ASU Res at Rex Plbg Reno_BID PACKAGES A_Drawings.pdf
PDF 36 MB Posted
- Attached to
- Residence at Rex Domestic Water Line Replacement
- Solicitation number
- ASU 2023-01*
- Issued by
- Alamosa County, Colorado
About this file
The document is a comprehensive bid package for the Residence at Rex Plumbing Renovations: Phase 1 project at Adams State University in Alamosa, Colorado. The project involves a selective demolition and renovation of domestic water lines throughout a four-story residential apartment building, with work spanning architectural, electrical, and plumbing systems. The scope includes replacing existing PEX domestic water supply lines, repairing water-damaged architectural finishes, upgrading mechanical room equipment, and addressing broken glazing. The project is classified as a Level 1 alteration per the 2021 International Existing Building Code, with a Level 2 alteration specifically in the mechanical room to install a new domestic water storage tank, thermal expansion tank, and digital water mixing valve.
The bid package is structured into multiple areas and phases, with contractors required to price Phase 1 and Phase 2 separately. Phase 1 covers work on the residential side of the building and main mechanical room upgrades on the stadium side, while Phase 2 will address remaining work on the stadium side. The project involves careful preservation of existing building systems, with strict requirements to maintain structural integrity, fire ratings, and building occupancy classifications. The total building area is approximately 67,875 square feet, comprising student residences, stadium, and assembly spaces. The project documents indicate a February 9, 2024 bid issuance date, with detailed architectural, electrical, and life safety plans providing comprehensive guidance for the renovation work.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| SBP-6.14 BidBond (1) (1).docx | DOCX document | |
| SBP-6.133 Unit Pricing (1).docx | DOCX document | |
| ASU Res at Rex Plbg Reno_BID PACKAGES B_Drawings.pdf | ||
| SBP-6.13 Bid Form (1) (1).docx | DOCX document | |
| 2024_02_09 - ASU Res at Rex Plbg Reno_BID PACKAGES_Project Manual.pdf | ||
| SC6.21 DBB A 2024 (1).docx | DOCX document | |
| SBP-6.12 Information for Bidders (2) (1).docx | DOCX document | |
| Addendum 3B - 2024_03_11 - ASU Res at Rex Plbg Reno.pdf | ||
| ASU Res at Rex Plbg Reno_BID PACKAGES C_Drawings.pdf | ||
| SC6.23 DBB GC 2024 (1).docx | DOCX document | |
| AFB-2 Residence at Rex Pex.pdf |
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
2901 Blake Street, Suite 100 Denver, CO 80205
303.861.8555
Issue Date:
Project:
Original Issuance:
08-Feb-24 22:41:41
ASU RESIDENCE AT REX - PLUMBING
RENOVATIONS: PHASE 1
Febuary 09, 2024
77 STADIUM DRIVE
ALAMOSA, CO 81101
22808.00.000
BID PACK A
COPYRIGHT © 2022 - DAVIS PARTNERSHIP, P.C.
Selective Demolition - Architecture and Electrical
YRemy Image
YRemy Text Box 02-09-2024
X-###
SIM
WALL SECTION
REFERENCE
EXTERIOR ELEVATION
REFERENCE
DIMENSION STRING
DOOR TAG
CENTERLINE
ROOM TAG ROOM NAME
#GRID LABEL - NEW
ELEVATION LABEL
INTERIOR ELEVATION
REFERENCE
8'-2"
AREA TAG AREA NAME
150 SF
INTERIOR PARTITION TYPE TAG
STOREFRONT TAG
NORTH ARROW
GRAPHIC SCALE
X-###
SIM
BUILDING SECTION
REFERENCE
X-###
SIM
SPOT ELEVATION
X-###
# TYP.
REVISION CLOUD
AND TAG
EL = 100'-0"
DETAIL CALLOUT
DETAIL ELEVATION
REFERENCE
CEILING HEIGHT TAG
CURTAIN WALL TAG
EXTERIOR SYSTEM TAG
X-#### #
####X
X-###
VIEW REFERENCE
DETAIL NUMBERING
BATTLESHIP GRID ORDER
A
B
C
D
E
1 2 3 4 5 6
FINISH TAG
KEYNOTE AND LEADER-
TYPE 1
SHADED DETAIL LOCATION
WOULD BE NUMBERED "A2" ON
THE DETAIL SHEET
F15
07 2700 - SHEET
WATERPROOFING
KEYNOTE AND LEADER-
TYPE 2
WINDOW TAG
GRID LABEL - EXISTING #
ARCHITECTURAL SYMBOLS LEGEND
Note: Not all symbols are used in this project.
STANDARD ABBREVIATIONS LEGENDGENERAL NOTES
X-###
1. IF DISCREPANCIES OCCUR BETWEEN DRAWINGS OR BETWEEN THE DRAWINGS
AND SPECIFICATIONS, SUBMIT AN RFI FOR RESOLUTION.
2. DO NOT SCALE THE DRAWINGS. SUBMIT AN RFI IF CRITICAL DIMENSIONS DO NOT
APPEAR ON THE DRAWINGS.
3. THE BUILDING EXTERIOR IS DEFINED BASED ON A SYSTEMS METHODOLOGY.
REFER TO A-700 DRAWING SERIES FOR COMPONENTS THAT COMPRISE EACH
SYSTEM.
4. PROVIDE ISOLATION BETWEEN ALL DISSIMILAR METALS WHERE THEY OCCUR TO
PREVENT ELECTROLYTIC REACTION AND CORROSION.
5. VERIFY EQUIPMENT ROUGH-IN DIMENSIONS WITH MANUFACTURER FOR
EQUIPMENT THAT IS EXISTING, REUSED, OR FURNISHED BY OWNER.
ALIGN
MAXIMUM
MINIMUM
TYPICAL
TO ACCURATELY LOCATE FACE BASED ON ADJACENT ITEMS OR
CONSTRUCTION
THE CONDITION MAY NOT VARY TO A DIMENSION GREATER THAN THAT
SHOWN WITHOUT THE APPROVAL OF THE ARCHITECT
THE CONDITION MAY NOT VARY TO A DIMENSION SMALLER THAN THAT
SHOWN WITHOUT THE APPROVAL OF THE ARCHITECT
THE CONDITION APPLIES TO SAME CONDITIONS THROUGHOUT UNLESS
NOTED OTHERWISE
DEFINITIONS
W#
C#
S#
/1 A-101
10'-10"
N
0' 4' 8' 16' 32'
SCALE: 1/8" = 1'-0"
LEVEL 1
100' - 0"
XX#
Fn2PX
F
EXISTING CONDITION
IMAGE CALLOUT
APPLICABLE BUILDING CODES:
2021 INTERNATIONAL BUILDING CODE (IBC)
2021 INTERNATIONAL EXISTING BUILDING CODE (IEBC)
2021 INTERNATIONAL MECHANICAL CODE (IMC)
2021 INTERNATIONAL ENERGY CONSERVATION CODE (IECC)
2020 NATIONAL ELECTRICAL CODE (NEC) (NFPA 70®)
2018 INTERNATIONAL PLUMBING CODE (IPC)
2018 INTERNATIONAL FUEL GAS CODE (IFGC) FIRST
2021 INTERNATIONAL FIRE CODE (IFC)
NATIONAL FIRE PROTECTION ASSOCIATION STANDARDS (NFPA)
ICC/ANSI A117.1, ACCESSIBLE AND USABLE BUILDINGS AND FACILITIES
CONSTRUCTION TYPE: EXISTING (NOT CHANGED): TYPE II-B, FULLY SPRINKLERED UNDER THE 2006 IBC
LIFE SAFETY SYSTEMS: EXISTING (NOT CHANGED)
OCCUPANCY CLASSIFICATION: EXISTING (NOT CHANGED): R-2 / A-5 / A-3 PER ORIGINAL CONSTRUCTION UNDER THE 2006 IBC
MAX. TRAVEL DISTANCE ALLOWED TO EXIT: EXISTING (NOT CHANGED)
NUMBER OF EXITS REQUIRED: EXISTING (NOT CHANGED)
NUMBER OF EXITS PROVIDED: EXISTING (NOT CHANGED)
PLUMBING FIXTURES: EXISTING (NOT CHANGED)
PROJECT DESCRIPTION:
THIS PROJECT IS FOR EXISTING BUILDING THAT WAS COMPLETED IN 2011. THE SCOPE CONSISTS OF INTERIOR REPAIRS OF ARCHITECTURAL FINISHES THAT HAVE SUSTAINED WATER DAMAGE AND THE REPLACEMENT OF PLUMBING DOMESTIC WATER SUPPLY LINES AND ASSOCIATED EQUIPMENT.
THE EXISTING BUILDING CONSISTS OF 33,657 SQUARE FEET OF R-2 STUDENT RESIDENCES; AND 34,218 SQUARE FEET OF A-5 STADIUM WITH 3,897 SQUARE FEET OF A-3 ASSEMBLY PER THE 2006 IBC. THE SQUARE FOOTAGE AND FIRE RATINGS OF THE BUILDING WILL NOT BE MODIFIED IN ANY WAY.
ADDITIONAL SCOPE ITEMS INCLUDE NEW PLUMBING EQUIPMENT AND A NEW MIXING VALVE THERMOSTAT IN MECHANICAL ROOM #159 AND REPAIRS TO BROKEN
GLAZING IN LOUNGE #412.
THIS PROJECT IS PRIMARILY A LEVEL 1 ALTERATION PER THE 2021 IEBC THROUGHOUT THE WHOLE EXTENTS OF THE EXISTING BUILDING. IT IS A LEVEL 2 ALTERATION PER THE 2021 IEBC AT THE EXISTING MECHANICAL ROOM #159 TO ALLOW FOR NEW DOMESTIC WATER STORAGE TANK (BUFFER TANK), NEW
THERMAL EXPANSION TANK, & NEW DIGITAL WATER MIXING VALVE.
THIS PROJECT DOES NOT INCLUDE DEFERRED SUBMITTALS.
CODE ANALYSIS
2901 Blake Street, Suite 100 Denver, CO 80205
303.861.8555
Location Map
Project Team
Sheet Index
DPA Project:
Sheet Number:
Sheet Title:
Revisions Date No.
Sheet Information
Project Information
Issuance Date
Consultant(s)
Stamp
-F eb -2
:4 1:
OWNER
ADAMS STATE UNIVERSITY
208 EDGEMONT BLVD.
ALAMOSA, CO 81101
719.587.8353
BRUCE DELTONDO
bdeltond@adams.edu
ARCHITECT
DAVIS PARTNERSHIP ARCHITECTS
2901 BLAKE STREET
SUITE 100
DENVER, CO 80205
303.861.8555
BRIAN ERICKSON
brian.erickson@davispartnership.com
MEP ENGINEER
BRIDGERS & PAXTON
1365 GARDEN OF THE GODS RD.
SUITE 260
COLORADO SPRINGS, CO 80907
719.550.5605
STEVE TAYLOR, PE, LEED AP
smtaylor@bpce.com
22808.00.000
G-001 A
AS
U
R
ES
ID
EN
C E
AT
R
EX
PL
U
M B
IN
G
R
EN
O
VA
TI
O
N S:
P H
AS
E
Se le ct iv e
D em ol iti on
Ar ch ite ct ur e an d
El ec tri ca l
CODE SUMMARY,
SHEET INDEX, &
PROJECT DATA
02/09/2024BID PACK A
COPYRIGHT © 2022 - DAVIS PARTNERSHIP, P.C.
S
TA
D
IU
M
D R
IV
E
AL
AM
O
SA
, C O
ACT ACOUSTICAL CEILING TILE
ADD ADDENDUM
AFF ABOVE FINISHED FLOOR
AL ALUMINUM
ALT ALTERNATE
ALUM ALUMINUM
ANOD ANODIZED
APPROX APPROXIMATE(LY)
ARCH ARCHITECT or ARCHITECTURAL
ASI ARCHITECT'S SUPPLEMENTAL INSTRUCTIONS
AUX AUXILIARY
BLDG BUILDING
BSMT BASEMENT
BTWN BETWEEN
CD CONSTRUCTION DOCUMENTS or CONTRACT DOCUMENTS CJ CONSTRUCTION JOINT or CONTROL JOINT
CLG CEILING
CLR CLEAR
CMU CONCRETE MASONRY UNIT
CONC CONCRETE
CORR CORRIDOR
DBL DOUBLE
DEMO DEMOLISH or DEMOLITION
DF DRINKING FOUNTAIN
DIA DIAMETER
DIM DIMENSION or DIMENSIONAL
DW DISHWASHER
DWG DRAWING
EA EACH
EJ EXPANSION JOINT
ELEC ELECTRIC(AL)
ELEV ELEVATOR
EMER EMERGENCY
EOS EDGE OF SLAB
EQ EQUAL
EQUIP EQUIPMENT
EWC ELECTRIC WATER COOLER
EXIST EXISTING
FD FLOOR DRAIN
FDC FIRE DEPARTMENT CONNECTION
FE FIRE EXTINGUISHER
FEC FIRE EXTINGUISHER CABINET
FFE FURNITURE, FIXTURES AND EQUIPMENT
FHC FIRE HOSE CABINET
GA GAUGE
GALV GALVANIZED
HB HOSE BIBB
HORIZ HORIZONTAL
HT HEIGHT
HVAC HEATING, VENTILATION and AIR CONDITIONING
IBC INTERNATIONAL BUILDING CODE
JAN JANITOR
JT JOINT
L ANGLE
MAX MAXIMUM
MECH MECHANICAL
MEP MECHANICAL, ELECTRICAL and PLUMBING
MEZZ MEZZANINE
MIN MINIMUM
MISC MISCELLANEOUS
MO MASONRY OPENING
NA NOT APPLICABLE
NIC NOT IN CONTRACT
NO. NUMBER
NOTE: FOR ADDITIONAL ABBREVATIONS; REFER TO SPECIFICATION 01 4200 FOR
COMPLETE INDUSTRY STANDARD ABBREVIATION LIST
NRC NOISE REDUCTION COEFFICIENT
NTS NOT TO SCALE
OC ON-CENTER
OPNG OPENING
OPP OPPOSITE
PERIM PERIMETER
PR PAIR or PROPOSAL REQUEST
PSF POUNDS PER SQUARE FOOT
PSI POUNDS PER SQUARE INCH
PT PAINT(ED), POST-TENSIONED SLAB or PRESSURE TREATED
QTY QUANTITY
R RADIUS, RISER or THERMAL RESISTANCE
RCP REFLECTED CEILING PLAN
RD ROAD or ROOF DRAIN RE REFER TO or REFERENCE REV REVISE, REVISED or REVISION
RM ROOM
RO ROUGH OPENING
ROW RIGHT-OF-WAY
RTU ROOFTOP UNIT
SAN SANITARY
SF SQUARE FOOT (FEET)
SHT SHEET
SIM SIMILAR
SPEC SPECIFICATION(S)
SQ SQUARE
STC SOUND TRANSMISSION CLASS
STL STEEL
STOR STORAGE
TO TOP OF
TOC TOP OF CONCRETE
TOP TOP OF PARAPET
TOS TOP OF STEEL
TOW TOP OF WALL
TYP TYPICAL
UNO UNLESS NOTED OTHERWISE
VIF VERIFY IN FIELD
W/ WITH
W/O WITHOUT
WD WOOD
WP WORKING POINT
WT WEIGHT
Code Summary
Sheet Index
PROJECT LOCATION
N
# Name Is su an ce
Sh ee t I ss ue D at e
R ev is io n N am e
R ev is io n D at e
General
G-000 A COVER - BID PACK A BID PACK A 02/09/2024
G-001 A CODE SUMMARY, SHEET INDEX, & PROJECT DATA BID PACK A 02/09/2024 ADDENDUM #02 04/05/2023
G-002 A CONSTRUCTION ACCESS SITE PLAN BID PACK A 02/09/2024
G-101 A CONSTRUCTION PHASE PLAN - LEVEL 01 & LEVEL 02 BID PACK A 02/09/2024 ADDENDUM #02 04/05/2023 G-102 A CONSTRUCTION PHASE PLAN - LEVEL 03 & LEVEL 04 BID PACK A 02/09/2024 ADDENDUM #02 04/05/2023
Life Safety
LS-101 A LIFE SAFETY PLAN - LEVEL 01 & LEVEL 02 BID PACK A 02/09/2024
LS-102 A LIFE SAFETY PLAN - LEVEL 03 & LEVEL 04 BID PACK A 02/09/2024
Architectural Demolition AD-101.A DEMOLITION FLOOR PLAN - LEVEL 01 - AREA A BID PACK A 02/09/2024 ADDENDUM #01 03/10/2023 AD-101.B DEMOLITION FLOOR PLAN - LEVEL 01 - AREA B BID PACK A 02/09/2024 ADDENDUM #01 03/10/2023 AD-102.A DEMOLITION FLOOR PLAN - LEVEL 02 - AREA A BID PACK A 02/09/2024 ADDENDUM #01 03/10/2023 AD-102.B DEMOLITION FLOOR PLAN - LEVEL 02 - AREA B BID PACK A 02/09/2024 ADDENDUM #01 03/10/2023 AD-103.A DEMOLITION FLOOR PLAN - LEVEL 03 - AREA A BID PACK A 02/09/2024 ADDENDUM #01 03/10/2023 AD-103.B DEMOLITION FLOOR PLAN - LEVEL 03 - AREA B BID PACK A 02/09/2024 ADDENDUM #01 03/10/2023 AD-104.A DEMOLITION FLOOR PLAN - LEVEL 04 - AREA A BID PACK A 02/09/2024 ADDENDUM #01 03/10/2023 AD-104.B DEMOLITION FLOOR PLAN - LEVEL 04 - AREA B BID PACK A 02/09/2024 ADDENDUM #01 03/10/2023 AD-151.A DEMOLITION RCP - LEVEL 01 - AREA A BID PACK A 02/09/2024 ADDENDUM #01 03/10/2023 AD-151.B DEMOLITION RCP - LEVEL 01 - AREA B BID PACK A 02/09/2024 ADDENDUM #01 03/10/2023 AD-152.A DEMOLITION RCP - LEVEL 02 - AREA A BID PACK A 02/09/2024 ADDENDUM #01 03/10/2023 AD-152.B DEMOLITION RCP - LEVEL 02 - AREA B BID PACK A 02/09/2024 ADDENDUM #01 03/10/2023 AD-153.A DEMOLITION RCP - LEVEL 03 - AREA A BID PACK A 02/09/2024 ADDENDUM #01 03/10/2023 AD-153.B DEMOLITION RCP - LEVEL 03 - AREA B BID PACK A 02/09/2024 ADDENDUM #01 03/10/2023 AD-154.A DEMOLITION RCP - LEVEL 04 - AREA A BID PACK A 02/09/2024 ADDENDUM #01 03/10/2023 AD-154.B DEMOLITION RCP - LEVEL 04 - AREA B BID PACK A 02/09/2024 ADDENDUM #01 03/10/2023
Electrical Demolition
E-001 ELECTRICAL LEGEND BID PACK A 02/09/2024
ED-101.A ELECTRICAL DEMOLITION FLOOR PLAN - LEVEL 01 - AREA A BID PACK A 02/09/2024 ED-101.B ELECTRICAL DEMOLITION FLOOR PLAN - LEVEL 01 - AREA B BID PACK A 02/09/2024 ED-102.A ELECTRICAL DEMOLITION FLOOR PLAN - LEVEL 02 - AREA A BID PACK A 02/09/2024 ED-102.B ELECTRICAL DEMOLITION FLOOR PLAN - LEVEL 02 - AREA B BID PACK A 02/09/2024 ED-103.A ELECTRICAL DEMOLITION FLOOR PLAN - LEVEL 03 - AREA A BID PACK A 02/09/2024 ED-103.B ELECTRICAL DEMOLITION FLOOR PLAN - LEVEL 03 - AREA B BID PACK A 02/09/2024 ED-104.A ELECTRICAL DEMOLITION FLOOR PLAN - LEVEL 04 - AREA A BID PACK A 02/09/2024 ED-104.B ELECTRICAL DEMOLITION FLOOR PLAN - LEVEL 04 - AREA B BID PACK A 02/09/2024
ADDENDUM #01 03/10/2023 001
ADDENDUM #02 04/05/2023 002
YRemy Image
YRemy
DNDN
DN
DN
DN
FD
FD
REF.FD
FD
REF.
DN
R
EF
.REF. FD
FD
FD
FD
FD
FD
FD
FD
FD
FD
FD
FDDN
DN
R
EF
.DN
REF.
REF.
REF.
REF.
REF.
REF.
REF.
REF.
REF.
REF.
REF.
REF.
REF.
FD
FD
FDFD
FD
V A N
VAN
10 20 03 04 05 40 30 20 10
03 04 05 40 30 20 10
C O
C O
C O
C O
C O x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x
PUBLIC ACCESS TO
REMAIN FOR
PEDESTRIAN AND
MAINTENANCE
VEHICLES.
TEMP CONSTRUCTION AREA FENCE
(Field office, staging/layout, dumpster)
NO CONSTRUCTION PARKING
PROTECT LANDSCAPING
CONSTRUCTION PARKING
SITE ACCESS LEGEND
2901 Blake Street, Suite 100 Denver, CO 80205
303.861.8555
DPA Project:
Sheet Number:
Sheet Title:
Revisions Date No.
Sheet Information
Project Information
Issuance Date
Consultant(s)
A
B
C
D
E
F
2 3 4 5 6
1 2 3 4 5 6
A
B
C
D
E
F
Stamp
-F eb -2
:4 1:
22808.00.000
G-002 A
AS
U
R
ES
ID
EN
C E
AT
R
EX
PL
U
M B
IN
G
R
EN
O
VA
TI
O
N S:
P H
AS
E
Se le ct iv e
D em ol iti on
Ar ch ite ct ur e an d
El ec tri ca l
CONSTRUCTION
ACCESS SITE
PLAN
02/09/2024BID PACK A
COPYRIGHT © 2022 - DAVIS PARTNERSHIP, P.C.
S
TA
D
IU
M
D R
IV
E
AL
AM
O
SA
, C O
1" = 30'-0"B1 CONSTRUCTION ACCESS SITE PLAN CONSTRUCTION PARKING DIAGRAM
OVERFLOW
PARKING
O
VE
R
FL
O W
PA
R
KI
N G
C
IT
Y
PA
R
KI
N G
CITY PARKING
YRemy Image
YRemy
UP
UP
UP
UP
UP
UP
FD
FD
DN
UP
FD
DN
DN
UP
FD
UP
DN
UP UP
UP
DN
UP
FD
FD
FD
FD
FD
FD
AREA A AREA B
AREA A AREA B
AREA OF CONSTRUCTION PHASE #2
AREA OF CONSTRUCTION PHASE #1
NOT IN SCOPE
AREA A AREA B
AREA A AREA B
AREA OF CONSTRUCTION PHASE #1
CONSTRUCTION PHASE NOTES & DESCRIPTIONS
NOTE:
CONTRACTOR TO PRICE PHASE #1 & #2 SEPARATELY.
PHASE #1
INCLUDES ALL WORK ON THE
RESIDENTIAL SIDE OF THE BUILDING
AND THE MAIN MECHANICAL ROOM
UPGRADES ON THE STADIUM SIDE.
PHASE #2
INCLUDES ALL REMAINING WORK ON
THE STADIUM SIDE OF THE BUILDING.
2901 Blake Street, Suite 100 Denver, CO 80205
303.861.8555
DPA Project:
Sheet Number:
Sheet Title:
Revisions Date No.
Sheet Information
Project Information
Issuance Date
Consultant(s)
A
B
C
D
E
F
2 3 4 5 6
1 2 3 4 5 6
A
B
C
D
E
F
Stamp
-F eb -2
:4 2:
22808.00.000
G-101 A
AS
U
R
ES
ID
EN
C E
AT
R
EX
PL
U
M B
IN
G
R
EN
O
VA
TI
O
N S:
P H
AS
E
Se le ct iv e
D em ol iti on
Ar ch ite ct ur e an d
El ec tri ca l
CONSTRUCTION
PHASE PLAN -
LEVEL 01 & LEVEL
02/09/2024BID PACK A
COPYRIGHT © 2022 - DAVIS PARTNERSHIP, P.C.
S
TA
D
IU
M
D R
IV
E
AL
AM
O
SA
, C O
1/16" = 1'-0"A1 CONSTRUCTION PHASE PLAN - LEVEL 01
1/16" = 1'-0"C1 CONSTRUCTION PHASE PLAN - LEVEL 02
ADDENDUM #02 04/05/2023 001
YRemy Image
YRemy
UP DN UPDN
DN
UP
FD
FD
FD
FD
FD
DN DN UP
DN
FD
DN
DN
FD
FD
FD
FD
AREA A AREA B
AREA A AREA B
AREA OF CONSTRUCTION PHASE #2
AREA OF CONSTRUCTION PHASE #1
NOT IN SCOPE
AREA A AREA B
AREA A AREA B
AREA OF CONSTRUCTION PHASE #1
AREA OF CONSTRUCTION PHASE #2
NOT IN SCOPE
CONSTRUCTION PHASE NOTES & DESCRIPTIONS
NOTE:
CONTRACTOR TO PRICE PHASE #1 & #2 SEPARATELY.
PHASE #1
INCLUDES ALL WORK ON THE
RESIDENTIAL SIDE OF THE BUILDING
AND THE MAIN MECHANICAL ROOM
UPGRADES ON THE STADIUM SIDE.
PHASE #2
INCLUDES ALL REMAINING WORK ON
THE STADIUM SIDE OF THE BUILDING.
2901 Blake Street, Suite 100 Denver, CO 80205
303.861.8555
DPA Project:
Sheet Number:
Sheet Title:
Revisions Date No.
Sheet Information
Project Information
Issuance Date
Consultant(s)
A
B
C
D
E
F
2 3 4 5 6
1 2 3 4 5 6
A
B
C
D
E
F
Stamp
-F eb -2
:4 2:
22808.00.000
G-102 A
AS
U
R
ES
ID
EN
C E
AT
R
EX
PL
U
M B
IN
G
R
EN
O
VA
TI
O
N S:
P H
AS
E
Se le ct iv e
D em ol iti on
Ar ch ite ct ur e an d
El ec tri ca l
CONSTRUCTION
PHASE PLAN -
LEVEL 03 & LEVEL
02/09/2024BID PACK A
COPYRIGHT © 2022 - DAVIS PARTNERSHIP, P.C.
S
TA
D
IU
M
D R
IV
E
AL
AM
O
SA
, C O
1/16" = 1'-0"A1 CONSTRUCTION PHASE PLAN - LEVEL 03
1/16" = 1'-0"C1 CONSTRUCTION PHASE PLAN - LEVEL 04
ADDENDUM #02 04/05/2023 001
YRemy Image
YRemy
UP
UP
UP
UP
UP
FD
FD
DN
UP
FD
DN
DN
UP
FD
UP
DN
UP UP
UP
DN
UP
FD
FD
FD
FD
FD
FD
LIFE SAFETY LEGEND
EXIT
EXISTING EXIT DISCHARGE
EXISTING EXIT ACCESS
LIFE SAFETY GENERAL NOTES
1. THE SCOPE OF WORK REQUIRED FOR THIS
PROJECT WILL NOT MODIFY ANY EXISTING EGRESS
PATHS OR OCCUPANCY LOADS.
2. THE LIFE SAFETY PLANS HAVE BEEN PROVIDED AS
REFERENCE FOR WALL RATING LOCATIONS.
3. THE CONTRACTOR IS RESPONSIBLE FOR ENSURING
THE WALL RATINGS REMAIN UNCHANGED AFTER
THE PLUMBING REPAIRS AND OTHER SCOPE ITEMS
INCLUDED IN THIS PROJECT HAVE BEEN
COMPLETED.
4. IF THE EXISTING CONDITIONS ARE FOUND TO BE
DIFFERENT FROM THE RATINGS SHOWN ON THE
LIFE SAFETY PLANS AND THE CORESPONDING
WALL REPAIR DETAILS ON SHEET A-550, THE
CONTRACTOR IS RESPONSIBLE FOR INFORMING
THE ARCHITECT OF THE DISCREPANCY TO OBTAIN
CLARIFICATION BEFORE THE REPAIRS ARE
FINALIZED.
1HREXISTING
FIRE PARTITION
(c)
FIRE RATED WALL LEGEND
EXISTING
FIRE WALL 2HR
EXISTING
FIRE BARRIER
FI
R
E / S
M
KE
RA
TI
NG
M
O
DI
FI
ER
S
NO
N-
RA
TE
D
SMOKE PARTITION (V)
EXISTING WALL
(HALFTONE)
2HR
1HR
1HR
EXISTING
FIRE BARRIER -
MIXED OCCUPANCY
SEPERATION
EXIT
EX
IT
EXIT
EXIT
EXIT
EXISTING
1-HOUR RATED LID ON STORAGE
ROOM UNDER STAIR LANDING
PER IBC 2006 SECTION 1009.5.3.
EX
IT
EX
IT
EX
IT
EXITEX
IT
EXIT
EX
IT
EXIT
EX
IT
EX
IT
EXIT
EXISTING
INCIDENTAL USE AREA PER IBC 2006
TABLE 508.2 AND SECTION 508.2.2.1.
EXIT
EXISTING
1-HOUR RATED LID ON EQUIP.
STORAGE ROOM AND
VESTIBULE UNDER STAIR
LANDING PER IBC 2006 SECTION
1009.5.3.
EXISTING
1-HOUR LID ON FIRE PUMP ROOM PER
NFPA-20, EXCEPTION 2.
EX
IT
EX
IT
EX
IT
EXISTING
2-HOUR FIRE-
RATED SHAFT
WALLS
EXISTING
1-HOUR SMOKE BARRIER LID ON MECH ROOM.
EXISTING
2-HOUR LID ON EXIT
VESTIBULE
EXISTING
1-HOUR SMOKE BARRIER
LID ON LAUNDRY ROOM.
EXISTING
1-HOUR FIRE-RATED LID
ON ELEC. / MECH. ROOM.
EXISTING
2-HOUR LID TO CLOSE
AND MAINTAIN STAIR
ENCLOSURE RATING
AT FLOOR ABOVE.
EISTING
2-HOUR FIRE-
RATED WALL
EXISTING
2-HOUR FIRE-
RATED LID
EXISTING
2-HOUR FIRE-RATED WALL
EXISTING
2-HOUR FIRE-RATED
SHAFT WALLS
EXISTING
2-HOUR FIRE-RATED
SHAFT WALLS
EXISTING
2-HOUR FIRE-RATED
SHAFT WALLS
EXISTING
2-HOUR FIRE-RATED
SHAFT WALLS
EXISTING
2-HOUR FIRE-RATED
SHAFT WALLS
EXISTING
2-HOUR FIRE-RATED
SHAFT WALLS
EXISTING
2-HOUR RATED LID UNDER
LANDING ABOVE TO ENCLOSE
PIPE PENETRATIONS
THROUGH STAIR.
EXIT
EXIT
EXIT
EXIT
EXIT
EXIT
EXISTING
2-HOUR FIRE-RATED
SHAFT WALLS
EXISTING
2-HOUR FIRE-RATED
SHAFT WALLS
EXISTING
2-HOUR FIRE-RATED
SHAFT WALLS
EXISTING
2-HOUR FIRE-RATED
SHAFT WALLS
EXISTING
2-HOUR FIRE-
RATED SHAFT
WALLS
EXISITING
2-HOUR FIRE-RATED
SHAFT WALLS
EXISTING
2-HOUR FIRE-RATED
SHAFT WALLS
EXISTING
2-HOUR FIRE-RATED
SHAFT WALLS
EXISTING
2-HOUR RATED LID UNDER
LANDING ABOVE TO ENCLOSE PIPE
PENETRATIONS THROUGH STAIR.
EXISTING
1/2-HOUR FIRE-
RATED FLOOR
EXISTING
1/2-HOUR FIRE-
RATED FLOOR
EXISTING
1-HOUR FIRE-RATED FLOOR
UNDER APARTMENT AND
CABLE/TV ROOM, THIS
LOCATION ONLY
2901 Blake Street, Suite 100 Denver, CO 80205
303.861.8555
DPA Project:
Sheet Number:
Sheet Title:
Revisions Date No.
Sheet Information
Project Information
Issuance Date
Consultant(s)
A
B
C
D
E
F
2 3 4 5 6
1 2 3 4 5 6
A
B
C
D
E
F
Stamp
-F eb -2
:4 3:
22808.00.000
LS-101
A
AS
U
R
ES
ID
EN
C E
AT
R
EX
PL
U
M B
IN
G
R
EN
O
VA
TI
O
N S:
P H
AS
E
Se le ct iv e
D em ol iti on
Ar ch ite ct ur e an d
El ec tri ca l
LIFE SAFETY
PLAN - LEVEL 01 &
LEVEL 02
02/09/2024BID PACK A
COPYRIGHT © 2022 - DAVIS PARTNERSHIP, P.C.
S
TA
D
IU
M
D R
IV
E
AL
AM
O
SA
, C O
1/16" = 1'-0"A1 LIFE SAFETY PLAN - LEVEL 01
1/16" = 1'-0"C1 LIFE SAFETY PLAN - LEVEL 02
YRemy Image
YRemy
UP DN UPDN
DN
UP
FD
FD
FD
FD
FD
DN DN UP
DN
FD
DN
DN
FD
FD
FD
FD
LIFE SAFETY LEGEND
EXIT
EXISTING EXIT DISCHARGE
EXISTING EXIT ACCESS
LIFE SAFETY GENERAL NOTES
1. THE SCOPE OF WORK REQUIRED FOR THIS
PROJECT WILL NOT MODIFY ANY EXISTING EGRESS
PATHS OR OCCUPANCY LOADS.
2. THE LIFE SAFETY PLANS HAVE BEEN PROVIDED AS
REFERENCE FOR WALL RATING LOCATIONS.
3. THE CONTRACTOR IS RESPONSIBLE FOR ENSURING
THE WALL RATINGS REMAIN UNCHANGED AFTER
THE PLUMBING REPAIRS AND OTHER SCOPE ITEMS
INCLUDED IN THIS PROJECT HAVE BEEN
COMPLETED.
4. IF THE EXISTING CONDITIONS ARE FOUND TO BE
DIFFERENT FROM THE RATINGS SHOWN ON THE
LIFE SAFETY PLANS AND THE CORESPONDING
WALL REPAIR DETAILS ON SHEET A-550, THE
CONTRACTOR IS RESPONSIBLE FOR INFORMING
THE ARCHITECT OF THE DISCREPANCY TO OBTAIN
CLARIFICATION BEFORE THE REPAIRS ARE
FINALIZED.
1HREXISTING
FIRE PARTITION
(c)
FIRE RATED WALL LEGEND
EXISTING
FIRE WALL 2HR
EXISTING
FIRE BARRIER
FI
R
E / S
M
KE
RA
TI
NG
M
O
DI
FI
ER
S
NO
N-
RA
TE
D
SMOKE PARTITION (V)
EXISTING WALL
(HALFTONE)
2HR
1HR
1HR
EXISTING
FIRE BARRIER -
MIXED OCCUPANCY
SEPERATION
EXIT
EXIT
EXIT
EXIT
EX
IT
EX
IT
EXIT
EXIT
EXIT
EXISTING
2-HOUR FIRE-RATED
SHAFT WALLS
EXISTING
2-HOUR FIRE-RATED
SHAFT WALLS
EXISTING
2-HOUR FIRE-RATED
SHAFT WALLS
EXISTING
2-HOUR FIRE-RATED
SHAFT WALLS
EXISTING
2-HOUR FIRE-
RATED SHAFT
WALLS
EXISTING
2-HOUR FIRE-RATED
SHAFT WALLS
EXISTING
2-HOUR FIRE-RATED
SHAFT WALLS
EXISTING
2-HOUR FIRE-RATED
SHAFT WALLS
EXISTING
ADA COMPLIANT UNIT
EXISTING
2-HOUR RATED LID UNDER LANDING
ABOVE TO ENCLOSE PIPE
PENETRATIONS THROUGH STAIR.
EXISTING
2-HOUR FIRE-RATED
SHAFT WALLS
EXISTING
1/2-HOUR FIRE-
RATED FLOOR
EXISTING
1/2-HOUR FIRE-
RATED FLOOR
EXIT
EXIT
EXIT
EXIT
EXITEXIT
EX
IT
EX
IT
EXITEXIT
EXISTING
INCIDENTAL USE AREA PER
IBC 2006 TABLE 508.2 AND
SECTION 508.2.2.1.
OPEN TO
BELOW
EXISTING
2-HOUR FIRE-RATED
SHAFT WALLS
EXISTING
2-HOUR FIRE-RATED
SHAFT WALLS
EXISTING
2-HOUR FIRE-RATED
SHAFT WALLS
EXISTING
2-HOUR FIRE-RATED
SHAFT WALLS
EXISTING
2-HOUR FIRE-RATED
SHAFT WALLS
EXISTING
2-HOUR FIRE-RATED
SHAFT WALLS
EXISTING
2-HOUR FIRE-RATED
SHAFT WALLS
EXISTING
2-HOUR FIRE-RATED
SHAFT WALLS
2-HOUR FIRE-RATED
SHAFT WALLS
EXISTING
2-HOUR FIRE-RATED
SHAFT WALLS
EXISTING
ADA COMPLIANT UNITS
EXISTING
2-HOUR RATED LID UNDER
LANDING ABOVE TO ENCLOSE PIPE
PENETRATIONS THROUGH STAIR.
EXISTING
2-HOUR FIRE-RATED
SHAFT WALLS
NOTE:
EXISTING
ROOF IS NOT REQUIRED
TO BE FIRE -RATED.
EXISTING
1/2-HOUR FIRE-RATED FLOOR
EXCEPT AS FOLLOWS:
1-HOUR FIRE-RATED FLOOR AT
APARTMENTS AND WALKWAY
LOCATED BETWEEN GRID
LINES 4 AND 6, A AND F
EXISTING
1/2-HOUR FIRE-
RATED FLOOR
2901 Blake Street, Suite 100 Denver, CO 80205
303.861.8555
DPA Project:
Sheet Number:
Sheet Title:
Revisions Date No.
Sheet Information
Project Information
Issuance Date
Consultant(s)
A
B
C
D
E
F
2 3 4 5 6
1 2 3 4 5 6
A
B
C
D
E
F
Stamp
-F eb -2
:4 3:
22808.00.000
LS-102
A
AS
U
R
ES
ID
EN
C E
AT
R
EX
PL
U
M B
IN
G
R
EN
O
VA
TI
O
N S:
P H
AS
E
Se le ct iv e
D em ol iti on
Ar ch ite ct ur e an d
El ec tri ca l
LIFE SAFETY
PLAN - LEVEL 03 &
LEVEL 04
02/09/2024BID PACK A
COPYRIGHT © 2022 - DAVIS PARTNERSHIP, P.C.
S
TA
D
IU
M
D R
IV
E
AL
AM
O
SA
, C O
1/16" = 1'-0"A1 LIFE SAFETY PLAN - LEVEL 03
1/16" = 1'-0"C1 LIFE SAFETY PLAN - LEVEL 04
YRemy Image
YRemy
UP
UP
UP
UPUP
UP
AB
CD
H EFGJKLMNP
C.5D.5
RW
GAMEDAY
LOCKER B
GAMEDAY
LOCKER A
TRAINING
SHOWER
TOILET
WOMEN #1
OFFICIALS
LOCKER
ELEC. / MECH.
VEST
VEST
EQUIP STOR
CONCOURSE
STAIR #5
ST-105
STAIR #2
ST-102
ELEV MACH
ELEV #1
EL-101
EQUIP STOR
CORRIDOR
WOMEN #2
TOILET
TRAINING
SHOWER
CL
CL
CORRIDOR
STAIR #6
ST-106
LAUNDRY
ELEV MACH
D07
STAIR #8
ST-108
CUSTODIAL
MECH ROOM
WATER ENTRY
STOR
FIRE PUMP
VEST
OFFICIALS
BATHROOM
VIF
+/- 9'-0"
CORRIDOR
CORRIDOR
RAMP #2
R-102
STAIR #4
ST-104
UNISEX
MEN
TICKETS
PANTRY
SOFT GOODS
CONCESSIONS
154CONCESSIONS
D07D08
D22
D23
D23
D23
D23 D23
D23
D23
D23
D23
D23
D23
D23
D23
D23
D23
A1
A2
A2
A4
M
AT
C H
LI
N
E A
M
AT
C H
LI
N
E A
NOT IN SCOPE
A
B
N
TRUE
NORTH
N
PROJECT
NORTH
EXISTING TO REMAIN
EXISTING TO BE REMOVED
EXISTING FINISHES TO BE REMOVED
EXISTING PLUMBING FIXTURES TO BE REMOVED
REMOVE GYP CEILINGS
Key Plan
Demo Legend (Note: Not all symbols are used in this project.)
Demolition General Notes
Demolition Key Notes
1. FURNITURE TO REMAIN IN ALL UNITS. THE CONTRACTOR
SHALL MOVE ALL FURNITURE AWAY FROM THE AREA OF
WORK & ENSURE THAT THE FURNITURE IS PROTECTED &
PRESERVED FOR THE DURATION OF THE WORK.
2. REMOVE GYP WALLS AND CEILINGS AS REQUIRED FOR PEX
REPLACEMENT, REMOVE WATER DAMAGED GYP AND
INSULATION IN ITS ENTIRETY, METAL FRAMING TO REMAIN;
SEE PLUMBING.
3. AT ALL AREAS OF PEX REPLACEMENT AND WATER DAMAGE
WHERE GYP IS REMOVED WITHIN 1'-0" OF THE FFE, REMOVE
THE EXISTING RESILIENT BASE 1'-0" BEYOND EDGE OF GYP
DEMO TO ALLOW FOR MUDDING AND FEATHERING-IN OF
NEW GYP BOARD.
4. IN ALL AREAS WITH GYP WORK: REMOVE, SALVAGE,
PROTECT, & PRESERVE LIGHTING FIXTURES, VENT COVERS,
WALL FIXTURES, AND ALL OTHER GYP MOUNTED
ACCESSORIES AS REQUIRED, SEE ELECTRICAL.
5. REMOVE ACT TILES AND GRID AS NEEDED FOR PEX
REPLACEMENT. REMOVE WATER DAMAGED ACT CEILING
TILES AND PROVIDE NEW WHEN NEEDED, SUSPENSION
SYSTEM TO REMAIN; SEE PLUMBING.
6. PATCH AND REPAIR ANY WALLS AND CEILINGS TO REMAIN
ADJACENT TO DEMOLITION.
7. RE: PLUMBING AND ELECTRICAL SHEETS FOR EXTENTS OF
DEMOLITION WORK.
8. WHENEVER EXISTING UTILITIES MUST BE REMOVED:
EXPOSED OPENINGS IN ADJACENT FLOORS OR WALLS ARE
TO BE KEPT TO A MINIMUM AND ONLY DEMOLISHED TO THE
EXTENT TO ALLOW THE DEMOLITION WORK TO OCCUR.
9. BUILDING EXITS TO REMAIN FUNCTIONAL THROUGHOUT
CONSTRUCTION. IF NECESSARY, PROVIDE TEMPORARY EXIT
PATH WHERE DEMOLITION MAY IMPEDE EXISTING EXIT.
10. ALL FIRE PROTECTION SYSTEMS TO REMAIN OPERATIONAL
DURING DEMOLITION AND FOR THE DURATION OF THE
WORK.
11. THE CONTRACTOR SHALL MAINTAIN THE EXISTING
STRUCTURAL AND FIREPROOFING INTEGRITY THROUGHOUT
THE ENTIRE BUILDING AREA.
12. PHOTOS ARE PROVIDED FOR EXISTING REFERENCES ONLY
AND ARE NOT INTENDED TO FULLY CAPTURE THE EXISTING
CONDITIONS OF THE BUILDING.
13. ALL CARPET, COUNTERTOPS, TILE, AND CASEWORK WITHIN
THE AREA OF WORK SHALL BE PROTECTED & PRESERVED
FOR THE DURATION OF THE WORK.
14. ANY BASE CABINET, SINK, COUNTERTOP, AND UPPER
CABINET AS REQUIRED SHALL BE PROTECTED &
PRESERVED FROM OVERHEAD WORK DURING THE
DURATION OF THE WORK.
15. PROTECT AND PRESERVE IN PLACE ALL EXISTING METAL
STUDS AND FRAMING, UNLESS OTHERWISE NOTED. IN THE
EVENT THAT METAL STUDS AND/OR FRAMING ARE DAMAGED
DURING DEMOLITION, THE CONTRACTOR IS RESPONSIBLE
FOR MAINTAINING THE STRUCTURAL INTEGRITY OF ALL
LOAD BEARING MEMBERS, SHORING IF NECESSARY, AND
INFORMING THE ARCHITECT.
16. AT ALL EXIT SIGNS WHERE THE WORK REQUIRES THE EXIT
SIGNS TO BE REMOVED AND REINSTALLED, THE
CONTRACTOR SHALL DOCUMENT THE SPECIFIC LOCATION
AND ORIENTATION OF EACH SIGN IN PLAN AND WITH
PHOTOGRAPHS; AND SUBMIT THESE DOCUMENTS TO THE
ARCHITECT FOR THEIR RECORDS TO BE REFERENCED AT
REINSTALLATION.
2901 Blake Street, Suite 100 Denver, CO 80205
303.861.8555
DPA Project:
Sheet Number:
Sheet Title:
Revisions Date No.
Sheet Information
Project Information
Issuance Date
Consultant(s)
A
B
C
D
E
F
2 3 4 5 6
1 2 3 4 5 6
A
B
C
D
E
F
Stamp
-F eb -2
:3 9:
22808.00.000
AD-101.A
AS
U
R
ES
ID
EN
C E
AT
R
EX
PL
U
M B
IN
G
R
EN
O
VA
TI
O
N S:
P H
AS
E
Se le ct iv e
D em ol iti on
Ar ch ite ct ur e an d
El ec tri ca l
DEMOLITION
FLOOR PLAN -
LEVEL 01 - AREA
A
02/09/2024BID PACK A
COPYRIGHT © 2022 - DAVIS PARTNERSHIP, P.C.
S
TA
D
IU
M
D R
IV
E
AL
AM
O
SA
, C O
1/8" = 1'-0"B1 DEMOLITION FLOOR PLAN - LEVEL 1 - AREA A
Key Value Keynote Text
D07 REMOVE GYP AS REQUIRED FOR PEX TUBING REPLACEMENT, REMOVE
WATER DAMAGED GYP AND INSULATION WHERE PRESENT IN IT'S ENTIRETY,
METAL FRAMING TO REMAIN, SEE PLUMBING
D08 EXISTING MOP SINK TO REMAIN. REMOVE, SALVAGE, PROTECT & PRESERVE
FOR RE-INSTALLATION METAL WALL PLATE COVER WHERE PRESENT.
D22 AREA OF WORK FOR NEW DOMESTIC WATER STORAGE TANK (BUFFER
TANK), NEW THERMAL EXPANSION TANK, & NEW DIGITAL WATER MIXING
VALVE; SEE PLUMBING & ELECTRICAL
D23 TOOTH OUT CMU AS REQUIRED FOR PEX REPLACEMENT; SEE PLUMBING.
ASSUME 16" X 16" TOOTHED OUT FACE OF CMU TO ALLOW FOR ACCESS AT
ALL PLUMBING PENETRATIONS TO BE REPLACED IN EXISTING CMU WALLS.
Not To ScaleA1 165 - CUSTODIAL - EXIST. MOP SINK Not To ScaleA2 166 - LAUNDRY - EXIST. WALL CONDITIONS
Not To ScaleA3 174 - WOMEN - EXIST. SINK CONDITIONS Not To ScaleA4 187 - WOMEN - EXIST. WALL CONDITIONS
ADDENDUM #01 03/10/2023 001
YRemy Image
YRemy
DN
FD
DN
REF.
REF.
REF.
FD
A
RU RT RS RR
RP
RN
RM
RL
RK
RJ
RH
RG
RF
RE
RD
RC
RA
R1
R1.2
R2.2
R3.2
R1.1
R2.1
R3.1
R2
R3
RQ
RVRW
RB
VEST
EQUIP STOR
LOBBY
VEST
103G
VEST
102G
BREEZEWAY
STAIR #9
ST-109
VEST
101J
LAUNDRY
ELEV MACH
SUITE 1A
103A
SUITE 1B
103B
SUITE 1C
103C
SUITE 1D
103D
LIVING
103E
KITCHEN
103F
TOILET
103HSINK
103J
SHOWER
103K
HALL
103M
SUITE 2A
102A
SUITE 2B
102B
SUITE 2C
102C
SUITE 2D
102D
LIVING
102E
KITCHEN
102F
TOILET
102H
SINK
102JSHOWER
102K
CL
102L
HALL
102M
SUITE 3A
101A
SUITE 3B
101B
SUITE 3C
101C
SUITE 3D
101D
LIVING
101E
KITCHEN
101F
SHOWER
101K
CL
101L
HALL
101M
TOILET
101H
SINK
101G
D19
D03
D13 D12
D13
D12
D13
CL
103L
D24D24
D07 D07 D09
D12
D03
D07
D24
D07
D07
D24
D27
D07
D07
D10
D07
D07
D07
D07
D18 D27 D09
D12
D09
D12
D18
D07
D19
D24
D07 D18
D27
D07
D19
D26
D18
M
AT
C H
LI
N
E A
M
AT
C H
LI
N
E A
N O
T
IN
S C
O
PE
A
B
N
TRUE
NORTH
N
PROJECT
NORTH
EXISTING TO REMAIN
EXISTING TO BE REMOVED
EXISTING FINISHES TO BE REMOVED
EXISTING PLUMBING FIXTURES TO BE REMOVED
REMOVE GYP CEILINGS
Key Plan
Demo Legend (Note: Not all symbols are used in this project.)
Demolition General Notes
Demolition Key Notes
1. FURNITURE TO REMAIN IN ALL UNITS. THE CONTRACTOR
SHALL MOVE ALL FURNITURE AWAY FROM THE AREA OF
WORK & ENSURE THAT THE FURNITURE IS PROTECTED &
PRESERVED FOR THE DURATION OF THE WORK.
2. REMOVE GYP WALLS AND CEILINGS AS REQUIRED FOR PEX
REPLACEMENT, REMOVE WATER DAMAGED GYP AND
INSULATION IN ITS ENTIRETY, METAL FRAMING TO REMAIN;
SEE PLUMBING.
3. AT ALL AREAS OF PEX REPLACEMENT AND WATER DAMAGE
WHERE GYP IS REMOVED WITHIN 1'-0" OF THE FFE, REMOVE
THE EXISTING RESILIENT BASE 1'-0" BEYOND EDGE OF GYP
DEMO TO ALLOW FOR MUDDING AND FEATHERING-IN OF
NEW GYP BOARD.
4. IN ALL AREAS WITH GYP WORK: REMOVE, SALVAGE,
PROTECT, & PRESERVE LIGHTING FIXTURES, VENT COVERS,
WALL FIXTURES, AND ALL OTHER GYP MOUNTED
ACCESSORIES AS REQUIRED, SEE ELECTRICAL.
5. REMOVE ACT TILES AND GRID AS NEEDED FOR PEX
REPLACEMENT. REMOVE WATER DAMAGED ACT CEILING
TILES AND PROVIDE NEW WHEN NEEDED, SUSPENSION
SYSTEM TO REMAIN; SEE PLUMBING.
6. PATCH AND REPAIR ANY WALLS AND CEILINGS TO REMAIN
ADJACENT TO DEMOLITION.
7. RE: PLUMBING AND ELECTRICAL SHEETS FOR EXTENTS OF
DEMOLITION WORK.
8. WHENEVER EXISTING UTILITIES MUST BE REMOVED:
EXPOSED OPENINGS IN ADJACENT FLOORS OR WALLS ARE
TO BE KEPT TO A MINIMUM AND ONLY DEMOLISHED TO THE
EXTENT TO ALLOW THE DEMOLITION WORK TO OCCUR.
9. BUILDING EXITS TO REMAIN FUNCTIONAL THROUGHOUT
CONSTRUCTION. IF NECESSARY, PROVIDE TEMPORARY EXIT
PATH WHERE DEMOLITION MAY IMPEDE EXISTING EXIT.
10. ALL FIRE PROTECTION SYSTEMS TO REMAIN OPERATIONAL
DURING DEMOLITION AND FOR THE DURATION OF THE
WORK.
11. THE CONTRACTOR SHALL MAINTAIN THE EXISTING
STRUCTURAL AND FIREPROOFING INTEGRITY THROUGHOUT
THE ENTIRE BUILDING AREA.
12. PHOTOS ARE PROVIDED FOR EXISTING REFERENCES ONLY
AND ARE NOT INTENDED TO FULLY CAPTURE THE EXISTING
CONDITIONS OF THE BUILDING.
13. ALL CARPET, COUNTERTOPS, TILE, AND CASEWORK WITHIN
THE AREA OF WORK SHALL BE PROTECTED & PRESERVED
FOR THE DURATION OF THE WORK.
14. ANY BASE CABINET, SINK, COUNTERTOP, AND UPPER
CABINET AS REQUIRED SHALL BE PROTECTED &
PRESERVED FROM OVERHEAD WORK DURING THE
DURATION OF THE WORK.
15. PROTECT AND PRESERVE IN PLACE ALL EXISTING METAL
STUDS AND FRAMING, UNLESS OTHERWISE NOTED. IN THE
EVENT THAT METAL STUDS AND/OR FRAMING ARE DAMAGED
DURING DEMOLITION, THE CONTRACTOR IS RESPONSIBLE
FOR MAINTAINING THE STRUCTURAL INTEGRITY OF ALL
LOAD BEARING MEMBERS, SHORING IF NECESSARY, AND
INFORMING THE ARCHITECT.
16. AT ALL EXIT SIGNS WHERE THE WORK REQUIRES THE EXIT
SIGNS TO BE REMOVED AND REINSTALLED, THE
CONTRACTOR SHALL DOCUMENT THE SPECIFIC LOCATION
AND ORIENTATION OF EACH SIGN IN PLAN AND WITH
PHOTOGRAPHS; AND SUBMIT THESE DOCUMENTS TO THE
ARCHITECT FOR THEIR RECORDS TO BE REFERENCED AT
REINSTALLATION.
2901 Blake Street, Suite 100 Denver, CO 80205
303.861.8555
DPA Project:
Sheet Number:
Sheet Title:
Revisions Date No.
Sheet Information
Project Information
Issuance Date
Consultant(s)
A
B
C
D
E
F
2 3 4 5 6
1 2 3 4 5 6
A
B
C
D
E
F
Stamp
-F eb -2
:3 9:
22808.00.000
AD-101.B
AS
U
R
ES
ID
EN
C E
AT
R
EX
PL
U
M B
IN
G
R
EN
O
VA
TI
O
N S:
P H
AS
E
Se le ct iv e
D em ol iti on
Ar ch ite ct ur e an d
El ec tri ca l
DEMOLITION
FLOOR PLAN -
LEVEL 01 - AREA
B
02/09/2024BID PACK A
COPYRIGHT © 2022 - DAVIS PARTNERSHIP, P.C.
S
TA
D
IU
M
D R
IV
E
AL
AM
O
SA
, C O
1/8" = 1'-0"1 DEMOLITION FLOOR PLAN - LEVEL 1 - AREA B
Key Value Keynote Text
D03 EXISTING CASEWORK TO REMAIN, PROTECT & PRESERVE CASEWORK
DURING PEX REPLACEMENT; SEE PLUMBING
D07 REMOVE GYP AS REQUIRED FOR PEX TUBING REPLACEMENT, REMOVE
WATER DAMAGED GYP AND INSULATION WHERE PRESENT IN IT'S ENTIRETY,
METAL FRAMING TO REMAIN, SEE PLUMBING
D09 REMOVE, SALVAGE, PROTECT, & PRESERVE FOR RE-INSTALLATION
SHOWER HEAD AS REQUIRED FOR GYP & PEX REPLACEMENT, SEE
PLUMBING
D10 REMOVE FRP WALL PANELING AS REQUIRED FOR PEX REPLACEMENT; SEE
PLUMBING. PREPARE WALL TO RECEIVE NEW FRP. AT DORM BATHROOMS,
ASSUME REMOVAL OF FRP ALONG THE FULL LENGTH OF THE EXISTING
PLUMBING WALL. AT THE COMMERCIAL KITCHEN, ASSUME THE REMOVAL
OF FRP IN UNITS OF 48" X 72" PANELS AT EXISTING PLUMBING DROPS TO BE
REPLACED.
D12 REMOVE WATER DAMAGED GYP AND INSULATION (WHERE PRESENT) FROM
APROX. 4'-0" ABOVE FFE TO CEILING IN IT'S ENTIRETY, METAL FRAMING TO
REMAIN. AT SHOWERS, PRESERVE 6" OF GYP ABOVE TOP EDGE OF
SHOWER INSERT TO ALLOW FOR MUDDING AND FEATHERING-IN OF NEW
GYP BOARD.
D13 REMOVE WATER DAMAGED GYP, INSULATION (WHERE PRESENT), &
RESILIENT BASE FROM FLOOR TO CEILING IN IT'S ENTIRETY, METAL
FRAMING TO REMAIN. REMOVE RESILIENT BASE 1'-0" BEYOND EDGE OF GYP
DEMO TO ALLOW FOR MUDDING AND FEATHERING-IN OF NEW GYP BOARD.
D18 UNINSTALL, SALVAGE, PROTECT, & PRESERVE FOR RE-INSTALLATION SINK,
BASE CABINET, & UPPER CABINET AS REQUIRED FOR PEX REPLACEMENT;
SEE PLUMBING
D19 UNINSTALL, SALVAGE, PROTECT, & PRESERVE FOR RE-INSTALLATION
EXISTING SOLID SURFACE COUNTERTOP. CASEWORK TO REMAIN AND TO
BE PROTECTED & PRESERVED FOR THE DURATION OF THE WORK UNLESS
OTHERWISE NOTED.
D24 REMOVE EXITING MIRRORS AND ALL ASSOCIATED CLIPS AND TRACKS AS
REQUIRED FOR PEX REPLACEMENT, SEE PLUMBING
D26 REMOVE, SALVAGE, PROTECT, & PRESERVE FOR RE-INSTALLATION IN-WALL
MEDICINE CABINET AS NEEDED FOR PEX REPLACEMENT.
D27 UNINSTALL, SALVAGE, PROTECT, & PRESERVE FOR RE-INSTALLATION ADA
ACCESS PANEL UNDER SINK AS REQUIRED FOR PEX REPLACEMENT; SEE
PLUMBING. SURROUNDING CASEWORK TO REMAIN AND TO BE PROTECTED
& PRESERVED FOR THE DURATION OF THE WORK UNLESS OTHERWISE
NOTED.
ADDENDUM #01 03/10/2023 001
YRemy Image
YRemy
UP UP
DN
DN
DN
DN
UP
R
EF
DNDN
FD
FD
DN
A
B
N
TRUE
NORTH
N
PROJECT
NORTH
A
A
B
CD
H EFGJKLMNP
C.5D.5
RW
JAN
CABLE/TV
CORR
LIVING
205G
SUITE 4A
205A
SUITE 4B
SUITE 4C
205C
SUITE 4D
205D
KITCHEN
205F
LIVING
205G
STAIR #8
ST-208
REFUGE
SUITE 4E
205E
TOILET
205J
SINK
205K
SHOWER
205L
BATHROOM
205M
CL
205N
D13
STAIR #5
ST-205
STAIR #2
ST-202
ELEV #1
EL-101
SEATING
201Y
VOMITORIUM #2
GRIZZLY CLUB
201X
VOMITORIUM #3
SEATING
201W
VOMITORIUM #1
STAIR #6
ST-106
VOMITORIUM #4
VOMITORIUM #5
D03
D07
D07
D18
D07
D24
D07
D10
D18D19 D03
D07
D10
D07
D12D09
D12
D19
D07
D24
A1
A2
A3
E1
M
AT
C H
LI
N
E A
M
AT
C H
LI
N
E A
NOT IN SCOPE
EXISTING TO REMAIN
EXISTING TO BE REMOVED
EXISTING FINISHES TO BE REMOVED
EXISTING PLUMBING FIXTURES TO BE REMOVED
REMOVE GYP CEILINGS
Key Plan
Demo Legend (Note: Not all symbols are used in this project.)
Demolition General Notes
Demolition Key Notes
1. FURNITURE TO REMAIN IN ALL UNITS. THE CONTRACTOR
SHALL MOVE ALL FURNITURE AWAY FROM THE AREA OF
WORK & ENSURE THAT THE FURNITURE IS PROTECTED &
PRESERVED FOR THE DURATION OF THE WORK.
2. REMOVE GYP WALLS AND CEILINGS AS REQUIRED FOR PEX
REPLACEMENT, REMOVE WATER DAMAGED GYP AND
INSULATION IN ITS ENTIRETY, METAL FRAMING TO REMAIN;
SEE PLUMBING.
3. AT ALL AREAS OF PEX REPLACEMENT AND WATER DAMAGE
WHERE GYP IS REMOVED WITHIN 1'-0" OF THE FFE, REMOVE
THE EXISTING RESILIENT BASE 1'-0" BEYOND EDGE OF GYP
DEMO TO ALLOW FOR MUDDING AND FEATHERING-IN OF
NEW GYP BOARD.
4. IN ALL AREAS WITH GYP WORK: REMOVE, SALVAGE,
PROTECT, & PRESERVE LIGHTING FIXTURES, VENT COVERS,
WALL FIXTURES, AND ALL OTHER GYP MOUNTED
ACCESSORIES AS REQUIRED, SEE ELECTRICAL.
5. REMOVE ACT TILES AND GRID AS NEEDED FOR PEX
REPLACEMENT. REMOVE WATER DAMAGED ACT CEILING
TILES AND PROVIDE NEW WHEN NEEDED, SUSPENSION
SYSTEM TO REMAIN; SEE PLUMBING.
6. PATCH AND REPAIR ANY WALLS AND CEILINGS TO REMAIN
ADJACENT TO DEMOLITION.
7. RE: PLUMBING AND ELECTRICAL SHEETS FOR EXTENTS OF
DEMOLITION WORK.
8. WHENEVER EXISTING UTILITIES MUST BE REMOVED:
EXPOSED OPENINGS IN ADJACENT FLOORS OR WALLS ARE
TO BE KEPT TO A MINIMUM AND ONLY DEMOLISHED TO THE
EXTENT TO ALLOW THE DEMOLITION WORK TO OCCUR.
9. BUILDING EXITS TO REMAIN FUNCTIONAL THROUGHOUT
CONSTRUCTION. IF NECESSARY, PROVIDE TEMPORARY EXIT
PATH WHERE DEMOLITION MAY IMPEDE EXISTING EXIT.
10. ALL FIRE PROTECTION SYSTEMS TO REMAIN OPERATIONAL
DURING DEMOLITION AND FOR THE DURATION OF THE
WORK.
11. THE CONTRACTOR SHALL MAINTAIN THE EXISTING
STRUCTURAL AND FIREPROOFING INTEGRITY THROUGHOUT
THE ENTIRE BUILDING AREA.
12. PHOTOS ARE PROVIDED FOR EXISTING REFERENCES ONLY
AND ARE NOT INTENDED TO FULLY CAPTURE THE EXISTING
CONDITIONS OF THE BUILDING.
13. ALL CARPET, COUNTERTOPS, TILE, AND CASEWORK WITHIN
THE AREA OF WORK SHALL BE PROTECTED & PRESERVED
FOR THE DURATION OF THE WORK.
14. ANY BASE CABINET, SINK, COUNTERTOP, AND UPPER
CABINET AS REQUIRED SHALL BE PROTECTED &
PRESERVED FROM OVERHEAD WORK DURING THE
DURATION OF THE WORK.
15. PROTECT AND PRESERVE IN PLACE ALL EXISTING METAL
STUDS AND FRAMING, UNLESS OTHERWISE NOTED. IN THE
EVENT THAT METAL STUDS AND/OR FRAMING ARE DAMAGED
DURING DEMOLITION, THE CONTRACTOR IS RESPONSIBLE
FOR MAINTAINING THE STRUCTURAL INTEGRITY OF ALL
LOAD BEARING MEMBERS, SHORING IF NECESSARY, AND
INFORMING THE ARCHITECT.
16. AT ALL EXIT SIGNS WHERE THE WORK REQUIRES THE EXIT
SIGNS TO BE REMOVED AND REINSTALLED, THE
CONTRACTOR SHALL DOCUMENT THE SPECIFIC LOCATION
AND ORIENTATION OF EACH SIGN IN PLAN AND WITH
PHOTOGRAPHS; AND SUBMIT THESE DOCUMENTS TO THE
ARCHITECT FOR THEIR RECORDS TO BE REFERENCED AT
REINSTALLATION.
2901 Blake Street, Suite 100 Denver, CO 80205
303.861.8555
DPA Project:
Sheet Number:
Sheet Title:
Revisions Date No.
Sheet Information
Project Information
Issuance Date
Consultant(s)
A
B
C
D
E
F
2 3 4 5 6
1 2 3 4 5 6
A
B
C
D
E
F
Stamp
-F eb -2
:3 9:
22808.00.000
AD-102.A
AS
U
R
ES
ID
EN
C E
AT
R
EX
PL
U
M B
IN
G
R
EN
O
VA
TI
O
N S:
P H
AS
E
Se le ct iv e
D em ol iti on
Ar ch ite ct ur e an d
El ec tri ca l
DEMOLITION
FLOOR PLAN -
LEVEL 02 - AREA
A
02/09/2024BID PACK A
COPYRIGHT © 2022 - DAVIS PARTNERSHIP, P.C.
S
TA
D
IU
M
D R
IV
E
AL
AM
O
SA
, C O
1/8" = 1'-0"b1 DEMOLITION FLOOR PLAN - LEVEL 2 - AREA A
Key Value Keynote Text
D03 EXISTING CASEWORK TO REMAIN, PROTECT & PRESERVE CASEWORK
DURING PEX REPLACEMENT; SEE PLUMBING
D07 REMOVE GYP AS REQUIRED FOR PEX TUBING REPLACEMENT, REMOVE
WATER DAMAGED GYP AND INSULATION WHERE PRESENT IN IT'S ENTIRETY,
METAL FRAMING TO REMAIN, SEE PLUMBING
D09 REMOVE, SALVAGE, PROTECT, & PRESERVE FOR RE-INSTALLATION
SHOWER HEAD AS REQUIRED FOR GYP & PEX REPLACEMENT, SEE
PLUMBING
D10 REMOVE FRP WALL PANELING AS REQUIRED FOR PEX REPLACEMENT; SEE
PLUMBING. PREPARE WALL TO RECEIVE NEW FRP. AT DORM BATHROOMS,
ASSUME REMOVAL OF FRP ALONG THE FULL LENGTH OF THE EXISTING
PLUMBING WALL. AT THE COMMERCIAL KITCHEN, ASSUME THE REMOVAL
OF FRP IN UNITS OF 48" X 72" PANELS AT EXISTING PLUMBING DROPS TO BE
REPLACED.
D12 REMOVE WATER DAMAGED GYP AND INSULATION (WHERE PRESENT) FROM
APROX. 4'-0" ABOVE FFE TO CEILING IN IT'S ENTIRETY, METAL FRAMING TO
REMAIN. AT SHOWERS, PRESERVE 6" OF GYP ABOVE TOP EDGE OF
SHOWER INSERT TO ALLOW FOR MUDDING AND FEATHERING-IN OF NEW
GYP BOARD.
D13 REMOVE WATER DAMAGED GYP, INSULATION (WHERE PRESENT), &
RESILIENT BASE FROM FLOOR TO CEILING IN IT'S ENTIRETY, METAL
FRAMING TO REMAIN. REMOVE RESILIENT BASE 1'-0" BEYOND EDGE OF GYP
DEMO TO ALLOW FOR MUDDING AND FEATHERING-IN OF NEW GYP BOARD.
D18 UNINSTALL, SALVAGE, PROTECT, & PRESERVE FOR RE-INSTALLATION SINK,
BASE CABINET, & UPPER CABINET AS REQUIRED FOR PEX REPLACEMENT;
SEE PLUMBING
D19 UNINSTALL, SALVAGE, PROTECT, & PRESERVE FOR RE-INSTALLATION
EXISTING SOLID SURFACE COUNTERTOP. CASEWORK TO REMAIN AND TO
BE PROTECTED & PRESERVED FOR THE DURATION OF THE WORK UNLESS
OTHERWISE NOTED.
D24 REMOVE EXITING MIRRORS AND ALL ASSOCIATED CLIPS AND TRACKS AS
REQUIRED FOR PEX REPLACEMENT, SEE PLUMBING
Not To ScaleA1 205 - DORM - EXIST. KITCHEN SINK CONDITION Not To ScaleA2 205 - DORM - EXIST. CLOSET CONDITION
Not To ScaleA3 205 - DORM - EXIST. FLOOR CONDITIONS
Not To ScaleE1 205 - DORM - EXIST. MIRROR AND SINK COND.
ADDENDUM #01 03/10/2023 001
YRemy Image
YRemy
UP
DN
UP
FD
FD
FD
FD
REF.
REF.
REF.
REF.
A
B
N
TRUE
NORTH
N
PROJECT
NORTH
A
A
B
B
RU RT RS RR
RP
RN
RM
RL
RK
RJ
RH
RG
RF
RE
RD
RC
RA
R1
R1.2
R2.2
R3.2
R1.1
R2.1
R3.1
R2
R3
RQ
RVRW
RB
VEST
204E
VEST
203G
VEST
202G
VEST
201J
WALKWAY
STAIR #9
ST-209
BREEZEWAY
JAN
212CABLE/TV
CORR
LIVING
205G
SUITE 1A
203A
SUITE 1B
203B
SUITE 1C
203C
SUITE 1D
203D
LIVING
203E
SINK
203J
TOILET
203H
SHOWER
203K
CL
203L
TELECOM
LOBBY
KITCHEN
204D
LIVING
204C
BATH
204B
RA SUITE
204ASTAIR #8
ST-208
KITCHEN
203F
D03
D12
D13
D12
D13 D12
D12
SUITE 2A
202A
SUITE 2B
202B
SUITE 2C
202C
SUITE 2D
202D
LIVING
202E
SHOWER
202K SINK
202J
TOILET
202H
CL
202L
HALL
202M
KITCHEN
202F
CL
201L
SUITE 3A
201A
SUITE 3B
201B
SUITE 3C
201C
SUITE 3D
201D
LIVING
201E
KITCHEN
201F
TOILET
201H
SINK
201G
HALL
201M
SHOWER
201K
D19
D07
D24
D07
HALL
203M
D07 D09
D07
D07
D07
D07
D19
D24
D24
D27
D07
D07
D07
D10
D07
D07
D09
D12 D09
D12
D09
D12
D03D19D24
D07
D18
D19
D07
D18
D07
D07
D18
D18
D03
D07 D08
A1
A3A4
E1
E2
E3
D26
D18
D27
D27
D18
D07
D24
D27
M
AT
C H
LI
N
E A
M
AT
C H
LI
N
E A
EXISTING TO REMAIN
EXISTING TO BE REMOVED
EXISTING FINISHES TO BE REMOVED
EXISTING PLUMBING FIXTURES TO BE REMOVED
REMOVE GYP CEILINGS
Key Plan
Demo Legend (Note: Not all symbols are used in this project.)
Demolition General Notes
Demolition Key Notes
1. FURNITURE TO REMAIN IN ALL UNITS. THE CONTRACTOR
SHALL MOVE ALL FURNITURE AWAY FROM THE AREA OF
WORK & ENSURE THAT THE FURNITURE IS PROTECTED &
PRESERVED FOR THE DURATION OF THE WORK.
2. REMOVE GYP WALLS AND CEILINGS AS REQUIRED FOR PEX
REPLACEMENT, REMOVE WATER DAMAGED GYP AND
INSULATION IN ITS ENTIRETY, METAL FRAMING TO REMAIN;
SEE PLUMBING.
3. AT ALL AREAS OF PEX REPLACEMENT AND WATER DAMAGE
WHERE GYP IS REMOVED WITHIN 1'-0" OF THE FFE, REMOVE
THE EXISTING RESILIENT BASE 1'-0" BEYOND EDGE OF GYP
DEMO TO ALLOW FOR MUDDING AND FEATHERING-IN OF
NEW GYP BOARD.
4. IN ALL AREAS WITH GYP WORK: REMOVE, SALVAGE,
PROTECT, & PRESERVE LIGHTING FIXTURES, VENT COVERS,
WALL FIXTURES, AND ALL OTHER GYP MOUNTED
ACCESSORIES AS REQUIRED, SEE ELECTRICAL.
5. REMOVE ACT TILES AND GRID AS NEEDED FOR PEX
REPLACEMENT. REMOVE WATER DAMAGED ACT CEILING
TILES AND PROVIDE NEW WHEN NEEDED, SUSPENSION
SYSTEM TO REMAIN; SEE PLUMBING.
6. PATCH AND REPAIR ANY WALLS AND CEILINGS TO REMAIN
ADJACENT TO DEMOLITION.
7. RE: PLUMBING AND ELECTRICAL SHEETS FOR EXTENTS OF
DEMOLITION WORK.
8. WHENEVER EXISTING UTILITIES MUST BE REMOVED:
EXPOSED OPENINGS IN ADJACENT FLOORS OR WALLS ARE
TO BE KEPT TO A MINIMUM AND ONLY DEMOLISHED TO THE
EXTENT TO ALLOW THE DEMOLITION WORK TO OCCUR.
9. BUILDING EXITS TO REMAIN FUNCTIONAL THROUGHOUT
CONSTRUCTION. IF NECESSARY, PROVIDE TEMPORARY EXIT
PATH WHERE DEMOLITION MAY IMPEDE EXISTING EXIT.
10. ALL FIRE PROTECTION SYSTEMS TO REMAIN OPERATIONAL
DURING DEMOLITION AND FOR THE DURATION OF THE
WORK.
11. THE CONTRACTOR SHALL MAINTAIN THE EXISTING
STRUCTURAL AND FIREPROOFING INTEGRITY THROUGHOUT
THE ENTIRE BUILDING AREA.
12. PHOTOS ARE PROVIDED FOR EXISTING REFERENCES ONLY
AND ARE NOT INTENDED TO FULLY CAPTURE THE EXISTING
CONDITIONS OF THE BUILDING.
13. ALL CARPET, COUNTERTOPS, TILE, AND CASEWORK WITHIN
THE AREA OF WORK SHALL BE PROTECTED & PRESERVED
FOR THE DURATION OF THE WORK.
14. ANY BASE CABINET, SINK, COUNTERTOP, AND UPPER
CABINET AS REQUIRED SHALL BE PROTECTED &
PRESERVED FROM OVERHEAD WORK DURING THE
DURATION OF THE WORK.
15. PROTECT AND PRESERVE IN PLACE ALL EXISTING METAL
STUDS AND FRAMING, UNLESS OTHERWISE NOTED. IN THE
EVENT THAT METAL STUDS AND/OR FRAMING ARE DAMAGED
DURING DEMOLITION, THE CONTRACTOR IS RESPONSIBLE
FOR MAINTAINING THE STRUCTURAL INTEGRITY OF ALL
LOAD BEARING MEMBERS, SHORING IF NECESSARY, AND
INFORMING THE ARCHITECT.
16. AT ALL EXIT SIGNS WHERE THE WORK REQUIRES THE EXIT
SIGNS TO BE REMOVED AND REINSTALLED, THE
CONTRACTOR SHALL DOCUMENT THE SPECIFIC LOCATION
AND ORIENTATION OF EACH SIGN IN PLAN AND WITH
PHOTOGRAPHS; AND SUBMIT THESE DOCUMENTS TO THE
ARCHITECT FOR THEIR RECORDS TO BE REFERENCED AT
REINSTALLATION.
2901 Blake Street, Suite 100 Denver, CO 80205
303.861.8555
DPA Project:
Sheet Number:
Sheet Title:
Revisions Date No.
Sheet Information
Project Information
Issuance Date
Consultant(s)
A
B
C
D
E
F
2 3 4 5 6
1 2 3 4 5 6
A
B
C
D
E
F
Stamp
-F eb -2
:3 9:
22808.00.000
AD-102.B
AS
U
R
ES
ID
EN
C E
AT
R
EX
PL
U
M B
IN
G
R
EN
O
VA
TI
O
N S:
P H
AS
E
Se le ct iv e
D em ol iti on
Ar ch ite ct ur e an d
El ec tri ca l
DEMOLITION
FLOOR PLAN -
LEVEL 02 - AREA
B
02/09/2024BID PACK A
COPYRIGHT © 2022 - DAVIS PARTNERSHIP, P.C.
S
TA
D
IU
M
D R
IV
E
AL
AM
O
SA
, C O
1/8" = 1'-0"B1 DEMOLITION FLOOR PLAN - LEVEL 2 - AREA B
Key Value Keynote Text
D03 EXISTING CASEWORK TO REMAIN, PROTECT & PRESERVE CASEWORK
DURING PEX REPLACEMENT; SEE PLUMBING
D07 REMOVE GYP AS REQUIRED FOR PEX TUBING REPLACEMENT, REMOVE
WATER DAMAGED GYP AND INSULATION WHERE PRESENT IN IT'S ENTIRETY,
METAL FRAMING TO REMAIN, SEE PLUMBING
D08 EXISTING MOP SINK TO REMAIN. REMOVE, SALVAGE, PROTECT & PRESERVE
FOR RE-INSTALLATION METAL WALL PLATE COVER WHERE PRESENT.
D09 REMOVE, SALVAGE, PROTECT, & PRESERVE FOR RE-INSTALLATION
SHOWER HEAD AS REQUIRED FOR GYP & PEX REPLACEMENT, SEE
PLUMBING
D10 REMOVE FRP WALL PANELING AS REQUIRED FOR PEX REPLACEMENT; SEE
PLUMBING. PREPARE WALL TO RECEIVE NEW FRP. AT DORM BATHROOMS,
ASSUME REMOVAL OF FRP ALONG THE FULL LENGTH OF THE EXISTING
PLUMBING WALL. AT THE COMMERCIAL KITCHEN, ASSUME THE REMOVAL
OF FRP IN UNITS OF 48" X 72" PANELS AT EXISTING PLUMBING DROPS TO BE
REPLACED.
D12 REMOVE WATER DAMAGED GYP AND INSULATION (WHERE PRESENT) FROM
APROX. 4'-0" ABOVE FFE TO CEILING IN IT'S ENTIRETY, METAL FRAMING TO
REMAIN. AT SHOWERS, PRESERVE 6" OF GYP ABOVE TOP EDGE OF
SHOWER INSERT TO ALLOW FOR MUDDING AND FEATHERING-IN OF NEW
GYP BOARD.
D13 REMOVE WATER DAMAGED GYP, INSULATION (WHERE PRESENT), &
RESILIENT BASE FROM FLOOR TO CEILING IN IT'S ENTIRETY, METAL
FRAMING TO REMAIN. REMOVE RESILIENT BASE 1'-0" BEYOND EDGE OF GYP
DEMO TO ALLOW FOR MUDDING AND FEATHERING-IN OF NEW GYP BOARD.
D18 UNINSTALL, SALVAGE, PROTECT, & PRESERVE FOR RE-INSTALLATION SINK,
BASE CABINET, & UPPER CABINET AS REQUIRED FOR PEX REPLACEMENT;
SEE PLUMBING
D19 UNINSTALL, SALVAGE, PROTECT, & PRESERVE FOR RE-INSTALLATION
EXISTING SOLID SURFACE COUNTERTOP. CASEWORK TO REMAIN AND TO
BE PROTECTED & PRESERVED FOR THE DURATION OF THE WORK UNLESS
OTHERWISE NOTED.
D24 REMOVE EXITING MIRRORS AND ALL ASSOCIATED CLIPS AND TRACKS AS
REQUIRED FOR PEX REPLACEMENT, SEE PLUMBING
D26 REMOVE, SALVAGE, PROTECT, & PRESERVE FOR RE-INSTALLATION IN-WALL
MEDICINE CABINET AS NEEDED FOR PEX REPLACEMENT.
D27 UNINSTALL, SALVAGE, PROTECT, & PRESERVE FOR RE-INSTALLATION ADA
ACCESS PANEL UNDER SINK AS REQUIRED FOR PEX REPLACEMENT; SEE
PLUMBING. SURROUNDING CASEWORK TO REMAIN AND TO BE PROTECTED
& PRESERVED FOR THE DURATION OF THE WORK UNLESS OTHERWISE
NOTED.
Not To ScaleA1 201 - DORM - EXIST. SINK CONDITIONS Not To ScaleA3 202 - DORM - EXIST. FLOOR & WALL COND.
Not To ScaleA4 202 - DORM - EXIST. MIRROR CONDITIONS
1 1/2" = 1'-0"E1 203 - DORM - EXIST. FLOOR CONDITIONS
Not To ScaleE2 203 - DORM - EXIST. WALL CONDITIONS
Not To ScaleE3 203 - DORM - EXIST. BATHROOM FLOOR COND.
ADDENDUM #01 03/10/2023 001
YRemy Image
YRemy
UPDN
DN
R
EF
FD
A
B
N
TRUE
NORTH
N
PROJECT
NORTH
AB
CD
H EFGJKLMNP
C.5D.5
RW
JAN
SUITE 4C
305C
SUITE 4B
305B
SUITE 4A
305A
SINK
305JSHOWER
305K
TOILET
305H
SUITE 4D
305D
STAIR #8
ST-308
KITCHEN
305E
LIVING
305F
HALL
305M
D03
D13
D13D13
D13
D15
D07
D03
D07
D07
D19
D07
D24
D07
D10
D07
D16
ELECT.
STOR
COATS
STAIR #5
ST-305
BALCONY
MULTI-PURPOSE
KITCHEN PREP
KITCHEN
COOLER
DRY STORAGE
ELEV #1
EL-101
Room
BOOSTER CLUB
359OPEN DECK
SEATING
201Y
GRIZZLY CLUB
201X
SEATING
201W
D09
D12
D07
D28
D07
D28
D24
D24
D18
D10D25
D25
D25
WOMEN
MEN
A1
A2
A4
E1 E2
LOBBY
D21
D21
A3
D07D10D25
D07
M
AT
C H
LI
N
E A
M
AT
C H
LI
N
E A
NOT IN SCOPE
EXISTING TO REMAIN
EXISTING TO BE REMOVED
EXISTING FINISHES TO BE REMOVED
EXISTING PLUMBING FIXTURES TO BE REMOVED
REMOVE GYP CEILINGS
Key Plan
Demo Legend (Note: Not all symbols are used in this project.)
Demolition General Notes
Demolition Key Notes
1. FURNITURE TO REMAIN IN ALL UNITS. THE CONTRACTOR
SHALL MOVE ALL FURNITURE AWAY FROM THE AREA OF
WORK & ENSURE THAT THE FURNITURE IS PROTECTED &
PRESERVED FOR THE DURATION OF THE WORK.
2. REMOVE GYP WALLS AND CEILINGS AS REQUIRED FOR PEX
REPLACEMENT, REMOVE WATER DAMAGED GYP AND
INSULATION IN ITS ENTIRETY, METAL FRAMING TO REMAIN;
SEE PLUMBING.
3. AT ALL AREAS OF PEX REPLACEMENT AND WATER DAMAGE
WHERE GYP IS REMOVED WITHIN 1'-0" OF THE FFE, REMOVE
THE EXISTING RESILIENT BASE 1'-0" BEYOND EDGE OF GYP
DEMO TO ALLOW FOR MUDDING AND FEATHERING-IN OF
NEW GYP BOARD.
4. IN ALL AREAS WITH GYP WORK: REMOVE, SALVAGE,
PROTECT, & PRESERVE LIGHTING FIXTURES, VENT COVERS,
WALL FIXTURES, AND ALL OTHER GYP MOUNTED
ACCESSORIES AS REQUIRED, SEE ELECTRICAL.
5. REMOVE ACT TILES AND GRID AS NEEDED FOR PEX
REPLACEMENT. REMOVE WATER DAMAGED ACT CEILING
TILES AND PROVIDE NEW WHEN NEEDED, SUSPENSION
SYSTEM TO REMAIN; SEE PLUMBING.
6. PATCH AND REPAIR ANY WALLS AND CEILINGS TO REMAIN
ADJACENT TO DEMOLITION.
7. RE: PLUMBING AND ELECTRICAL SHEETS FOR EXTENTS OF
DEMOLITION WORK.
8. WHENEVER EXISTING UTILITIES MUST BE REMOVED:
EXPOSED OPENINGS IN ADJACENT FLOORS OR WALLS ARE
TO BE KEPT TO A MINIMUM AND ONLY DEMOLISHED TO THE
EXTENT TO ALLOW THE DEMOLITION WORK TO OCCUR.
9. BUILDING EXITS TO REMAIN FUNCTIONAL THROUGHOUT
CONSTRUCTION. IF NECESSARY, PROVIDE TEMPORARY EXIT
PATH WHERE DEMOLITION MAY IMPEDE EXISTING EXIT.
10. ALL FIRE PROTECTION SYSTEMS TO REMAIN OPERATIONAL
DURING DEMOLITION AND FOR THE DURATION OF THE
WORK.
11. THE CONTRACTOR SHALL MAINTAIN THE EXISTING
STRUCTURAL AND FIREPROOFING INTEGRITY THROUGHOUT
THE ENTIRE BUILDING AREA.
12. PHOTOS ARE PROVIDED FOR EXISTING REFERENCES ONLY
AND ARE NOT INTENDED TO FULLY CAPTURE THE EXISTING
CONDITIONS OF THE BUILDING.
13. ALL CARPET, COUNTERTOPS, TILE, AND CASEWORK WITHIN
THE AREA OF WORK SHALL BE PROTECTED & PRESERVED
FOR THE DURATION OF THE WORK.
14. ANY BASE CABINET, SINK, COUNTERTOP, AND UPPER
CABINET AS REQUIRED SHALL BE PROTECTED &
PRESERVED FROM OVERHEAD WORK DURING THE
DURATION OF THE WORK.
15. PROTECT AND PRESERVE IN PLACE ALL EXISTING METAL
STUDS AND FRAMING, UNLESS OTHERWISE NOTED. IN THE
EVENT THAT METAL STUDS AND/OR FRAMING ARE DAMAGED
DURING DEMOLITION, THE CONTRACTOR IS RESPONSIBLE
FOR MAINTAINING THE STRUCTURAL INTEGRITY OF ALL
LOAD BEARING MEMBERS, SHORING IF NECESSARY, AND
INFORMING THE ARCHITECT.
16. AT ALL EXIT SIGNS WHERE THE WORK REQUIRES THE EXIT
SIGNS TO BE REMOVED AND REINSTALLED, THE
CONTRACTOR SHALL DOCUMENT THE SPECIFIC LOCATION
AND ORIENTATION OF EACH SIGN IN PLAN AND WITH
PHOTOGRAPHS; AND SUBMIT THESE DOCUMENTS TO THE
ARCHITECT FOR THEIR RECORDS TO BE REFERENCED AT
REINSTALLATION.
2901 Blake Street, Suite 100 Denver, CO 80205
303.861.8555
DPA Project:
Sheet Number:
Sheet Title:
Revisions Date No.
Sheet Information
Project Information
Issuance Date
Consultant(s)
A
B
C
D
E
F
2 3 4 5 6
1 2 3 4 5 6
A
B
C
D
E
F
Stamp
-F eb -2
:4 0:
22808.00.000
AD-103.A
AS
U
R
ES
ID
EN
C E
AT
R
EX
PL
U
M B
IN
G
R
EN
O
VA
TI
O
N S:
P H
AS
E
Se le ct iv e
D em ol iti on
Ar ch ite ct ur e an d
El ec tri ca l
DEMOLITION
FLOOR PLAN -
LEVEL 03 - AREA
A
02/09/2024BID PACK A
COPYRIGHT © 2022 - DAVIS PARTNERSHIP, P.C.
S
TA
D
IU
M
D R
IV
E
AL
AM
O
SA
, C O
1/8" = 1'-0"B1 DEMOLITION FLOOR PLAN - LEVEL 3 - AREA A
Key Value Keynote Text
D03 EXISTING CASEWORK TO REMAIN, PROTECT & PRESERVE CASEWORK
DURING PEX REPLACEMENT; SEE PLUMBING
D07 REMOVE GYP AS REQUIRED FOR PEX TUBING REPLACEMENT, REMOVE
WATER DAMAGED GYP AND INSULATION WHERE PRESENT IN IT'S ENTIRETY,
METAL FRAMING TO REMAIN, SEE PLUMBING
D09 REMOVE, SALVAGE, PROTECT, & PRESERVE FOR RE-INSTALLATION
SHOWER HEAD AS REQUIRED FOR GYP & PEX REPLACEMENT, SEE
PLUMBING
D10 REMOVE FRP WALL PANELING AS REQUIRED FOR PEX REPLACEMENT; SEE
PLUMBING. PREPARE WALL TO RECEIVE NEW FRP. AT DORM BATHROOMS,
ASSUME REMOVAL OF FRP ALONG THE FULL LENGTH OF THE EXISTING
PLUMBING WALL. AT THE COMMERCIAL KITCHEN, ASSUME THE REMOVAL
OF FRP IN UNITS OF 48" X 72" PANELS AT EXISTING PLUMBING DROPS TO BE
REPLACED.
D12 REMOVE WATER DAMAGED GYP AND INSULATION (WHERE PRESENT) FROM
APROX. 4'-0" ABOVE FFE TO CEILING IN IT'S ENTIRETY, METAL FRAMING TO
REMAIN. AT SHOWERS, PRESERVE 6" OF GYP ABOVE TOP EDGE OF
SHOWER INSERT TO ALLOW FOR MUDDING AND FEATHERING-IN OF NEW
GYP BOARD.
D13 REMOVE WATER DAMAGED GYP, INSULATION (WHERE PRESENT), &
RESILIENT BASE FROM FLOOR TO CEILING IN IT'S ENTIRETY, METAL
FRAMING TO REMAIN. REMOVE RESILIENT BASE 1'-0" BEYOND EDGE OF GYP
DEMO TO ALLOW FOR MUDDING AND FEATHERING-IN OF NEW GYP BOARD.
D15 REMOVE WATER DAMAGED CLOSET BUILT-IN SHELF AND HANGER ROD IN
ITS ENTIRETY. SALVAGE HANGER ROD AND ACCESSORIES FOR
REINSTALLING. PREPARE AREA TO RECEIVE NEW BUILT-IN SHELF TO
MATCH EXISTING.
D16 COORDINATE PEX REPLACEMENT WORK WITH EXISTING KITCHEN HOODS.
SEE SPECIFICATIONS FOR ALLOWANCE.
D18 UNINSTALL, SALVAGE, PROTECT, & PRESERVE FOR RE-INSTALLATION SINK,
BASE CABINET, & UPPER CABINET AS REQUIRED FOR PEX REPLACEMENT;
SEE PLUMBING
D19 UNINSTALL, SALVAGE, PROTECT, & PRESERVE FOR RE-INSTALLATION
EXISTING SOLID SURFACE COUNTERTOP. CASEWORK TO REMAIN AND TO
BE PROTECTED & PRESERVED FOR THE DURATION OF THE WORK UNLESS
OTHERWISE NOTED.
D21 REMOVE WALL TILING AS REQUIRED FOR PEX REPLACEMENT. PROTECT &
PRESERVE ADJACENT WALL & FLOOR TILE. PLUMBING FIXTURES TO REMAIN
AND TO BE PROTECTED & PRESERVED FOR THE DURATION OF THE WORK
UNLESS OTHERWISE NOTED. ASSUME THE REMOVAL OF 24" X 72" OF TILE,
TOOTHED-OUT AT ALL EXISTING PLUMBING DROPS TO BE REPLACED.
D24 REMOVE EXITING MIRRORS AND ALL ASSOCIATED CLIPS AND TRACKS AS
REQUIRED FOR PEX REPLACEMENT, SEE PLUMBING
D25 EXISTING KITCHEN EQUIPMENT TO REMAIN.
D28 EXISTING SOLID SURFACE COUNTERTOP AND SINK TO REMAIN AND
PROTECT DURING PEX REMOVAL PROCESS
Not To ScaleA1 305 - DORM - EXIST. CLOSET CONDITION Not To ScaleA2 365 - KITCHEN - EXIST. DOOR AND FRP COND.
Not To ScaleA3 365 - KITCHEN - EXIST. SINK CONDITION Not To ScaleA4 365 - KITCHEN -…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .