ASU Res at Rex Plbg Reno_BID PACKAGES C_Drawings.pdf
PDF 16 MB Posted
- Attached to
- Residence at Rex Domestic Water Line Replacement
- Solicitation number
- ASU 2023-01*
- Issued by
- Alamosa County, Colorado
About this file
These documents are architectural and engineering drawings for the ASU Residence at Rex Plumbing Renovations - Phase 1 project located at 77 Stadium Drive in Alamosa, Colorado. The project involves selective renovation of an existing four-story residential building completed in 2011, with a primary focus on interior repairs of architectural finishes that have sustained water damage and replacement of domestic water supply lines and associated equipment. The renovation is classified as a Level 1 alteration per the 2021 International Existing Building Code (IEBC) throughout most of the building, with a Level 2 alteration in the mechanical room to accommodate new domestic water storage and mixing equipment. The project does not modify the building's square footage or fire ratings, and includes repairs to broken glazing in a specific lounge area.
The project documents indicate a comprehensive renovation approach, with detailed plans for construction phasing, life safety considerations, and specific architectural and plumbing system modifications. The existing building consists of 33,657 square feet of R-2 student residences and 34,218 square feet of A-5 stadium space with 3,897 square feet of A-3 assembly areas. The renovation will involve selective demolition, plumbing line replacements, and targeted architectural repairs while maintaining the building's existing occupancy classifications and structural integrity. The drawings are prepared by Davis Partnership Architects and include extensive technical specifications for wall assemblies, ceiling treatments, and finish materials, suggesting a meticulous approach to maintaining the building's original design standards while addressing critical infrastructure needs.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| SBP-6.14 BidBond (1) (1).docx | DOCX document | |
| SBP-6.133 Unit Pricing (1).docx | DOCX document | |
| ASU Res at Rex Plbg Reno_BID PACKAGES B_Drawings.pdf | ||
| SBP-6.13 Bid Form (1) (1).docx | DOCX document | |
| 2024_02_09 - ASU Res at Rex Plbg Reno_BID PACKAGES_Project Manual.pdf | ||
| SC6.21 DBB A 2024 (1).docx | DOCX document | |
| SBP-6.12 Information for Bidders (2) (1).docx | DOCX document | |
| Addendum 3B - 2024_03_11 - ASU Res at Rex Plbg Reno.pdf | ||
| ASU Res at Rex Plbg Reno_BID PACKAGES A_Drawings.pdf | ||
| SC6.23 DBB GC 2024 (1).docx | DOCX document | |
| AFB-2 Residence at Rex Pex.pdf |
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
2901 Blake Street, Suite 100 Denver, CO 80205
303.861.8555
Issue Date:
Project:
Original Issuance:
08-Feb-24 22:55:28
ASU RESIDENCE AT REX - PLUMBING
RENOVATIONS: PHASE 1
Febuary 09, 2024
77 STADIUM DRIVE
ALAMOSA, CO 81101
22808.00.000
BID PACK C
COPYRIGHT © 2022 - DAVIS PARTNERSHIP, P.C.
Selective Renovation - Architecture
YRemy Image
YRemy Text Box 02-09-2024
X-###
SIM
WALL SECTION
REFERENCE
EXTERIOR ELEVATION
REFERENCE
DIMENSION STRING
DOOR TAG
CENTERLINE
ROOM TAG ROOM NAME
#GRID LABEL - NEW
ELEVATION LABEL
INTERIOR ELEVATION
REFERENCE
8'-2"
AREA TAG AREA NAME
150 SF
INTERIOR PARTITION TYPE TAG
STOREFRONT TAG
NORTH ARROW
GRAPHIC SCALE
X-###
SIM
BUILDING SECTION
REFERENCE
X-###
SIM
SPOT ELEVATION
X-###
# TYP.
REVISION CLOUD
AND TAG
EL = 100'-0"
DETAIL CALLOUT
DETAIL ELEVATION
REFERENCE
CEILING HEIGHT TAG
CURTAIN WALL TAG
EXTERIOR SYSTEM TAG
X-#### #
####X
X-###
VIEW REFERENCE
DETAIL NUMBERING
BATTLESHIP GRID ORDER
A
B
C
D
E
1 2 3 4 5 6
FINISH TAG
KEYNOTE AND LEADER-
TYPE 1
SHADED DETAIL LOCATION
WOULD BE NUMBERED "A2" ON
THE DETAIL SHEET
F15
07 2700 - SHEET
WATERPROOFING
KEYNOTE AND LEADER-
TYPE 2
WINDOW TAG
GRID LABEL - EXISTING #
ARCHITECTURAL SYMBOLS LEGEND
Note: Not all symbols are used in this project.
STANDARD ABBREVIATIONS LEGENDGENERAL NOTES
X-###
1. IF DISCREPANCIES OCCUR BETWEEN DRAWINGS OR BETWEEN THE DRAWINGS
AND SPECIFICATIONS, SUBMIT AN RFI FOR RESOLUTION.
2. DO NOT SCALE THE DRAWINGS. SUBMIT AN RFI IF CRITICAL DIMENSIONS DO NOT
APPEAR ON THE DRAWINGS.
3. THE BUILDING EXTERIOR IS DEFINED BASED ON A SYSTEMS METHODOLOGY.
REFER TO A-700 DRAWING SERIES FOR COMPONENTS THAT COMPRISE EACH
SYSTEM.
4. PROVIDE ISOLATION BETWEEN ALL DISSIMILAR METALS WHERE THEY OCCUR TO
PREVENT ELECTROLYTIC REACTION AND CORROSION.
5. VERIFY EQUIPMENT ROUGH-IN DIMENSIONS WITH MANUFACTURER FOR
EQUIPMENT THAT IS EXISTING, REUSED, OR FURNISHED BY OWNER.
ALIGN
MAXIMUM
MINIMUM
TYPICAL
TO ACCURATELY LOCATE FACE BASED ON ADJACENT ITEMS OR
CONSTRUCTION
THE CONDITION MAY NOT VARY TO A DIMENSION GREATER THAN THAT
SHOWN WITHOUT THE APPROVAL OF THE ARCHITECT
THE CONDITION MAY NOT VARY TO A DIMENSION SMALLER THAN THAT
SHOWN WITHOUT THE APPROVAL OF THE ARCHITECT
THE CONDITION APPLIES TO SAME CONDITIONS THROUGHOUT UNLESS
NOTED OTHERWISE
DEFINITIONS
W#
C#
S#
/1 A-101
10'-10"
N
0' 4' 8' 16' 32'
SCALE: 1/8" = 1'-0"
LEVEL 1
100' - 0"
XX#
Fn2PX
F
EXISTING CONDITION
IMAGE CALLOUT
APPLICABLE BUILDING CODES:
2021 INTERNATIONAL BUILDING CODE (IBC)
2021 INTERNATIONAL EXISTING BUILDING CODE (IEBC)
2021 INTERNATIONAL MECHANICAL CODE (IMC)
2021 INTERNATIONAL ENERGY CONSERVATION CODE (IECC)
2020 NATIONAL ELECTRICAL CODE (NEC) (NFPA 70®)
2018 INTERNATIONAL PLUMBING CODE (IPC)
2018 INTERNATIONAL FUEL GAS CODE (IFGC) FIRST
2021 INTERNATIONAL FIRE CODE (IFC)
NATIONAL FIRE PROTECTION ASSOCIATION STANDARDS (NFPA)
ICC/ANSI A117.1, ACCESSIBLE AND USABLE BUILDINGS AND FACILITIES
CONSTRUCTION TYPE: EXISTING (NOT CHANGED): TYPE II-B, FULLY SPRINKLERED UNDER THE 2006 IBC
LIFE SAFETY SYSTEMS: EXISTING (NOT CHANGED)
OCCUPANCY CLASSIFICATION: EXISTING (NOT CHANGED): R-2 / A-5 / A-3 PER ORIGINAL CONSTRUCTION UNDER THE 2006 IBC
MAX. TRAVEL DISTANCE ALLOWED TO EXIT: EXISTING (NOT CHANGED)
NUMBER OF EXITS REQUIRED: EXISTING (NOT CHANGED)
NUMBER OF EXITS PROVIDED: EXISTING (NOT CHANGED)
PLUMBING FIXTURES: EXISTING (NOT CHANGED)
PROJECT DESCRIPTION:
THIS PROJECT IS FOR EXISTING BUILDING THAT WAS COMPLETED IN 2011. THE SCOPE CONSISTS OF INTERIOR REPAIRS OF ARCHITECTURAL FINISHES THAT HAVE SUSTAINED WATER DAMAGE AND THE REPLACEMENT OF PLUMBING DOMESTIC WATER SUPPLY LINES AND ASSOCIATED EQUIPMENT.
THE EXISTING BUILDING CONSISTS OF 33,657 SQUARE FEET OF R-2 STUDENT RESIDENCES; AND 34,218 SQUARE FEET OF A-5 STADIUM WITH 3,897 SQUARE FEET OF A-3 ASSEMBLY PER THE 2006 IBC. THE SQUARE FOOTAGE AND FIRE RATINGS OF THE BUILDING WILL NOT BE MODIFIED IN ANY WAY.
ADDITIONAL SCOPE ITEMS INCLUDE NEW PLUMBING EQUIPMENT AND A NEW MIXING VALVE THERMOSTAT IN MECHANICAL ROOM #159 AND REPAIRS TO BROKEN
GLAZING IN LOUNGE #412.
THIS PROJECT IS PRIMARILY A LEVEL 1 ALTERATION PER THE 2021 IEBC THROUGHOUT THE WHOLE EXTENTS OF THE EXISTING BUILDING. IT IS A LEVEL 2 ALTERATION PER THE 2021 IEBC AT THE EXISTING MECHANICAL ROOM #159 TO ALLOW FOR NEW DOMESTIC WATER STORAGE TANK (BUFFER TANK), NEW
THERMAL EXPANSION TANK, & NEW DIGITAL WATER MIXING VALVE.
THIS PROJECT DOES NOT INCLUDE DEFERRED SUBMITTALS.
CODE ANALYSIS
2901 Blake Street, Suite 100 Denver, CO 80205
303.861.8555
Location Map
Project Team
Sheet Index
DPA Project:
Sheet Number:
Sheet Title:
Revisions Date No.
Sheet Information
Project Information
Issuance Date
Consultant(s)
Stamp
-F eb -2
:5 5:
OWNER
ADAMS STATE UNIVERSITY
208 EDGEMONT BLVD.
ALAMOSA, CO 81101
719.587.8353
BRUCE DELTONDO
bdeltond@adams.edu
ARCHITECT
DAVIS PARTNERSHIP ARCHITECTS
2901 BLAKE STREET
SUITE 100
DENVER, CO 80205
303.861.8555
BRIAN ERICKSON
brian.erickson@davispartnership.com
MEP ENGINEER
BRIDGERS & PAXTON
1365 GARDEN OF THE GODS RD.
SUITE 260
COLORADO SPRINGS, CO 80907
719.550.5605
STEVE TAYLOR, PE, LEED AP
smtaylor@bpce.com
22808.00.000
G-001 C
AS
U
R
ES
ID
EN
C E
AT
R
EX
PL
U
M B
IN
G
R
EN
O
VA
TI
O
N S:
P H
AS
E
Se le ct iv e
R en ov at io n
-A rc hi te ct ur e
CODE SUMMARY,
SHEET INDEX, &
PROJECT DATA
02/09/2024BID PACK C
COPYRIGHT © 2022 - DAVIS PARTNERSHIP, P.C.
S
TA
D
IU
M
D R
IV
E
AL
AM
O
SA
, C O
ACT ACOUSTICAL CEILING TILE
ADD ADDENDUM
AFF ABOVE FINISHED FLOOR
AL ALUMINUM
ALT ALTERNATE
ALUM ALUMINUM
ANOD ANODIZED
APPROX APPROXIMATE(LY)
ARCH ARCHITECT or ARCHITECTURAL
ASI ARCHITECT'S SUPPLEMENTAL INSTRUCTIONS
AUX AUXILIARY
BLDG BUILDING
BSMT BASEMENT
BTWN BETWEEN
CD CONSTRUCTION DOCUMENTS or CONTRACT DOCUMENTS CJ CONSTRUCTION JOINT or CONTROL JOINT
CLG CEILING
CLR CLEAR
CMU CONCRETE MASONRY UNIT
CONC CONCRETE
CORR CORRIDOR
DBL DOUBLE
DEMO DEMOLISH or DEMOLITION
DF DRINKING FOUNTAIN
DIA DIAMETER
DIM DIMENSION or DIMENSIONAL
DW DISHWASHER
DWG DRAWING
EA EACH
EJ EXPANSION JOINT
ELEC ELECTRIC(AL)
ELEV ELEVATOR
EMER EMERGENCY
EOS EDGE OF SLAB
EQ EQUAL
EQUIP EQUIPMENT
EWC ELECTRIC WATER COOLER
EXIST EXISTING
FD FLOOR DRAIN
FDC FIRE DEPARTMENT CONNECTION
FE FIRE EXTINGUISHER
FEC FIRE EXTINGUISHER CABINET
FFE FURNITURE, FIXTURES AND EQUIPMENT
FHC FIRE HOSE CABINET
GA GAUGE
GALV GALVANIZED
HB HOSE BIBB
HORIZ HORIZONTAL
HT HEIGHT
HVAC HEATING, VENTILATION and AIR CONDITIONING
IBC INTERNATIONAL BUILDING CODE
JAN JANITOR
JT JOINT
L ANGLE
MAX MAXIMUM
MECH MECHANICAL
MEP MECHANICAL, ELECTRICAL and PLUMBING
MEZZ MEZZANINE
MIN MINIMUM
MISC MISCELLANEOUS
MO MASONRY OPENING
NA NOT APPLICABLE
NIC NOT IN CONTRACT
NO. NUMBER
NOTE: FOR ADDITIONAL ABBREVATIONS; REFER TO SPECIFICATION 01 4200 FOR
COMPLETE INDUSTRY STANDARD ABBREVIATION LIST
NRC NOISE REDUCTION COEFFICIENT
NTS NOT TO SCALE
OC ON-CENTER
OPNG OPENING
OPP OPPOSITE
PERIM PERIMETER
PR PAIR or PROPOSAL REQUEST
PSF POUNDS PER SQUARE FOOT
PSI POUNDS PER SQUARE INCH
PT PAINT(ED), POST-TENSIONED SLAB or PRESSURE TREATED
QTY QUANTITY
R RADIUS, RISER or THERMAL RESISTANCE
RCP REFLECTED CEILING PLAN
RD ROAD or ROOF DRAIN RE REFER TO or REFERENCE REV REVISE, REVISED or REVISION
RM ROOM
RO ROUGH OPENING
ROW RIGHT-OF-WAY
RTU ROOFTOP UNIT
SAN SANITARY
SF SQUARE FOOT (FEET)
SHT SHEET
SIM SIMILAR
SPEC SPECIFICATION(S)
SQ SQUARE
STC SOUND TRANSMISSION CLASS
STL STEEL
STOR STORAGE
TO TOP OF
TOC TOP OF CONCRETE
TOP TOP OF PARAPET
TOS TOP OF STEEL
TOW TOP OF WALL
TYP TYPICAL
UNO UNLESS NOTED OTHERWISE
VIF VERIFY IN FIELD
W/ WITH
W/O WITHOUT
WD WOOD
WP WORKING POINT
WT WEIGHT
Code Summary
Sheet Index
PROJECT LOCATION
N
# Name Is su an ce
Sh ee t I ss ue D at e
R ev is io n N am e
R ev is io n D at e
General
G-000 C COVER - BID PACK C BID PACK C 02/09/2024
G-001 C CODE SUMMARY, SHEET INDEX, & PROJECT DATA BID PACK C 02/09/2024 ADDENDUM #02 04/05/2023
G-002 C CONSTRUCTION ACCESS SITE PLAN BID PACK C 02/09/2024
G-101 C CONSTRUCTION PHASE PLAN - LEVEL 01 & LEVEL 02 BID PACK C 02/09/2024 ADDENDUM #02 04/05/2023 G-102 C CONSTRUCTION PHASE PLAN - LEVEL 03 & LEVEL 04 BID PACK C 02/09/2024 ADDENDUM #02 04/05/2023
Life Safety
LS-101 C LIFE SAFETY PLAN - LEVEL 01 & LEVEL 02 BID PACK C 02/09/2024
LS-102 C LIFE SAFETY PLAN - LEVEL 03 & LEVEL 04 BID PACK C 02/09/2024
Architectural
A-101.A FLOOR PLAN - LEVEL 01 - AREA A BID PACK C 02/09/2024
A-101.B FLOOR PLAN - LEVEL 01 - AREA B BID PACK C 02/09/2024
A-102.A FLOOR PLAN - LEVEL 02 - AREA A BID PACK C 02/09/2024
A-102.B FLOOR PLAN - LEVEL 02 - AREA B BID PACK C 02/09/2024
A-103.A FLOOR PLAN - LEVEL 03 - AREA A BID PACK C 02/09/2024
A-103.B FLOOR PLAN - LEVEL 03 - AREA B BID PACK C 02/09/2024
A-104.A FLOOR PLAN - LEVEL 04 - AREA A BID PACK C 02/09/2024
A-104.B FLOOR PLAN - LEVEL 04 - AREA B BID PACK C 02/09/2024
A-151.A REFLECTED CEILING PLAN - LEVEL 01 - AREA A BID PACK C 02/09/2024 ADDENDUM #01 03/10/2023 A-151.B REFLECTED CEILING PLAN - LEVEL 01 - AREA B BID PACK C 02/09/2024 ADDENDUM #01 03/10/2023 A-152.A REFLECTED CEILING PLAN - LEVEL 02 - AREA A BID PACK C 02/09/2024 ADDENDUM #01 03/10/2023 A-152.B REFLECTED CEILING PLAN - LEVEL 02 - AREA B BID PACK C 02/09/2024 ADDENDUM #01 03/10/2023 A-153.A REFLECTED CEILING PLAN - LEVEL 03 - AREA A BID PACK C 02/09/2024 ADDENDUM #01 03/10/2023 A-153.B REFLECTED CEILING PLAN - LEVEL 03 - AREA B BID PACK C 02/09/2024 ADDENDUM #01 03/10/2023 A-154.A REFLECTED CEILING PLAN - LEVEL 04 - AREA A BID PACK C 02/09/2024 ADDENDUM #01 03/10/2023 A-154.B REFLECTED CEILING PLAN - LEVEL 04 - AREA B BID PACK C 02/09/2024 ADDENDUM #01 03/10/2023 A-550 INTERIOR DETAILS, FINISH SCHEDULE, & WINDOW ELEVATION BID PACK C 02/09/2024
ADDENDUM #01 03/10/2023 001
ADDENDUM #02 04/05/2023 002
YRemy Image
YRemy
DNDN
DN
DN
DN
FD
FD
REF.FD
FD
REF.
DN
R
EF
.REF. FD
FD
FD
FD
FD
FD
FD
FD
FD
FD
FD
FDDN
DN
R
EF
.DN
REF.
REF.
REF.
REF.
REF.
REF.
REF.
REF.
REF.
REF.
REF.
REF.
REF.
FD
FD
FDFD
FD
V A N
VAN
10 20 03 04 05 40 30 20 10
03 04 05 40 30 20 10
C O
C O
C O
C O
C O x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x
PUBLIC ACCESS TO
REMAIN FOR
PEDESTRIAN AND
MAINTENANCE
VEHICLES.
TEMP CONSTRUCTION AREA FENCE
(Field office, staging/layout, dumpster)
NO CONSTRUCTION PARKING
PROTECT LANDSCAPING
CONSTRUCTION PARKING
SITE ACCESS LEGEND
2901 Blake Street, Suite 100 Denver, CO 80205
303.861.8555
DPA Project:
Sheet Number:
Sheet Title:
Revisions Date No.
Sheet Information
Project Information
Issuance Date
Consultant(s)
A
B
C
D
E
F
2 3 4 5 6
1 2 3 4 5 6
A
B
C
D
E
F
Stamp
-F eb -2
:5 5:
22808.00.000
G-002 C
AS
U
R
ES
ID
EN
C E
AT
R
EX
PL
U
M B
IN
G
R
EN
O
VA
TI
O
N S:
P H
AS
E
Se le ct iv e
R en ov at io n
-A rc hi te ct ur e
CONSTRUCTION
ACCESS SITE
PLAN
02/09/2024BID PACK C
COPYRIGHT © 2022 - DAVIS PARTNERSHIP, P.C.
S
TA
D
IU
M
D R
IV
E
AL
AM
O
SA
, C O
1" = 30'-0"B1 CONSTRUCTION ACCESS SITE PLAN CONSTRUCTION PARKING DIAGRAM
OVERFLOW
PARKING
O
VE
R
FL
O W
PA
R
KI
N G
C
IT
Y
PA
R
KI
N G
CITY PARKING
YRemy Image
YRemy
UP
UP
UP
UP
UP
UP
FD
FD
DN
UP
FD
DN
DN
UP
FD
UP
DN
UP UP
UP
DN
UP
FD
FD
FD
FD
FD
FD
AREA A AREA B
AREA A AREA B
AREA OF CONSTRUCTION PHASE #2
AREA OF CONSTRUCTION PHASE #1
NOT IN SCOPE
AREA A AREA B
AREA A AREA B
AREA OF CONSTRUCTION PHASE #1
CONSTRUCTION PHASE NOTES & DESCRIPTIONS
NOTE:
CONTRACTOR TO PRICE PHASE #1 & #2 SEPARATELY.
PHASE #1
INCLUDES ALL WORK ON THE
RESIDENTIAL SIDE OF THE BUILDING
AND THE MAIN MECHANICAL ROOM
UPGRADES ON THE STADIUM SIDE.
PHASE #2
INCLUDES ALL REMAINING WORK ON
THE STADIUM SIDE OF THE BUILDING.
2901 Blake Street, Suite 100 Denver, CO 80205
303.861.8555
DPA Project:
Sheet Number:
Sheet Title:
Revisions Date No.
Sheet Information
Project Information
Issuance Date
Consultant(s)
A
B
C
D
E
F
2 3 4 5 6
1 2 3 4 5 6
A
B
C
D
E
F
Stamp
-F eb -2
:5 6:
22808.00.000
G-101 C
AS
U
R
ES
ID
EN
C E
AT
R
EX
PL
U
M B
IN
G
R
EN
O
VA
TI
O
N S:
P H
AS
E
Se le ct iv e
R en ov at io n
-A rc hi te ct ur e
CONSTRUCTION
PHASE PLAN -
LEVEL 01 & LEVEL
02/09/2024BID PACK C
COPYRIGHT © 2022 - DAVIS PARTNERSHIP, P.C.
S
TA
D
IU
M
D R
IV
E
AL
AM
O
SA
, C O
1/16" = 1'-0"A1 CONSTRUCTION PHASE PLAN - LEVEL 01
1/16" = 1'-0"C1 CONSTRUCTION PHASE PLAN - LEVEL 02
ADDENDUM #02 04/05/2023 001
YRemy Image
YRemy
UP DN UPDN
DN
UP
FD
FD
FD
FD
FD
DN DN UP
DN
FD
DN
DN
FD
FD
FD
FD
AREA A AREA B
AREA A AREA B
AREA OF CONSTRUCTION PHASE #2
AREA OF CONSTRUCTION PHASE #1
NOT IN SCOPE
AREA A AREA B
AREA A AREA B
AREA OF CONSTRUCTION PHASE #1
AREA OF CONSTRUCTION PHASE #2
NOT IN SCOPE
CONSTRUCTION PHASE NOTES & DESCRIPTIONS
NOTE:
CONTRACTOR TO PRICE PHASE #1 & #2 SEPARATELY.
PHASE #1
INCLUDES ALL WORK ON THE
RESIDENTIAL SIDE OF THE BUILDING
AND THE MAIN MECHANICAL ROOM
UPGRADES ON THE STADIUM SIDE.
PHASE #2
INCLUDES ALL REMAINING WORK ON
THE STADIUM SIDE OF THE BUILDING.
2901 Blake Street, Suite 100 Denver, CO 80205
303.861.8555
DPA Project:
Sheet Number:
Sheet Title:
Revisions Date No.
Sheet Information
Project Information
Issuance Date
Consultant(s)
A
B
C
D
E
F
2 3 4 5 6
1 2 3 4 5 6
A
B
C
D
E
F
Stamp
-F eb -2
:5 6:
22808.00.000
G-102 C
AS
U
R
ES
ID
EN
C E
AT
R
EX
PL
U
M B
IN
G
R
EN
O
VA
TI
O
N S:
P H
AS
E
Se le ct iv e
R en ov at io n
-A rc hi te ct ur e
CONSTRUCTION
PHASE PLAN -
LEVEL 03 & LEVEL
02/09/2024BID PACK C
COPYRIGHT © 2022 - DAVIS PARTNERSHIP, P.C.
S
TA
D
IU
M
D R
IV
E
AL
AM
O
SA
, C O
1/16" = 1'-0"A1 CONSTRUCTION PHASE PLAN - LEVEL 03
1/16" = 1'-0"C1 CONSTRUCTION PHASE PLAN - LEVEL 04
ADDENDUM #02 04/05/2023 001
YRemy Image
YRemy
UP
UP
UP
UP
UP
FD
FD
DN
UP
FD
DN
DN
UP
FD
UP
DN
UP UP
UP
DN
UP
FD
FD
FD
FD
FD
FD
LIFE SAFETY LEGEND
EXIT
EXISTING EXIT DISCHARGE
EXISTING EXIT ACCESS
LIFE SAFETY GENERAL NOTES
1. THE SCOPE OF WORK REQUIRED FOR THIS
PROJECT WILL NOT MODIFY ANY EXISTING EGRESS
PATHS OR OCCUPANCY LOADS.
2. THE LIFE SAFETY PLANS HAVE BEEN PROVIDED AS
REFERENCE FOR WALL RATING LOCATIONS.
3. THE CONTRACTOR IS RESPONSIBLE FOR ENSURING
THE WALL RATINGS REMAIN UNCHANGED AFTER
THE PLUMBING REPAIRS AND OTHER SCOPE ITEMS
INCLUDED IN THIS PROJECT HAVE BEEN
COMPLETED.
4. IF THE EXISTING CONDITIONS ARE FOUND TO BE
DIFFERENT FROM THE RATINGS SHOWN ON THE
LIFE SAFETY PLANS AND THE CORESPONDING
WALL REPAIR DETAILS ON SHEET A-550, THE
CONTRACTOR IS RESPONSIBLE FOR INFORMING
THE ARCHITECT OF THE DISCREPANCY TO OBTAIN
CLARIFICATION BEFORE THE REPAIRS ARE
FINALIZED.
1HREXISTING
FIRE PARTITION
(c)
FIRE RATED WALL LEGEND
EXISTING
FIRE WALL 2HR
EXISTING
FIRE BARRIER
FI
R
E / S
M
KE
RA
TI
NG
M
O
DI
FI
ER
S
NO
N-
RA
TE
D
SMOKE PARTITION (V)
EXISTING WALL
(HALFTONE)
2HR
1HR
1HR
EXISTING
FIRE BARRIER -
MIXED OCCUPANCY
SEPERATION
EXIT
EX
IT
EXIT
EXIT
EXIT
EXISTING
1-HOUR RATED LID ON STORAGE
ROOM UNDER STAIR LANDING
PER IBC 2006 SECTION 1009.5.3.
EX
IT
EX
IT
EX
IT
EXITEX
IT
EXIT
EX
IT
EXIT
EX
IT
EX
IT
EXIT
EXISTING
INCIDENTAL USE AREA PER IBC 2006
TABLE 508.2 AND SECTION 508.2.2.1.
EXIT
EXISTING
1-HOUR RATED LID ON EQUIP.
STORAGE ROOM AND
VESTIBULE UNDER STAIR
LANDING PER IBC 2006 SECTION
1009.5.3.
EXISTING
1-HOUR LID ON FIRE PUMP ROOM PER
NFPA-20, EXCEPTION 2.
EX
IT
EX
IT
EX
IT
EXISTING
2-HOUR FIRE-
RATED SHAFT
WALLS
EXISTING
1-HOUR SMOKE BARRIER LID ON MECH ROOM.
EXISTING
2-HOUR LID ON EXIT
VESTIBULE
EXISTING
1-HOUR SMOKE BARRIER
LID ON LAUNDRY ROOM.
EXISTING
1-HOUR FIRE-RATED LID
ON ELEC. / MECH. ROOM.
EXISTING
2-HOUR LID TO CLOSE
AND MAINTAIN STAIR
ENCLOSURE RATING
AT FLOOR ABOVE.
EISTING
2-HOUR FIRE-
RATED WALL
EXISTING
2-HOUR FIRE-
RATED LID
EXISTING
2-HOUR FIRE-RATED WALL
EXISTING
2-HOUR FIRE-RATED
SHAFT WALLS
EXISTING
2-HOUR FIRE-RATED
SHAFT WALLS
EXISTING
2-HOUR FIRE-RATED
SHAFT WALLS
EXISTING
2-HOUR FIRE-RATED
SHAFT WALLS
EXISTING
2-HOUR FIRE-RATED
SHAFT WALLS
EXISTING
2-HOUR FIRE-RATED
SHAFT WALLS
EXISTING
2-HOUR RATED LID UNDER
LANDING ABOVE TO ENCLOSE
PIPE PENETRATIONS
THROUGH STAIR.
EXIT
EXIT
EXIT
EXIT
EXIT
EXIT
EXISTING
2-HOUR FIRE-RATED
SHAFT WALLS
EXISTING
2-HOUR FIRE-RATED
SHAFT WALLS
EXISTING
2-HOUR FIRE-RATED
SHAFT WALLS
EXISTING
2-HOUR FIRE-RATED
SHAFT WALLS
EXISTING
2-HOUR FIRE-
RATED SHAFT
WALLS
EXISITING
2-HOUR FIRE-RATED
SHAFT WALLS
EXISTING
2-HOUR FIRE-RATED
SHAFT WALLS
EXISTING
2-HOUR FIRE-RATED
SHAFT WALLS
EXISTING
2-HOUR RATED LID UNDER
LANDING ABOVE TO ENCLOSE PIPE
PENETRATIONS THROUGH STAIR.
EXISTING
1/2-HOUR FIRE-
RATED FLOOR
EXISTING
1/2-HOUR FIRE-
RATED FLOOR
EXISTING
1-HOUR FIRE-RATED FLOOR
UNDER APARTMENT AND
CABLE/TV ROOM, THIS
LOCATION ONLY
2901 Blake Street, Suite 100 Denver, CO 80205
303.861.8555
DPA Project:
Sheet Number:
Sheet Title:
Revisions Date No.
Sheet Information
Project Information
Issuance Date
Consultant(s)
A
B
C
D
E
F
2 3 4 5 6
1 2 3 4 5 6
A
B
C
D
E
F
Stamp
-F eb -2
:5 7:
22808.00.000
LS-101
C
AS
U
R
ES
ID
EN
C E
AT
R
EX
PL
U
M B
IN
G
R
EN
O
VA
TI
O
N S:
P H
AS
E
Se le ct iv e
R en ov at io n
-A rc hi te ct ur e
LIFE SAFETY
PLAN - LEVEL 01 &
LEVEL 02
02/09/2024BID PACK C
COPYRIGHT © 2022 - DAVIS PARTNERSHIP, P.C.
S
TA
D
IU
M
D R
IV
E
AL
AM
O
SA
, C O
1/16" = 1'-0"A1 LIFE SAFETY PLAN - LEVEL 01
1/16" = 1'-0"C1 LIFE SAFETY PLAN - LEVEL 02
YRemy Image
YRemy
UP DN UPDN
DN
UP
FD
FD
FD
FD
FD
DN DN UP
DN
FD
DN
DN
FD
FD
FD
FD
LIFE SAFETY LEGEND
EXIT
EXISTING EXIT DISCHARGE
EXISTING EXIT ACCESS
LIFE SAFETY GENERAL NOTES
1. THE SCOPE OF WORK REQUIRED FOR THIS
PROJECT WILL NOT MODIFY ANY EXISTING EGRESS
PATHS OR OCCUPANCY LOADS.
2. THE LIFE SAFETY PLANS HAVE BEEN PROVIDED AS
REFERENCE FOR WALL RATING LOCATIONS.
3. THE CONTRACTOR IS RESPONSIBLE FOR ENSURING
THE WALL RATINGS REMAIN UNCHANGED AFTER
THE PLUMBING REPAIRS AND OTHER SCOPE ITEMS
INCLUDED IN THIS PROJECT HAVE BEEN
COMPLETED.
4. IF THE EXISTING CONDITIONS ARE FOUND TO BE
DIFFERENT FROM THE RATINGS SHOWN ON THE
LIFE SAFETY PLANS AND THE CORESPONDING
WALL REPAIR DETAILS ON SHEET A-550, THE
CONTRACTOR IS RESPONSIBLE FOR INFORMING
THE ARCHITECT OF THE DISCREPANCY TO OBTAIN
CLARIFICATION BEFORE THE REPAIRS ARE
FINALIZED.
1HREXISTING
FIRE PARTITION
(c)
FIRE RATED WALL LEGEND
EXISTING
FIRE WALL 2HR
EXISTING
FIRE BARRIER
FI
R
E / S
M
KE
RA
TI
NG
M
O
DI
FI
ER
S
NO
N-
RA
TE
D
SMOKE PARTITION (V)
EXISTING WALL
(HALFTONE)
2HR
1HR
1HR
EXISTING
FIRE BARRIER -
MIXED OCCUPANCY
SEPERATION
EXIT
EXIT
EXIT
EXIT
EX
IT
EX
IT
EXIT
EXIT
EXIT
EXISTING
2-HOUR FIRE-RATED
SHAFT WALLS
EXISTING
2-HOUR FIRE-RATED
SHAFT WALLS
EXISTING
2-HOUR FIRE-RATED
SHAFT WALLS
EXISTING
2-HOUR FIRE-RATED
SHAFT WALLS
EXISTING
2-HOUR FIRE-
RATED SHAFT
WALLS
EXISTING
2-HOUR FIRE-RATED
SHAFT WALLS
EXISTING
2-HOUR FIRE-RATED
SHAFT WALLS
EXISTING
2-HOUR FIRE-RATED
SHAFT WALLS
EXISTING
ADA COMPLIANT UNIT
EXISTING
2-HOUR RATED LID UNDER LANDING
ABOVE TO ENCLOSE PIPE
PENETRATIONS THROUGH STAIR.
EXISTING
2-HOUR FIRE-RATED
SHAFT WALLS
EXISTING
1/2-HOUR FIRE-
RATED FLOOR
EXISTING
1/2-HOUR FIRE-
RATED FLOOR
EXIT
EXIT
EXIT
EXIT
EXITEXIT
EX
IT
EX
IT
EXITEXIT
EXISTING
INCIDENTAL USE AREA PER
IBC 2006 TABLE 508.2 AND
SECTION 508.2.2.1.
OPEN TO
BELOW
EXISTING
2-HOUR FIRE-RATED
SHAFT WALLS
EXISTING
2-HOUR FIRE-RATED
SHAFT WALLS
EXISTING
2-HOUR FIRE-RATED
SHAFT WALLS
EXISTING
2-HOUR FIRE-RATED
SHAFT WALLS
EXISTING
2-HOUR FIRE-RATED
SHAFT WALLS
EXISTING
2-HOUR FIRE-RATED
SHAFT WALLS
EXISTING
2-HOUR FIRE-RATED
SHAFT WALLS
EXISTING
2-HOUR FIRE-RATED
SHAFT WALLS
2-HOUR FIRE-RATED
SHAFT WALLS
EXISTING
2-HOUR FIRE-RATED
SHAFT WALLS
EXISTING
ADA COMPLIANT UNITS
EXISTING
2-HOUR RATED LID UNDER
LANDING ABOVE TO ENCLOSE PIPE
PENETRATIONS THROUGH STAIR.
EXISTING
2-HOUR FIRE-RATED
SHAFT WALLS
NOTE:
EXISTING
ROOF IS NOT REQUIRED
TO BE FIRE -RATED.
EXISTING
1/2-HOUR FIRE-RATED FLOOR
EXCEPT AS FOLLOWS:
1-HOUR FIRE-RATED FLOOR AT
APARTMENTS AND WALKWAY
LOCATED BETWEEN GRID
LINES 4 AND 6, A AND F
EXISTING
1/2-HOUR FIRE-
RATED FLOOR
2901 Blake Street, Suite 100 Denver, CO 80205
303.861.8555
DPA Project:
Sheet Number:
Sheet Title:
Revisions Date No.
Sheet Information
Project Information
Issuance Date
Consultant(s)
A
B
C
D
E
F
2 3 4 5 6
1 2 3 4 5 6
A
B
C
D
E
F
Stamp
-F eb -2
:5 7:
22808.00.000
LS-102
C
AS
U
R
ES
ID
EN
C E
AT
R
EX
PL
U
M B
IN
G
R
EN
O
VA
TI
O
N S:
P H
AS
E
Se le ct iv e
R en ov at io n
-A rc hi te ct ur e
LIFE SAFETY
PLAN - LEVEL 03 &
LEVEL 04
02/09/2024BID PACK C
COPYRIGHT © 2022 - DAVIS PARTNERSHIP, P.C.
S
TA
D
IU
M
D R
IV
E
AL
AM
O
SA
, C O
1/16" = 1'-0"A1 LIFE SAFETY PLAN - LEVEL 03
1/16" = 1'-0"C1 LIFE SAFETY PLAN - LEVEL 04
YRemy Image
YRemy
UP
UP
UP
UPUP
UP
A
B
CD
H EFGJKLMNP
C.5D.5
RW
GAMEDAY
LOCKER B
GAMEDAY
LOCKER A
TRAINING
SHOWER
TOILET
WOMEN #1
OFFICIALS
LOCKER
ELEC. / MECH.
VEST
VEST
EQUIP STOR
CONCOURSE
STAIR #5
ST-105
STAIR #2
ST-102
ELEV MACH
ELEV #1
EL-101
EQUIP STOR
CORRIDOR
WOMEN #2
TOILET
TRAINING
SHOWER
CL
CL
CORRIDOR
STAIR #6
ST-106
LAUNDRY
ELEV MACH
CUSTODIAL
MECH ROOM
VEST
STAIR #8
ST-108
WATER ENTRY
FIRE PUMP
STOR
F01
MEN
UNISEX
CORRIDOR
STAIR #3
ST-103
PANTRY
SOFT GOODS
CONCESSIONS
CONCESSIONS
STAIR #4
ST-104
UNISEX
MEN
CONCOURSE
TICKETS
RAMP #2
R-102
CORRIDOR
180CORRIDOR
F16 F17
F18
F01F19
F02
F20
F20
F20
F20
F20
F20
D23
F20
F20
F20
F20
F20
F20
F20 F20
M
AT
C H
LI
N
E A
M
AT
C H
LI
N
E A
NOT IN SCOPE
EXISTING INTERIOR PARTITION WALL OR SHAFT WALL TO REMAIN.
REFER TO LIFE SAFETY PLANS FOR EXTENT OF FIRE RATED AND
SHAFT WALLS.
FINISH REPAIRS
ABOVE FLOOR LINE
CENTERLINE
NOT IN CONTRACT or BY OWNER EQUIPMENT
Key Plan
Plan Keynotes
Plan Legend (Note: Not all symbols are used in this project.)
Plan General Notes
1. DO NOT SCALE DRAWINGS.
2. PROVIDE AND INSTALL NEW VINYL WALL BASE AT ALL
AREAS OF PEX REPLACEMENT AND WATER DAMAGE WHERE
GYP IS BEING REPLACED WITHIN 1'-0" OF THE FFE.
3. RETURN ALL LIGHTING FIXTURES, VENT COVERS, WALL
FIXTURES, AND ALL OTHER GYP MOUNTED ACCESSORIES
TO THEIR ORIGINAL LOCATIONS, SEE ELECTRICAL IN BID
PACK A.
4. ALL GYP THAT WAS REMOVE DURING THE PEX
REPLACEMENT OR DUE TO WATER DAMAGE TO BE
REPLACED WITH NEW GYP BOARD. MUD AND FEATHER GYP
TO REMOVE SEAMS,& PROVIDE CORNER BEADS AS NEEDED.
PAINT & TEXTURE TO MATCH EXISTING.
A
B
N
TRUE
NORTH
N
PROJECT
NORTH
2901 Blake Street, Suite 100 Denver, CO 80205
303.861.8555
DPA Project:
Sheet Number:
Sheet Title:
Revisions Date No.
Sheet Information
Project Information
Issuance Date
Consultant(s)
A
B
C
D
E
F
2 3 4 5 6
1 2 3 4 5 6
A
B
C
D
E
F
Stamp
-F eb -2
:5 4:
22808.00.000
A-101.A
AS
U
R
ES
ID
EN
C E
AT
R
EX
PL
U
M B
IN
G
R
EN
O
VA
TI
O
N S:
P H
AS
E
Se le ct iv e
R en ov at io n
-A rc hi te ct ur e
FLOOR PLAN -
LEVEL 01 - AREA
A
02/09/2024BID PACK C
COPYRIGHT © 2022 - DAVIS PARTNERSHIP, P.C.
S
TA
D
IU
M
D R
IV
E
AL
AM
O
SA
, C O
1/8" = 1'-0"B1 FLOOR PLAN - LEVEL 1 - AREA A
Key Value Keynote Text
D23 TOOTH OUT CMU AS REQUIRED FOR PEX REPLACEMENT; SEE PLUMBING.
ASSUME 16" X 16" TOOTHED OUT FACE OF CMU TO ALLOW FOR ACCESS AT
ALL PLUMBING PENETRATIONS TO BE REPLACED IN EXISTING CMU WALLS.
F01 PROVIDE NEW GYP, INSULATION (WHERE PRESENT), AND RESILIENT BASE
OVER EXISTING FRAMING. PATCH, TEXTURE, & PAINT GYP TO MATCH
ADJACENT FINISHES. PROVIDE FIRE CAULKING AT ALL WALL PENETRATIONS
TO MATCH EXISTING WALL'S FIRE RATING, SEE LIFE SAFETY PLANS.
F02 NEW VINYL WALL BASE AS REQUIRED AT GYP BOARD REPAIR
F16 NEW DIGITAL WATER MIXING VALVE; SEE PLUMBING & ELECTRICAL
F17 NEW THERMAL EXPANSION TANK; SEE PLUMBING
F18 NEW DOMESTIC WATER STORAGE TANK (BUFFER TANK); SEE PLUMBING
F19 REINSTALL SALVAGED METAL WALL PLATE COVER WHERE PRESENT
F20 TOOTH IN CMU AS REQUIRED FOR PEX REPLACEMENT; SEE PLUMBING.
PROVIDE FIRE CAULKING AT ALL WALL PENETRATIONS TO MATCH EXISTING
WALL'S FIRE RATING, SEE LIFE SAFETY PLANS. REPAIR AND PAINT TO
MATCH ADJACENT FINISHES.
YRemy Image
YRemy
DN
FD
DN
REF.
REF.
REF.
FD
A
RU RT RS RR
RP
RN
RM
RL
RK
RJ
RH
RG
RF
RE
RD
RC
RA
R1
R1.2
R2.2
R3.2
R1.1
R2.1
R3.1
R2
R3
RQ
RVRW
RB
VEST
EQUIP STOR
LOBBY
VEST
103G
VEST
102G
BREEZEWAY
STAIR #9
ST-109
VEST
101J
LAUNDRY
ELEV MACH
SUITE 1A
103A
SUITE 1B
103B
SUITE 1C
103C
SUITE 1D
103D
LIVING
103E
CL
103L
SHOWER
103K
SINK
103J TOILET
103H
HALL
103M
KITCHEN
103F
ELEV #2
TELECOM
SUITE 2A
102A
SUITE 2B
102B
SUITE 2C
102C
SUITE 2D
102D
LIVING
102ESHOWER
102K
CL
102L
HALL
102M
SINK
102J
TOILET
102H
KITCHEN
102F
SUITE 3A
101A
SUITE 3B
101B
SUITE 3C
101C
SUITE 3D
101D
LIVING
101E
KITCHEN
101F
TOILET
101H
SINK
101G
HALL
101M
SHOWER
101K
CL
101L
STOR
F01
F01
F01
F01 F01
F04F01
F04 F01
F01
F01
E2
A-550
TYP
E1
A-550
TYP
F06
F01
F04
F01
F05
F01
F01
F01
F01
F01
F04
F04
F01
F01
F01
F06
F01
F06
F09
E4
A-550
TYP
F09
F09
F09
M
AT
C H
LI
N
E A
M
AT
C H
LI
N
E A
N O
T
IN
S C
O
PE
EXISTING INTERIOR PARTITION WALL OR SHAFT WALL TO REMAIN.
REFER TO LIFE SAFETY PLANS FOR EXTENT OF FIRE RATED AND
SHAFT WALLS.
FINISH REPAIRS
ABOVE FLOOR LINE
CENTERLINE
NOT IN CONTRACT or BY OWNER EQUIPMENT
Key Plan
Plan Keynotes
Plan Legend (Note: Not all symbols are used in this project.)
Plan General Notes
1. DO NOT SCALE DRAWINGS.
2. PROVIDE AND INSTALL NEW VINYL WALL BASE AT ALL
AREAS OF PEX REPLACEMENT AND WATER DAMAGE WHERE
GYP IS BEING REPLACED WITHIN 1'-0" OF THE FFE.
3. RETURN ALL LIGHTING FIXTURES, VENT COVERS, WALL
FIXTURES, AND ALL OTHER GYP MOUNTED ACCESSORIES
TO THEIR ORIGINAL LOCATIONS, SEE ELECTRICAL IN BID
PACK A.
4. ALL GYP THAT WAS REMOVE DURING THE PEX
REPLACEMENT OR DUE TO WATER DAMAGE TO BE
REPLACED WITH NEW GYP BOARD. MUD AND FEATHER GYP
TO REMOVE SEAMS,& PROVIDE CORNER BEADS AS NEEDED.
PAINT & TEXTURE TO MATCH EXISTING.
A
B
N
TRUE
NORTH
N
PROJECT
NORTH
2901 Blake Street, Suite 100 Denver, CO 80205
303.861.8555
DPA Project:
Sheet Number:
Sheet Title:
Revisions Date No.
Sheet Information
Project Information
Issuance Date
Consultant(s)
A
B
C
D
E
F
2 3 4 5 6
1 2 3 4 5 6
A
B
C
D
E
F
Stamp
-F eb -2
:5 4:
22808.00.000
A-101.B
AS
U
R
ES
ID
EN
C E
AT
R
EX
PL
U
M B
IN
G
R
EN
O
VA
TI
O
N S:
P H
AS
E
Se le ct iv e
R en ov at io n
-A rc hi te ct ur e
FLOOR PLAN -
LEVEL 01 - AREA
B
02/09/2024BID PACK C
COPYRIGHT © 2022 - DAVIS PARTNERSHIP, P.C.
S
TA
D
IU
M
D R
IV
E
AL
AM
O
SA
, C O
1/8" = 1'-0"B1 FLOOR PLAN - LEVEL 1 - AREA B
Key Value Keynote Text
F01 PROVIDE NEW GYP, INSULATION (WHERE PRESENT), AND RESILIENT BASE
OVER EXISTING FRAMING. PATCH, TEXTURE, & PAINT GYP TO MATCH
ADJACENT FINISHES. PROVIDE FIRE CAULKING AT ALL WALL PENETRATIONS
TO MATCH EXISTING WALL'S FIRE RATING, SEE LIFE SAFETY PLANS.
F04 NEW MIRROR AND ALUMINUM J-CHANNELS
F05 NEW FRP WALL COVERING AS REQUIRED
F06 RE-INSTALL SHOWER HEAD
F09 RE-INSTALL SOLID SURFACE COUNTERTOP & SINK, BASE CABINET, & UPPER
CABINET. PROVIDE CAULKING AS REQUIRED
YRemy Image
YRemy
UP UP
DN
DN
DN
DN
UP
R
EF
DNDN
FD
FD
DN
A
BCD
H EFGJKLMNP
C.5D.5
RW
JAN
CABLE/TV
CORR
LIVING
205G
SUITE 4A
205A
SUITE 4B
SUITE 4C
205C SUITE 4D
205D
KITCHEN
205F
LIVING
205G
STAIR #8
ST-208
SUITE 4E
205E
TOILET
205J
SINK
205KSHOWER
205L
BATHROOM
205M
CL
205N
HALL
205P
REFUGE
STAIR #2
ST-202
ELEV #1
EL-101
STAIR #5
ST-205
SEATING
201Y
GRIZZLY CLUB
201X
SEATING
201W
STAIR #6
ST-106
VOMITORIUM #4
VOMITORIUM #3
VOMITORIUM #2
VOMITORIUM #1
VOMITORIUM #5
F01
F01
F04
F01
F01
F05
F01
F01
F01
F01
F04
F05
F01
F06
F09
F09
M
AT
C H
LI
N
E A
M
AT
C H
LI
N
E A
NOT IN SCOPE
EXISTING INTERIOR PARTITION WALL OR SHAFT WALL TO REMAIN.
REFER TO LIFE SAFETY PLANS FOR EXTENT OF FIRE RATED AND
SHAFT WALLS.
FINISH REPAIRS
ABOVE FLOOR LINE
CENTERLINE
NOT IN CONTRACT or BY OWNER EQUIPMENT
Key Plan
Plan Keynotes
Plan Legend (Note: Not all symbols are used in this project.)
Plan General Notes
1. DO NOT SCALE DRAWINGS.
2. PROVIDE AND INSTALL NEW VINYL WALL BASE AT ALL
AREAS OF PEX REPLACEMENT AND WATER DAMAGE WHERE
GYP IS BEING REPLACED WITHIN 1'-0" OF THE FFE.
3. RETURN ALL LIGHTING FIXTURES, VENT COVERS, WALL
FIXTURES, AND ALL OTHER GYP MOUNTED ACCESSORIES
TO THEIR ORIGINAL LOCATIONS, SEE ELECTRICAL IN BID
PACK A.
4. ALL GYP THAT WAS REMOVE DURING THE PEX
REPLACEMENT OR DUE TO WATER DAMAGE TO BE
REPLACED WITH NEW GYP BOARD. MUD AND FEATHER GYP
TO REMOVE SEAMS,& PROVIDE CORNER BEADS AS NEEDED.
PAINT & TEXTURE TO MATCH EXISTING.
A
B
N
TRUE
NORTH
N
PROJECT
NORTH
2901 Blake Street, Suite 100 Denver, CO 80205
303.861.8555
DPA Project:
Sheet Number:
Sheet Title:
Revisions Date No.
Sheet Information
Project Information
Issuance Date
Consultant(s)
A
B
C
D
E
F
2 3 4 5 6
1 2 3 4 5 6
A
B
C
D
E
F
Stamp
-F eb -2
:5 4:
22808.00.000
A-102.A
AS
U
R
ES
ID
EN
C E
AT
R
EX
PL
U
M B
IN
G
R
EN
O
VA
TI
O
N S:
P H
AS
E
Se le ct iv e
R en ov at io n
-A rc hi te ct ur e
FLOOR PLAN -
LEVEL 02 - AREA
A
02/09/2024BID PACK C
COPYRIGHT © 2022 - DAVIS PARTNERSHIP, P.C.
S
TA
D
IU
M
D R
IV
E
AL
AM
O
SA
, C O
1/8" = 1'-0"B1 FLOOR PLAN - LEVEL 2 - AREA A
Key Value Keynote Text
F01 PROVIDE NEW GYP, INSULATION (WHERE PRESENT), AND RESILIENT BASE
OVER EXISTING FRAMING. PATCH, TEXTURE, & PAINT GYP TO MATCH
ADJACENT FINISHES. PROVIDE FIRE CAULKING AT ALL WALL PENETRATIONS
TO MATCH EXISTING WALL'S FIRE RATING, SEE LIFE SAFETY PLANS.
F04 NEW MIRROR AND ALUMINUM J-CHANNELS
F05 NEW FRP WALL COVERING AS REQUIRED
F06 RE-INSTALL SHOWER HEAD
F09 RE-INSTALL SOLID SURFACE COUNTERTOP & SINK, BASE CABINET, & UPPER
CABINET. PROVIDE CAULKING AS REQUIRED
YRemy Image
YRemy
UP
DN
UP
FD
FD
FD
FD
REF.
REF.
REF.
REF.
AB
RU RT RS RR
RP
RN
RM
RL
RK
RJ
RH
RG
RF
RE
RD
RC
RA
R1
R1.2
R2.2
R3.2
R1.1
R2.1
R3.1
R2
R3
RQ
RVRW
RB
VEST
204E
VEST
203G
VEST
202G
VEST
201J
WALKWAY
BREEZEWAY
WALKWAY
JAN
CABLE/TV
CORR
LIVING
205G
SUITE 1A
203A
SUITE 1B
203B
SUITE 1C
203C
SUITE 1D
203D
LIVING
203E
SUITE 2A
202A
SUITE 2B
202B
SUITE 2C
202C
SUITE 2D
202D
LIVING
202E
KITCHEN
202F
TOILET
202H
SINK
202J
SHOWER
202K
CL
202L
HALL
202M
SHOWER
203K
SINK
203J
TOILET
203H
HALL
203M
CL
203L
KITCHEN
203F
LIVING
204C
BATH
204B
RA SUITE
204A
KITCHEN
204D
LOBBY
TELECOM
ELEV #2
3REFUGE
SUITE 3A
201A
SUITE 3B
201B
SUITE 3C
201C
SUITE 3D
201D
LIVING
201E
KITCHEN
201F
SINK
201G
TOILET
201H
SHOWER
201K
CL
201L
HALL
201M
STAIR #9
ST-209
F01
F01
F01
F01 F04
F01
F01
F05
F01
F01
F01 F01
F01
F01F04
F01 F01 F01
F04 F04
E2
A-550
TYP
E4
A-550
TYP
E1
A-550
TYP
F01
F06F01
F01
F01
F06 F01
F06
F01
F06
F09
F09
F04
F09
F01
F09
F02
F09
F01 F19
M
AT
C H
LI
N
E A
M
AT
C H
LI
N
E A
F09
EXISTING INTERIOR PARTITION WALL OR SHAFT WALL TO REMAIN.
REFER TO LIFE SAFETY PLANS FOR EXTENT OF FIRE RATED AND
SHAFT WALLS.
FINISH REPAIRS
ABOVE FLOOR LINE
CENTERLINE
NOT IN CONTRACT or BY OWNER EQUIPMENT
Key Plan
Plan Keynotes
Plan Legend (Note: Not all symbols are used in this project.)
Plan General Notes
1. DO NOT SCALE DRAWINGS.
2. PROVIDE AND INSTALL NEW VINYL WALL BASE AT ALL
AREAS OF PEX REPLACEMENT AND WATER DAMAGE WHERE
GYP IS BEING REPLACED WITHIN 1'-0" OF THE FFE.
3. RETURN ALL LIGHTING FIXTURES, VENT COVERS, WALL
FIXTURES, AND ALL OTHER GYP MOUNTED ACCESSORIES
TO THEIR ORIGINAL LOCATIONS, SEE ELECTRICAL IN BID
PACK A.
4. ALL GYP THAT WAS REMOVE DURING THE PEX
REPLACEMENT OR DUE TO WATER DAMAGE TO BE
REPLACED WITH NEW GYP BOARD. MUD AND FEATHER GYP
TO REMOVE SEAMS,& PROVIDE CORNER BEADS AS NEEDED.
PAINT & TEXTURE TO MATCH EXISTING.
A
B
N
TRUE
NORTH
N
PROJECT
NORTH
2901 Blake Street, Suite 100 Denver, CO 80205
303.861.8555
DPA Project:
Sheet Number:
Sheet Title:
Revisions Date No.
Sheet Information
Project Information
Issuance Date
Consultant(s)
A
B
C
D
E
F
2 3 4 5 6
1 2 3 4 5 6
A
B
C
D
E
F
Stamp
-F eb -2
:5 4:
22808.00.000
A-102.B
AS
U
R
ES
ID
EN
C E
AT
R
EX
PL
U
M B
IN
G
R
EN
O
VA
TI
O
N S:
P H
AS
E
Se le ct iv e
R en ov at io n
-A rc hi te ct ur e
FLOOR PLAN -
LEVEL 02 - AREA
B
02/09/2024BID PACK C
COPYRIGHT © 2022 - DAVIS PARTNERSHIP, P.C.
S
TA
D
IU
M
D R
IV
E
AL
AM
O
SA
, C O
1/8" = 1'-0"B1 FLOOR PLAN - LEVEL 2 - AREA B
Key Value Keynote Text
F01 PROVIDE NEW GYP, INSULATION (WHERE PRESENT), AND RESILIENT BASE
OVER EXISTING FRAMING. PATCH, TEXTURE, & PAINT GYP TO MATCH
ADJACENT FINISHES. PROVIDE FIRE CAULKING AT ALL WALL PENETRATIONS
TO MATCH EXISTING WALL'S FIRE RATING, SEE LIFE SAFETY PLANS.
F02 NEW VINYL WALL BASE AS REQUIRED AT GYP BOARD REPAIR
F04 NEW MIRROR AND ALUMINUM J-CHANNELS
F05 NEW FRP WALL COVERING AS REQUIRED
F06 RE-INSTALL SHOWER HEAD
F09 RE-INSTALL SOLID SURFACE COUNTERTOP & SINK, BASE CABINET, & UPPER
CABINET. PROVIDE CAULKING AS REQUIRED
F19 REINSTALL SALVAGED METAL WALL PLATE COVER WHERE PRESENT
YRemy Image
YRemy
UPDN
DN
R
EF
FD
AB
C
H EFGJKLMNP
C.5D.5
RW
F01
F03
F01
SUITE 4A
305A
SUITE 4B
305B
SUITE 4C
305C
KITCHEN
305E
LIVING
305F
TOILET
305H
SUITE 4D
305D
STAIR #8
ST-308
SINK
305J
SHOWER
305K
HALL
305M
WOMEN
MEN
OPEN DECK
STAIR #5
ST-305
ELECT.
STOR
COATS
LOBBY
MULTI-PURPOSE
BALCONY
FREEZER
DRY STORAGE
COOLER
KITCHEN
KITCHEN PREP
Room
BOOSTER CLUB
OPEN DECK
SEATING
201Y
GRIZZLY CLUB
201X
SEATING
201W
F01
F01
F01
F01
F01
F05
F01
F04
F10
F01
F06
F01
F04
F08
F01
F04
F08 F09
F09
F09
D16
F01
F02
F02
F02
F02
F05
F01
F01F05
M
AT
C H
LI
N
E A
M
AT
C H
LI
N
E A
NOT IN SCOPE
EXISTING INTERIOR PARTITION WALL OR SHAFT WALL TO REMAIN.
REFER TO LIFE SAFETY PLANS FOR EXTENT OF FIRE RATED AND
SHAFT WALLS.
FINISH REPAIRS
ABOVE FLOOR LINE
CENTERLINE
NOT IN CONTRACT or BY OWNER EQUIPMENT
Key Plan
Plan Keynotes
Plan Legend (Note: Not all symbols are used in this project.)
Plan General Notes
1. DO NOT SCALE DRAWINGS.
2. PROVIDE AND INSTALL NEW VINYL WALL BASE AT ALL
AREAS OF PEX REPLACEMENT AND WATER DAMAGE WHERE
GYP IS BEING REPLACED WITHIN 1'-0" OF THE FFE.
3. RETURN ALL LIGHTING FIXTURES, VENT COVERS, WALL
FIXTURES, AND ALL OTHER GYP MOUNTED ACCESSORIES
TO THEIR ORIGINAL LOCATIONS, SEE ELECTRICAL IN BID
PACK A.
4. ALL GYP THAT WAS REMOVE DURING THE PEX
REPLACEMENT OR DUE TO WATER DAMAGE TO BE
REPLACED WITH NEW GYP BOARD. MUD AND FEATHER GYP
TO REMOVE SEAMS,& PROVIDE CORNER BEADS AS NEEDED.
PAINT & TEXTURE TO MATCH EXISTING.
A
B
N
TRUE
NORTH
N
PROJECT
NORTH
2901 Blake Street, Suite 100 Denver, CO 80205
303.861.8555
DPA Project:
Sheet Number:
Sheet Title:
Revisions Date No.
Sheet Information
Project Information
Issuance Date
Consultant(s)
A
B
C
D
E
F
2 3 4 5 6
1 2 3 4 5 6
A
B
C
D
E
F
Stamp
-F eb -2
:5 4:
22808.00.000
A-103.A
AS
U
R
ES
ID
EN
C E
AT
R
EX
PL
U
M B
IN
G
R
EN
O
VA
TI
O
N S:
P H
AS
E
Se le ct iv e
R en ov at io n
-A rc hi te ct ur e
FLOOR PLAN -
LEVEL 03 - AREA
A
02/09/2024BID PACK C
COPYRIGHT © 2022 - DAVIS PARTNERSHIP, P.C.
S
TA
D
IU
M
D R
IV
E
AL
AM
O
SA
, C O
1/8" = 1'-0"B1 FLOOR PLAN - LEVEL 3 - AREA A
Key Value Keynote Text
D16 COORDINATE PEX REPLACEMENT WORK WITH EXISTING KITCHEN HOODS.
SEE SPECIFICATIONS FOR ALLOWANCE.
F01 PROVIDE NEW GYP, INSULATION (WHERE PRESENT), AND RESILIENT BASE
OVER EXISTING FRAMING. PATCH, TEXTURE, & PAINT GYP TO MATCH
ADJACENT FINISHES. PROVIDE FIRE CAULKING AT ALL WALL PENETRATIONS
TO MATCH EXISTING WALL'S FIRE RATING, SEE LIFE SAFETY PLANS.
F02 NEW VINYL WALL BASE AS REQUIRED AT GYP BOARD REPAIR
F03 INSTALL NEW PEX TUBING IN IT'S ENTIRETY; SEE PLUMBING
F04 NEW MIRROR AND ALUMINUM J-CHANNELS
F05 NEW FRP WALL COVERING AS REQUIRED
F06 RE-INSTALL SHOWER HEAD
F08 NEW WALL TILE AS REQUIRED TO REPAIR WALL. GROUT TO MATCH
ADJACENT FINISHES; SEE FINISH SCHEDULE
F09 RE-INSTALL SOLID SURFACE COUNTERTOP & SINK, BASE CABINET, & UPPER
CABINET. PROVIDE CAULKING AS REQUIRED
F10 INSTALL NEW CLOSET BUILT-IN SHELF AND HANGER ROD; MATCH EXISTING.
YRemy Image
YRemy
UP
REF.
FD
FD
FD
REF.
REF.
REF.
FD
AB
RU RT RS RR
RP
RN
RM
RL
RK
RJ
RH
RG
RF
RE
RD
RC
RA
R1
R1.2
R2.2
R3.2
R1.1
R2.1
R3.1
R2
R3
RQ
RVRW
RB
LIVING
305F
JAN
VEST
304E
VEST
303G
VEST
302G
BREEZEWAY
STAIR #9
ST-309
VEST
301J
SUITE 1A
303A
SUITE 1B
303B
SUITE 1C
303C
SUITE 1D
303D
LIVING
303E
KITCHEN
303F
TOILET
303H
HALL
303M
SINK
303J
SHOWER
303K
CL
303L
LIVING
304C
BATH
304B
RA SUITE
304A
LOBBY
TELECOM
ELEV #2
ELEC
STAIR #8
ST-308
OPEN DECK
SUITE 2A
302A SUITE 2B
302B
SUITE 2C
302C
SUITE 2D
302D
LIVING
302E
KITCHEN
302F
TOILET
302H
SINK
302J
SHOWER
302K
CL
302L
HALL
302MWALKWAY
SUITE 3A
301A
SUITE 3B
301B
SUITE 3C
301C
SUITE 3D
301D
LIVING
301E
KITCHEN
301F
SINK
301G
TOILET
301H
SHOWER
301K
CL
301L
HALL
301M
F01
F01
F01
F01
F01
F01
F05
F01
F04
F01
F01
F04
F01
F01
F01
F04
F01
F01
F01
F06
F01
F06
F01
F06
F09
F09
F09
F09
E2
A-550
TYP E4
A-550
TYP
E1
A-550
TYP
F09
F01 F19
F01
F04
F01
F04
M
AT
C H
LI
N
E A
M
AT
C H
LI
N
E A
F09
EXISTING INTERIOR PARTITION WALL OR SHAFT WALL TO REMAIN.
REFER TO LIFE SAFETY PLANS FOR EXTENT OF FIRE RATED AND
SHAFT WALLS.
FINISH REPAIRS
ABOVE FLOOR LINE
CENTERLINE
NOT IN CONTRACT or BY OWNER EQUIPMENT
Key Plan
Plan Keynotes
Plan Legend (Note: Not all symbols are used in this project.)
Plan General Notes
1. DO NOT SCALE DRAWINGS.
2. PROVIDE AND INSTALL NEW VINYL WALL BASE AT ALL
AREAS OF PEX REPLACEMENT AND WATER DAMAGE WHERE
GYP IS BEING REPLACED WITHIN 1'-0" OF THE FFE.
3. RETURN ALL LIGHTING FIXTURES, VENT COVERS, WALL
FIXTURES, AND ALL OTHER GYP MOUNTED ACCESSORIES
TO THEIR ORIGINAL LOCATIONS, SEE ELECTRICAL IN BID
PACK A.
4. ALL GYP THAT WAS REMOVE DURING THE PEX
REPLACEMENT OR DUE TO WATER DAMAGE TO BE
REPLACED WITH NEW GYP BOARD. MUD AND FEATHER GYP
TO REMOVE SEAMS,& PROVIDE CORNER BEADS AS NEEDED.
PAINT & TEXTURE TO MATCH EXISTING.
A
B
N
TRUE
NORTH
N
PROJECT
NORTH
2901 Blake Street, Suite 100 Denver, CO 80205
303.861.8555
DPA Project:
Sheet Number:
Sheet Title:
Revisions Date No.
Sheet Information
Project Information
Issuance Date
Consultant(s)
A
B
C
D
E
F
2 3 4 5 6
1 2 3 4 5 6
A
B
C
D
E
F
Stamp
-F eb -2
:5 4:
22808.00.000
A-103.B
AS
U
R
ES
ID
EN
C E
AT
R
EX
PL
U
M B
IN
G
R
EN
O
VA
TI
O
N S:
P H
AS
E
Se le ct iv e
R en ov at io n
-A rc hi te ct ur e
FLOOR PLAN -
LEVEL 03 - AREA
B
02/09/2024BID PACK C
COPYRIGHT © 2022 - DAVIS PARTNERSHIP, P.C.
S
TA
D
IU
M
D R
IV
E
AL
AM
O
SA
, C O
1/8" = 1'-0"B1 FLOOR PLAN - LEVEL 3 - AREA B
Key Value Keynote Text
F01 PROVIDE NEW GYP, INSULATION (WHERE PRESENT), AND RESILIENT BASE
OVER EXISTING FRAMING. PATCH, TEXTURE, & PAINT GYP TO MATCH
ADJACENT FINISHES. PROVIDE FIRE CAULKING AT ALL WALL PENETRATIONS
TO MATCH EXISTING WALL'S FIRE RATING, SEE LIFE SAFETY PLANS.
F04 NEW MIRROR AND ALUMINUM J-CHANNELS
F05 NEW FRP WALL COVERING AS REQUIRED
F06 RE-INSTALL SHOWER HEAD
F09 RE-INSTALL SOLID SURFACE COUNTERTOP & SINK, BASE CABINET, & UPPER
CABINET. PROVIDE CAULKING AS REQUIRED
F19 REINSTALL SALVAGED METAL WALL PLATE COVER WHERE PRESENT
YRemy Image
YRemy
DN DN UP
REF.
FD
DN
DN
REF.
FD
AB
C
H EFGJKLM
C.5D.5
RW
LIVING
405J LIVING
404J
JAN
SUITE 6B
405B
SUITE 6C
405C SUITE 6D
405D
SUITE 5D
404D
SUITE 5C
404C
SUITE 5B
404B
KITCHEN
404K
SUITE 5A
404A
SHOWER
404E
SHOWER
405E
SINK
405F SINK
404F
TOILET
404G
TOILET
405G
HALL
405H
HALL
404H
KITCHEN
405K
SUITE 6A
405A
LOBBY
STAIR #11
ST-411
VIS PRESS
VIS CH
OFFICIALS BOX
HOME CH
HOME PRESS
ST MEDIA
PRESIDENT'S BOX
MEN'S
WOMEN'S
IT/AV
KSPK RM
STAIR #2
ST-402
ELEV #1
EL-101
CORRIDOR
CORRIDOR
454 F01
F01
F01
F04
F01
F04
F01 F01
F06 F01F08
F01F08
F04
F09
M
AT
C H
LI
N
E A
M
AT
C H
LI
N
E A
NOT IN SCOPE
EXISTING INTERIOR PARTITION WALL OR SHAFT WALL TO REMAIN.
REFER TO LIFE SAFETY PLANS FOR EXTENT OF FIRE RATED AND
SHAFT WALLS.
FINISH REPAIRS
ABOVE FLOOR LINE
CENTERLINE
NOT IN CONTRACT or BY OWNER EQUIPMENT
Key Plan
Plan Keynotes
Plan Legend (Note: Not all symbols are used in this project.)
Plan General Notes
1. DO NOT SCALE DRAWINGS.
2. PROVIDE AND INSTALL NEW VINYL WALL BASE AT ALL
AREAS OF PEX REPLACEMENT AND WATER DAMAGE WHERE
GYP IS BEING REPLACED WITHIN 1'-0" OF THE FFE.
3. RETURN ALL LIGHTING FIXTURES, VENT COVERS, WALL
FIXTURES, AND ALL OTHER GYP MOUNTED ACCESSORIES
TO THEIR ORIGINAL LOCATIONS, SEE ELECTRICAL IN BID
PACK A.
4. ALL GYP THAT WAS REMOVE DURING THE PEX
REPLACEMENT OR DUE TO WATER DAMAGE TO BE
REPLACED WITH NEW GYP BOARD. MUD AND FEATHER GYP
TO REMOVE SEAMS,& PROVIDE CORNER BEADS AS NEEDED.
PAINT & TEXTURE TO MATCH EXISTING.
A
B
N
TRUE
NORTH
N
PROJECT
NORTH
2901 Blake Street, Suite 100 Denver, CO 80205
303.861.8555
DPA Project:
Sheet Number:
Sheet Title:
Revisions Date No.
Sheet Information
Project Information
Issuance Date
Consultant(s)
A
B
C
D
E
F
2 3 4 5 6
1 2 3 4 5 6
A
B
C
D
E
F
Stamp
-F eb -2
:5 4:
22808.00.000
A-104.A
AS
U
R
ES
ID
EN
C E
AT
R
EX
PL
U
M B
IN
G
R
EN
O
VA
TI
O
N S:
P H
AS
E
Se le ct iv e
R en ov at io n
-A rc hi te ct ur e
FLOOR PLAN -
LEVEL 04 - AREA
A
02/09/2024BID PACK C
COPYRIGHT © 2022 - DAVIS PARTNERSHIP, P.C.
S
TA
D
IU
M
D R
IV
E
AL
AM
O
SA
, C O
1/8" = 1'-0"B1 FLOOR PLAN - LEVEL 4 - AREA A
Key Value Keynote Text
F01 PROVIDE NEW GYP, INSULATION (WHERE PRESENT), AND RESILIENT BASE
OVER EXISTING FRAMING. PATCH, TEXTURE, & PAINT GYP TO MATCH
ADJACENT FINISHES. PROVIDE FIRE CAULKING AT ALL WALL PENETRATIONS
TO MATCH EXISTING WALL'S FIRE RATING, SEE LIFE SAFETY PLANS.
F04 NEW MIRROR AND ALUMINUM J-CHANNELS
F06 RE-INSTALL SHOWER HEAD
F08 NEW WALL TILE AS REQUIRED TO REPAIR WALL. GROUT TO MATCH
ADJACENT FINISHES; SEE FINISH SCHEDULE
F09 RE-INSTALL SOLID SURFACE COUNTERTOP & SINK, BASE CABINET, & UPPER
CABINET. PROVIDE CAULKING AS REQUIRED
YRemy Image
YRemy
FD
FD
FD
REF.
REF.
REF.
A
RU RT RS RR
RP
RN
RM
RL
RK
RJ
RH
RG
RF
RE
RD
RC
RA
R1
R1.2
R2.2
R3.2
R1.1
R2.1
R3.1
R2
R3
RQRVRW
RB
LOUNGE
JAN
414 VEST
403G
VEST
402G
BREEZEWAY
STAIR #9
ST-409
VEST
401J
SUITE 1A
403A
SUITE 1B
403B
SUITE 1C
403C
SUITE 1D
403D
LIVING
403E
SUITE 2A
402A SUITE 2B
402B
SUITE 2C
402C
SUITE 2D
402D
LIVING
402E
KITCHEN
402F
SUITE 3A
401A
SUITE 3B
401B
SUITE 3C
401C
SUITE 3D
401D
LIVING
401E
KITCHEN
401F
SINK
401G
TOILET
401H
HALL
401M
WALKWAY
SHOWER
401K
CL
401L
CL
402L
SHOWER
402K
SINK
402J
TOILET
402H
HALL
402M
LOBBY
TELECOM
ELEV #2
CL
403L
SHOWER
403K
HALL
403M
SINK
403J
TOILET
403H
SUITE 5A
404A
SUITE 5B
404B
F01
A-550
C4
F01
F01
F01 F04
F01
F05
F01
F01
F04
F06
F01
F01
F01
F01
F04
F01
F06
F07
F01
F06
F09
F01
F09
F09
F09
E2
A-550
TYP E4
A-550
TYP
E1
A-550
TYP
F01 F19
F01
F04
F01
F04
M
AT
C H
LI
N
E A
M
AT
C H
LI
N
E A
EXISTING INTERIOR PARTITION WALL OR SHAFT WALL TO REMAIN.
REFER TO LIFE SAFETY PLANS FOR EXTENT OF FIRE RATED AND
SHAFT WALLS.
FINISH REPAIRS
ABOVE FLOOR LINE
CENTERLINE
NOT IN CONTRACT or BY OWNER EQUIPMENT
Key Plan
Plan Keynotes
Plan Legend (Note: Not all symbols are used in this project.)
Plan General Notes
1. DO NOT SCALE DRAWINGS.
2. PROVIDE AND INSTALL NEW VINYL WALL BASE AT ALL
AREAS OF PEX REPLACEMENT AND WATER DAMAGE WHERE
GYP IS BEING REPLACED WITHIN 1'-0" OF THE FFE.
3. RETURN ALL LIGHTING FIXTURES, VENT COVERS, WALL
FIXTURES, AND ALL OTHER GYP MOUNTED ACCESSORIES
TO THEIR ORIGINAL LOCATIONS, SEE ELECTRICAL IN BID
PACK A.
4. ALL GYP THAT WAS REMOVE DURING THE PEX
REPLACEMENT OR DUE TO WATER DAMAGE TO BE
REPLACED WITH NEW GYP BOARD. MUD AND FEATHER GYP
TO REMOVE SEAMS,& PROVIDE CORNER BEADS AS NEEDED.
PAINT & TEXTURE TO MATCH EXISTING.
A
B
N
TRUE
NORTH
N
PROJECT
NORTH
2901 Blake Street, Suite 100 Denver, CO 80205
303.861.8555
DPA Project:
Sheet Number:
Sheet Title:
Revisions Date No.
Sheet Information
Project Information
Issuance Date
Consultant(s)
A
B
C
D
E
F
2 3 4 5 6
1 2 3 4 5 6
A
B
C
D
E
F
Stamp
-F eb -2
:5 4:
22808.00.000
A-104.B
AS
U
R
ES
ID
EN
C E
AT
R
EX
PL
U
M B
IN
G
R
EN
O
VA
TI
O
N S:
P H
AS
E
Se le ct iv e
R en ov at io n
-A rc hi te ct ur e
FLOOR PLAN -
LEVEL 04 - AREA
B
02/09/2024BID PACK C
COPYRIGHT © 2022 - DAVIS PARTNERSHIP, P.C.
S
TA
D
IU
M
D R
IV
E
AL
AM
O
SA
, C O
1/8" = 1'-0"B1 FLOOR PLAN - LEVEL 4 - AREA B
Key Value Keynote Text
F01 PROVIDE NEW GYP, INSULATION (WHERE PRESENT), AND RESILIENT BASE
OVER EXISTING FRAMING. PATCH, TEXTURE, & PAINT GYP TO MATCH
ADJACENT FINISHES. PROVIDE FIRE CAULKING AT ALL WALL PENETRATIONS
TO MATCH EXISTING WALL'S FIRE RATING, SEE LIFE SAFETY PLANS.
F04 NEW MIRROR AND ALUMINUM J-CHANNELS
F05 NEW FRP WALL COVERING AS REQUIRED
F06 RE-INSTALL SHOWER HEAD
F07 NEW GLAZING, CAULKING, & BACKER ROD TO MATCH EXISTING; REFER TO
WINDOW ELEVATION FOR SIZING. PROTECT AND PRESERVE ADJACENT
EXISTING ALUMINUM WINDOW FRAME AND ADJACENT GLAZING.
F09 RE-INSTALL SOLID SURFACE COUNTERTOP & SINK, BASE CABINET, & UPPER
CABINET. PROVIDE CAULKING AS REQUIRED
F19 REINSTALL SALVAGED METAL WALL PLATE COVER WHERE PRESENT
YRemy Image
YRemy
AB
CD
H EFGJKLMNP
C.5D.5
RW
C01
GYP 1
EXIST
EXIST EXIST
GYP 1
TICKETS
ST-111
STAIR #5
ST-105
CONCOURSE
MECH ROOM
VEST
WATER ENTRY
FIRE PUMP
STOR
STAIR #8
ST-108
CUSTODIAL
165 ELEV MACH
LAUNDRY
STAIR #6
ST-106
OFFICIALS
BATHROOM
OFFICIALS
LOCKER
VEST
ELEC. / MECH.
VEST
EQUIP STOR
CONCESSIONS
SOFT GOODS
CONCESSIONS
PANTRY
CORRIDOR
TRAINING
SHOWER
CL
TOILET
175 WOMEN #1
CORRIDOR
MEN
UNISEX
GAMEDAY
LOCKER A
GAMEDAY
LOCKER B
EQUIP STOR
CORRIDOR
CL
TOILET
WOMEN #2
SHOWER
MEN
UNISEX
ELEV #1
EL-101
GUEST SERVICES
375STAIR #2
ST-102
ELEV MACH
TRAINING
CORRIDOR
GYP 1
EXIST
GYP 1
EXIST
C2
A-550
TYP
C1
A-550
TYP
C01
C04
GYP 1
EXIST
GYP 1
EXIST
C04
EXIST
EXIST
EXIST EXIST
GYP 1
EXIST
GYP 1
GYP 1
EXIST
C04
C04
GYP 1
GYP 1
C04
GYP 1
GYP 1 GYP 1
M
AT
C H
LI
N
E A
M
AT
C H
LI
N
E A
NOT IN SCOPE
A
B
N
TRUE
NORTH
N
PROJECT
NORTH
GYPSUM BOARD CEILING
ACOUSTICAL CEILING TILE
ACOUSTICAL CEILING TILE, WASHABLE
ACOUSTICAL CEILING TILE, WOOD SYSTEM
MECHANICAL DIFFUSER (SUPPLY)
MECHANICAL DIFFUSER (RETURN)
EXIT SIGN
CUBICLE CURTAIN TRACK
DPA FINISH MATERIAL TAG
CEILING HEIGHT ABOVE FINISHED FLOOR
ABOVE FLOOR LINE
CENTERLINE
EXPANSION JOINT (EJ)
SHIELDING
Key Plan
Reflected Ceiling Plan Keynotes
Reflected Ceiling Plan Symbol Legend (Note: Not all symbols are used in this project.)
Reflected Ceiling Plan General Notes
RECESSED IN GRADE
STAKE MOUNT ACCENT
BOLLARD
PENDANT
SCONCE
STEP LIGHT
ILLUMINATED MIRROR
RECESSED ADJUSTABLE
RECESSED DOWNLIGHT
RECESSED WALLWASH
SURFACE MOUNT DOWNLIGHT
TRACK HEAD
LINEAR EXTRUSION
Lighting Symbol Legend
1. DO NOT SCALE DRAWINGS.
2. RETURN ALL LIGHTING FIXTURES, VENT COVERS, WALL
FIXTURES, AND ALL OTHER GYP MOUNTED ACCESSORIES
TO THEIR ORIGINAL LOCATIONS, SEE ELECTRICAL IN BID
PACK A.
3. ALL GYP THAT WAS REMOVE DURING THE PEX
REPLACEMENT OR DUE TO WATER DAMAGE TO BE
REPLACED WITH NEW GYP BOARD. MUD AND FEATHER GYP
TO REMOVE SEAMS,& PROVIDE CORNER BEADS AS NEEDED.
PAINT & TEXTURE TO MATCH EXISTING.
4. REINSTALL ALL EXIT SIGNS THAT WERE REMOVED DURING
THE RENOVATIONS TO THEIR ORIGINAL LOCATIONS AND
ORIENTATIONS.
2901 Blake Street, Suite 100 Denver, CO 80205
303.861.8555
DPA Project:
Sheet Number:
Sheet Title:
Revisions Date No.
Sheet Information
Project Information
Issuance Date
Consultant(s)
A
B
C
D
E
F
2 3 4 5 6
1 2 3 4 5 6
A
B
C
D
E
F
Stamp
-F eb -2
:5 4:
22808.00.000
A-151.A
AS
U
R
ES
ID
EN
C E
AT
R
EX
PL
U
M B
IN
G
R
EN
O
VA
TI
O
N S:
P H
AS
E
Se le ct iv e
R en ov at io n
-A rc hi te ct ur e
REFLECTED
CEILING PLAN -
LEVEL 01 - AREA
A
02/09/2024BID PACK C
COPYRIGHT © 2022 - DAVIS PARTNERSHIP, P.C.
S
TA
D
IU
M
D R
IV
E
AL
AM
O
SA
, C O
1/8" = 1'-0"B1 RCP - LEVEL 1 - AREA A
Key Value Keynote Text
C01 RE-INSTALL EXISTING CEILING LIGHT FIXTURES, PROVIDE NEW IF DAMAGED;
RE: ELECTRICAL
C04 INSTALL NEW 24"X24" CEILING ACCESS PANEL. AT ALL EXISTING 12"X12"
ACCESS PANELS, REFRAME OPENING AND PROVIDE NEW 24" X 24" ACCESS
PANEL.
ADDENDUM #01 03/10/2023 001
YRemy Image
YRemy
A
RU RT RS RR
RP
RN
RM
RL
RK
RJ
RH
RG
RF
RE
RD
RC
RA
R1
R1.2
R2.2
R3.2
R1.1
R2.1
R3.1
R2
R3
RQ
RVRW
RB
GYP 1
GYP 1
ACT 1
SUITE 1A
103A
SUITE 1B
103B
SUITE 1C
103C
SUITE 1D
103D
LIVING
103E
SHOWER
103K
SINK
103J
TOILET
103H
VEST
103G
HALL
103M
CL
103L
KITCHEN
103F
C04
ELEV #2
TELECOM
LOBBY
SUITE 2A
102A
SUITE 2B
102B
SUITE 2C
102C
SUITE 2D
102DCL
102L
SHOWER
102K
SINK
102J
TOILET
102H
HALL
102M
VEST
102G
KITCHEN
102F
LIVING
102E
STAIR #9
ST-109
BREEZEWAY
SUITE 3A
101A
SUITE 3B
101B
SUITE 3C
101C
SUITE 3D
101D
LIVING
101E
KITCHEN
101F
SINK
101G
TOILET
101H
VEST
101J
HALL
101M
SHOWER
101K
CL
101L
STOR
FIRE PUMP
ACT 1
GYP 1
ACT 1
GYP 1
C04
VI
F
- 2
2' -0
VIF
+/- 2'-6 1/4"
EXIST
EXIST
C04
EXIST
C04
C04
EXIST
EXIST
C04
C04
EXIST
EXIST
C04
C2
A-550
TYP
C1
A-550
TYP
GYP 1GYP 1
EXIST
C2
A-550
TYP
C01
C04
C03
C03
C03M
AT
C H
LI
N
E A
M
AT
C H
LI
N
E A
N O
T
IN
S C
O
PE
A
B
N
TRUE
NORTH
N
PROJECT
NORTH
GYPSUM BOARD CEILING
ACOUSTICAL CEILING TILE
ACOUSTICAL CEILING TILE, WASHABLE
ACOUSTICAL CEILING TILE, WOOD SYSTEM
MECHANICAL DIFFUSER (SUPPLY)
MECHANICAL DIFFUSER (RETURN)
EXIT SIGN
CUBICLE CURTAIN TRACK
DPA FINISH MATERIAL TAG
CEILING HEIGHT ABOVE FINISHED FLOOR
ABOVE FLOOR LINE
CENTERLINE
EXPANSION JOINT (EJ)
SHIELDING
Key Plan
Reflected Ceiling Plan Keynotes
Reflected Ceiling Plan Symbol Legend (Note: Not all symbols are used in this project.)
Reflected Ceiling Plan General Notes
RECESSED IN GRADE
STAKE MOUNT ACCENT
BOLLARD
PENDANT
SCONCE
STEP LIGHT
ILLUMINATED MIRROR
RECESSED ADJUSTABLE
RECESSED DOWNLIGHT
RECESSED WALLWASH
SURFACE MOUNT DOWNLIGHT
TRACK HEAD
LINEAR EXTRUSION
Lighting Symbol Legend
1. DO NOT SCALE DRAWINGS.
2. RETURN ALL LIGHTING FIXTURES, VENT COVERS, WALL
FIXTURES, AND ALL OTHER GYP MOUNTED ACCESSORIES
TO THEIR ORIGINAL LOCATIONS, SEE ELECTRICAL IN BID
PACK A.
3. ALL GYP THAT WAS REMOVE DURING THE PEX
REPLACEMENT OR DUE TO WATER DAMAGE TO BE
REPLACED WITH NEW GYP BOARD. MUD AND FEATHER GYP
TO REMOVE SEAMS,& PROVIDE CORNER BEADS AS NEEDED.
PAINT & TEXTURE TO MATCH EXISTING.
4. REINSTALL ALL EXIT SIGNS THAT WERE REMOVED DURING
THE RENOVATIONS TO THEIR ORIGINAL LOCATIONS AND
ORIENTATIONS.
2901 Blake Street, Suite 100 Denver, CO 80205
303.861.8555
DPA Project:
Sheet Number:
Sheet Title:
Revisions Date No.
Sheet Information
Project Information
Issuance Date
Consultant(s)
A
B
C
D
E
F
2 3 4 5 6
1 2 3 4 5 6
A
B
C
D
E
F
Stamp
-F eb -2
:5 4:
22808.00.000
A-151.B
AS
U
R
ES
ID
EN
C E
AT
R
EX
PL
U
M B
IN
G
R
EN
O
VA
TI
O
N S:
P H
AS
E
Se le ct iv e
R en ov at io n
-A rc hi te ct ur e
REFLECTED
CEILING PLAN -
LEVEL 01 - AREA
B
02/09/2024BID PACK C
COPYRIGHT © 2022 - DAVIS PARTNERSHIP, P.C.
S
TA
D
IU
M
D R
IV
E
AL
AM
O
SA
, C O
1/8" = 1'-0"B1 RCP - LEVEL 1 - AREA B
Key Value Keynote Text
C01 RE-INSTALL EXISTING CEILING LIGHT FIXTURES, PROVIDE NEW IF DAMAGED;
RE: ELECTRICAL
C03 PROVIDE NEW ACT CEILING
C04 INSTALL NEW 24"X24" CEILING ACCESS PANEL. AT ALL EXISTING 12"X12"
ACCESS PANELS, REFRAME OPENING AND PROVIDE NEW 24" X 24" ACCESS
PANEL.
ADDENDUM #01 03/10/2023 001
YRemy Image
YRemy
H EFGJKLMNP
C.5D.5
R1.2
R2.2
R3.2
RW
SUITE 4A
205A
SUITE 4B
SUITE 4C
205C
SUITE 4D
205D KITCHEN
205F
LIVING
205G
STAIR #8
ST-208
SUITE 4E
205E
TOILET
205J
SINK
205K
SHOWER
205L
BATHROOM
205M
CL
205N
HALL
205P
CORR
REFUGE
ELEC
JAN
212CABLE/TV
215 LOBBY
VOMITORIUM #5
VOMITORIUM #4
STAIR #6
ST-106
SEATING
201W
GRIZZLY CLUB
201X
SEATING
201Y
VOMITORIUM #2
VOMITORIUM #3
STAIR #5
ST-205
STAIR #2
ST-202
ELEV #1
EL-101
C04
C04 EXISTEXIST
EXIST EXIST
EXIST
EXIST
GYP 1
GYP 1 GYP 1 GYP 1
GYP 1
GYP 1
C04 C04
C04
M
AT
C H
LI
N
E A
M
AT
C H
LI
N
E A
NOT IN SCOPE
A
B
N
TRUE
NORTH
N
PROJECT
NORTH
GYPSUM BOARD CEILING
ACOUSTICAL CEILING TILE
ACOUSTICAL CEILING TILE, WASHABLE
ACOUSTICAL CEILING TILE, WOOD SYSTEM
MECHANICAL DIFFUSER (SUPPLY)
MECHANICAL DIFFUSER (RETURN)
EXIT SIGN
CUBICLE CURTAIN TRACK
DPA FINISH MATERIAL TAG
CEILING HEIGHT ABOVE FINISHED FLOOR
ABOVE FLOOR LINE
CENTERLINE
EXPANSION JOINT (EJ)
SHIELDING
Key Plan
Reflected Ceiling Plan Keynotes
Reflected Ceiling Plan Symbol Legend (Note: Not all symbols are used in this project.)
Reflected Ceiling Plan General Notes
RECESSED IN GRADE
STAKE MOUNT ACCENT
BOLLARD
PENDANT
SCONCE
STEP LIGHT
ILLUMINATED MIRROR
RECESSED ADJUSTABLE
RECESSED DOWNLIGHT
RECESSED WALLWASH
SURFACE MOUNT DOWNLIGHT
TRACK HEAD
LINEAR EXTRUSION
Lighting Symbol Legend
1. DO NOT SCALE DRAWINGS.
2. RETURN ALL LIGHTING FIXTURES, VENT COVERS, WALL
FIXTURES, AND ALL OTHER GYP MOUNTED ACCESSORIES
TO THEIR ORIGINAL LOCATIONS, SEE ELECTRICAL IN BID
PACK A.
3. ALL GYP THAT WAS REMOVE DURING THE PEX
REPLACEMENT OR DUE TO WATER DAMAGE TO BE
REPLACED WITH NEW GYP BOARD. MUD AND FEATHER GYP
TO REMOVE SEAMS,& PROVIDE CORNER BEADS AS NEEDED.
PAINT & TEXTURE TO MATCH EXISTING.
4. REINSTALL ALL EXIT SIGNS THAT WERE REMOVED DURING
THE RENOVATIONS TO THEIR ORIGINAL LOCATIONS AND
ORIENTATIONS.
2901 Blake Street, Suite 100 Denver, CO 80205
303.861.8555
DPA Project:
Sheet Number:
Sheet Title:
Revisions Date No.
Sheet Information
Project Information
Issuance Date
Consultant(s)
A
B
C
D
E
F
2 3 4 5 6
1 2 3 4 5 6
A
B
C
D
E
F
Stamp
-F eb -2
:5 4:
22808.00.000
A-152.A
AS
U
R
ES
ID
EN
C E
AT
R
EX
PL
U
M B
IN
G
R
EN
O
VA
TI
O
N S:
P H
AS
E
Se le ct iv e
R en ov at io n
-A rc hi te ct ur e
REFLECTED
CEILING PLAN -
LEVEL 02 - AREA
A
02/09/2024BID PACK C
COPYRIGHT © 2022 - DAVIS PARTNERSHIP, P.C.
S
TA
D
IU
M
D R
IV
E
AL
AM
O
SA
, C O
1/8" = 1'-0"B1 RCP - LEVEL 2 - AREA A
Key Value Keynote Text
C04 INSTALL NEW 24"X24" CEILING ACCESS PANEL. AT ALL EXISTING 12"X12"
ACCESS PANELS, REFRAME OPENING AND PROVIDE NEW 24" X 24" ACCESS
PANEL.
ADDENDUM #01 03/10/2023 001
YRemy Image
YRemy
RU RT RS RR
RP
RN
RM
RL
RK
RJ
RH
RG
RF
RE
RD
RC
RA
R1
R1.2
R2.2
R3.2
R1.1
R2.1
R3.1
R2
R3
RQ
RVRW
RB
SUITE 1A
203A
SUITE 1B
203B
SUITE 1C
203C
SUITE 1D
203D
LIVING
203E
KITCHEN
203F
VEST
203G
TOILET
203H
SINK
203J
SHOWER
203K
CL
203L
HALL
203M
LOBBY
TELECOM
CABLE/TV
JAN
CORR
RA SUITE
204A
ELEC
VEST
204E
BATH
204B
KITCHEN
204D
LIVING
204C
LIVING
205G
SUITE 2A
202A
SUITE 2B
202B
SUITE 2C
202C
SUITE 2D
202D
HALL
202M
TOILET
202H
SINK
202J
SHOWER
202K
CL
202L
LIVING
202E
KITCHEN
202F
STAIR #9
ST-209
BREEZEWAY
SHOWER
201K
CL
201L
SUITE 3A
201A
SUITE 3B
201B
SUITE 3C
201C
SUITE 3D
201D
TOILET
201H
HALL
201M
VEST
201J
WALKWAY
SINK
201G
LIVING
201E
KITCHEN
201F
EXIST
GYP 1
C04
C04
GYP 1GYP 1
EXIST
C04
C04
C04
EXIST
GYP 1
EXIST
ACT 1
ACT 1
EXIST
C04
C04
C04
ACT 1
GYP 1
EXIST
EXIST
?GYP 1
EXIST
GYP 1
GYP 1
EXIST
EXIST
C04
C1
A-550
TYP
C2
A-550
TYP
GYP 1GYP 1
EXIST
C03
C03
C03M
AT
C H
LI
N
E A
M
AT
C H
LI
N
E A
A
B
N
TRUE
NORTH
N
PROJECT
NORTH
GYPSUM BOARD CEILING
ACOUSTICAL CEILING TILE
ACOUSTICAL CEILING TILE, WASHABLE
ACOUSTICAL CEILING TILE, WOOD SYSTEM
MECHANICAL DIFFUSER (SUPPLY)
MECHANICAL DIFFUSER (RETURN)
EXIT SIGN
CUBICLE CURTAIN TRACK
DPA FINISH MATERIAL TAG
CEILING HEIGHT ABOVE FINISHED FLOOR
ABOVE FLOOR LINE
CENTERLINE
EXPANSION JOINT (EJ)
SHIELDING
Key Plan
Reflected Ceiling Plan Keynotes
Reflected Ceiling Plan Symbol Legend (Note: Not all symbols are used in this project.)
Reflected Ceiling Plan General Notes
RECESSED IN GRADE
STAKE MOUNT ACCENT
BOLLARD
PENDANT
SCONCE
STEP LIGHT
ILLUMINATED MIRROR
RECESSED ADJUSTABLE
RECESSED DOWNLIGHT
RECESSED WALLWASH
SURFACE MOUNT DOWNLIGHT
TRACK HEAD
LINEAR EXTRUSION
Lighting Symbol Legend
1. DO NOT SCALE DRAWINGS.
2. RETURN ALL LIGHTING FIXTURES, VENT COVERS, WALL
FIXTURES, AND ALL OTHER GYP MOUNTED ACCESSORIES
TO THEIR ORIGINAL LOCATIONS, SEE ELECTRICAL IN BID
PACK A.
3. ALL GYP THAT WAS REMOVE DURING THE PEX
REPLACEMENT OR DUE TO WATER DAMAGE TO BE
REPLACED WITH NEW GYP BOARD. MUD AND FEATHER GYP
TO REMOVE SEAMS,& PROVIDE CORNER BEADS AS NEEDED.
PAINT & TEXTURE TO MATCH EXISTING.
4. REINSTALL ALL EXIT SIGNS THAT WERE REMOVED DURING
THE RENOVATIONS TO THEIR ORIGINAL LOCATIONS AND
ORIENTATIONS.
2901 Blake Street, Suite 100 Denver, CO 80205
303.861.8555
DPA Project:
Sheet Number:
Sheet Title:
Revisions Date No.
Sheet Information
Project Information
Issuance Date
Consultant(s)
A
B
C
D
E
F
2 3 4 5 6
1 2 3 4 5 6
A
B
C
D
E
F
Stamp
-F eb -2
:5 4:
22808.00.000
A-152.B
AS
U
R
ES
ID
EN
C E
AT
R
EX
PL
U
M B
IN
G
R
EN
O
VA
TI
O
N S:
P H
AS
E
S
TA
D
IU
M D
R
IV
E
AL
AM
O
SA
, C
O
REFLECTED
CEILING PLAN -
LEVEL 02 - AREA
B
02/09/2024BID PACK C
COPYRIGHT © 2022 - DAVIS…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .