORE THE REPAIRS ARE

FINALIZED.

1HREXISTING

FIRE PARTITION

(c)

FIRE RATED WALL LEGEND

EXISTING

FIRE WALL 2HR

EXISTING

FIRE BARRIER

FI

R

E / S

M

KE

RA

TI

NG

M

O

DI

FI

ER

S

NO

N-

RA

TE

D

SMOKE PARTITION (V)

EXISTING WALL

(HALFTONE)

2HR

1HR

1HR

EXISTING

FIRE BARRIER -

MIXED OCCUPANCY

SEPERATION

EXIT

EXIT

EXIT

EXIT

EX

IT

EX

IT

EXIT

EXIT

EXIT

EXISTING

2-HOUR FIRE-RATED

SHAFT WALLS

EXISTING

2-HOUR FIRE-RATED

SHAFT WALLS

EXISTING

2-HOUR FIRE-RATED

SHAFT WALLS

EXISTING

2-HOUR FIRE-RATED

SHAFT WALLS

EXISTING

2-HOUR FIRE-

RATED SHAFT

WALLS

EXISTING

2-HOUR FIRE-RATED

SHAFT WALLS

EXISTING

2-HOUR FIRE-RATED

SHAFT WALLS

EXISTING

2-HOUR FIRE-RATED

SHAFT WALLS

EXISTING

ADA COMPLIANT UNIT

EXISTING

2-HOUR RATED LID UNDER LANDING

ABOVE TO ENCLOSE PIPE

PENETRATIONS THROUGH STAIR.

EXISTING

2-HOUR FIRE-RATED

SHAFT WALLS

EXISTING

1/2-HOUR FIRE-

RATED FLOOR

EXISTING

1/2-HOUR FIRE-

RATED FLOOR

EXIT

EXIT

EXIT

EXIT

EXITEXIT

EX

IT

EX

IT

EXITEXIT

EXISTING

INCIDENTAL USE AREA PER

IBC 2006 TABLE 508.2 AND

SECTION 508.2.2.1.

OPEN TO

BELOW

EXISTING

2-HOUR FIRE-RATED

SHAFT WALLS

EXISTING

2-HOUR FIRE-RATED

SHAFT WALLS

EXISTING

2-HOUR FIRE-RATED

SHAFT WALLS

EXISTING

2-HOUR FIRE-RATED

SHAFT WALLS

EXISTING

2-HOUR FIRE-RATED

SHAFT WALLS

EXISTING

2-HOUR FIRE-RATED

SHAFT WALLS

EXISTING

2-HOUR FIRE-RATED

SHAFT WALLS

EXISTING

2-HOUR FIRE-RATED

SHAFT WALLS

2-HOUR FIRE-RATED

SHAFT WALLS

EXISTING

2-HOUR FIRE-RATED

SHAFT WALLS

EXISTING

ADA COMPLIANT UNITS

EXISTING

2-HOUR RATED LID UNDER

LANDING ABOVE TO ENCLOSE PIPE

PENETRATIONS THROUGH STAIR.

EXISTING

2-HOUR FIRE-RATED

SHAFT WALLS

NOTE:

EXISTING

ROOF IS NOT REQUIRED

TO BE FIRE -RATED.

EXISTING

1/2-HOUR FIRE-RATED FLOOR

EXCEPT AS FOLLOWS:

1-HOUR FIRE-RATED FLOOR AT

APARTMENTS AND WALKWAY

LOCATED BETWEEN GRID

LINES 4 AND 6, A AND F

EXISTING

1/2-HOUR FIRE-

RATED FLOOR

2901 Blake Street, Suite 100 Denver, CO 80205

303.861.8555

DPA Project:

Sheet Number:

Sheet Title:

Revisions Date No.

Sheet Information

Project Information

Issuance Date

Consultant(s)

A

B

C

D

E

F

2 3 4 5 6

1 2 3 4 5 6

A

B

C

D

E

F

Stamp

-F eb -2

:5 7:

22808.00.000

LS-102

C

AS

U

R

ES

ID

EN

C E

AT

R

EX

PL

U

M B

IN

G

R

EN

O

VA

TI

O

N S:

P H

AS

E

Se le ct iv e

R en ov at io n

-A rc hi te ct ur e

LIFE SAFETY

PLAN - LEVEL 03 &

LEVEL 04

02/09/2024BID PACK C

COPYRIGHT © 2022 - DAVIS PARTNERSHIP, P.C.

S

TA

D

IU

M

D R

IV

E

AL

AM

O

SA

, C O

1/16" = 1'-0"A1 LIFE SAFETY PLAN - LEVEL 03

1/16" = 1'-0"C1 LIFE SAFETY PLAN - LEVEL 04

YRemy Image

YRemy

UP

UP

UP

UPUP

UP

A

B

CD

H EFGJKLMNP

C.5D.5

RW

GAMEDAY

LOCKER B

GAMEDAY

LOCKER A

TRAINING

SHOWER

TOILET

WOMEN #1

OFFICIALS

LOCKER

ELEC. / MECH.

VEST

VEST

EQUIP STOR

CONCOURSE

STAIR #5

ST-105

STAIR #2

ST-102

ELEV MACH

ELEV #1

EL-101

EQUIP STOR

CORRIDOR

WOMEN #2

TOILET

TRAINING

SHOWER

CL

CL

CORRIDOR

STAIR #6

ST-106

LAUNDRY

ELEV MACH

CUSTODIAL

MECH ROOM

VEST

STAIR #8

ST-108

WATER ENTRY

FIRE PUMP

STOR

F01

MEN

UNISEX

CORRIDOR

STAIR #3

ST-103

PANTRY

SOFT GOODS

CONCESSIONS

CONCESSIONS

STAIR #4

ST-104

UNISEX

MEN

CONCOURSE

TICKETS

RAMP #2

R-102

CORRIDOR

180CORRIDOR

F16 F17

F18

F01F19

F02

F20

F20

F20

F20

F20

F20

D23

F20

F20

F20

F20

F20

F20

F20 F20

M

AT

C H

LI

N

E A

M

AT

C H

LI

N

E A

NOT IN SCOPE

EXISTING INTERIOR PARTITION WALL OR SHAFT WALL TO REMAIN.

REFER TO LIFE SAFETY PLANS FOR EXTENT OF FIRE RATED AND

SHAFT WALLS.

FINISH REPAIRS

ABOVE FLOOR LINE

CENTERLINE

NOT IN CONTRACT or BY OWNER EQUIPMENT

Key Plan

Plan Keynotes

Plan Legend (Note: Not all symbols are used in this project.)

Plan General Notes

1. DO NOT SCALE DRAWINGS.

2. PROVIDE AND INSTALL NEW VINYL WALL BASE AT ALL

AREAS OF PEX REPLACEMENT AND WATER DAMAGE WHERE

GYP IS BEING REPLACED WITHIN 1'-0" OF THE FFE.

3. RETURN ALL LIGHTING FIXTURES, VENT COVERS, WALL

FIXTURES, AND ALL OTHER GYP MOUNTED ACCESSORIES

TO THEIR ORIGINAL LOCATIONS, SEE ELECTRICAL IN BID

PACK A.

4. ALL GYP THAT WAS REMOVE DURING THE PEX

REPLACEMENT OR DUE TO WATER DAMAGE TO BE

REPLACED WITH NEW GYP BOARD. MUD AND FEATHER GYP

TO REMOVE SEAMS,& PROVIDE CORNER BEADS AS NEEDED.

PAINT & TEXTURE TO MATCH EXISTING.

A

B

N

TRUE

NORTH

N

PROJECT

NORTH

2901 Blake Street, Suite 100 Denver, CO 80205

303.861.8555

DPA Project:

Sheet Number:

Sheet Title:

Revisions Date No.

Sheet Information

Project Information

Issuance Date

Consultant(s)

A

B

C

D

E

F

2 3 4 5 6

1 2 3 4 5 6

A

B

C

D

E

F

Stamp

-F eb -2

:5 4:

22808.00.000

A-101.A

AS

U

R

ES

ID

EN

C E

AT

R

EX

PL

U

M B

IN

G

R

EN

O

VA

TI

O

N S:

P H

AS

E

Se le ct iv e

R en ov at io n

-A rc hi te ct ur e

FLOOR PLAN -

LEVEL 01 - AREA

A

02/09/2024BID PACK C

COPYRIGHT © 2022 - DAVIS PARTNERSHIP, P.C.

S

TA

D

IU

M

D R

IV

E

AL

AM

O

SA

, C O

1/8" = 1'-0"B1 FLOOR PLAN - LEVEL 1 - AREA A

Key Value Keynote Text

D23 TOOTH OUT CMU AS REQUIRED FOR PEX REPLACEMENT; SEE PLUMBING.

ASSUME 16" X 16" TOOTHED OUT FACE OF CMU TO ALLOW FOR ACCESS AT

ALL PLUMBING PENETRATIONS TO BE REPLACED IN EXISTING CMU WALLS.

F01 PROVIDE NEW GYP, INSULATION (WHERE PRESENT), AND RESILIENT BASE

OVER EXISTING FRAMING. PATCH, TEXTURE, & PAINT GYP TO MATCH

ADJACENT FINISHES. PROVIDE FIRE CAULKING AT ALL WALL PENETRATIONS

TO MATCH EXISTING WALL'S FIRE RATING, SEE LIFE SAFETY PLANS.

F02 NEW VINYL WALL BASE AS REQUIRED AT GYP BOARD REPAIR

F16 NEW DIGITAL WATER MIXING VALVE; SEE PLUMBING & ELECTRICAL

F17 NEW THERMAL EXPANSION TANK; SEE PLUMBING

F18 NEW DOMESTIC WATER STORAGE TANK (BUFFER TANK); SEE PLUMBING

F19 REINSTALL SALVAGED METAL WALL PLATE COVER WHERE PRESENT

F20 TOOTH IN CMU AS REQUIRED FOR PEX REPLACEMENT; SEE PLUMBING.

PROVIDE FIRE CAULKING AT ALL WALL PENETRATIONS TO MATCH EXISTING

WALL'S FIRE RATING, SEE LIFE SAFETY PLANS. REPAIR AND PAINT TO

MATCH ADJACENT FINISHES.

YRemy Image

YRemy

DN

FD

DN

REF.

REF.

REF.

FD

A

RU RT RS RR

RP

RN

RM

RL

RK

RJ

RH

RG

RF

RE

RD

RC

RA

R1

R1.2

R2.2

R3.2

R1.1

R2.1

R3.1

R2

R3

RQ

RVRW

RB

VEST

EQUIP STOR

LOBBY

VEST

103G

VEST

102G

BREEZEWAY

STAIR #9

ST-109

VEST

101J

LAUNDRY

ELEV MACH

SUITE 1A

103A

SUITE 1B

103B

SUITE 1C

103C

SUITE 1D

103D

LIVING

103E

CL

103L

SHOWER

103K

SINK

103J TOILET

103H

HALL

103M

KITCHEN

103F

ELEV #2

TELECOM

SUITE 2A

102A

SUITE 2B

102B

SUITE 2C

102C

SUITE 2D

102D

LIVING

102ESHOWER

102K

CL

102L

HALL

102M

SINK

102J

TOILET

102H

KITCHEN

102F

SUITE 3A

101A

SUITE 3B

101B

SUITE 3C

101C

SUITE 3D

101D

LIVING

101E

KITCHEN

101F

TOILET

101H

SINK

101G

HALL

101M

SHOWER

101K

CL

101L

STOR

F01

F01

F01

F01 F01

F04F01

F04 F01

F01

F01

E2

A-550

TYP

E1

A-550

TYP

F06

F01

F04

F01

F05

F01

F01

F01

F01

F01

F04

F04

F01

F01

F01

F06

F01

F06

F09

E4

A-550

TYP

F09

F09

F09

M

AT

C H

LI

N

E A

M

AT

C H

LI

N

E A

N O

T

IN

S C

O

PE

EXISTING INTERIOR PARTITION WALL OR SHAFT WALL TO REMAIN.

REFER TO LIFE SAFETY PLANS FOR EXTENT OF FIRE RATED AND

SHAFT WALLS.

FINISH REPAIRS

ABOVE FLOOR LINE

CENTERLINE

NOT IN CONTRACT or BY OWNER EQUIPMENT

Key Plan

Plan Keynotes

Plan Legend (Note: Not all symbols are used in this project.)

Plan General Notes

1. DO NOT SCALE DRAWINGS.

2. PROVIDE AND INSTALL NEW VINYL WALL BASE AT ALL

AREAS OF PEX REPLACEMENT AND WATER DAMAGE WHERE

GYP IS BEING REPLACED WITHIN 1'-0" OF THE FFE.

3. RETURN ALL LIGHTING FIXTURES, VENT COVERS, WALL

FIXTURES, AND ALL OTHER GYP MOUNTED ACCESSORIES

TO THEIR ORIGINAL LOCATIONS, SEE ELECTRICAL IN BID

PACK A.

4. ALL GYP THAT WAS REMOVE DURING THE PEX

REPLACEMENT OR DUE TO WATER DAMAGE TO BE

REPLACED WITH NEW GYP BOARD. MUD AND FEATHER GYP

TO REMOVE SEAMS,& PROVIDE CORNER BEADS AS NEEDED.

PAINT & TEXTURE TO MATCH EXISTING.

A

B

N

TRUE

NORTH

N

PROJECT

NORTH

2901 Blake Street, Suite 100 Denver, CO 80205

303.861.8555

DPA Project:

Sheet Number:

Sheet Title:

Revisions Date No.

Sheet Information

Project Information

Issuance Date

Consultant(s)

A

B

C

D

E

F

2 3 4 5 6

1 2 3 4 5 6

A

B

C

D

E

F

Stamp

-F eb -2

:5 4:

22808.00.000

A-101.B

AS

U

R

ES

ID

EN

C E

AT

R

EX

PL

U

M B

IN

G

R

EN

O

VA

TI

O

N S:

P H

AS

E

Se le ct iv e

R en ov at io n

-A rc hi te ct ur e

FLOOR PLAN -

LEVEL 01 - AREA

B

02/09/2024BID PACK C

COPYRIGHT © 2022 - DAVIS PARTNERSHIP, P.C.

S

TA

D

IU

M

D R

IV

E

AL

AM

O

SA

, C O

1/8" = 1'-0"B1 FLOOR PLAN - LEVEL 1 - AREA B

Key Value Keynote Text

F01 PROVIDE NEW GYP, INSULATION (WHERE PRESENT), AND RESILIENT BASE

OVER EXISTING FRAMING. PATCH, TEXTURE, & PAINT GYP TO MATCH

ADJACENT FINISHES. PROVIDE FIRE CAULKING AT ALL WALL PENETRATIONS

TO MATCH EXISTING WALL'S FIRE RATING, SEE LIFE SAFETY PLANS.

F04 NEW MIRROR AND ALUMINUM J-CHANNELS

F05 NEW FRP WALL COVERING AS REQUIRED

F06 RE-INSTALL SHOWER HEAD

F09 RE-INSTALL SOLID SURFACE COUNTERTOP & SINK, BASE CABINET, & UPPER

CABINET. PROVIDE CAULKING AS REQUIRED

YRemy Image

YRemy

UP UP

DN

DN

DN

DN

UP

R

EF

DNDN

FD

FD

DN

A

BCD

H EFGJKLMNP

C.5D.5

RW

JAN

CABLE/TV

CORR

LIVING

205G

SUITE 4A

205A

SUITE 4B

SUITE 4C

205C SUITE 4D

205D

KITCHEN

205F

LIVING

205G

STAIR #8

ST-208

SUITE 4E

205E

TOILET

205J

SINK

205KSHOWER

205L

BATHROOM

205M

CL

205N

HALL

205P

REFUGE

STAIR #2

ST-202

ELEV #1

EL-101

STAIR #5

ST-205

SEATING

201Y

GRIZZLY CLUB

201X

SEATING

201W

STAIR #6

ST-106

VOMITORIUM #4

VOMITORIUM #3

VOMITORIUM #2

VOMITORIUM #1

VOMITORIUM #5

F01

F01

F04

F01

F01

F05

F01

F01

F01

F01

F04

F05

F01

F06

F09

F09

M

AT

C H

LI

N

E A

M

AT

C H

LI

N

E A

NOT IN SCOPE

EXISTING INTERIOR PARTITION WALL OR SHAFT WALL TO REMAIN.

REFER TO LIFE SAFETY PLANS FOR EXTENT OF FIRE RATED AND

SHAFT WALLS.

FINISH REPAIRS

ABOVE FLOOR LINE

CENTERLINE

NOT IN CONTRACT or BY OWNER EQUIPMENT

Key Plan

Plan Keynotes

Plan Legend (Note: Not all symbols are used in this project.)

Plan General Notes

1. DO NOT SCALE DRAWINGS.

2. PROVIDE AND INSTALL NEW VINYL WALL BASE AT ALL

AREAS OF PEX REPLACEMENT AND WATER DAMAGE WHERE

GYP IS BEING REPLACED WITHIN 1'-0" OF THE FFE.

3. RETURN ALL LIGHTING FIXTURES, VENT COVERS, WALL

FIXTURES, AND ALL OTHER GYP MOUNTED ACCESSORIES

TO THEIR ORIGINAL LOCATIONS, SEE ELECTRICAL IN BID

PACK A.

4. ALL GYP THAT WAS REMOVE DURING THE PEX

REPLACEMENT OR DUE TO WATER DAMAGE TO BE

REPLACED WITH NEW GYP BOARD. MUD AND FEATHER GYP

TO REMOVE SEAMS,& PROVIDE CORNER BEADS AS NEEDED.

PAINT & TEXTURE TO MATCH EXISTING.

A

B

N

TRUE

NORTH

N

PROJECT

NORTH

2901 Blake Street, Suite 100 Denver, CO 80205

303.861.8555

DPA Project:

Sheet Number:

Sheet Title:

Revisions Date No.

Sheet Information

Project Information

Issuance Date

Consultant(s)

A

B

C

D

E

F

2 3 4 5 6

1 2 3 4 5 6

A

B

C

D

E

F

Stamp

-F eb -2

:5 4:

22808.00.000

A-102.A

AS

U

R

ES

ID

EN

C E

AT

R

EX

PL

U

M B

IN

G

R

EN

O

VA

TI

O

N S:

P H

AS

E

Se le ct iv e

R en ov at io n

-A rc hi te ct ur e

FLOOR PLAN -

LEVEL 02 - AREA

A

02/09/2024BID PACK C

COPYRIGHT © 2022 - DAVIS PARTNERSHIP, P.C.

S

TA

D

IU

M

D R

IV

E

AL

AM

O

SA

, C O

1/8" = 1'-0"B1 FLOOR PLAN - LEVEL 2 - AREA A

Key Value Keynote Text

F01 PROVIDE NEW GYP, INSULATION (WHERE PRESENT), AND RESILIENT BASE

OVER EXISTING FRAMING. PATCH, TEXTURE, & PAINT GYP TO MATCH

ADJACENT FINISHES. PROVIDE FIRE CAULKING AT ALL WALL PENETRATIONS

TO MATCH EXISTING WALL'S FIRE RATING, SEE LIFE SAFETY PLANS.

F04 NEW MIRROR AND ALUMINUM J-CHANNELS

F05 NEW FRP WALL COVERING AS REQUIRED

F06 RE-INSTALL SHOWER HEAD

F09 RE-INSTALL SOLID SURFACE COUNTERTOP & SINK, BASE CABINET, & UPPER

CABINET. PROVIDE CAULKING AS REQUIRED

YRemy Image

YRemy

UP

DN

UP

FD

FD

FD

FD

REF.

REF.

REF.

REF.

AB

RU RT RS RR

RP

RN

RM

RL

RK

RJ

RH

RG

RF

RE

RD

RC

RA

R1

R1.2

R2.2

R3.2

R1.1

R2.1

R3.1

R2

R3

RQ

RVRW

RB

VEST

204E

VEST

203G

VEST

202G

VEST

201J

WALKWAY

BREEZEWAY

WALKWAY

JAN

CABLE/TV

CORR

LIVING

205G

SUITE 1A

203A

SUITE 1B

203B

SUITE 1C

203C

SUITE 1D

203D

LIVING

203E

SUITE 2A

202A

SUITE 2B

202B

SUITE 2C

202C

SUITE 2D

202D

LIVING

202E

KITCHEN

202F

TOILET

202H

SINK

202J

SHOWER

202K

CL

202L

HALL

202M

SHOWER

203K

SINK

203J

TOILET

203H

HALL

203M

CL

203L

KITCHEN

203F

LIVING

204C

BATH

204B

RA SUITE

204A

KITCHEN

204D

LOBBY

TELECOM

ELEV #2

3REFUGE

SUITE 3A

201A

SUITE 3B

201B

SUITE 3C

201C

SUITE 3D

201D

LIVING

201E

KITCHEN

201F

SINK

201G

TOILET

201H

SHOWER

201K

CL

201L

HALL

201M

STAIR #9

ST-209

F01

F01

F01

F01 F04

F01

F01

F05

F01

F01

F01 F01

F01

F01F04

F01 F01 F01

F04 F04

E2

A-550

TYP

E4

A-550

TYP

E1

A-550

TYP

F01

F06F01

F01

F01

F06 F01

F06

F01

F06

F09

F09

F04

F09

F01

F09

F02

F09

F01 F19

M

AT

C H

LI

N

E A

M

AT

C H

LI

N

E A

F09

EXISTING INTERIOR PARTITION WALL OR SHAFT WALL TO REMAIN.

REFER TO LIFE SAFETY PLANS FOR EXTENT OF FIRE RATED AND

SHAFT WALLS.

FINISH REPAIRS

ABOVE FLOOR LINE

CENTERLINE

NOT IN CONTRACT or BY OWNER EQUIPMENT

Key Plan

Plan Keynotes

Plan Legend (Note: Not all symbols are used in this project.)

Plan General Notes

1. DO NOT SCALE DRAWINGS.

2. PROVIDE AND INSTALL NEW VINYL WALL BASE AT ALL

AREAS OF PEX REPLACEMENT AND WATER DAMAGE WHERE

GYP IS BEING REPLACED WITHIN 1'-0" OF THE FFE.

3. RETURN ALL LIGHTING FIXTURES, VENT COVERS, WALL

FIXTURES, AND ALL OTHER GYP MOUNTED ACCESSORIES

TO THEIR ORIGINAL LOCATIONS, SEE ELECTRICAL IN BID

PACK A.

4. ALL GYP THAT WAS REMOVE DURING THE PEX

REPLACEMENT OR DUE TO WATER DAMAGE TO BE

REPLACED WITH NEW GYP BOARD. MUD AND FEATHER GYP

TO REMOVE SEAMS,& PROVIDE CORNER BEADS AS NEEDED.

PAINT & TEXTURE TO MATCH EXISTING.

A

B

N

TRUE

NORTH

N

PROJECT

NORTH

2901 Blake Street, Suite 100 Denver, CO 80205

303.861.8555

DPA Project:

Sheet Number:

Sheet Title:

Revisions Date No.

Sheet Information

Project Information

Issuance Date

Consultant(s)

A

B

C

D

E

F

2 3 4 5 6

1 2 3 4 5 6

A

B

C

D

E

F

Stamp

-F eb -2

:5 4:

22808.00.000

A-102.B

AS

U

R

ES

ID

EN

C E

AT

R

EX

PL

U

M B

IN

G

R

EN

O

VA

TI

O

N S:

P H

AS

E

Se le ct iv e

R en ov at io n

-A rc hi te ct ur e

FLOOR PLAN -

LEVEL 02 - AREA

B

02/09/2024BID PACK C

COPYRIGHT © 2022 - DAVIS PARTNERSHIP, P.C.

S

TA

D

IU

M

D R

IV

E

AL

AM

O

SA

, C O

1/8" = 1'-0"B1 FLOOR PLAN - LEVEL 2 - AREA B

Key Value Keynote Text

F01 PROVIDE NEW GYP, INSULATION (WHERE PRESENT), AND RESILIENT BASE

OVER EXISTING FRAMING. PATCH, TEXTURE, & PAINT GYP TO MATCH

ADJACENT FINISHES. PROVIDE FIRE CAULKING AT ALL WALL PENETRATIONS

TO MATCH EXISTING WALL'S FIRE RATING, SEE LIFE SAFETY PLANS.

F02 NEW VINYL WALL BASE AS REQUIRED AT GYP BOARD REPAIR

F04 NEW MIRROR AND ALUMINUM J-CHANNELS

F05 NEW FRP WALL COVERING AS REQUIRED

F06 RE-INSTALL SHOWER HEAD

F09 RE-INSTALL SOLID SURFACE COUNTERTOP & SINK, BASE CABINET, & UPPER

CABINET. PROVIDE CAULKING AS REQUIRED

F19 REINSTALL SALVAGED METAL WALL PLATE COVER WHERE PRESENT

YRemy Image

YRemy

UPDN

DN

R

EF

FD

AB

C

H EFGJKLMNP

C.5D.5

RW

F01

F03

F01

SUITE 4A

305A

SUITE 4B

305B

SUITE 4C

305C

KITCHEN

305E

LIVING

305F

TOILET

305H

SUITE 4D

305D

STAIR #8

ST-308

SINK

305J

SHOWER

305K

HALL

305M

WOMEN

MEN

OPEN DECK

STAIR #5

ST-305

ELECT.

STOR

COATS

LOBBY

MULTI-PURPOSE

BALCONY

FREEZER

DRY STORAGE

COOLER

KITCHEN

KITCHEN PREP

Room

BOOSTER CLUB

OPEN DECK

SEATING

201Y

GRIZZLY CLUB

201X

SEATING

201W

F01

F01

F01

F01

F01

F05

F01

F04

F10

F01

F06

F01

F04

F08

F01

F04

F08 F09

F09

F09

D16

F01

F02

F02

F02

F02

F05

F01

F01F05

M

AT

C H

LI

N

E A

M

AT

C H

LI

N

E A

NOT IN SCOPE

EXISTING INTERIOR PARTITION WALL OR SHAFT WALL TO REMAIN.

REFER TO LIFE SAFETY PLANS FOR EXTENT OF FIRE RATED AND

SHAFT WALLS.

FINISH REPAIRS

ABOVE FLOOR LINE

CENTERLINE

NOT IN CONTRACT or BY OWNER EQUIPMENT

Key Plan

Plan Keynotes

Plan Legend (Note: Not all symbols are used in this project.)

Plan General Notes

1. DO NOT SCALE DRAWINGS.

2. PROVIDE AND INSTALL NEW VINYL WALL BASE AT ALL

AREAS OF PEX REPLACEMENT AND WATER DAMAGE WHERE

GYP IS BEING REPLACED WITHIN 1'-0" OF THE FFE.

3. RETURN ALL LIGHTING FIXTURES, VENT COVERS, WALL

FIXTURES, AND ALL OTHER GYP MOUNTED ACCESSORIES

TO THEIR ORIGINAL LOCATIONS, SEE ELECTRICAL IN BID

PACK A.

4. ALL GYP THAT WAS REMOVE DURING THE PEX

REPLACEMENT OR DUE TO WATER DAMAGE TO BE

REPLACED WITH NEW GYP BOARD. MUD AND FEATHER GYP

TO REMOVE SEAMS,& PROVIDE CORNER BEADS AS NEEDED.

PAINT & TEXTURE TO MATCH EXISTING.

A

B

N

TRUE

NORTH

N

PROJECT

NORTH

2901 Blake Street, Suite 100 Denver, CO 80205

303.861.8555

DPA Project:

Sheet Number:

Sheet Title:

Revisions Date No.

Sheet Information

Project Information

Issuance Date

Consultant(s)

A

B

C

D

E

F

2 3 4 5 6

1 2 3 4 5 6

A

B

C

D

E

F

Stamp

-F eb -2

:5 4:

22808.00.000

A-103.A

AS

U

R

ES

ID

EN

C E

AT

R

EX

PL

U

M B

IN

G

R

EN

O

VA

TI

O

N S:

P H

AS

E

Se le ct iv e

R en ov at io n

-A rc hi te ct ur e

FLOOR PLAN -

LEVEL 03 - AREA

A

02/09/2024BID PACK C

COPYRIGHT © 2022 - DAVIS PARTNERSHIP, P.C.

S

TA

D

IU

M

D R

IV

E

AL

AM

O

SA

, C O

1/8" = 1'-0"B1 FLOOR PLAN - LEVEL 3 - AREA A

Key Value Keynote Text

D16 COORDINATE PEX REPLACEMENT WORK WITH EXISTING KITCHEN HOODS.

SEE SPECIFICATIONS FOR ALLOWANCE.

F01 PROVIDE NEW GYP, INSULATION (WHERE PRESENT), AND RESILIENT BASE

OVER EXISTING FRAMING. PATCH, TEXTURE, & PAINT GYP TO MATCH

ADJACENT FINISHES. PROVIDE FIRE CAULKING AT ALL WALL PENETRATIONS

TO MATCH EXISTING WALL'S FIRE RATING, SEE LIFE SAFETY PLANS.

F02 NEW VINYL WALL BASE AS REQUIRED AT GYP BOARD REPAIR

F03 INSTALL NEW PEX TUBING IN IT'S ENTIRETY; SEE PLUMBING

F04 NEW MIRROR AND ALUMINUM J-CHANNELS

F05 NEW FRP WALL COVERING AS REQUIRED

F06 RE-INSTALL SHOWER HEAD

F08 NEW WALL TILE AS REQUIRED TO REPAIR WALL. GROUT TO MATCH

ADJACENT FINISHES; SEE FINISH SCHEDULE

F09 RE-INSTALL SOLID SURFACE COUNTERTOP & SINK, BASE CABINET, & UPPER

CABINET. PROVIDE CAULKING AS REQUIRED

F10 INSTALL NEW CLOSET BUILT-IN SHELF AND HANGER ROD; MATCH EXISTING.

YRemy Image

YRemy

UP

REF.

FD

FD

FD

REF.

REF.

REF.

FD

AB

RU RT RS RR

RP

RN

RM

RL

RK

RJ

RH

RG

RF

RE

RD

RC

RA

R1

R1.2

R2.2

R3.2

R1.1

R2.1

R3.1

R2

R3

RQ

RVRW

RB

LIVING

305F

JAN

VEST

304E

VEST

303G

VEST

302G

BREEZEWAY

STAIR #9

ST-309

VEST

301J

SUITE 1A

303A

SUITE 1B

303B

SUITE 1C

303C

SUITE 1D

303D

LIVING

303E

KITCHEN

303F

TOILET

303H

HALL

303M

SINK

303J

SHOWER

303K

CL

303L

LIVING

304C

BATH

304B

RA SUITE

304A

LOBBY

TELECOM

ELEV #2

ELEC

STAIR #8

ST-308

OPEN DECK

SUITE 2A

302A SUITE 2B

302B

SUITE 2C

302C

SUITE 2D

302D

LIVING

302E

KITCHEN

302F

TOILET

302H

SINK

302J

SHOWER

302K

CL

302L

HALL

302MWALKWAY

SUITE 3A

301A

SUITE 3B

301B

SUITE 3C

301C

SUITE 3D

301D

LIVING

301E

KITCHEN

301F

SINK

301G

TOILET

301H

SHOWER

301K

CL

301L

HALL

301M

F01

F01

F01

F01

F01

F01

F05

F01

F04

F01

F01

F04

F01

F01

F01

F04

F01

F01

F01

F06

F01

F06

F01

F06

F09

F09

F09

F09

E2

A-550

TYP E4

A-550

TYP

E1

A-550

TYP

F09

F01 F19

F01

F04

F01

F04

M

AT

C H

LI

N

E A

M

AT

C H

LI

N

E A

F09

EXISTING INTERIOR PARTITION WALL OR SHAFT WALL TO REMAIN.

REFER TO LIFE SAFETY PLANS FOR EXTENT OF FIRE RATED AND

SHAFT WALLS.

FINISH REPAIRS

ABOVE FLOOR LINE

CENTERLINE

NOT IN CONTRACT or BY OWNER EQUIPMENT

Key Plan

Plan Keynotes

Plan Legend (Note: Not all symbols are used in this project.)

Plan General Notes

1. DO NOT SCALE DRAWINGS.

2. PROVIDE AND INSTALL NEW VINYL WALL BASE AT ALL

AREAS OF PEX REPLACEMENT AND WATER DAMAGE WHERE

GYP IS BEING REPLACED WITHIN 1'-0" OF THE FFE.

3. RETURN ALL LIGHTING FIXTURES, VENT COVERS, WALL

FIXTURES, AND ALL OTHER GYP MOUNTED ACCESSORIES

TO THEIR ORIGINAL LOCATIONS, SEE ELECTRICAL IN BID

PACK A.

4. ALL GYP THAT WAS REMOVE DURING THE PEX

REPLACEMENT OR DUE TO WATER DAMAGE TO BE

REPLACED WITH NEW GYP BOARD. MUD AND FEATHER GYP

TO REMOVE SEAMS,& PROVIDE CORNER BEADS AS NEEDED.

PAINT & TEXTURE TO MATCH EXISTING.

A

B

N

TRUE

NORTH

N

PROJECT

NORTH

2901 Blake Street, Suite 100 Denver, CO 80205

303.861.8555

DPA Project:

Sheet Number:

Sheet Title:

Revisions Date No.

Sheet Information

Project Information

Issuance Date

Consultant(s)

A

B

C

D

E

F

2 3 4 5 6

1 2 3 4 5 6

A

B

C

D

E

F

Stamp

-F eb -2

:5 4:

22808.00.000

A-103.B

AS

U

R

ES

ID

EN

C E

AT

R

EX

PL

U

M B

IN

G

R

EN

O

VA

TI

O

N S:

P H

AS

E

Se le ct iv e

R en ov at io n

-A rc hi te ct ur e

FLOOR PLAN -

LEVEL 03 - AREA

B

02/09/2024BID PACK C

COPYRIGHT © 2022 - DAVIS PARTNERSHIP, P.C.

S

TA

D

IU

M

D R

IV

E

AL

AM

O

SA

, C O

1/8" = 1'-0"B1 FLOOR PLAN - LEVEL 3 - AREA B

Key Value Keynote Text

F01 PROVIDE NEW GYP, INSULATION (WHERE PRESENT), AND RESILIENT BASE

OVER EXISTING FRAMING. PATCH, TEXTURE, & PAINT GYP TO MATCH

ADJACENT FINISHES. PROVIDE FIRE CAULKING AT ALL WALL PENETRATIONS

TO MATCH EXISTING WALL'S FIRE RATING, SEE LIFE SAFETY PLANS.

F04 NEW MIRROR AND ALUMINUM J-CHANNELS

F05 NEW FRP WALL COVERING AS REQUIRED

F06 RE-INSTALL SHOWER HEAD

F09 RE-INSTALL SOLID SURFACE COUNTERTOP & SINK, BASE CABINET, & UPPER

CABINET. PROVIDE CAULKING AS REQUIRED

F19 REINSTALL SALVAGED METAL WALL PLATE COVER WHERE PRESENT

YRemy Image

YRemy

DN DN UP

REF.

FD

DN

DN

REF.

FD

AB

C

H EFGJKLM

C.5D.5

RW

LIVING

405J LIVING

404J

JAN

SUITE 6B

405B

SUITE 6C

405C SUITE 6D

405D

SUITE 5D

404D

SUITE 5C

404C

SUITE 5B

404B

KITCHEN

404K

SUITE 5A

404A

SHOWER

404E

SHOWER

405E

SINK

405F SINK

404F

TOILET

404G

TOILET

405G

HALL

405H

HALL

404H

KITCHEN

405K

SUITE 6A

405A

LOBBY

STAIR #11

ST-411

VIS PRESS

VIS CH

OFFICIALS BOX

HOME CH

HOME PRESS

ST MEDIA

PRESIDENT'S BOX

MEN'S

WOMEN'S

IT/AV

KSPK RM

STAIR #2

ST-402

ELEV #1

EL-101

CORRIDOR

CORRIDOR

454 F01

F01

F01

F04

F01

F04

F01 F01

F06 F01F08

F01F08

F04

F09

M

AT

C H

LI

N

E A

M

AT

C H

LI

N

E A

NOT IN SCOPE

EXISTING INTERIOR PARTITION WALL OR SHAFT WALL TO REMAIN.

REFER TO LIFE SAFETY PLANS FOR EXTENT OF FIRE RATED AND

SHAFT WALLS.

FINISH REPAIRS

ABOVE FLOOR LINE

CENTERLINE

NOT IN CONTRACT or BY OWNER EQUIPMENT

Key Plan

Plan Keynotes

Plan Legend (Note: Not all symbols are used in this project.)

Plan General Notes

1. DO NOT SCALE DRAWINGS.

2. PROVIDE AND INSTALL NEW VINYL WALL BASE AT ALL

AREAS OF PEX REPLACEMENT AND WATER DAMAGE WHERE

GYP IS BEING REPLACED WITHIN 1'-0" OF THE FFE.

3. RETURN ALL LIGHTING FIXTURES, VENT COVERS, WALL

FIXTURES, AND ALL OTHER GYP MOUNTED ACCESSORIES

TO THEIR ORIGINAL LOCATIONS, SEE ELECTRICAL IN BID

PACK A.

4. ALL GYP THAT WAS REMOVE DURING THE PEX

REPLACEMENT OR DUE TO WATER DAMAGE TO BE

REPLACED WITH NEW GYP BOARD. MUD AND FEATHER GYP

TO REMOVE SEAMS,& PROVIDE CORNER BEADS AS NEEDED.

PAINT & TEXTURE TO MATCH EXISTING.

A

B

N

TRUE

NORTH

N

PROJECT

NORTH

2901 Blake Street, Suite 100 Denver, CO 80205

303.861.8555

DPA Project:

Sheet Number:

Sheet Title:

Revisions Date No.

Sheet Information

Project Information

Issuance Date

Consultant(s)

A

B

C

D

E

F

2 3 4 5 6

1 2 3 4 5 6

A

B

C

D

E

F

Stamp

-F eb -2

:5 4:

22808.00.000

A-104.A

AS

U

R

ES

ID

EN

C E

AT

R

EX

PL

U

M B

IN

G

R

EN

O

VA

TI

O

N S:

P H

AS

E

Se le ct iv e

R en ov at io n

-A rc hi te ct ur e

FLOOR PLAN -

LEVEL 04 - AREA

A

02/09/2024BID PACK C

COPYRIGHT © 2022 - DAVIS PARTNERSHIP, P.C.

S

TA

D

IU

M

D R

IV

E

AL

AM

O

SA

, C O

1/8" = 1'-0"B1 FLOOR PLAN - LEVEL 4 - AREA A

Key Value Keynote Text

F01 PROVIDE NEW GYP, INSULATION (WHERE PRESENT), AND RESILIENT BASE

OVER EXISTING FRAMING. PATCH, TEXTURE, & PAINT GYP TO MATCH

ADJACENT FINISHES. PROVIDE FIRE CAULKING AT ALL WALL PENETRATIONS

TO MATCH EXISTING WALL'S FIRE RATING, SEE LIFE SAFETY PLANS.

F04 NEW MIRROR AND ALUMINUM J-CHANNELS

F06 RE-INSTALL SHOWER HEAD

F08 NEW WALL TILE AS REQUIRED TO REPAIR WALL. GROUT TO MATCH

ADJACENT FINISHES; SEE FINISH SCHEDULE

F09 RE-INSTALL SOLID SURFACE COUNTERTOP & SINK, BASE CABINET, & UPPER

CABINET. PROVIDE CAULKING AS REQUIRED

YRemy Image

YRemy

FD

FD

FD

REF.

REF.

REF.

A

RU RT RS RR

RP

RN

RM

RL

RK

RJ

RH

RG

RF

RE

RD

RC

RA

R1

R1.2

R2.2

R3.2

R1.1

R2.1

R3.1

R2

R3

RQRVRW

RB

LOUNGE

JAN

414 VEST

403G

VEST

402G

BREEZEWAY

STAIR #9

ST-409

VEST

401J

SUITE 1A

403A

SUITE 1B

403B

SUITE 1C

403C

SUITE 1D

403D

LIVING

403E

SUITE 2A

402A SUITE 2B

402B

SUITE 2C

402C

SUITE 2D

402D

LIVING

402E

KITCHEN

402F

SUITE 3A

401A

SUITE 3B

401B

SUITE 3C

401C

SUITE 3D

401D

LIVING

401E

KITCHEN

401F

SINK

401G

TOILET

401H

HALL

401M

WALKWAY

SHOWER

401K

CL

401L

CL

402L

SHOWER

402K

SINK

402J

TOILET

402H

HALL

402M

LOBBY

TELECOM

ELEV #2

CL

403L

SHOWER

403K

HALL

403M

SINK

403J

TOILET

403H

SUITE 5A

404A

SUITE 5B

404B

F01

A-550

C4

F01

F01

F01 F04

F01

F05

F01

F01

F04

F06

F01

F01

F01

F01

F04

F01

F06

F07

F01

F06

F09

F01

F09

F09

F09

E2

A-550

TYP E4

A-550

TYP

E1

A-550

TYP

F01 F19

F01

F04

F01

F04

M

AT

C H

LI

N

E A

M

AT

C H

LI

N

E A

EXISTING INTERIOR PARTITION WALL OR SHAFT WALL TO REMAIN.

REFER TO LIFE SAFETY PLANS FOR EXTENT OF FIRE RATED AND

SHAFT WALLS.

FINISH REPAIRS

ABOVE FLOOR LINE

CENTERLINE

NOT IN CONTRACT or BY OWNER EQUIPMENT

Key Plan

Plan Keynotes

Plan Legend (Note: Not all symbols are used in this project.)

Plan General Notes

1. DO NOT SCALE DRAWINGS.

2. PROVIDE AND INSTALL NEW VINYL WALL BASE AT ALL

AREAS OF PEX REPLACEMENT AND WATER DAMAGE WHERE

GYP IS BEING REPLACED WITHIN 1'-0" OF THE FFE.

3. RETURN ALL LIGHTING FIXTURES, VENT COVERS, WALL

FIXTURES, AND ALL OTHER GYP MOUNTED ACCESSORIES

TO THEIR ORIGINAL LOCATIONS, SEE ELECTRICAL IN BID

PACK A.

4. ALL GYP THAT WAS REMOVE DURING THE PEX

REPLACEMENT OR DUE TO WATER DAMAGE TO BE

REPLACED WITH NEW GYP BOARD. MUD AND FEATHER GYP

TO REMOVE SEAMS,& PROVIDE CORNER BEADS AS NEEDED.

PAINT & TEXTURE TO MATCH EXISTING.

A

B

N

TRUE

NORTH

N

PROJECT

NORTH

2901 Blake Street, Suite 100 Denver, CO 80205

303.861.8555

DPA Project:

Sheet Number:

Sheet Title:

Revisions Date No.

Sheet Information

Project Information

Issuance Date

Consultant(s)

A

B

C

D

E

F

2 3 4 5 6

1 2 3 4 5 6

A

B

C

D

E

F

Stamp

-F eb -2

:5 4:

22808.00.000

A-104.B

AS

U

R

ES

ID

EN

C E

AT

R

EX

PL

U

M B

IN

G

R

EN

O

VA

TI

O

N S:

P H

AS

E

Se le ct iv e

R en ov at io n

-A rc hi te ct ur e

FLOOR PLAN -

LEVEL 04 - AREA

B

02/09/2024BID PACK C

COPYRIGHT © 2022 - DAVIS PARTNERSHIP, P.C.

S

TA

D

IU

M

D R

IV

E

AL

AM

O

SA

, C O

1/8" = 1'-0"B1 FLOOR PLAN - LEVEL 4 - AREA B

Key Value Keynote Text

F01 PROVIDE NEW GYP, INSULATION (WHERE PRESENT), AND RESILIENT BASE

OVER EXISTING FRAMING. PATCH, TEXTURE, & PAINT GYP TO MATCH

ADJACENT FINISHES. PROVIDE FIRE CAULKING AT ALL WALL PENETRATIONS

TO MATCH EXISTING WALL'S FIRE RATING, SEE LIFE SAFETY PLANS.

F04 NEW MIRROR AND ALUMINUM J-CHANNELS

F05 NEW FRP WALL COVERING AS REQUIRED

F06 RE-INSTALL SHOWER HEAD

F07 NEW GLAZING, CAULKING, & BACKER ROD TO MATCH EXISTING; REFER TO

WINDOW ELEVATION FOR SIZING. PROTECT AND PRESERVE ADJACENT

EXISTING ALUMINUM WINDOW FRAME AND ADJACENT GLAZING.

F09 RE-INSTALL SOLID SURFACE COUNTERTOP & SINK, BASE CABINET, & UPPER

CABINET. PROVIDE CAULKING AS REQUIRED

F19 REINSTALL SALVAGED METAL WALL PLATE COVER WHERE PRESENT

YRemy Image

YRemy

AB

CD

H EFGJKLMNP

C.5D.5

RW

C01

GYP 1

EXIST

EXIST EXIST

GYP 1

TICKETS

ST-111

STAIR #5

ST-105

CONCOURSE

MECH ROOM

VEST

WATER ENTRY

FIRE PUMP

STOR

STAIR #8

ST-108

CUSTODIAL

165 ELEV MACH

LAUNDRY

STAIR #6

ST-106

OFFICIALS

BATHROOM

OFFICIALS

LOCKER

VEST

ELEC. / MECH.

VEST

EQUIP STOR

CONCESSIONS

SOFT GOODS

CONCESSIONS

PANTRY

CORRIDOR

TRAINING

SHOWER

CL

TOILET

175 WOMEN #1

CORRIDOR

MEN

UNISEX

GAMEDAY

LOCKER A

GAMEDAY

LOCKER B

EQUIP STOR

CORRIDOR

CL

TOILET

WOMEN #2

SHOWER

MEN

UNISEX

ELEV #1

EL-101

GUEST SERVICES

375STAIR #2

ST-102

ELEV MACH

TRAINING

CORRIDOR

GYP 1

EXIST

GYP 1

EXIST

C2

A-550

TYP

C1

A-550

TYP

C01

C04

GYP 1

EXIST

GYP 1

EXIST

C04

EXIST

EXIST

EXIST EXIST

GYP 1

EXIST

GYP 1

GYP 1

EXIST

C04

C04

GYP 1

GYP 1

C04

GYP 1

GYP 1 GYP 1

M

AT

C H

LI

N

E A

M

AT

C H

LI

N

E A

NOT IN SCOPE

A

B

N

TRUE

NORTH

N

PROJECT

NORTH

GYPSUM BOARD CEILING

ACOUSTICAL CEILING TILE

ACOUSTICAL CEILING TILE, WASHABLE

ACOUSTICAL CEILING TILE, WOOD SYSTEM

MECHANICAL DIFFUSER (SUPPLY)

MECHANICAL DIFFUSER (RETURN)

EXIT SIGN

CUBICLE CURTAIN TRACK

DPA FINISH MATERIAL TAG

CEILING HEIGHT ABOVE FINISHED FLOOR

ABOVE FLOOR LINE

CENTERLINE

EXPANSION JOINT (EJ)

SHIELDING

Key Plan

Reflected Ceiling Plan Keynotes

Reflected Ceiling Plan Symbol Legend (Note: Not all symbols are used in this project.)

Reflected Ceiling Plan General Notes

RECESSED IN GRADE

STAKE MOUNT ACCENT

BOLLARD

PENDANT

SCONCE

STEP LIGHT

ILLUMINATED MIRROR

RECESSED ADJUSTABLE

RECESSED DOWNLIGHT

RECESSED WALLWASH

SURFACE MOUNT DOWNLIGHT

TRACK HEAD

LINEAR EXTRUSION

Lighting Symbol Legend

1. DO NOT SCALE DRAWINGS.

2. RETURN ALL LIGHTING FIXTURES, VENT COVERS, WALL

FIXTURES, AND ALL OTHER GYP MOUNTED ACCESSORIES

TO THEIR ORIGINAL LOCATIONS, SEE ELECTRICAL IN BID

PACK A.

3. ALL GYP THAT WAS REMOVE DURING THE PEX

REPLACEMENT OR DUE TO WATER DAMAGE TO BE

REPLACED WITH NEW GYP BOARD. MUD AND FEATHER GYP

TO REMOVE SEAMS,& PROVIDE CORNER BEADS AS NEEDED.

PAINT & TEXTURE TO MATCH EXISTING.

4. REINSTALL ALL EXIT SIGNS THAT WERE REMOVED DURING

THE RENOVATIONS TO THEIR ORIGINAL LOCATIONS AND

ORIENTATIONS.

2901 Blake Street, Suite 100 Denver, CO 80205

303.861.8555

DPA Project:

Sheet Number:

Sheet Title:

Revisions Date No.

Sheet Information

Project Information

Issuance Date

Consultant(s)

A

B

C

D

E

F

2 3 4 5 6

1 2 3 4 5 6

A

B

C

D

E

F

Stamp

-F eb -2

:5 4:

22808.00.000

A-151.A

AS

U

R

ES

ID

EN

C E

AT

R

EX

PL

U

M B

IN

G

R

EN

O

VA

TI

O

N S:

P H

AS

E

Se le ct iv e

R en ov at io n

-A rc hi te ct ur e

REFLECTED

CEILING PLAN -

LEVEL 01 - AREA

A

02/09/2024BID PACK C

COPYRIGHT © 2022 - DAVIS PARTNERSHIP, P.C.

S

TA

D

IU

M

D R

IV

E

AL

AM

O

SA

, C O

1/8" = 1'-0"B1 RCP - LEVEL 1 - AREA A

Key Value Keynote Text

C01 RE-INSTALL EXISTING CEILING LIGHT FIXTURES, PROVIDE NEW IF DAMAGED;

RE: ELECTRICAL

C04 INSTALL NEW 24"X24" CEILING ACCESS PANEL. AT ALL EXISTING 12"X12"

ACCESS PANELS, REFRAME OPENING AND PROVIDE NEW 24" X 24" ACCESS

PANEL.

ADDENDUM #01 03/10/2023 001

YRemy Image

YRemy

A

RU RT RS RR

RP

RN

RM

RL

RK

RJ

RH

RG

RF

RE

RD

RC

RA

R1

R1.2

R2.2

R3.2

R1.1

R2.1

R3.1

R2

R3

RQ

RVRW

RB

GYP 1

GYP 1

ACT 1

SUITE 1A

103A

SUITE 1B

103B

SUITE 1C

103C

SUITE 1D

103D

LIVING

103E

SHOWER

103K

SINK

103J

TOILET

103H

VEST

103G

HALL

103M

CL

103L

KITCHEN

103F

C04

ELEV #2

TELECOM

LOBBY

SUITE 2A

102A

SUITE 2B

102B

SUITE 2C

102C

SUITE 2D

102DCL

102L

SHOWER

102K

SINK

102J

TOILET

102H

HALL

102M

VEST

102G

KITCHEN

102F

LIVING

102E

STAIR #9

ST-109

BREEZEWAY

SUITE 3A

101A

SUITE 3B

101B

SUITE 3C

101C

SUITE 3D

101D

LIVING

101E

KITCHEN

101F

SINK

101G

TOILET

101H

VEST

101J

HALL

101M

SHOWER

101K

CL

101L

STOR

FIRE PUMP

ACT 1

GYP 1

ACT 1

GYP 1

C04

VI

F

- 2

2' -0

VIF

+/- 2'-6 1/4"

EXIST

EXIST

C04

EXIST

C04

C04

EXIST

EXIST

C04

C04

EXIST

EXIST

C04

C2

A-550

TYP

C1

A-550

TYP

GYP 1GYP 1

EXIST

C2

A-550

TYP

C01

C04

C03

C03

C03M

AT

C H

LI

N

E A

M

AT

C H

LI

N

E A

N O

T

IN

S C

O

PE

A

B

N

TRUE

NORTH

N

PROJECT

NORTH

GYPSUM BOARD CEILING

ACOUSTICAL CEILING TILE

ACOUSTICAL CEILING TILE, WASHABLE

ACOUSTICAL CEILING TILE, WOOD SYSTEM

MECHANICAL DIFFUSER (SUPPLY)

MECHANICAL DIFFUSER (RETURN)

EXIT SIGN

CUBICLE CURTAIN TRACK

DPA FINISH MATERIAL TAG

CEILING HEIGHT ABOVE FINISHED FLOOR

ABOVE FLOOR LINE

CENTERLINE

EXPANSION JOINT (EJ)

SHIELDING

Key Plan

Reflected Ceiling Plan Keynotes

Reflected Ceiling Plan Symbol Legend (Note: Not all symbols are used in this project.)

Reflected Ceiling Plan General Notes

RECESSED IN GRADE

STAKE MOUNT ACCENT

BOLLARD

PENDANT

SCONCE

STEP LIGHT

ILLUMINATED MIRROR

RECESSED ADJUSTABLE

RECESSED DOWNLIGHT

RECESSED WALLWASH

SURFACE MOUNT DOWNLIGHT

TRACK HEAD

LINEAR EXTRUSION

Lighting Symbol Legend

1. DO NOT SCALE DRAWINGS.

2. RETURN ALL LIGHTING FIXTURES, VENT COVERS, WALL

FIXTURES, AND ALL OTHER GYP MOUNTED ACCESSORIES

TO THEIR ORIGINAL LOCATIONS, SEE ELECTRICAL IN BID

PACK A.

3. ALL GYP THAT WAS REMOVE DURING THE PEX

REPLACEMENT OR DUE TO WATER DAMAGE TO BE

REPLACED WITH NEW GYP BOARD. MUD AND FEATHER GYP

TO REMOVE SEAMS,& PROVIDE CORNER BEADS AS NEEDED.

PAINT & TEXTURE TO MATCH EXISTING.

4. REINSTALL ALL EXIT SIGNS THAT WERE REMOVED DURING

THE RENOVATIONS TO THEIR ORIGINAL LOCATIONS AND

ORIENTATIONS.

2901 Blake Street, Suite 100 Denver, CO 80205

303.861.8555

DPA Project:

Sheet Number:

Sheet Title:

Revisions Date No.

Sheet Information

Project Information

Issuance Date

Consultant(s)

A

B

C

D

E

F

2 3 4 5 6

1 2 3 4 5 6

A

B

C

D

E

F

Stamp

-F eb -2

:5 4:

22808.00.000

A-151.B

AS

U

R

ES

ID

EN

C E

AT

R

EX

PL

U

M B

IN

G

R

EN

O

VA

TI

O

N S:

P H

AS

E

Se le ct iv e

R en ov at io n

-A rc hi te ct ur e

REFLECTED

CEILING PLAN -

LEVEL 01 - AREA

B

02/09/2024BID PACK C

COPYRIGHT © 2022 - DAVIS PARTNERSHIP, P.C.

S

TA

D

IU

M

D R

IV

E

AL

AM

O

SA

, C O

1/8" = 1'-0"B1 RCP - LEVEL 1 - AREA B

Key Value Keynote Text

C01 RE-INSTALL EXISTING CEILING LIGHT FIXTURES, PROVIDE NEW IF DAMAGED;

RE: ELECTRICAL

C03 PROVIDE NEW ACT CEILING

C04 INSTALL NEW 24"X24" CEILING ACCESS PANEL. AT ALL EXISTING 12"X12"

ACCESS PANELS, REFRAME OPENING AND PROVIDE NEW 24" X 24" ACCESS

PANEL.

ADDENDUM #01 03/10/2023 001

YRemy Image

YRemy

H EFGJKLMNP

C.5D.5

R1.2

R2.2

R3.2

RW

SUITE 4A

205A

SUITE 4B

SUITE 4C

205C

SUITE 4D

205D KITCHEN

205F

LIVING

205G

STAIR #8

ST-208

SUITE 4E

205E

TOILET

205J

SINK

205K

SHOWER

205L

BATHROOM

205M

CL

205N

HALL

205P

CORR

REFUGE

ELEC

JAN

212CABLE/TV

215 LOBBY

VOMITORIUM #5

VOMITORIUM #4

STAIR #6

ST-106

SEATING

201W

GRIZZLY CLUB

201X

SEATING

201Y

VOMITORIUM #2

VOMITORIUM #3

STAIR #5

ST-205

STAIR #2

ST-202

ELEV #1

EL-101

C04

C04 EXISTEXIST

EXIST EXIST

EXIST

EXIST

GYP 1

GYP 1 GYP 1 GYP 1

GYP 1

GYP 1

C04 C04

C04

M

AT

C H

LI

N

E A

M

AT

C H

LI

N

E A

NOT IN SCOPE

A

B

N

TRUE

NORTH

N

PROJECT

NORTH

GYPSUM BOARD CEILING

ACOUSTICAL CEILING TILE

ACOUSTICAL CEILING TILE, WASHABLE

ACOUSTICAL CEILING TILE, WOOD SYSTEM

MECHANICAL DIFFUSER (SUPPLY)

MECHANICAL DIFFUSER (RETURN)

EXIT SIGN

CUBICLE CURTAIN TRACK

DPA FINISH MATERIAL TAG

CEILING HEIGHT ABOVE FINISHED FLOOR

ABOVE FLOOR LINE

CENTERLINE

EXPANSION JOINT (EJ)

SHIELDING

Key Plan

Reflected Ceiling Plan Keynotes

Reflected Ceiling Plan Symbol Legend (Note: Not all symbols are used in this project.)

Reflected Ceiling Plan General Notes

RECESSED IN GRADE

STAKE MOUNT ACCENT

BOLLARD

PENDANT

SCONCE

STEP LIGHT

ILLUMINATED MIRROR

RECESSED ADJUSTABLE

RECESSED DOWNLIGHT

RECESSED WALLWASH

SURFACE MOUNT DOWNLIGHT

TRACK HEAD

LINEAR EXTRUSION

Lighting Symbol Legend

1. DO NOT SCALE DRAWINGS.

2. RETURN ALL LIGHTING FIXTURES, VENT COVERS, WALL

FIXTURES, AND ALL OTHER GYP MOUNTED ACCESSORIES

TO THEIR ORIGINAL LOCATIONS, SEE ELECTRICAL IN BID

PACK A.

3. ALL GYP THAT WAS REMOVE DURING THE PEX

REPLACEMENT OR DUE TO WATER DAMAGE TO BE

REPLACED WITH NEW GYP BOARD. MUD AND FEATHER GYP

TO REMOVE SEAMS,& PROVIDE CORNER BEADS AS NEEDED.

PAINT & TEXTURE TO MATCH EXISTING.

4. REINSTALL ALL EXIT SIGNS THAT WERE REMOVED DURING

THE RENOVATIONS TO THEIR ORIGINAL LOCATIONS AND

ORIENTATIONS.

2901 Blake Street, Suite 100 Denver, CO 80205

303.861.8555

DPA Project:

Sheet Number:

Sheet Title:

Revisions Date No.

Sheet Information

Project Information

Issuance Date

Consultant(s)

A

B

C

D

E

F

2 3 4 5 6

1 2 3 4 5 6

A

B

C

D

E

F

Stamp

-F eb -2

:5 4:

22808.00.000

A-152.A

AS

U

R

ES

ID

EN

C E

AT

R

EX

PL

U

M B

IN

G

R

EN

O

VA

TI

O

N S:

P H

AS

E

Se le ct iv e

R en ov at io n

-A rc hi te ct ur e

REFLECTED

CEILING PLAN -

LEVEL 02 - AREA

A

02/09/2024BID PACK C

COPYRIGHT © 2022 - DAVIS PARTNERSHIP, P.C.

S

TA

D

IU

M

D R

IV

E

AL

AM

O

SA

, C O

1/8" = 1'-0"B1 RCP - LEVEL 2 - AREA A

Key Value Keynote Text

C04 INSTALL NEW 24"X24" CEILING ACCESS PANEL. AT ALL EXISTING 12"X12"

ACCESS PANELS, REFRAME OPENING AND PROVIDE NEW 24" X 24" ACCESS

PANEL.

ADDENDUM #01 03/10/2023 001

YRemy Image

YRemy

RU RT RS RR

RP

RN

RM

RL

RK

RJ

RH

RG

RF

RE

RD

RC

RA

R1

R1.2

R2.2

R3.2

R1.1

R2.1

R3.1

R2

R3

RQ

RVRW

RB

SUITE 1A

203A

SUITE 1B

203B

SUITE 1C

203C

SUITE 1D

203D

LIVING

203E

KITCHEN

203F

VEST

203G

TOILET

203H

SINK

203J

SHOWER

203K

CL

203L

HALL

203M

LOBBY

TELECOM

CABLE/TV

JAN

CORR

RA SUITE

204A

ELEC

VEST

204E

BATH

204B

KITCHEN

204D

LIVING

204C

LIVING

205G

SUITE 2A

202A

SUITE 2B

202B

SUITE 2C

202C

SUITE 2D

202D

HALL

202M

TOILET

202H

SINK

202J

SHOWER

202K

CL

202L

LIVING

202E

KITCHEN

202F

STAIR #9

ST-209

BREEZEWAY

SHOWER

201K

CL

201L

SUITE 3A

201A

SUITE 3B

201B

SUITE 3C

201C

SUITE 3D

201D

TOILET

201H

HALL

201M

VEST

201J

WALKWAY

SINK

201G

LIVING

201E

KITCHEN

201F

EXIST

GYP 1

C04

C04

GYP 1GYP 1

EXIST

C04

C04

C04

EXIST

GYP 1

EXIST

ACT 1

ACT 1

EXIST

C04

C04

C04

ACT 1

GYP 1

EXIST

EXIST

?GYP 1

EXIST

GYP 1

GYP 1

EXIST

EXIST

C04

C1

A-550

TYP

C2

A-550

TYP

GYP 1GYP 1

EXIST

C03

C03

C03M

AT

C H

LI

N

E A

M

AT

C H

LI

N

E A

A

B

N

TRUE

NORTH

N

PROJECT

NORTH

GYPSUM BOARD CEILING

ACOUSTICAL CEILING TILE

ACOUSTICAL CEILING TILE, WASHABLE

ACOUSTICAL CEILING TILE, WOOD SYSTEM

MECHANICAL DIFFUSER (SUPPLY)

MECHANICAL DIFFUSER (RETURN)

EXIT SIGN

CUBICLE CURTAIN TRACK

DPA FINISH MATERIAL TAG

CEILING HEIGHT ABOVE FINISHED FLOOR

ABOVE FLOOR LINE

CENTERLINE

EXPANSION JOINT (EJ)

SHIELDING

Key Plan

Reflected Ceiling Plan Keynotes

Reflected Ceiling Plan Symbol Legend (Note: Not all symbols are used in this project.)

Reflected Ceiling Plan General Notes

RECESSED IN GRADE

STAKE MOUNT ACCENT

BOLLARD

PENDANT

SCONCE

STEP LIGHT

ILLUMINATED MIRROR

RECESSED ADJUSTABLE

RECESSED DOWNLIGHT

RECESSED WALLWASH

SURFACE MOUNT DOWNLIGHT

TRACK HEAD

LINEAR EXTRUSION

Lighting Symbol Legend

1. DO NOT SCALE DRAWINGS.

2. RETURN ALL LIGHTING FIXTURES, VENT COVERS, WALL

FIXTURES, AND ALL OTHER GYP MOUNTED ACCESSORIES

TO THEIR ORIGINAL LOCATIONS, SEE ELECTRICAL IN BID

PACK A.

3. ALL GYP THAT WAS REMOVE DURING THE PEX

REPLACEMENT OR DUE TO WATER DAMAGE TO BE

REPLACED WITH NEW GYP BOARD. MUD AND FEATHER GYP

TO REMOVE SEAMS,& PROVIDE CORNER BEADS AS NEEDED.

PAINT & TEXTURE TO MATCH EXISTING.

4. REINSTALL ALL EXIT SIGNS THAT WERE REMOVED DURING

THE RENOVATIONS TO THEIR ORIGINAL LOCATIONS AND

ORIENTATIONS.

2901 Blake Street, Suite 100 Denver, CO 80205

303.861.8555

DPA Project:

Sheet Number:

Sheet Title:

Revisions Date No.

Sheet Information

Project Information

Issuance Date

Consultant(s)

A

B

C

D

E

F

2 3 4 5 6

1 2 3 4 5 6

A

B

C

D

E

F

Stamp

-F eb -2

:5 4:

22808.00.000

A-152.B

AS

U

R

ES

ID

EN

C E

AT

R

EX

PL

U

M B

IN

G

R

EN

O

VA

TI

O

N S:

P H

AS

E

S

TA

D

IU

M D

R

IV

E

AL

AM

O

SA

, C

O

REFLECTED

CEILING PLAN -

LEVEL 02 - AREA

B

02/09/2024BID PACK C

COPYRIGHT © 2022 - DAVIS…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .